1 T-4 Capacity Market Auction 2020/21 Provisional Auction Results

Transcript of Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction...

Page 1: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

1

T-4 Capacity Market Auction 2020/21

Provisional Auction Results

Page 2: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

Contents

Provisional Auction Results

2

Page 3: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

Executive Summary National Grid in its role as EMR Delivery Body is required by the Capacity Market Rules 2014 (Rule 5.10.2) to notify the Secretary of State of the Provisional Results of the Capacity Market Auction as soon as reasonably practicable following the conclusion of the Capacity Auction. This report discharges that obligation. The T-4 Capacity Auction for delivery in 2020/21 concluded on 8th December 2016, 14:30 GMT. The results of the auction are as follows, where all prices are in 2015/16 prices and any capacity figure refers to de-rated capacity, unless otherwise stated. The Clearing Price is: £22.50 kW / year (2015/16 Prices).

The Aggregate Capacity of Capacity Market Units awarded Capacity Agreements is: 52,425.302 MW. The CMUs to which a Capacity Agreement has been provisionally awarded and the duration of those Capacity Agreements are listed in Appendix A. In addition to the results presented above, National Grid is required under Capacity Market Rule 5.10.3 to report any CMUs that were removed from the Auction System under Capacity Market Rule 5.3.3. The Auction concluded without any CMUs being removed from the system by National Grid. The remainder of this report gives further detail on the Capacity Market Auction Clearing, how the Clearing Price was reached and what makes up the capacity that has been procured.

The results of the auction remain provisional for the period of 8 working days after the completion of the Capacity Market Auction, during which time the Secretary of State may annul the auction on the grounds specified in Regulation 27 of the Electricity Capacity Regulations 2014. Final results will be published once this period has elapsed.

Provisional Auction Results

3

Page 4: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

The Auction Clearing Price

The Clearing Price is: £22.50 kW / year (2015/16 Prices). The 2016 T-4 Auction Cleared in Bidding Round 11 on the 8th December 2016, 14:30 GMT. The Auction did not clear with an exact match of Offered Capacity and target capacity (“Clearing Capacity”) and so the Net Welfare Algorithm was used to determine price and volume. The Net Welfare Algorithm evaluates the integral specified in Rule 5.9.6 to determine whether to include the marginal unit. The algorithm subtracts the additional cost of procuring the marginal unit from the welfare gained by procuring the marginal unit. If the result is positive i.e. the welfare gained by procuring the additional unit outweighs the cost, the unit is included, and the Clearing Price is set to the Exit Bid Price of that unit. The result of the Net Welfare Algorithm was negative and the marginal unit has not been procured. Figure 1 shows the Demand Curve and the supply curve. The supply curve is found by cumulatively adding the Bidding Capacities of CMUs, according to their Exit Ranking.

Provisional Auction Results

Round 15

Round 14

Round 13

Round 12

Round 11

Round 10

Round 9

Round 8

Round 7

Round 6

Round 5

Round 4

Round 3

Round 2

Round 1

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000

Price (£/kW/y)

Capacity (MW)

Demand Curve Remaining Capacity Capacity Procured/Clearing Price

Figure 1: Demand and Possible Supply Range

4

Page 5: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

44,464 MW

2,342 MW

3,413 MW

44 MW 173 MW

622 MW 1,367 MW

52.43 GW

0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000

Capacity Awarded Capacity Exited

Demand at £0 kW/y Demand at the Auction Price Cap

Target Demand

The Aggregate Bidding Capacity of CMUs Provisionally Awarded Agreements

The Aggregate Bidding Capacity of CMUs provisionally awarded Capacity Agreements is: 52,425.302 MW. A total of 69,777.050 MW entered the Auction, of which 75.13% received Capacity Agreements for delivery in 2020/21.

243

4

129

8 2

8

89

483 CMUs

Figure 2: Breakdown of the Capacity Entering the Auction Provisionally Awarded Agreements

Figure 3: Breakdown of Awarded Capacity by CMU Type

Figure 3 and Table 1 show the breakdown of the Total Awarded Capacity Agreements by CMU Type. A mixture of new and existing Capacity was procured. 4,779.405 MW of the volume of Capacity Agreements awarded is for new or refurbishing capacity. This is the sum of the capacity of CMUs that have been awarded agreements that are Refurbishing, Unproven DSR or New Build CMUs. This excludes CMUs which have only been awarded a Capacity Agreement for their Pre-Refurbishment component.

Provisional Auction Results

5

Page 6: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

% %

84.81 50.31

4.47 0.83

0.00 0.00

6.51 26.71

0.08 1.66

0.33 0.41

1.19 1.66

2.61 18.43

52.43

No. of CMUs

243

4

CMU Type Capacity (MW)

Existing Generating 44,464.301

Existing Interconnector 2,342.100

Proven DSR 44.068

Refurbishing Generating 173.322

New Build Interconnector 0.000

New Build Generating 3,412.520

0

129

8

2

Pre-Refurbishment 622.106

Unproven DSR 1,366.885

8

89

7,878.366 15.03

OCGT & Reip (Other) 819.264 1.56

CHP and autogeneration 4,407.487

11.62

1.36

1.29

Nuclear

8.41

Coal/biomass

DSR 1,410.953 2.69

Hydro

CMU Type Capacity (MW) %

CCGT 22,596.060 43.10

711.301

6,089.654

Storage

OCGT & Recip (Gas) 2,290.196 4.37

3,201.039 6.11

Interconnector 2,342.100 4.47

OCGT & Recip (Diesel) 678.882

Table 1: Breakdown of Awarded Capacity by CMU Classification

Provisional Auction Results

Figure 4 shows the breakdown of CMUs provisionally awarded Capacity Agreements by Technology Type.

Figure 4: Capacity Awarded by Technology Type

Table 2: Breakdown of Awarded Capacity by CMU Type

The majority of the Capacity Agreements provisionally awarded, by capacity, are to CCGT components.

22,596 MW

4,407 MW 6,090 MW

1,411 MW

711 MW

7,878 MW

819 MW

679 MW

2,290 MW

3,201 MW

2,342 MW

GW 52.43

6

Page 7: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

Capacity

(MW)%

No. of

CMUs%

49,776.546 94.95 358 74.12

0.000 0.00 0 0.00

0.000 0.00 0 0.00

0.000 0.00 0 0.00

0.000 0.00 0 0.00

0.000 0.00 0 0.00

0.000 0.00 0 0.00

0.000 0.00 0 0.00

0.000 0.00 0 0.00

0.000 0.00 0 0.00

0.000 0.00 0 0.00

33.397 0.06 1 0.21

0.000 0.00 0 0.00

0.000 0.00 0 0.00

2,615.359 4.99 124 25.67

6 Years

7 Years

4 Years

5 Years

14 Years

8 Years

3 Years

9 Years

2 Years

Duration

1 Year

15 Years

10 Years

11 Years

12 Years

13 Years

The CMUs to which Capacity Agreements have been Provisionally Awarded A List of the CMUs and their provisional status has been included in Appendix A. In total there are 483 CMUs that have been awarded Capacity Agreements, from 166 Applicant Companies.

The Duration of Agreements Awarded The duration of the Capacity Agreement received for each CMU is listed in Appendix A. 74.12% of CMUs that received Capacity Agreements were for a duration of 1 year, 0.21% for 12 years and 25.67% 15 years.

