PROPOSED SHAREWAY CROOME ROAD to PRINCES HIGHWAY … · g6. u.n.o. standards/codes referenced shall...

10
E W S T MOF G SCALES SURVEYED OFFICER: DATE: SURVEY MARKS: LIST OF REVISIONS REV. DATE OFFICER .......... ................. .......... .......... ................. .......... .......... ................. .......... .......... ................. .......... .......... ................. .......... .......... ................. .......... .......... ................. .......... .......... ................. .......... .......... ................. .......... .......... ................. .......... AMENDMENT DETAILS APPROVED - Manager Technical Services DATE: DESIGNED: DATE: SEDIMENT AND EROSION CONTROL Provide sediment and erosion control measures in accordance with the 'Erosion & Sediment Control' guide by the NSW Office of Environment & Heritage DRAWN: DATE: SERVICES Gas: Electricity: Water: Sewer: TelComm Local Cable: TelComm Major or Optic Fibre: LEGEND LOCATIONS Services shown are those known to exist at date of design. Prior to commencement of excavation contact the relevant gas, electricity, water and telecommunications service providers, including the RMS, for most recent service locations and precautions that may be necessary ADMINISTRATION CENTRE SHELLHARBOUR CIVIC CENTRE Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529 PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE FILE: PLAN No: REVISION SHEET: 76 CYGNET AVENUE (Cnr Cygnet & College Avenue) POSTAL ADDRESS GENERAL NOTES. G1. THESE NOTES APPLY TO ALL CIVIL/STRUCTURAL DRAWINGS ISSUED ON THIS PROJECT G2. CIVIL/STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL RELATED PROJECT DOCUMENTATION. ANY DISCREPANCY IN THE PROJECT DOCUMENTATION AFFECTING WORK SHOWN ON THESE DRAWINGS SHALL BE REFERRED TO THE PROJECT ENGINEER AND AN INSTRUCTION OBTAINED BEFORE PROCEEDING WITH WORK SO AFFECTED. G3. VERIFY SETTING OUT DIMENSIONS SHOWN ON THESE DRAWINGS BEFORE COMMENCING WORK. G4. EXECUTE ALL WORK SHOWN ON THESE DRAWINGS IN ACCORDANCE WITH THE RELEVANT AUSTRALIAN CODES, STANDARDS AND LOCAL GOVERNMENT ORDINANCES. G5. ENSURE THAT ALL STRUCTURE IS MAINTAINED IN A SAFE AND STABLE STATE THROUGHOUT THE CONSTRUCTION PERIOD. G6. U.N.O. STANDARDS/CODES REFERENCED SHALL BE THOSE CURRENT AT THE DATE DRAWINGS WERE APPROVED. G7. SERVICE LOCATIONS SHOWN ON PLAN ARE APPROXIMATE ONLY. CARE MUST BE TAKEN DURING EXCAVATION. LOCATE ALL SERVICES & MAINS ON SITE PRIOR TO CONSTRUCTION. G8. N25 CONCRETE WITH SL72 REINFORCEMENT IN ACCORDANCE WITH AS 1379 AND AS 3600. G9. 2.5m WIDE SHAREWAY WITH 'CONNELLY KEY' JOINTS OR SAW CUTS @ 3m CTRS. G12. WHERE NEW CONCRETE WORKS MEETS EXISTING CONCRETE PATHS, KERB RAMPS & DRIVEWAYS, A DOWELLED EXPANSION JOINT SHOULD BE CONSTRUCTED WITH 300mm x 12mm DIA. DOWELS @ 400mm CTRS. G11. BROOM FINISH @ RIGHT ANGLE TO DIRECTION OF TRAVEL. G10. EXPANSION JOINTS @ 12m CTRS. LOCALITY DIAGRAM N.T.S. LEGEND Min. 125mm thick shareway with SL72 reinforcement Min. 150mm thick driveway with SL82 reinforcement Kerb ramps Existing concrete works 30mm AC shoulder seal ch. 00 ch. 10 ch. 20 ch. 30 ch. 40 ch. 50 ch. 60 ch. 70 ch. 80 GFIP GFIP PP WM Gate 11 DP 1099281 26 G12. NEW KERB RAMPS TO BE CONSTRUCRED IN ACCORDANCE WITH AS 1428.1. Ex i s t i n g Sh a re wa y 1:125 @ A1 1:250 @ A3 G.P.S. MS October 2018 PCW PCW O 1 of 10 PROPOSED SHAREWAY CROOME ROAD to PRINCES HIGHWAY via. STATION ROAD ALBION PARK RAIL 7C65 W:\Design Projects\2018_2019 Design Projects\7C65 - Proposed Shareway, Croome Road to Princes Highway via Station Road, APR\7C65.dwg November 2018 November 2018 November 2018 R 10 R5 R20 R17. 5 BDY BDY BDY CROOME ROAD

Transcript of PROPOSED SHAREWAY CROOME ROAD to PRINCES HIGHWAY … · g6. u.n.o. standards/codes referenced shall...

