PROTECTING THE PASTBUILDING THE FUTURE

Page 3: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

INDEXWho We Are

A Word from the Chairman

About RME • Vision • Mission

Business Core Values • Quality • HSE

Projects Reference • Industrial & Power •• Infrastructure • Commercial & Special Buildings • Monument Restoration & Structure Repair

Subsidiaries

Page 4: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

Since our establishment in 1998, ROWAD Modern Engineering (RME) has developed an unrivaled reputation built on world-class technical and commercial competencies, superior quality and value as well as long-term relationships with both public and private sector clients, to become today one of Egypt’s most reputable turnkey contractors with a strong reputation and growing business across the Middle East and Africa regions.

At RME, we implement the latest and most reliable technological tools to ensure dynamic and cost-effective operations. We also have invested in our subsidiaries through strategic mergers and acquisitions integrating our scope of work while ensuring superior quality. Business excellence and project proficiency are at the core of RME, yet our employees are at the heart of everything we do. With over 2000 highly qualified employees, we enjoy a strong reputation for technical expertise, integrity, cooperation, and teamwork. Our people challenge themselves every day to reach highest levels of professionalism and exceptional performance enabling RME to deliver quality value-added construction service.

As we continue to expand our reach beyond Egypt and Africa, we are committed to deliver sustainable services, while keeping track of our carbon footprint and implementing Green Technological Solutions in all our projects.

A WORD FROM THE CHAIRMAN

Mohamed Mahlab

WHO WE ARE

Throughout our years of operations, RME has been recognized as one of Egypt’s most reputable turnkey contractors executing landmark projects and performing diversified alliances with major international contractors enabling the company to undertake multidisciplinary projects of high scale and complexity. Thanks to our proven track record of success, we’re today perceived as a key player in a large number of mega projects conducted over the past years besides our vital role in some of the most prominent landmarks.

In addition to our well established operations in Egypt, we have expanded our presence across Africa with successful projects in Algeria, Egypt, Mozambique, Nigeria and the Republic of Chad, hence gaining a strong foothold across Africa and currently planning to sustain RME operations across Africa and beyond.

All over our operations in Egypt and outside, our scope of work boasts sectors of Power Generation, Heavy Industries and Infrastructure, Bridges, Commercial Buildings, Hospitals, Hotels, Educational Facilities, etc.

Page 5: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

RME has extensive experience in various industrial projects, including establishing power generation projects, cement factories, petrochemical utilities, electrical substations as well as oil and gas establishments.

INDUSTRIAL & POWER

The infrastructure is the cornerstone of the social and economic development of a country. Thanks to our deep-seated know-how and long experience in the construction industry, RME has completed a number of national infrastructure projects across Egypt and abroad.

INFRASTRUCTURE

RME is a market leader with a firm foothold in the area of commercial and special buildings both nationally and internationally. RME is best known for its high-end finishing and compliance with top construction standards.

COMMERCIAL & SPECIAL BUILDINGS

RME is dedicated to monument restoration and historic preservation services. In cooperation with governmental bodies and international consultants, we carry out deep, sweeping architectural and historical research in advance with the aim to ensure the historic structures are accurately and diligently restored.

MONUMENT RESTORATION & STRUCTURAL REPAIR

OUR VISION OUR MISSIONTo pursue our long lasting path as being the most efficient Turnkey Contractor surpassing expectations to excel all over surrounding markets while focusing on operating in EPC contracts in Egypt specially in commercial, industrial, power and infrastructure sectors.

Maintain our commitment to deliver quality construction ser-vices while working in an ethical and sustainable atmosphere, hence becoming the General Contractor of choice, and build trust-based partnership with our customers, only attainable through highly qualified employees challenging themselves constantly to reach ultimate levels of professionalism.

2500 +Employees

240 + Mega Projects

Founded in 1998

ABOUT RME OUR SERVICES

8500 +Labors

Page 6: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

At RME, we consider quality an essential element of our work. We develop quality policies and procedures that reflects our commitment to new opportunities and ideas to optimize the level of service provided to our clients. RME has developed and implemented a Quality Management System in compliance with the standards of ISO 9001. This system ensures service quality and enhances our commitment to constant development and compliance with applicable statutory, regulatory and any other requirements. RME is ISO certified and we have our own capabilities and experience enabling us to achieve clients’ satisfaction and fulfill their needs. We are always committed to meeting our promise to provide our construction services to meet the project’s requirements and quality standards.