Provisional Auction Results

Table 3: Breakdown of Awarded Capacity by Duration

Capacity Agreements with duration of more than one year provide capacity in additional Delivery Years to 2020/21. The volume of Capacity Agreements awarded in this auction for Delivery Years 2020/21– 2034/35 are shown in Figure 5 and Table 4.

7

Page 8: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

Delivery Year Total

2018 49,258.938

2019 51,877.886

2020 58,932.139

2021 6,054.572

2022 6,054.572

2023 6,054.572

2024 6,054.572

2025 6,054.572

2026 6,054.572

2027 6,054.572

2028 6,054.572

2029 6,054.572

2030 6,054.572

2031 6,054.572

2032 5,988.883

2033 3,584.959

2034 2,615.359

982.520

-

982.520

982.520

969.600

T-4 2015 (MW)

-

46,353.569

982.520

982.520

982.520

982.520

982.520

982.520

982.520

982.520

982.520

- -

T-4 2016 (MW)

-

-

52,425.302

2,648.756

2,648.756

2,648.756

982.520

2,423.296

2,423.296

49,258.938

5,524.317

5,524.317

2,423.296

2,423.296

2,423.296

2,423.296

2,423.296

2,423.296

2,423.296

2,423.296

2,423.296

2,391.004

T-4 2014 (MW)

2,648.756

2,648.756

2,648.756

2,648.756

2,648.756

2,648.756

2,648.756

2,648.756

2,615.359

2,615.359

2,615.359

Provisional Auction Results

0

10,000

20,000

30,000

40,000

50,000

2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033

Capacity (MW)

Delivery Year

Volume of Capacity Procured in the2014 T-4 Auction

Volume of Capacity Procured in the2015 T-4 Auction

Volume of Capacity Procured in the2016 T-4 Auction

Figure 5: Volume of Capacity Procured by Delivery Year

Table 4: Capacity Procured by Delivery Year

8

Page 9: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

% %

33.53 21.19

0.00 0.00

4.44 0.66

59.32 58.94

0.00 0.00

0.48 5.30

2.23 13.91

10,293.029 89

Refurbishing Generating * 83.502

Existing Interconnector 0.000

Existing Generating

Proven DSR 0.000 0

0

New Build Interconnector 770.000 1

No. of CMUsCMU TYPE Capacity (MW)

5,817.744 32

8

New Build Generating

Unproven DSR 387.473 21

Provisional Auction Results

Capacity that Exited the Auction above the Clearing Price A total of 17,351.748 MW exited the auction above the clearing price. This Capacity is broken down by CMU Classification and Technology Type below.

32

1

89

3

21

146 CMUs

5,818 MW

770 MW 10,293 MW

84 MW 387 MW

17.35 GW

Figure 6: Breakdown of Exited Capacity by CMU Type

New Build Generating CMUs make up the largest group of Capacity that Exited the Auction by Classification.

Table 5: Capacity Exited by CMU Classification

* Refurbishing Generating capacity figure includes CMUs that have moved from a Refurbishing to Pre-Refurbishing a state

9

Page 10: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

17.35

Hydro 0.000

CHP and autogeneration 26.694

Coal/biomass 3,959.056

OCGT & Recip (Diesel) 320.780

OCGT & Recip (Gas) 1,236.692

Nuclear 0.000

OCGT & Reip (Other) 870.043

DSR

Storage 18.295

Interconnector 770.000

0.15

22.82

0.00

0.00

5.01

1.85

7.13

0.11

4.44

CMU Type Capacity (MW) %

CCGT 9,762.715 56.26

387.473 2.23

Provisional Auction Results

Figure 7: Breakdown of Exited Capacity by Technology Type

Table 6: Capacity Exited by Technology Type

The Technology Type exiting the largest overall volume of capacity from the auction was CCGT (9763 MW).

9,763 MW

27 MW

3,959 MW

387 MW

870 MW

321 MW

1,237 MW 18 MW 770 MW

GW 17.35

10

Page 11: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

elms11 No N/A N/A

cavrd2 No N/A N/A

cavrd1 No N/A N/A

ALKE08 Yes 3.442 1

AUKN11 Yes 5.65 15

AUKN15 Yes 5.65 15

AUKN16 No N/A N/A

AUKPR6 Yes 2.205 1

AUKPR7 Yes 8.164 1

AUKPR8 Yes 3.517 1

AUKPR9 Yes 9.22 1

AMPHUL No N/A N/A

AMPIMM No N/A N/A

AMPOCE No N/A N/A

IPSW-A Yes 18.834 15

BALB01 Yes 9.417 15

AF3001 Yes 19.663 15

B4PT3C Yes 33.397 12

Biody1 Yes 18.834 15

CES010 Yes 5.169 1

BG3002 No N/A N/A

BGTL01 No N/A N/A

BGTL03 No N/A N/A

BSBU17 Yes 55.549 1

Brit16 Yes 888 1

BURY02 No N/A N/A

BYGEN1 Yes 18.834 15

BAGE1b Yes 468 1

BAGE2b Yes 30.417 1

SUTB1Z Yes 737.1 1

SVR10Z Yes 382.5 1

SVR20Z Yes 382.5 1

CarGe1 Yes 25.11 1

CARR12 Yes 18.834 15

CARR01 Yes 409.5 1

CARR02 Yes 409.5 1

EBRYP2 No N/A N/A

EBRGG2 Yes 93.228 1

EFR-RO Yes 48.049 15

DG-BRI Yes 45.672 15

DG-PET Yes 45.672 15

Bury Power Limited

BYGEN POWER (TREGEEN) LIMITED

Calon Energy Limited

Bio Dynamic Power Limited

Birmingham District Energy Company Limited

Briscoe Energy Limited

British Gas Trading Limited

British Gas Trading Limited

Calon Energy Limited

Calon Energy Limited

Capacity (MW)Duration

(Years)CMU ID Capacity AG

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

CMU Classification

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

Existing Generating CMU

Existing Generating CMU

Existing Generating CMU

New Build Generating CMU

New Build Generating CMU

Existing Generating CMU

New Build Generating CMU

New Build Generating CMU

Existing Generating CMU

New Build Generating CMU

Centrica Brigg Limited

Centrica Distributed Generation Limited

Centrica Distributed Generation Limited

Applicant Company

AGR Peak Power LTD

AGR Peak Power LTD

AGR Peak Power LTD

Alkane Energy UK Limited

Alkane Energy UK Limited

Alkane Energy UK Limited

Alkane Energy UK Limited

Alkane Energy UK Limited

Alkane Energy UK Limited

Alkane Energy UK Limited

Alkane Energy UK Limited

AMP Energy Services Ltd

AMP Energy Services Ltd

CARRHILL POWER LIMITED

Carrington Power Limited

Carrington Power Limited

Centrica Barry Limited

Centrica Brigg Limited

Calon Energy Limited

Calon Energy Limited

Cargill PLC

AMP Energy Services Ltd

Balance Power Limited

BALBY POWER LIMITED

Barton Hill Way Limited

Battery Energy Storage Services 4 Limited

British Sugar plc

BritNed Development Limited

Existing Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

Existing Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

Existing Generating CMU

Existing Generating CMU

Existing Generating CMU

Unproven DSR CMU

Existing Generating CMU

Existing Interconnector CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

New Build Generating CMU

Existing Generating CMU

New Build Generating CMU

Unproven DSR CMU

Refurbishing Generating CMU

Existing Generating CMU

Existing Generating CMU

Provisional Auction Results

Appendix A – Complete List of CMUs and their Provisional Status. Note: Where a Capacity Agreement (AG) has been awarded the Capacity and duration are the Capacity and duration

