EUSEW 2010
REGIONAL DEPLOYMENT OF SUSTAINABLE ENERGY
PROVINCE OF CHIETIITALY
Antonio DI NUNZIO•General Manager of ALESA Province Agencyfor energy•Deputy President RENAEL National Networkof Local Energy Agency
EUSEW 2010
KNOWLEDGE OF THE TERRITORY: AIMS AND
INDICATORS
VALORIZATION OF LOCAL RESOURCES (ENVIRONMENTAL,
FINANCIAL, SOCIAL)
SUSTAINABILITY PATH
EUSEW 2010
SUSTAINABLE DEVELOPMENT CULTURAL GROWTH
INTRODUCTION AWARENESS OBVIOUSNESS
TIME
EUSEW 2010
TRAININGINTERNAL
EXTERNAL
PARTNERSHIP
FAVORABLE ADMINISTRATIVE BACKGROUND
TERRITORIAL DEVELOPMENT
EUSEW 2010
CREATION OF WARNING TABLES
SPLIT LOCAL BODIES LOCAL COMPANIES
COMMUNITY AND/OR NATIONAL BODIES CONCRETE ACTIONS ON
THE FIELD
STRATEGIC DEVELOPMENT GEOGRAPHY SECTORIAL
IDENTIFICATION OF PARTNERS
EUSEW 2010
EUSEW 2010
OTHER SOURCE77,62%
HYDRO22,18%
PHOTOVOLTAIC0,10%
WIND0,10%
HYDRO23,40%
OTHER SOURCE62,70%
WASTE
3,50%
P.V.
0,30%
BIOMASS
2,30%
THERMAL
0,40%
WIND
7,40%
EUSEW 2010
RES PRODUCTION
hydro 442,00 GWh
wind 187,00 GWh
thermal 0 GWh
p.v. 1,16 GWh
biomass 0 GWh
biogas 17,59 GWh
waste 0 GWh
EUSEW 2010
HYDRO: legislative barriers to build new plants causing of the strong reduction of the rivers water flow (related to multiple uses)
PHOTOVOLTAIC : thanks to the national “feed in tariff” incentive scheme, PV plants increased a lot in the last 5 years (especially on 2010). Considering the strong environmental impact of the big PV plants, it’s preferable to install small PV plants on the roofs.
SOLAR THERMAL: scarce development of ST plants causing of the elevated costs related to low performance.
EUSEW 2010
BIOMASS: social acceptance still constitutes a high barrier to overcome.
BIOGAS: each landfill (n. 4) has installed the biogas recovery plant for the production of EE and heat
WIND: many wind farms realized in the hinterland of the province of Chieti
WASTE: It still persist many social and legislative barriers (both at national and regional level). RDF is going to be developed.
EUSEW 2010
ENERGY EFFICIENCY: Still to be implemented in many sectors of activity, but public awareness is growing
CONSUMPTION
21,4
0
1.15
6,40
309,
70
339,
10
1.82
6,60
21,8
0
1.16
1,80
465,
40
373,
00
2.02
2,00
28,1
0
1.30
3,80
514,
00
385,
50
2.23
1,40
27,4
0
1.21
6,60
628,
10
394,
80
2.26
6,90
-
500
1.000
1.500
2.000
2.500
Agricolture Industry Terziary Domestic TOTALGWh
2000 2005 2007 2008
+ 24%
EUSEW 2010
YEAR 200022,38%
YEAR 200828,57%RES
CONSUMPTION 1.826 GWh 2.266 GWh
+6,19% (+35% on 2000)
+24,1%
EUSEW 2010
ALL 104 MAYORS HAVE SIGNED THE AGREEMENTPROVINCE OF CHIETI AND ALESA ARE SUPPORT STRUCTURES
EUSEW 2010
104 SEAP
104 MUNICIPALITIES
PROVINCIAL PLAN
EUSEW 2010
SEAP
ABRUZZO REGION
PROVINCIAL PLAN
REGIONAL PLAN
Euro 500.000 to draft the SEAPs
of all municipalities of
the Abruzzo region
EUSEW 2010
ENERGY EFFICIENCY
RES DEPLOYMENT
SUSTAINABLE MOBILITY
•behavioral standards •passive measures •active measures •sharing process •buildings energy certification
ACTIVATION OF PUBLIC
AND PRIVATE FUNDING
AREA MOBILITY MANAGEMENT
EUSEW 2010
ELENA
PV Plants in public buildings through “Third Party Financing”-establishment of public-private partnership to realize PV plants totallygranted by private companies on public roofs, developing financingschemes based on the intervention of a local bank with the support of thenational “feed in tariff” incentive scheme.Energy Service Contract in public buildings – heat and electric energymanagement in public buildings through the partnership with energyservice companies, able to realize energy efficiency interventions withoutcosts for the LA.
EUSEW 2010
DEPLOYMENT OF SUSTAINABLE ENERGYIS POSSIBLE AT LOCAL LEVEL
AND THE “COVENANT OF MAYORS”IS A GREAT TOOL IF WE USE IT
WITHOUT LIMITATION
THANK YOU FOR THE ATTENTION