![Page 1: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,](https://reader035.fdocuments.net/reader035/viewer/2022062407/56649e255503460f94b13872/html5/thumbnails/1.jpg)
Proposed SWG-LIR Work PlanProposed SWG-LIR Work Plan2012-2013 2012-2013
Mr. Thomas RojasCo-Convener, SWG-LIR
1st WG-GIC Meeting for 2012Audio Visual Room, BOI Penthouse
30 March 2012, 2:00 p.m.
![Page 2: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,](https://reader035.fdocuments.net/reader035/viewer/2022062407/56649e255503460f94b13872/html5/thumbnails/2.jpg)
OUTLINEOUTLINEBackground
- PDP Chapter 3 - Business Sector Memo to the President
- Arangkada Philippines 2010- WG-GIC Workshops > Sector Writeshop > Planning Workshop
Proposed SWG-LIR Work Plan for 2012-2013
Meeting of PDF Secretariats of WG-DLG and WG-GIC
![Page 3: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,](https://reader035.fdocuments.net/reader035/viewer/2022062407/56649e255503460f94b13872/html5/thumbnails/3.jpg)
BackgroundBackground2011-2016 Philippine Development Plan (PDP) signed by
President Aquino in March 2011; formally released to the public in May 2011
2011-2016 PDP Chapter 3: Competitive Industry and Services Sectors Strategic Goals:
- Improved business environment- Increased productivity and efficiency- Enhanced Consumer Welfare
![Page 4: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,](https://reader035.fdocuments.net/reader035/viewer/2022062407/56649e255503460f94b13872/html5/thumbnails/4.jpg)
BackgroundBackground
Business Sector Memo to the President
Arangkada Philippines 2010
Sector Writeshop on Assessing Competitiveness Issues, 03 June 2011
WG-GIC Planning Workshop, 28 July 2011
![Page 5: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,](https://reader035.fdocuments.net/reader035/viewer/2022062407/56649e255503460f94b13872/html5/thumbnails/5.jpg)
Proposed SWG-LIR Work Plan Proposed SWG-LIR Work Plan for 2012-2013for 2012-2013
Four (4) Themes/Areas of Concern
Streamlining local and national regulatory processes
Promoting local economic strategies conducive to investment
Improving information support for business matching and investment promotion
Addressing consumer-related issues
![Page 6: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,](https://reader035.fdocuments.net/reader035/viewer/2022062407/56649e255503460f94b13872/html5/thumbnails/6.jpg)
Theme 1: Streamlining Local and Theme 1: Streamlining Local and National Regulatory ProcessesNational Regulatory Processes
Roll out standards on BPLS to targeted LGUs - Capacity building and coaching support provided
to expanded target LGUs - BPLS advocacy and marketing program developed - Improved online BPLS support (e.g. Help
Desk and Helpline - Monitor compliance of LGUs to standards under
BPLS streamlining - Certification system of BPLS coaches - Implement robust M&E system
![Page 7: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,](https://reader035.fdocuments.net/reader035/viewer/2022062407/56649e255503460f94b13872/html5/thumbnails/7.jpg)
Theme 1: Streamlining Local and National Theme 1: Streamlining Local and National Regulatory ProcessesRegulatory Processes
Support the expansion of the Philippine Business Registry (PBR)
Assist LGUs in BPLS automation (component 2 of BPLS Streamlining Program) for interconnectivity with the PBR- Knowledge products on BPLS
automation (e.g. toolkits, training materials)
- Survey on e-readiness/BPLS automation
- Deployment of e- BPLS system/software and capacity building to target LGUs
![Page 8: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,](https://reader035.fdocuments.net/reader035/viewer/2022062407/56649e255503460f94b13872/html5/thumbnails/8.jpg)
Theme 1: Streamlining Local and National Regulatory Theme 1: Streamlining Local and National Regulatory ProcessesProcesses
Set up an Incentive system for BPLS reformed LGUs
- Outbound and inbound investment/trade missions
- Business-friendly LGUs
Assist LGUs in reforming inspection system - Distribute knowledge products in setting
up business-friendly local inspection system (toolkits, training materials) - Conduct training/capacity building
![Page 9: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,](https://reader035.fdocuments.net/reader035/viewer/2022062407/56649e255503460f94b13872/html5/thumbnails/9.jpg)
Theme 1: Streamlining Local and National Regulatory Theme 1: Streamlining Local and National Regulatory ProcessesProcesses
Formulate reforms in securing construction permits- Creation of a Technical Working Group
(TWG)/MOA between DPWH, DILG and DTI- Recommendations on the streamlining of