11

Page 12: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

DG-ROO No N/A N/A

KLYNA2 Yes 333 15

TLAGA1 Yes 814.5 1

PETEM2 No N/A N/A

SHB1_2 Yes 1260 1

CIT001 Yes 7.586 1

CLYN02 No N/A N/A

CORBY1 Yes 366.3 1

IGCOSO Yes 703.8 1

SEL002 Yes 47.076 15

CULV02 No N/A N/A

DAFE02 Yes 9.417 1

ADPPR2 No N/A N/A

DEEP02 No N/A N/A

EK3005 No N/A N/A

FL3006 No N/A N/A

GM3007 Yes 18.834 15

DX0516 Yes 557.843 1

DX0616 Yes 556.588 1

DX0916 Yes 28.752 1

DX1016 Yes 29.786 1

DX1216 Yes 29.786 1

QMC001 Yes 3.969 1

BBMBAT Yes 9.629 15

POL001 Yes 29.344 1

BRD001 Yes 2.133 1

CAST01 No N/A N/A

SAND01 No N/A N/A

THRN01 No N/A N/A

CEN002 Yes 2.656 1

DSR007 Yes 25 1

DSR008 Yes 25 1

DSR009 Yes 20 1

DSR010 Yes 20 1

DSR011 Yes 10 1

DSR012 No N/A N/A

DSR013 Yes 7 1

DSR014 Yes 7 1

DSR015 Yes 7 1

DSR016 Yes 7 1

DSR017 Yes 7 1

Centrica Langage Limited Existing Generating CMU

Centrica PB Limited Existing Generating CMU

Centrica SHB Limited Existing Generating CMU

Duration

(Years)

Centrica Distributed Generation Limited New Build Generating CMU

Centrica KL Limited New Build Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

Coryton Energy Company Ltd Existing Generating CMU

CREYKE BECK POWER LIMITED New Build Generating CMU

Culvery Power Limited New Build Generating CMU

Citigen (London) Limited Existing Generating CMU

Clyne Power Limited New Build Generating CMU

Corby Power Limited Existing Generating CMU

Dockside Power Limited New Build Generating CMU

Dockside Power Limited New Build Generating CMU

Down Barn Limited New Build Generating CMU

Dafen Reserve Power Limited Existing Generating CMU

Darent Power Limited Existing Generating CMU

Dee Power Limited New Build Generating CMU

Drax Power Limited Existing Generating CMU

Drax Power Limited Existing Generating CMU

E.ON Connecting Energies Limited Existing Generating CMU

Drax Power Limited Existing Generating CMU

Drax Power Limited Existing Generating CMU

Drax Power Limited Existing Generating CMU

E.ON UK Cogeneration Ltd Existing Generating CMU

E.ON UK Cogeneration Ltd Existing Generating CMU

E.ON UK Cogeneration Ltd Existing Generating CMU

E.ON UK CHP Limited New Build Generating CMU

E.ON UK CHP Limited Existing Generating CMU

E.ON UK Cogeneration Ltd Existing Generating CMU

E.ON UK Plc Unproven DSR CMU

E.ON UK Plc Unproven DSR CMU

E.ON UK Plc Unproven DSR CMU

E.ON UK Plc Existing Generating CMU

E.ON UK Plc Unproven DSR CMU

E.ON UK Plc Unproven DSR CMU

E.ON UK Plc Unproven DSR CMU

E.ON UK Plc Unproven DSR CMU

E.ON UK Plc Unproven DSR CMU

E.ON UK Plc Unproven DSR CMU

E.ON UK Plc Unproven DSR CMU

E.ON UK Plc Unproven DSR CMU

Provisional Auction Results

12

Page 13: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

DSR018 Yes 7 1

DSR019 Yes 5 1

DSR020 Yes 5 1

DSR021 Yes 5 1

DSR022 Yes 4 1

DSR023 Yes 4 1

CES006 Yes 2.851 1

CES007 Yes 5.09 1

WB4C16 Yes 47.182 15

DN2116 Yes 462.215 1

DN2216 Yes 465.864 1

HP7-16 Yes 450.698 1

HP8-16 Yes 444.362 1

HR1-16 Yes 510.44 1

HR2-16 Yes 510.908 1

HU7-16 Yes 452.563 1

HU8-16 Yes 453.464 1

HY1116 Yes 433.301 1

HY1216 Yes 502.543 1

HY2716 Yes 545.803 1

HY2816 Yes 546.171 1

SZ1-16 Yes 519.658 1

SZ2-16 Yes 519.658 1

TN1-16 Yes 525.93 1

TN2-16 Yes 534.788 1

CT1-16 No N/A N/A

CT2-16 No N/A N/A

CT3-16 No N/A N/A

CT4-16 No N/A N/A

WA1-16 Yes 434.339 1

WA2-16 Yes 434.513 1

WA3-16 No N/A N/A

WA4-16 Yes 434.6 1

WB1-16 Yes 415.35 1

WB2-16 Yes 415.35 1

WB3-16 Yes 415.35 1

WG1-16 Yes 18.834 1

WG4-16 Yes 18.834 1

EDP012 Yes 18.834 15

EDP011 Yes 18.834 15

EDP003 Yes 18.834 15

E.ON UK Plc Unproven DSR CMU

E.ON UK Plc Unproven DSR CMU

E.ON UK Plc Unproven DSR CMU

Duration

(Years)

E.ON UK Plc Unproven DSR CMU

E.ON UK Plc Unproven DSR CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

EDF Energy (West Burton Power) Limited New Build Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

E.ON UK Plc Unproven DSR CMU

East London Energy Limited Existing Generating CMU

East London Energy Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy Nuclear Generation Limited Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

Edge Power (Allen Farm East) Limited New Build Generating CMU

Edge Power (Allen Farm West) Limited New Build Generating CMU

Edge Power (Avro Business Park) Limited New Build Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