SAFETY

Safety is not just a policy, safety is a core attitude instilled in each and every member of RME. At RME, we believe that all construction projects can be performed in a safe manner that prevents almost all potential accidents. Accordingly, we commit to compliance with the requirements of any applicable regulations and legislation as well as our clients’ HSE policies.

Being certified in ISO 45001 & ISO 14001 is a proof of our organization’s commitment to our employees’ health and safety.

Safety procedures are more essential when it comes to the project’s onsite construction phase, as accidents are more likely to occur within the project site. Thus, RME is always keen on promoting awareness on health, safety, and environment appropriate measures among all concerned persons in order to protect them from any potential accidents or injuries.

QUALITY

Page 7: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

INDUSTRIAL AND POWER

Page 8: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

Lead by SIEMENS – ELSEWEDY consortium, the Beni Suef Combined-Cycle Power Plant Project is the largest power plant in Egypt and the MENA region with a capacity of 4800 MW. For a period of 18 months, RME was responsible for all the civil works of the power blocks in addition to the civil, architectural and MEP works for the utilities and facilities in the site as well as GIS area

BENI SUEF COMBINED CYCLE 4800 MW POWER PLANT

Page 9: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

BENBAN SOLAR PARK

RME was appointed by TSK/ENVIROMENA JV to carry out the construction works of four plots in Benban Project with a total capacity of approximately 200MW. The Benban Photovoltaic Solar Park is a national project aimed at increasing Egypt’s electricity generating capacity through the development of solar PV project. RME is proud to be the first contractor to deliver its plots and to start connecting its generated capacity to the grid.

EXTENTSION OF ATTAQA POWER PLANT

RME was selected to execute the civil works of ATTAQA 650 MW simple cycle gas turbine units. RME proved itself capable of completing the project within an extremely short time frame, delivering the project in just 5 months.

GE & RME worked as a consortium for 26 months for the procurement and installation of four independent substations located in Egypt.Time frame for finishing Substation 220/66/11 KV in Mostasmereen was 8 months.Energizing Substation 500/220 KV of Ismailya East is 20 months.Substation 500/220 KV in Beni Suef 18 months to be completed. Substation 500/220 KV of Tamy El Amdeed 19 months.

FRENCH FUND GIS SUBSTATIONS (4 SUBSTATIONS)

EZZDRI PLANT

DANIELI, ranked among the three largest suppliers of equipment and plants to the metal industry in the world, chose RME to act as the main contractor in charge of resuming and completing construction on the EZZ DRI plant in Ein El Sokhna. While DANIELI was facing a challenge in completing the project around the table set for it, RME’s proven track record in achieving DANIELI standards in terms of resources allocation, Quality, Safety working procedures and commitment to time tables.

Page 10: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

Sub-contracted by international EPC contractor, Gamesa, RME has successfully delivered the civil works of a wind farm projects with a total capacity over 380MW. In cooperation with Gamesa, RME handles the civil construction works of the technical foundations as well as the hardstands in addition to the design and construction of the farms road works.

JICA, KFW, FIEMWIND FARMS

Continuing cooperating with Siemens-Gamesa Renewable Energy, RME is assigned for carrying out the civil works package of the wind farm project for 96 wind turbines generators (WTG’S) with total capacity 250 MW located in Ras Gharib.

LEKELA 250 MW WIND FARM

ELECTRIC TRAIN (LRT) DEPOT

National Authority of Tunnels (NAT) has awarded GAMA-RME Joint-Venture the construction works for (LRT) the main line train fence and workshop buildings which consists of 26 buildings at Badr City. The LRT is designed to accommodate 340,000 passengers daily and contribute in reducing traffic on the Cairo-Ismailia highway by about 30 percent.

RME has been awarded the turnkey construction of Siemens maintenance Workshop (Ramsis II). The project entails activities to build a new training, repairing and tooling facility for Siemens. This cooperation marks yet another successful cooperation between Siemens Technologies & RME.

SIEMENS PS SERVICES CENTER - RAMSIS II

Page 11: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

BENI SUEF CEMENTPLANT

In cooperation with Chengdu design & research institute of building material industry Co., Ltd., RME Completed the civil works of GEO 6x6000 TPD clinker cement Plant at Benisuef and successfully completed the project in 14 months.

Being known for its compliance with the highest standards of quality, RME was assigned as the subcontractor for the execution and completion of the Building Materials Industries Company S.A.E. (BMIC) Cement plant located in Assiut, Egypt.