construction permits- Knowledge products in streamlining the
construction permitting system (e.g. toolkits, training materials)
- Capacity building to LGUs on reforming construction permitting system
![Page 10: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,](https://reader035.fdocuments.net/reader035/viewer/2022062407/56649e255503460f94b13872/html5/thumbnails/10.jpg)
Theme 1: Streamlining Local and National Regulatory Theme 1: Streamlining Local and National Regulatory ProcessesProcesses
Undertake Regulatory Impact Assessment (RIA) - Implement recommendations of the ADB Study on
RIA
Review and formulate reforms in land titling- Undertake study- Knowledge products- Capacity building
Expand the use of the Business One-Stop-shops (BOSS)- Assess BOSS experiences- Implement recommendations to further enhance the
current BOSS procedures
![Page 11: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,](https://reader035.fdocuments.net/reader035/viewer/2022062407/56649e255503460f94b13872/html5/thumbnails/11.jpg)
Theme 2: Promoting Local Theme 2: Promoting Local Economic Economic Strategies for Strategies for InvestmentInvestment
Review national laws and local regulations - Ensure consistency in incentive-giving
laws with local tax code and Local Investment and Incentives Code (LIIC)
- Review special permits for tourism and agribusiness required by LGUs
Pursue Alternative Dispute Resolution (ADR) to settle disputes between national and local agencies as alternative to filing cases/going to courts- Develop ADR mechanism per sector
![Page 12: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,](https://reader035.fdocuments.net/reader035/viewer/2022062407/56649e255503460f94b13872/html5/thumbnails/12.jpg)
Theme 2: Promoting Local Economic Theme 2: Promoting Local Economic Strategies Strategies for Investmentfor Investment
Strengthen the newly-created Local Economic and Investment Promotion Offices (LEIPOs)- Develop template knowledge
products and training materials to capacitate LEIPOs
- Establish the institutional linkages among regional office of NGAs like DTI, DILG, NEDA and LEIPOs
![Page 13: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,](https://reader035.fdocuments.net/reader035/viewer/2022062407/56649e255503460f94b13872/html5/thumbnails/13.jpg)
Encourage LGUs to participate in PPP and other modalities for local infrastructure development
- Roll out revised PPP/BOT manual for local governments and key cities to support rapid implementation of infrastructure projects in support of priority sectors e.g., tourism, agribusiness- Improve farm-to-market roads, postharvest facilities
Theme 2: Promoting Local Economic Strategies for Investment
![Page 14: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,](https://reader035.fdocuments.net/reader035/viewer/2022062407/56649e255503460f94b13872/html5/thumbnails/14.jpg)
Implement programs to assist MSMEs - Microfinance
- Microinsurance
Strengthen LGUs’ agricultural extension and training services for farmers
Theme 2: Promoting Local Economic Strategies for Investment
![Page 15: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,](https://reader035.fdocuments.net/reader035/viewer/2022062407/56649e255503460f94b13872/html5/thumbnails/15.jpg)
Theme 3: Improving Information Support Theme 3: Improving Information Support for Business Matching and for Business Matching and Investment Promotion Investment Promotion
Assist LGUs in generating information for promoting investments
- Use of LGU business registration information for business matching
- Methodology for quick area-based information/statistics, proxy statistics to measure provincial GDP/ to gauge local economic activity
- Develop with business groups framework for regular private sector (e.g. local chambers and LGU interaction to discuss issues and plans on investment-related projects)
![Page 16: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,](https://reader035.fdocuments.net/reader035/viewer/2022062407/56649e255503460f94b13872/html5/thumbnails/16.jpg)
Theme 4: Address Theme 4: Address Consumer- Related Consumer- Related Issues Issues
Strengthen standard setting (harmonized with international standards) and implementation at the local level- Scoping exercise- Review standards for tourism facilities
(initial focus on transport and hotels)Undertake case studies for Palawan
and Bohol
![Page 17: Proposed SWG-LIR Work Plan 2012-2013 Mr. Thomas Rojas Co-Convener, SWG-LIR 1st WG-GIC Meeting for 2012 Audio Visual Room, BOI Penthouse 30 March 2012,](https://reader035.fdocuments.net/reader035/viewer/2022062407/56649e255503460f94b13872/html5/thumbnails/17.jpg)