EDF Energy plc Existing Generating CMU

Provisional Auction Results

13

Page 14: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

EDP013 Yes 18.834 15

FRID12 Yes 18.834 15

EDP002 Yes 12.854 15

EWIC15 Yes 131.3 1

END001 Yes 34.752 1

END002 Yes 34.752 1

Wheat1 Yes 10.359 15

ECMU25 Yes 21.72 1

ECMU26 Yes 21.72 1

ECMU27 Yes 21.72 1

ECMU28 Yes 21.72 1

ECMU30 Yes 21.72 1

ECMU31 Yes 21.72 1

ECMU32 Yes 21.72 1

ECMU33 Yes 21.72 1

ECMU34 Yes 21.72 1

ECMU35 Yes 21.72 1

ECMU36 Yes 21.72 1

ECMU37 Yes 21.72 1

ECMU38 Yes 21.72 1

ECMU39 Yes 21.72 1

ECMU40 Yes 21.72 1

ECMU41 Yes 21.72 1

ECMU42 Yes 21.72 1

ECMU43 Yes 21.72 1

ECMU44 Yes 21.72 1

ECMU45 Yes 21.72 1

ECMU46 Yes 21.72 1

ECMU47 Yes 21.72 1

ECMU48 Yes 21.72 1

ECMU49 No N/A N/A

ECMU50 No N/A N/A

ECMU51 No N/A N/A

ECMU52 No N/A N/A

ECMU53 No N/A N/A

ECMU54 No N/A N/A

ECMU55 No N/A N/A

ECMU56 No N/A N/A

GCMU02 Yes 3.6 1

GCMU03 Yes 3.6 1

GCMU04 Yes 3.78 1

Edge Power (Greys Hall) Limited New Build Generating CMU

EirGrid Interconnector Limited Existing Interconnector CMU

Endeco Technologies Limited Unproven DSR CMU

Duration

(Years)

Edge Power (Fridaywood West) Limited New Build Generating CMU

Edge Power (Fridaywood) Ltd New Build Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

Endeco Technologies Limited Unproven DSR CMU

Energion Ltd. New Build Generating CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

EnerNOC UK Limited Unproven DSR CMU

Provisional Auction Results

14

Page 15: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

GCMU05 Yes 3.24 1

GCMU06 Yes 3.96 1

GCMU07 Yes 3.96 1

GCMU08 Yes 2.61 1

GCMU09 Yes 2.61 1

GCMU10 Yes 2.61 1

GCMU11 Yes 9.45 1

GCMU14 Yes 2.025 1

GCMU15 Yes 3.6 1

GCMU17 Yes 6.03 1

GCMU18 Yes 7.02 1

Castle Yes 3.428 15

FosLas Yes 8.569 15

HN3008 Yes 19.604 15

EM5-T4 Yes 124.34 1

CES004 Yes 7.354 1

BUCK02 Yes 23.642 1

ALL001 Yes 30.51 1

LINC01 Yes 11.27 1

HSGFEA No N/A N/A

FM2-20 No N/A N/A

FMFE20 Yes 66.687 1

DINO_1 Yes 263.835 1

DINO_2 Yes 263.835 1

DINO_3 Yes 290.764 1

DINO_4 Yes 289.672 1

DINO_5 Yes 263.835 1

DINO_6 Yes 263.835 1

FFES_3 Yes 86.661 1

FFES_4 Yes 86.661 1

FFES1R Yes 86.661 15

FFES2R Yes 86.661 15

PEN016 Yes 1.883 15

CAT001 Yes 18.834 15

CAT002 Yes 18.834 15

PEN002 Yes 18.834 15

FLXT01 Yes 8.148 1

FLXT02 Yes 4.982 1

FLXT03 Yes 4.85 1

FLXT04 Yes 6.075 1

FLXT05 Yes 5.362 1

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

Duration

(Years)

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

EnerNOC UK Limited Existing Generating CMU

Esso Petroleum Company Limited Existing Generating CMU

Excel District Energy Company Limited Existing Generating CMU

FCC Buckinghamshire Ltd New Build Generating CMU

Enersyst Limited New Build Generating CMU

Enersyst Limited New Build Generating CMU

ERF Way Limited New Build Generating CMU

Ferrybridge MFE 2 Limited New Build Generating CMU

Ferrybridge MFE Limited New Build Generating CMU

First Hydro Company Existing Generating CMU

FCC Recycling (UK) Ltd Existing Generating CMU

FCC Recycling (UK) Ltd Existing Generating CMU

Featherstone Energy Limited New Build Generating CMU

First Hydro Company Existing Generating CMU

First Hydro Company Existing Generating CMU

First Hydro Company Existing Generating CMU

First Hydro Company Existing Generating CMU

First Hydro Company Existing Generating CMU

First Hydro Company Existing Generating CMU

First Renewable Alpha Limited New Build Generating CMU

First Renewable Delta Limited New Build Generating CMU

First Renewable Epsilon Limited New Build Generating CMU

First Hydro Company Existing Generating CMU

First Hydro Company Refurbishing Generating CMU

First Hydro Company Refurbishing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

First Renewable Omega Limited New Build Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Provisional Auction Results

15

Page 16: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

FLXT06 Yes 10.264 1

FLXT08 Yes 4.414 1

FLXT09 Yes 4.05 1

FLXT10 Yes 2.708 1

FLXT11 Yes 2.744 1

FLXT12 Yes 2.673 1

FLXT13 Yes 2.664 1

FLXT14 Yes 2.355 1

FLXT15 Yes 7.473 1

FLXT16 Yes 7.655 1

FLXT18 Yes 3.083 1

FLXT19 Yes 3.063 1

FLXT20 Yes 4.655 1

FLXT21 Yes 2.953 1

FLXT22 Yes 3.769 1

FLXT24 Yes 3.413 1

FLXT25 No N/A N/A

FLXT26 Yes 3.6 15

FLXT27 Yes 7.129 1

FLXT40 Yes 3.475 1

FLXT41 Yes 4.492 1

FLXT42 Yes 12.007 1

FLXT43 Yes 12.04 1

FLXT61 Yes 2.581 1

FLXT62 Yes 3.323 1

FLXT63 Yes 3.372 1

FLXT64 Yes 2.778 1

FLXT70 Yes 34.752 1

FLXT71 Yes 17.376 1

FLXT72 Yes 2.606 1

FLXT73 Yes 8.688 1

FLXT74 Yes 5.213 1

FLXT75 Yes 17.376 1

FLXT76 Yes 21.72 1

FLXT77 Yes 17.376 1

FLXT78 Yes 4.344 1

FLXT79 Yes 3.475 1

FLXT80 Yes 17.376 1

FLXT81 Yes 6.95 1

FLXT82 Yes 22.068 1

FLXT83 Yes 3.91 1

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Duration

(Years)

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Proven DSR CMU

Flexitricity Limited Proven DSR CMU

Flexitricity Limited Proven DSR CMU

Flexitricity Limited New Build Generating CMU

Flexitricity Limited Existing Generating CMU

Flexitricity Limited Proven DSR CMU

Flexitricity Limited Proven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Proven DSR CMU

Flexitricity Limited Proven DSR CMU

Flexitricity Limited Proven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Provisional Auction Results

16

Page 17: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

FLXT84 Yes 3.041 1

FLXT85 Yes 3.041 1

FLXT86 Yes 2.606 1

FLXT87 Yes 3.649 1

FLXT88 Yes 2.606 1

FLXT89 Yes 3.475 1

FLXT90 Yes 9.557 1

FLXT91 Yes 9.383 1

FLIN02 No N/A N/A

OLD001 Yes 18.834 15

THU001 Yes 18.834 15

IGGATE No N/A N/A

CENES1 No N/A N/A

CENES2 No N/A N/A

BE3152 Yes 3.315 1

IL3159 Yes 6.027 1

KR3010 Yes 9.973 15

LP3011 Yes 5.984 15

MN3012 Yes 3.914 15

GCHPL1 Yes 128.208 1

AD3177 Yes 18.834 1

PS3116 No N/A N/A

QT3167 No N/A N/A

RU3168 No N/A N/A

SV3169 No N/A N/A

TW3170 No N/A N/A

UX3171 No N/A N/A

VY3172 No N/A N/A

WZ3173 No N/A N/A

XA3174 No N/A N/A

YB3175 No N/A N/A

ZC3176 No N/A N/A

GHBRE1 Yes 9.436 15

GHKBF1 Yes 9.629 15

GHLEV1 Yes 9.436 15

GHPAC1 Yes 9.436 15

CH3003 Yes 9.973 15

LS3013 Yes 18.204 15

MT3014 Yes 19.604 15

HPL_02 No N/A N/A

NECBAL Yes 15.315 15

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Duration

(Years)