BMIC ASSIUT CEMENTFACTORY

ELSEWEDY CABLES CEMENT FACTORY

RME has cooperated with Elsewedy Electric in many projects including, the manufacturing factory in Algeria among many others. Having a reliable presence in Algeria, RME could successfully complete the turnkey construction of Elsewedy Cables factory, on an area of 50,000 m2, within only 10 months.

Based on its worldwide fame of excellence and proficiency, RME was entrusted with the construction of the 125000m2 metro maintenance and garage complex in Algeria. RME again proved itself industry leaders by providing the highest quality and high-end complexity of civil engineering.

METRO ALGIERS MAINTENANCE WORKSHOPS AND SUBSTATIONS

Page 12: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

SWAG WIND MILL FACTORY

RME was assigned as the main contractor for the construction of the 15000 SQM manufacturing unit in El Ain El-Sokhna, Egypt, in addition to all utilities and utility buildings. The project was constructed successfully in a period of 10 months and the production started at the factory in early 2011.

RME was appointed to carry out the construction works of the SLP Logistic Center, The project site is located in industrial west, 10th of Ramadan City. RME is responsible for supplying, constructing, commissioning & validating the project components including HVAC Works, Firefighting Works, Plumbing Works and Electric Works.

EL SEWEDY LOGISTICS PROPERTIES – SLP PI PARKS

As part of our continuing success in heavy civil construction projects, RME was appointed by ELCO steel as the main contractor for all civil and utilities construction for their new rolling mill plant in the SOKHNA area. RME achieved significant results in terms of delivering the project in a very challenging time frame as well as in terms of quality for the installation works which were managed by DANIELI. In addition, RME was appointed to carry out the construction works of ELCO STEEL 220/33KV GIS Substation.

ELCOSTEEL ROLLINGMILL PLANT

RME took responsibility for constructing a warehouse on an area of 11,500 m2 with 15m height. Among this area, an area of 6,500 m2 will be dedicated for an air-conditioned area and 5000 m2 to serve as a cold store designed to work at temperature varies between -20 and +5. The warehouse also includes a 7m-high rack store, machine, utilities building, water tank and electrical substation.

LOGISTICA WAREHOUSES

Page 13: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

INFRASTRUCTURE

Page 14: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

In cooperation with DP World, RME was awarded an EGP 1.6 billion project for the Construction of Onshore yard works for a new container terminal to the southwest of the existing Basin 1 terminal. The construction is for terminal pavement and terminal buildings for operations and administrative use for the new Basin 2 terminal and the existing Basin 1 terminal.

PORT OF SOKHNA CONTAINER TERMINAL BASIN 2 - ONSHORE PORT AND TERMINAL

Page 15: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

CAIRO - ALEXANDRIA RAILWAY UPGRADE

RME has been assigned by the Egyptian Railways the Renewal works of 29 km of siding tracks, 17 km of mainline and the renewal of station yard’s turnouts for main lines and sidings including single and double slips, Common crossing and Scissors. The project duration is 24 months.

In cooperation with DP World, RME was awarded the turnkey construction of the iron oxide pellet terminal. This import terminal is needed in order to import the raw materials for iron oxide pellets. The project execution period is 7 months and located in Ain Sokhna Port.

SOKHNA PORT-BASIN 1 - IRON OXIDE PELLET TERMINAL CIVIL WORKS (A)

PORT OF ALGIERS CONTAINER TERMINAL REFURBISHMENT WORKS

RME has been awarded the upgrading & rehabilitation works for the port of Algiers container terminal, RME is responsible for rehabilitating the 30h a container terminal at Algiers currently operated by DP-World. Work includes Ship-to- Shore (STS) crane foundation works along quay wall, Apron refurbishment behind quay walls, reconstruction of the yard, including gall services and utilities. The throughput forecast of the terminal is 18,500 TEU containers as well as 123,600m² for general cargo.

In cooperation with MCA Mozambique, M.CoutoAlves, S.A & M. CoutoAlves, Vias, S.A, RME was assigned to rehabilitate and construct coastal protection for Maputo City, Mozambique. This project included establishing a new configuration system on Maputo’s South Coast as well as developing criteria for both the south and south west zones. RME constructed a 7 groynes system, nourishments of sand between groynes, toe of protection and rehabilitation of existing sea walls, groynes and revetments.

COASTAL PROTECTION FOR MAPUTO CITY

Page 16: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

RME has been assigned by the Engineering authority of the armed forces for the construction of Safir Bridge located in Heliopolis area, the bridge consists of 2 ways, roads for cars with a total length of 250 m and 27 m width and up to 9 m height and delivered in only 87 days.

SAFIRBRIDGE

RME has been assigned by the Engineering authority of the armed forces for the construction of Hegaz Bridge located in Heliopolis area, the bridge consists of 2 ways, roads for cars with a total length of 350 m and 27 m width and up to 9 m height and delivered in only two months.

AL-HEGAZBRIDGE

RING ROAD EXPANSION

RME has been awarded the construction works of the Ring Road Expansion Project from Al Mariouteya with a length of 4.1 km, In addition to El Marj sector with a length of 2.2 km to be completed in 12 months

RME has been assigned by the armament forces for the construction of the direct bridge that access off Al Wahat highway that will facilitate the traffic for this crowded junction to get in & out the mall of Egypt smoothly. The project total area is 20,800m2 and 1,810m lengths.

MALL OF EGYPTBRIDGE

Page 17: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

RME has been awarded the construction works for Marassi Marina Infrastructure networks in North Coast, Egypt. RME scope of work consists of the infrastructure works of Marassi Marina Wet and Dry utilities. The Project Duration is 15 Months.

MARASSI INLANDMARINA

RME was contracted by Cojaal, a large Japanese consortium, to carry out the construction of 46 bridges and 8 culverts in Setif, Algeria. Despite the aggressive geographical nature of the project’s location, RME proved itself qualified by successfully executing the project within 30 months.

ALGERIA NEWAUTOROUTE

IRRIGATION TREATMENTPLANTS

In collaboration with EMAAR, RME was responsible for the construction of EMAAR potable water tanks, irrigation treatment plants and infrastructure service buildings at Marrasi North Coast and Uptown Cairo.

RME was sub-contracted by Vinci-Bilfinger Berger and OCI JV to carry out civil construction works for one of the largest water infrastructure projects operated by the Egyptian Government. The Nagaa Hammadi Barrage project was conducted in cooperation with KFW.

NAGAA HAMMADIBARRAGE

Page 18: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

COMMERCIAL &SPECIAL BUILDINGS

Page 19: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

With a history of timely delivery and a reliable contractor reputation, RME was awarded the completion of the construction of four ministerial buildings in New Cairo Capital on a turnkey basis contract. The project represents one of Egypt’s important projects in its modern transformation and the development of Cairo New Capital.

GOVERNMENTALBUILDINGS

Page 20: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

THE KNOWLEDGE HUB

The Knowledge Hub Universities is a multidisciplinary educational hub hosting branches of world-class universities, each with programs in their areas of strength, to prepare students for a global career by offering an intellectually stimulating, culturally enriching, and innovative learning environment. RME was responsible for the turnkey construction of the Knowledge Hub Universities.

RME is acting as the turnkey Contractor for the construction of Mixed-use district project in New Cairo Capital. R5 project is one of our complex and mega projects with approximately 800,000 sqm BUA consisting of 7 towers and 5 clusters.

R5 MIXED USECOMPOUND

ZED TOWERS PHASE 01B

RME has been awarded the construction works for Package A and Package D for ZED Towers Project, Package A comprises the Basement (2 levels), and four (4) fully finished Residential Buildings G+10, Four (4) double core buildings. Package D comprises the for the basement under the piazza and the MEP works for the entire basement

RME is acting as the turnkey Contractor for the construction of the Olympic Multi-sports Hall, the project is a multi- sports platform with total BUA of 40,000 sqm that is certified to accommodate 15,000 spectators for Olympic Games of Handball, Basket Ball, Volley Ball, Judo, Karate, Taekwondo, Boxing and Wrestling.

OLYMPIC MULTI -SPORTS HALL

Page 21: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

Entrusted by Al- Futtaim Commercial and Administrative Centers (AFCAC), RME has been awarded the construction of CFC podium 2 located in New Cairo, Egypt. The project consists of 5 office buildings in which RME is responsible for delivering full concrete skeleton and façade works in only 18 months

CFC PODIUM II

Following the successful completion of the civil and electromechanical works in Phase 1 of the construction of New Giza University in the highest quality and within the time-frame agreed upon, RME was assigned the same works for Phase 2. The areas of both phases, 1 and 2, are 20,000m2 and 20,660m2, respectively, while the project completion periods for both phases were 8 and 10 months, respectively.