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

Flint Power Limited New Build Generating CMU

Gas Generation Oldham Limited New Build Generating CMU

Gas Generation Thurrock Limited New Build Generating CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

Flexitricity Limited Unproven DSR CMU

GF Power Peaking Limited Existing Generating CMU

GF Power Peaking Limited New Build Generating CMU

Goose House Limited New Build Generating CMU

Gateway Energy Centre Limited New Build Generating CMU

GB Gas Holdings Ltd Unproven DSR CMU

GB Gas Holdings Ltd Unproven DSR CMU

Green Frog Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Goose House Limited New Build Generating CMU

Goose House Limited New Build Generating CMU

Grangemouth CHP Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Green Hedge Energy Barn Limited New Build Generating CMU

Green Hedge Energy Barn Limited New Build Generating CMU

Green Hedge Energy Barn Limited New Build Generating CMU

Green Frog Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Green Frog Power Limited Existing Generating CMU

Haverton Energy Limited New Build Generating CMU

Hirwaun Power Limited New Build Generating CMU

Imperative Energy (Pendigo) Ltd New Build Generating CMU

Green Hedge Energy Barn Limited New Build Generating CMU

Griffith Generation Limited New Build Generating CMU

Haverton Energy Limited New Build Generating CMU

Provisional Auction Results

17

Page 18: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

INDQ_1 Yes 131.838 1

CES003 No N/A N/A

INEOS1 Yes 45.9 1

BRST1A Yes 5.694 1

BRST2B Yes 5.661 1

IRWE02 No N/A N/A

FID02G No N/A N/A

FID03G No N/A N/A

FID120 No N/A N/A

FIDL02 No N/A N/A

FIDL03 No N/A N/A

FIDL04 No N/A N/A

KEAD-2 No N/A N/A

KEADBY Yes 715.851 1

Keyst1 Yes 19.501 1

KILN02 No N/A N/A

King01 Yes 6.658 15

KPBL01 Yes 5.777 15

KIWI70 Yes 16 1

KIWI71 Yes 25 1

KIWI73 Yes 10 1

KIWI74 Yes 30 1

KIWI75 Yes 30 1

KIWI76 Yes 17 1

KIWI78 Yes 12 1

KIWI83 Yes 30 1

KIWI84 Yes 30 1

KIWI87 Yes 20 1

KIWI88 Yes 12 1

KNOT_1 No N/A N/A

KNOT_2 No N/A N/A

LAKefw Yes 32.096 1

LANC02 No N/A N/A

SEL007 Yes 48.049 15

LE2016 Yes 13.184 15

CES008 Yes 4.123 1

EXC_04 Yes 7.459 1

EXC_05 Yes 13.201 1

NBB_02 Yes 4.622 15

LODD02 No N/A N/A

LWL100 Yes 33.446 1

INEOS Nitriles (UK) Ltd Existing Generating CMU

Infinis Alternative Energies Limited Existing Generating CMU

Infinis Alternative Energies Limited Existing Generating CMU

Duration

(Years)

Indian Queens Power Limited Existing Generating CMU

Industrial Energy Services Limited Existing Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

Keadby Generation Limited Existing Generating CMU

Keadby Generation Limited Existing Generating CMU

Keadby Generation Limited Existing Generating CMU

Irwell Power Limited New Build Generating CMU

Keadby Generation Limited Existing Generating CMU

Keadby Generation Limited Existing Generating CMU

Keystone Power Limited Existing Generating CMU

Kiln Power Limited New Build Generating CMU

Kingsmoor Power Limited New Build Generating CMU

Keadby Generation Limited Existing Generating CMU

Keadby Generation Limited New Build Generating CMU

Keadby Generation Limited Existing Generating CMU

KiWi Power Ltd Unproven DSR CMU

KiWi Power Ltd Unproven DSR CMU

KiWi Power Ltd Unproven DSR CMU

KIWI POWER BATTERY LIMITED New Build Generating CMU

KiWi Power Ltd Unproven DSR CMU

KiWi Power Ltd Unproven DSR CMU

KiWi Power Ltd Unproven DSR CMU

KiWi Power Ltd Unproven DSR CMU

KiWi Power Ltd Unproven DSR CMU

KiWi Power Ltd Unproven DSR CMU

KiWi Power Ltd Unproven DSR CMU

KiWi Power Ltd Unproven DSR CMU

Lancaster Power Limited New Build Generating CMU

LANGLEY STORAGE LIMITED New Build Generating CMU

Leafield Energy Limited New Build Generating CMU

Knottingley Power Limited New Build Generating CMU

Knottingley Power Limited New Build Generating CMU

LAKESIDE ENERGY FROM WASTE LIMITED Existing Generating CMU

Limejump Ltd. New Build Generating CMU

Loddon Power Limited New Build Generating CMU

LondonWaste Limited Existing Generating CMU

Leicester District Energy Company Limited Existing Generating CMU

Limejump Ltd. Existing Generating CMU

Limejump Ltd. Existing Generating CMU

Provisional Auction Results

18

Page 19: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

CLEAT1 Yes 9.629 15

GLASS2 Yes 38.516 15

MARD02 No N/A N/A

RW3017 No N/A N/A

SY3018 No N/A N/A

MEDP01 Yes 666.3 1

TZ3019 Yes 17.951 15

UY3020 Yes 16.953 15

MPRAC1 Yes 3.767 15

MPRAL2 Yes 13.184 15

MPRCR1 Yes 7.308 15

MPRCL1 Yes 7.383 15

MPRCR2 Yes 7.534 15

MPRGW1 Yes 5.532 15

MPRLR1 Yes 9.596 15

MPRMA2 Yes 6.592 15

MPRNR1 Yes 6.564 15

MPRPR2 Yes 6.435 15

MPRPR1 Yes 4.591 15

MPRPR3 Yes 13.998 15

MPRWY1 Yes 6.465 15

MPRWR1 Yes 6.435 15

MERC02 Yes 21.73 1

CHAT01 Yes 18.834 15

VW3021 Yes 19.604 15

Moyle2 Yes 130 1

WILL-C No N/A N/A

IFA_16 Yes 1192.8 1

NEMO16 No N/A N/A

NEVE02 Yes 15.067 15

FO3032 No N/A N/A

CURZ03 No N/A N/A

WATE02 Yes 19.098 15

NORT02 No N/A N/A

SEL005 Yes 48.049 15

NDAMAN Yes 24.478 1

OGMO02 No N/A N/A

OEL001 Yes 9.991 1

CASQ14 Yes 3.038 1

BREH14 Yes 13.485 1

ParcAd No N/A N/A

Marden Power Limited New Build Generating CMU

Marsh Energy Limited New Build Generating CMU

Marsh Energy Limited New Build Generating CMU

Duration

(Years)