NEW GIZAUNIVERSITY

SODIC EAST TOWN RETAIL AND OFFICES

SODIC, RME’s recurring partner, trustingly awarded RME the construction its new Eastown Retail and Offices complex of total BUA 154,000 sqm which considered as one of the commercial iconic schemes at the New Cairo.

RME was awarded the turnkey construction of the SODIC Allegria Club House. The project work package comprises of one (1) building (G) with total BUA of 3,446m2, built over one story underground basement with the same area. The NOC building work package comprises of one (1) building (G), of total BUA of 169m2.

SODIC ALLEGRIACLUB HOUSE

Page 22: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

Uptown Cairo, owned by Emaar - the well-known real estate development company, is a world-class residential complex established in Egypt. RME was appointed to carry out the construction works for Village F (West) “Sierras”, phases 2 and 3 on a total area of 65,000m2 comprising 11 buildings.

UPTOWN CAIRO VILLAGE F (WEST) “SIERRAS”

RME was entrusted with the execution and completion of SODIC’s Westown entertainment hub. Acting as the main contractor, RME is responsible for remedying any defects related to the civil works, MEP and infrastructure works pertaining to Westown Entertainment Hub.

WESTOWN ENTERTAINMENT HUB

POINT 90MALL

Located in New Cairo, the Point 90 Mall project was assigned to RME to carry out all construction tasks and works based on the company’s solid reputation as an experienced professional contractor.

RME was responsible for the renovation of MPorium, construction of Emaar sales center and structural parking at Marassi North Coast. RME proved itself qualified by successfully executing the project within only 4 months at the highest quality standards and safety regulations.

RENOVATION OFMPORIUM

Page 23: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

RME was the turnkey contractor for the Strip Mall. This project is owned by AUTOVILLE, which is a unique one-stop destination for car enthusiasts and their families. It is located on Dahshour Road and beautifully designed by renowned architects Skidmore, Owings & Merrill LLP. The project duration was 16 months.

THE STRIPSHOPPING MALL

In collaboration with Egyptian Centers for Real Estate Development (MARAKEZ), RME has been awarded the turnkey construction works for IKEA Mall of Arabia with total BUA of 19,836 sqm located in 6th of october city.

IKEAMALL OF ARABIA

AL JAZIMALL

RME has been expanding its footprints in Egypt throughout our years of service; you can see our diversified array of projects everywhere. RME responsible for executing the Civil Works for Al Jazi Mall which is expected to be one of the landmarks of New Cairo very soon to be joining our series of Commercial modernization.

RME was awarded the construction of Royal City Mall located on 120,000m2 in Giza Governorate. The built up area of the mall is approximately 25,000m2 and the building represents a landmark on the main axis of Sheikh Zayed district with a 500m facade and a new modern-style retail complex.

ROYAL CITYMALL

Page 24: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

CAIRO AMERICANCOLLEGE

Located in the heart of Maadi, Cairo American College is a world-class education facility. Its environment encourages the students to express their opinions, passions and showcase their talents. Believing in the importance of raising fearless generations who are able to contribute to the development of our society, RME acted as the turnkey contractor in the completion of the new middle school and library-building project in a period of 13 months.

Arabian Group, a new Egyptian developer established in 1990, chose RME to handle the construction for its very first investment - a new administration and retail complex. The project is located in 6th of October City and includes Toyota show rooms, two new administration buildings in addition to two medical center towers. The total project duration was 36 months.

TWIN TOWERS ADMINSTRATIVE BUILDINGS

CAIRO INTERNATIONALAIRPORT BUILDING 2

Renowned for high quality, experience and excellence in providing construction services for vast projects, particularly national landmark projects, RME was assigned the construction of Cairo International Airport Buildings A & C, bridge construction, the connecting tunnel between terminals and airside infrastructure works. Subcontracted by LIMAK INSAAT (a main contractor for TB2 Project), RME has a remarkable proven record of achieving superior quality on time.

Continuing its global expansion, RME was awarded the civil works for N’djamena Hotel located in the capital of The Republic of Chad. The project encompasses five different zones including the Hotel, Service Building, Reception Hall, Conference Room and the Political Center. The project is built up on a total area of 38,000 m2 coping with the most modern techniques, RME carried out the project using precast in-situ beams and slabs.