Low Carbon Storage Investment Company Limited New Build Generating CMU

Low Carbon Storage Investment Company Limited New Build Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

Mercia Power Response (Albion Close) Limited New Build Generating CMU

Mercia Power Response (Asher Lane 2) Limited New Build Generating CMU

Mercia Power Response (Chesterfield Road) Limited New Build Generating CMU

Medway Power Limited Existing Generating CMU

Mellishaw Limited New Build Generating CMU

Mellishaw Limited New Build Generating CMU

Mercia Power Response (Lubenham Road) Limited New Build Generating CMU

Mercia Power Response (Manners Avenue 2) Limited New Build Generating CMU

Mercia Power Response (Nottingham Road) Limited New Build Generating CMU

Mercia Power Response (Common Lane) Limited New Build Generating CMU

Mercia Power Response (Cuckoo Road) Limited New Build Generating CMU

Mercia Power Response (Graphite Way) Limited New Build Generating CMU

Mercia Power Response (The Wood Yard) Limited New Build Generating CMU

Mercia Power Response (Whittington Road ) Limited New Build Generating CMU

Mercia Waste Management Ltd New Build Generating CMU

Mercia Power Response (Pontefract Road) Limited New Build Generating CMU

Mercia Power Response (Private Rd No. 5) Limited New Build Generating CMU

Mercia Power Response (Private Rd No. 5) Limited New Build Generating CMU

MPF Generation Limited New Build Generating CMU

National Grid Interconnectors Limited Existing Interconnector CMU

NEMO LINK LIMITED New Build Interconnector CMU

Merit Generation Limited New Build Generating CMU

Moorfield Way Limited New Build Generating CMU

Moyle Interconnector Ltd Existing Interconnector CMU

NG CM 2017 Limited New Build Generating CMU

Northwich Power Limited New Build Generating CMU

NORTON STORAGE LIMITED New Build Generating CMU

Nevern Power Limited New Build Generating CMU

New Power Generation N03 Limited New Build Generating CMU

NG CM 2017 Limited New Build Generating CMU

P3P Energy Management AE Limited Existing Generating CMU

P3P Energy Management Limited Existing Generating CMU

PARC ADFER LIMITED New Build Generating CMU

Nuclear Decommissioning Authority Existing Generating CMU

Ogmore Power Limited New Build Generating CMU

ORIGAMI ENERGY LIMITED Unproven DSR CMU

Provisional Auction Results

19

Page 20: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

PGP17W No N/A N/A

PGP24S No N/A N/A

PGP25S No N/A N/A

PGP27G No N/A N/A

PGP9NE No N/A N/A

BUXT02 Yes 19.098 15

CURZ02 No N/A N/A

SEL004 Yes 48.135 15

PBSSL1 Yes 6.623 15

PBSHW1 Yes 2.825 15

STOW-A Yes 18.834 15

SELBY2 Yes 19.588 15

PR_BLA No N/A N/A

PR_BUR No N/A N/A

PR_DOD No N/A N/A

PR_PEN No N/A N/A

PR_ZIG No N/A N/A

PPL_02 No N/A N/A

PUSH01 Yes 6.451 15

WY3022 Yes 18.834 15

YV3023 Yes 18.834 15

ZU3024 Yes 19.945 15

AT3025 Yes 18.204 15

BS3026 Yes 19.464 15

Gasc01 No N/A N/A

High01 No N/A N/A

Hull01 No N/A N/A

ARPPR6 Yes 2.871 1

ARPPR7 Yes 2.722 1

ARPPRc Yes 5.141 1

ARPPRd Yes 4.121 1

RIBB02 No N/A N/A

RRRF01 Yes 67.249 1

IGROCK Yes 747 1

BRISTa Yes 39.909 1

CROYDa Yes 47.264 1

DERBYa Yes 51.652 1

EXETRa Yes 45.21 1

HEARTa Yes 47.085 1

HEARTb Yes 47.085 1

VKINGa Yes 44.782 1

Peak Gen Power 25 Limited New Build Generating CMU

Peak Gen Power 27 Limited New Build Generating CMU

Peak Gen Power 9 Limited New Build Generating CMU

Duration

(Years)

Peak Gen Power 17 Limited New Build Generating CMU

Peak Gen Power 24 Limited New Build Generating CMU

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

Precision Diesel Enterprises Limited New Build Generating CMU

Power Balancing Services (Sandy Lane) Limited New Build Generating CMU

Power Balancing Services Limited New Build Generating CMU

Precise Energy Limited New Build Generating CMU

Peak Power Connections Limited New Build Generating CMU

Peak Power Connections Limited New Build Generating CMU

PELHAM STORAGE LIMITED New Build Generating CMU

Prime Energy Development Limited New Build Generating CMU

Prime Energy Development Limited New Build Generating CMU

Prime Energy Development Limited New Build Generating CMU

Prime Energy Development Limited New Build Generating CMU

Prime Energy Development Limited New Build Generating CMU

Progress Power Limited New Build Generating CMU

Push Energy (Kentishes West) Limited New Build Generating CMU

Rainbow Energy Limited New Build Generating CMU

Rainbow Energy Limited New Build Generating CMU

Rake Lane Limited New Build Generating CMU

Redscar Limited New Build Generating CMU

Redscar Limited New Build Generating CMU

REG Gascoigne Wood Ltd New Build Generating CMU

REG Highfield Limited New Build Generating CMU

REG Hull Ltd New Build Generating CMU

Regent Park Energy Limited Existing Generating CMU

Regent Park Energy Limited Existing Generating CMU

Regent Park Energy Limited Existing Generating CMU

Regent Park Energy Limited Existing Generating CMU

Ribble Power Limited New Build Generating CMU

Riverside Resource Recovery Limited Existing Generating CMU

Rocksavage Power Company Ltd Existing Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

Rolls-Royce Power Development Limited Existing Generating CMU

Provisional Auction Results Provisional Auction Results

20

Page 21: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

RO2016 Yes 9.417 15

Smith1 No N/A N/A

HYTHE2 Yes 44.91 1

CHEGT1 Yes 42.837 1

CHEN01 No N/A N/A

CHES01 No N/A N/A

CHEW01 No N/A N/A

SEALS2 No N/A N/A

GRIM01 Yes 18.834 15

ABTHC1 Yes 1474.819 1

COW161 Yes 46.613 1

COW162 Yes 46.562 1

DID161 Yes 23.543 1

DID162 Yes 23.543 1

DID163 Yes 23.543 1

DID164 Yes 23.543 1

DIDCB5 Yes 720 1

DIDCB6 Yes 675 1

GYAR01 Yes 369 1

LBA161 Yes 698.543 1

PEMB11 Yes 427.5 1

PEMB21 Yes 427.5 1

PEMB31 Yes 427.5 1

PEMB41 Yes 427.5 1

PEMB51 Yes 427.5 1

STAY01 Yes 417.6 1

STAY02 Yes 417.6 1

STAY03 Yes 417.6 1

STAY04 Yes 417.6 1

BOLC01 Yes 11.3 15

HAVE01 Yes 5.65 15

SALTPS Yes 1080 1

SPDR05 Yes 4.241 1

SPDR06 Yes 4.947 1

SPDR07 Yes 2.589 1

SPDR08 Yes 4.036 1

SPDR09 Yes 4.682 1

SPDR10 Yes 4.136 1

SPDR11 Yes 5.213 1

SPDR12 Yes 5.213 1

SPDR13 Yes 4.865 1

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)Duration

(Years)