N,DJAMENA GRAND HOTEL RADISSON BLU NOW

Page 25: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

MONUMENT RESTORATION & STRUCTURAL REPAIR

Page 26: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

Muhammad Ali’s Palace is considered to be one of the first significant structures in Shubra which led to the consecutive changes that the district later underwent. RME honored to work in the restoration and rehabilitation of The Fountain Palace or El-Faskeyya which consists of a colonnade divided into four terraces enclosed by a square pool resembling the yard of the mosque

MOHAMED ALIPALACE

Page 27: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

SULTANA MALAKPALACE

RME is responsible for the structural repair, the adaptive reuse and the restoration of Sultana Malak Palace located in Heliopolis, Egypt.The palace is prepared to be a headquarter for training the youth on the modern means of technology under the supervision of the Ministry of Communication& information technology.

Located in El- Azhar district, El Set Waseela House was established in 1664 and belonged to Waseela Khatun. RME restored the entire building to its original condition, showcasing the variety of architectural art that distinguishes this building. Furthermore, RME was able to fill the undesirable spaces, repair the damaged parts, stones, red bricks, decorated timber as well as the decorated ceiling.

EL SET WASEELA HOUSE

El Einy School & Mosque is an antique building comprising a mosque and a school in El-Azhar students. RME was accountable for restoring the building to its original condition as well as restoration and treatment of decorated and non-decorated timber, grout restoration, metal, marble and stone materials repair in addition to the replacement of damaged stones.

EL EINY SCHOOL& MOSQUE

Located in El-Batneya area in Old Cairo, this beautiful mosque was established by Judge Ahmed Hafiz Pacha in the 15th Century. RME restored the great building to its original condition through the restoration of stones, timber doors and windows, iron windows, repair of marble columns, granite columns as well as the decorated ceiling.

AHMED IBNSHAABAN MOSQUE

Page 28: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

OURSUBSIDIARIES

Page 29: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

DRILLER

An RME subsidiary, a specialized contractor in advance deep foundation, established in June 2015 to participate in the development of the construction industry in Egypt. Driller is supplied with modern equipment which enables us to support our clients with solutions for all foundation problems.

With a serious commitment to provide the Egyptian building industry with a comprehensive array of solutions from CFA piling works to Screw piling works, the breadth of projects varies, not only in terms of geographic location but also project magnitude and complexity.

Scope of Services• Screw piling

• Sheet piling

• Steel and driven piling

• Grout piling and anchoring technology

A Greek-Egyptian company operating in the field of Building-Insulations, and all finishes and applications that provide protection to the building from the elements of deterioration and human use. Established in June 2018, Troy has partially been acquired by RME beginning of 2019 to join as a strategic partner with the objective of expanding its operations in the Egyptian, the African and Middle Eastern markets. By increasing its capital, Troy’s financial capabilities and structure has expanded, to meet the fast-growing demand for its specialized services.

TROY

Scope of Services• Application solutions for Integrated Thermal

Insulations

• Water Proofing, Damp Proofing

• Indoor & Outdoor Performance Coatings for Industrial and Commercial use

A subsidiary from RME offering several specialized “Design and Build” construction services through its business line. It has extensive engineering capabilities, through our “In-house” design team with staff members of 10 years design experience in Post Tensioning.

Tetra works alongside the clients to analyze their objectives and proposing together alternative optimum solutions with the most updated techniques that effectively respond to their challenges, Our target is to optimize the cost and time of the project while improving the quality that extend the service life of the structure.

TETRA

Scope of Services• Post Tensioning slabs and bridges

• Bearings

• MSE walls

• Bridge construction, heavy lifting

• Ground engineering and special structural repair

MECHANICALLY STABILIZED EARTH

Renowned for its multi-sector services, RME performs projects for the Reinforced Earth Systems Sector including retaining walls infrastructures projects and commercial compounds. In carrying out such projects, RME adds flexibility and aesthetic architecture through the implementation of soil reinforcement by Geo Grid material technology. In addition, we offer our valuable clients services that help them reduce cost and time and improve quality.

Scope of Services• MSE Walls

• Installation Works

• Erection Works

MECHANICALLY STABILIZED EARTH

Page 30: PROTECTING THE PAST BUILDING THE FUTURE - rowad-rme.com

CONTACT US

EGYPT

Address: 1 Mahata Square, Maadi Palace.

Postal Code: Maadi 11431

Cairo, Egypt.

Tel: +202 235 81 518

Fax: +202 235 88 037

Email: [email protected]