Rounponds Energy Limited New Build Generating CMU

Russell Smith Farms Limited New Build Generating CMU

RWE Cogen UK (Hythe) Ltd Existing Generating CMU

RWE Cogen UK Ltd Existing Generating CMU

RWE Cogen UK Ltd New Build Generating CMU

RWE Cogen UK Ltd New Build Generating CMU

RWE Cogen UK Ltd New Build Generating CMU

RWE Cogen UK Ltd Existing Generating CMU

RWE Cogen UK Ltd New Build Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RWE Generation UK plc Existing Generating CMU

RYDBERG DEVELOPMENT COMPANY LIMITED New Build Generating CMU

RYDBERG DEVELOPMENT COMPANY LIMITED New Build Generating CMU

Saltend Cogeneration Company Limited Existing Generating CMU

ScottishPower Energy Retail Limited Unproven DSR CMU

ScottishPower Energy Retail Limited Unproven DSR CMU

ScottishPower Energy Retail Limited Unproven DSR CMU

ScottishPower Energy Retail Limited Unproven DSR CMU

ScottishPower Energy Retail Limited Unproven DSR CMU

ScottishPower Energy Retail Limited Unproven DSR CMU

ScottishPower Energy Retail Limited Unproven DSR CMU

ScottishPower Energy Retail Limited Unproven DSR CMU

ScottishPower Energy Retail Limited Unproven DSR CMU

Provisional Auction Results

21

Page 22: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

SPDR14 No N/A N/A

SPDR15 No N/A N/A

SPDR16 No N/A N/A

SP16BL Yes 54 1

SP16CR Yes 423.676 1

SP16D2 No N/A N/A

SP16D3 No N/A N/A

SP16DC Yes 724.5 1

SP16GL Yes 20.8 1

SP16KE Yes 20.82 1

SP16RH Yes 643.5 1

SP16SH Yes 382.5 1

SP16TO Yes 29.761 1

SEA1_2 Yes 1132.2 1

S20G01 Yes 37.539 1

S20G02 Yes 37.571 1

S20S11 Yes 21.738 1

SUEZ03 Yes 9.435 1

SUEZ04 Yes 20.876 1

SEL-01 Yes 26.064 1

SEL-02 Yes 26.064 1

SEL-03 Yes 17.376 1

SEL-04 Yes 17.376 1

CES009 Yes 6.061 1

IGSPLN Yes 812.7 1

IGSPEL No N/A N/A

IGSPEO Yes 298.519 15

MRWD-1 Yes 828 1

SSED01 Yes 43.44 1

SSED02 No N/A N/A

SSED03 No N/A N/A

SSED04 No N/A N/A

SSED05 No N/A N/A

ALDBAT No N/A N/A

CLAC-1 Yes 34.464 1

CLUNIE Yes 52.73 1

DEAN01 Yes 16.37 1

DEAN02 Yes 16.62 1

ERRO01 Yes 21.739 1

ERRO02 Yes 21.801 1

ERRO03 Yes 21.805 1

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)Duration

(Years)

ScottishPower Energy Retail Limited Unproven DSR CMU

ScottishPower Energy Retail Limited Unproven DSR CMU

ScottishPower Energy Retail Limited Unproven DSR CMU

ScottishPower Generation Limited Existing Generating CMU

ScottishPower Generation Limited Existing Generating CMU

ScottishPower Generation Limited New Build Generating CMU

ScottishPower Generation Limited New Build Generating CMU

ScottishPower Generation Limited Existing Generating CMU

ScottishPower Generation Limited Existing Generating CMU

ScottishPower Generation Limited Existing Generating CMU

ScottishPower Generation Limited Existing Generating CMU

ScottishPower Generation Limited Existing Generating CMU

ScottishPower Generation Limited Existing Generating CMU

Seabank Power Limited Existing Generating CMU

Sembcorp Utilities (UK) Limited Existing Generating CMU

Sembcorp Utilities (UK) Limited Existing Generating CMU

Sembcorp Utilities (UK) Limited Existing Generating CMU

SITA Northumberland Limited Existing Generating CMU

SITA South Tyne and Wear Limited Existing Generating CMU

SmartestEnergy Limited Unproven DSR CMU

SmartestEnergy Limited Unproven DSR CMU

SmartestEnergy Limited Unproven DSR CMU

SmartestEnergy Limited Unproven DSR CMU

Southampton Geothermal Heating Company Limited Existing Generating CMU

Spalding Energy Company Ltd Existing Generating CMU

Spalding Energy Expansion Limited New Build Generating CMU

Spalding Energy Expansion Limited New Build Generating CMU

SSE Energy Supply Ltd. Existing Generating CMU

SSE Energy Supply Ltd. Unproven DSR CMU

SSE Energy Supply Ltd. Unproven DSR CMU

SSE Energy Supply Ltd. Unproven DSR CMU

SSE Energy Supply Ltd. Unproven DSR CMU

SSE Energy Supply Ltd. Unproven DSR CMU

SSE Generation Ltd. New Build Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

Provisional Auction Results

22

Page 23: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

FASN01 Yes 19.817 1

FASN02 Yes 19.817 1

FASN03 Yes 19.817 1

FOYE01 Yes 149.538 1

FOYE02 Yes 144.435 1

GLENMS Yes 34.214 1

INAW01 Yes 21.54 1

LCHART Yes 29.294 1

LOCH01 Yes 40.495 1

PEH120 No N/A N/A

RANN-1 Yes 13.786 1

RANN-2 Yes 13.786 1

RANN-3 Yes 13.786 1

SLOY01 Yes 35.104 1

SLOY02 Yes 35.252 1

SLOY03 Yes 34.464 1

SLOY04 Yes 29.352 1

TUMB01 Yes 16.468 1

TUMB02 Yes 16.152 1

BURG01 Yes 44.298 1

CHIC01 Yes 44.298 1

CHIP01 Yes 9.614 1

FOAK01 Yes 6.136 1

THAT01 Yes 8.266 1

ASAP02 No N/A N/A

RHE2_1 Yes 18.402 1

RHE3_1 Yes 18.367 1

SPWR16 Yes 18.834 15

SPWR24 Yes 37.668 15

SPWR41 Yes 18.834 15

SPWR42 Yes 18.834 15

SPWR45 Yes 18.834 15

SPWR47 Yes 18.834 15

SPWR50 Yes 18.834 15

SUEZ01 Yes 9.429 1

SUEZ05 Yes 20.846 1

SUEZ02 Yes 17.02 1

TAYP02 No N/A N/A

TEES16 No N/A N/A

710054 Yes 5.65 15

710104 No N/A N/A

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)Duration

(Years)

SSE Generation Ltd. Refurbishing Generating CMU

SSE Generation Ltd. Refurbishing Generating CMU

SSE Generation Ltd. Refurbishing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Refurbishing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Refurbishing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Existing Generating CMU

SSE Generation Ltd. Refurbishing Generating CMU

SSE Generation Ltd. Refurbishing Generating CMU

SSEPG (Operations) Limited Existing Generating CMU

SSEPG (Operations) Limited Existing Generating CMU

SSEPG (Operations) Limited Existing Generating CMU

SSEPG (Operations) Limited Existing Generating CMU

SSEPG (Operations) Limited Existing Generating CMU

St Asaph Power Limited New Build Generating CMU

Statkraft Markets GmbH Existing Generating CMU

Statkraft Markets GmbH Existing Generating CMU

STOR 116 Ltd New Build Generating CMU

STOR 124 Ltd New Build Generating CMU

STOR 141 Ltd New Build Generating CMU

STOR 142 Ltd New Build Generating CMU

STOR 145 Ltd New Build Generating CMU

STOR 147 Ltd New Build Generating CMU

STOR 150 Ltd New Build Generating CMU

SUEZ RECYCLING AND RECOVERY KIRKLEES LTD Existing Generating CMU

SUEZ RECYCLING AND RECOVERY SUFFOLK LTD Existing Generating CMU

SUEZ RECYCLING AND RECOVERY TEES VALLEY LTD Existing Generating CMU

Tay Power Limited New Build Generating CMU

Teesside Hire Limited New Build Generating CMU

TGC Emerald Limited New Build Generating CMU

TGC Emerald Limited New Build Generating CMU

Provisional Auction Results

23

Page 24: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

710109 Yes 4.238 15

710113 Yes 5.65 15

710131 Yes 5.65 15

710139 Yes 5.65 15

710140 No N/A N/A

710142 No N/A N/A

710151 Yes 5.65 15

710154 No N/A N/A

710158 No N/A N/A

710161 Yes 5.65 15

710177 Yes 5.65 15

MAIN16 Yes 4.98 1

WH2016 Yes 18.834 15

THORM1 No N/A N/A

TWI123 Yes 4.709 15

UKER01 No N/A N/A

UKER02 No N/A N/A

UKER03 No N/A N/A

UKER05 No N/A N/A

UKER06 No N/A N/A

UKER07 No N/A N/A

UKER16 No N/A N/A

UKER18 No N/A N/A

UKER19 No N/A N/A

UKER21 No N/A N/A

UKER22 No N/A N/A

UKER24 No N/A N/A

UKER28 Yes 9.629 15

UKER30 Yes 9.629 15

UKER31 Yes 9.629 15

UKER33 Yes 7.703 15

UKER41 No N/A N/A

UKER42 No N/A N/A

UKER43 No N/A N/A

UKER48 Yes 11.555 15

UKER49 No N/A N/A

UKER75 Yes 9.629 15

UKER76 Yes 9.629 15

UKER77 Yes 9.629 15

UKER80 Yes 9.629 15

UKER82 Yes 9.629 15

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)Duration

(Years)

TGC Emerald Limited New Build Generating CMU

TGC Emerald Limited New Build Generating CMU

TGC Emerald Limited New Build Generating CMU

TGC Emerald Limited New Build Generating CMU

TGC Emerald Limited New Build Generating CMU

TGC Emerald Limited New Build Generating CMU

TGC Emerald Limited New Build Generating CMU

TGC Emerald Limited New Build Generating CMU

TGC Emerald Limited New Build Generating CMU

TGC Emerald Limited New Build Generating CMU

TGC Emerald Limited New Build Generating CMU

The Isle of Wight Energy Company Limited Existing Generating CMU

Thornton Estate Energy Limited New Build Generating CMU

Thorpe Marsh Power Limited New Build Generating CMU

TWIN OAKS SOLAR FARM LIMITED New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

Provisional Auction Results

24

Page 25: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

UKER83 Yes 9.629 15

UKER89 Yes 9.629 15

UKER91 No N/A N/A

16PR01 Yes 9.417 1

16PR02 Yes 9.417 1

16PR03 Yes 9.417 1

16PR04 Yes 9.417 1

16PR05 Yes 9.417 1

16PR06 Yes 9.916 1

16PR07 Yes 3.767 1

16PR08 Yes 9.134 1

16PR09 Yes 9.417 1

16PR10 Yes 9.417 1

16PR11 Yes 9.417 1

16PR12 No N/A N/A

16PR13 Yes 4.713 1

16PR14 No N/A N/A

16PR15 No N/A N/A

AGPR03 No N/A N/A

CDCL01 Yes 396 1

CNQPS1 Yes 337.5 1

CNQPS2 Yes 337.5 1

CNQPS3 Yes 337.5 1

CNQPS4 Yes 337.5 1

EECL01 Yes 367.2 1

GRAI06 Yes 421.2 1

GRAI07 Yes 421.2 1

GRAI08 Yes 421.2 1

GRG101 Yes 23.785 1

GRG40C Yes 25.897 1

KILH01 Yes 292.869 1

KILH02 Yes 292.869 1

RATS01 Yes 447.638 1

RATS02 Yes 447.638 1

RATS03 Yes 447.638 1

RATSU4 Yes 463.647 1

RTG20C Yes 16.009 1

TAYL22 Yes 69.686 1

TAYL23 Yes 62.152 1

STOW-B Yes 18.834 15

DCPS02 Yes 3.27 1

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)Duration

(Years)

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Energy Reserve Limited New Build Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Refurbishing Generating CMU

UK Power Reserve Limited Existing Generating CMU

UK Power Reserve Limited Refurbishing Generating CMU

UK Power Reserve Limited Refurbishing Generating CMU

UK Power Reserve Limited Unproven DSR CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Uniper Global Commodities SE Existing Generating CMU

Valence Power Limited New Build Generating CMU

Veolia UK Limited Existing Generating CMU

Provisional Auction Results

25

Page 26: Provisional Auction Results - EMR Portal - Home Markets Document Librar… · Provisional Auction Results 3. The Auction Clearing Price The Clearing Price is: £22.50 kW / year (2015/16

HAMP02 Yes 28.413 1

LEED02 Yes 11.7 1

NEWH02 Yes 15.582 1

STAF02 Yes 23.875 1

VWMdun Yes 31.291 15

CARerf Yes 27.319 1

EXEerf Yes 3.067 1

VWMbed Yes 23.468 15

VELCMa No N/A N/A

ICHP02 Yes 1188 1

SNAP01 Yes 6.592 15

WHAR02 No N/A N/A

CHPWIN Yes 83.626 1

WOLV02 No N/A N/A

Applicant Company CMU ID Capacity AG CMU Classification Capacity (MW)

Winnington CHP Limited Existing Generating CMU

Wolverhampton Power Limited New Build Generating CMU

Duration

(Years)

Veolia UK Limited Existing Generating CMU

Veolia UK Limited Existing Generating CMU

Veolia UK Limited Existing Generating CMU

Veolia UK Limited Existing Generating CMU

Viridor Waste Management Limited New Build Generating CMU

Viridor Waste Management Limited Existing Generating CMU

Viridor Waste Management Limited Existing Generating CMU

Viridor Waste Management Limited New Build Generating CMU

Vogen Energy Limited New Build Generating CMU

VPI Immingham LLP Existing Generating CMU

Walker & Son (Hauliers) Limited New Build Generating CMU

Wharf Power Limited New Build Generating CMU

Provisional Auction Results