Page 1: PROPOSED SHAREWAY CROOME ROAD to PRINCES HIGHWAY … · g6. u.n.o. standards/codes referenced shall be those current at the date drawings were approved. g7. service locations shown

E

W

S

T

MOF

G

SCALES

SURVEYEDOFFICER:

DATE:

SURVEY MARKS:

LIST OF REVISIONSREV. DATE OFFICER

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

AMENDMENT DETAILS APPROVED - Manager Technical Services

DATE:

DESIGNED:

DATE:

SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage

DRAWN:

DATE:

SERVICESGas:

Electricity:

Water:

Sewer:

TelComm Local Cable:

TelComm Major or Optic Fibre:

LEGENDLOCATIONS

Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas,electricity, water andtelecommunications serviceproviders, including the RMS,for most recent servicelocations and precautionsthat may be necessary

ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE

Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529

PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE

FILE:

PLAN No:

REVISION

SHEET:

76 CYGNET AVENUE(Cnr Cygnet & College Avenue)

POSTAL ADDRESS

GENERAL NOTES.G1. THESE NOTES APPLY TO ALL CIVIL/STRUCTURAL DRAWINGS ISSUED ON THIS PROJECT

G2. CIVIL/STRUCTURAL DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL RELATED PROJECT DOCUMENTATION. ANY DISCREPANCY IN THE PROJECT DOCUMENTATION AFFECTING WORK SHOWN ON THESE DRAWINGS SHALL BE REFERRED TO THE PROJECT ENGINEER AND AN INSTRUCTION OBTAINED BEFORE PROCEEDING WITH WORK SO AFFECTED.

G3. VERIFY SETTING OUT DIMENSIONS SHOWN ON THESE DRAWINGS BEFORE COMMENCING WORK.

G4. EXECUTE ALL WORK SHOWN ON THESE DRAWINGS IN ACCORDANCE WITH THE RELEVANT AUSTRALIAN CODES, STANDARDS AND LOCAL GOVERNMENT ORDINANCES.

G5. ENSURE THAT ALL STRUCTURE IS MAINTAINED IN A SAFE AND STABLE STATE THROUGHOUT THE CONSTRUCTION PERIOD.

G6. U.N.O. STANDARDS/CODES REFERENCED SHALL BE THOSE CURRENT AT THE DATE DRAWINGS WERE APPROVED.

G7. SERVICE LOCATIONS SHOWN ON PLAN ARE APPROXIMATE ONLY. CARE MUST BE TAKEN DURING EXCAVATION. LOCATE ALL SERVICES & MAINS ON SITE PRIOR TO CONSTRUCTION.

G8. N25 CONCRETE WITH SL72 REINFORCEMENT IN ACCORDANCE WITH AS 1379 AND AS 3600.

G9. 2.5m WIDE SHAREWAY WITH 'CONNELLY KEY' JOINTS OR SAW CUTS @ 3m CTRS.

G12. WHERE NEW CONCRETE WORKS MEETS EXISTING CONCRETE PATHS,KERB RAMPS & DRIVEWAYS, A DOWELLED EXPANSION JOINT SHOULD

BE CONSTRUCTED WITH 300mm x 12mm DIA. DOWELS @ 400mm CTRS.

G11. BROOM FINISH @ RIGHT ANGLE TO DIRECTION OF TRAVEL.

G10. EXPANSION JOINTS @ 12m CTRS.

LOCALITY DIAGRAMN.T.S.

LEGEND

Min. 125mm thick sharewaywith SL72 reinforcement

Min. 150mm thick drivewaywith SL82 reinforcement

Kerb ramps

Existing concrete works

30mm AC shoulder seal

ch. 00

ch. 10

ch. 20

ch. 30

ch. 40

ch. 50

ch. 60

ch. 70

ch. 80

GFIPGFIP PP

WM

Gate

11DP 1099281

26

G12. NEW KERB RAMPS TO BE CONSTRUCRED IN ACCORDANCE WITH AS 1428.1.E

xist

ing

S

hare

way

1:125 @ A11:250 @ A3

G.P.S.

MS

October 2018PCW

PCW

O

1 of 10

PROPOSED SHAREWAYCROOME ROAD to PRINCES HIGHWAY

via. STATION ROADALBION PARK RAIL

7C65

W:\Design Projects\2018_2019 DesignProjects\7C65 - Proposed Shareway,Croome Road to Princes Highway viaStation Road, APR\7C65.dwg

November 2018

November 2018

November 2018

R10

R5R20

R17.5

BD

Y

BD

Y

BDY

CROOME ROAD

Page 2: PROPOSED SHAREWAY CROOME ROAD to PRINCES HIGHWAY … · g6. u.n.o. standards/codes referenced shall be those current at the date drawings were approved. g7. service locations shown

E

W

S

T

MOF

G

SCALES

SURVEYEDOFFICER:

DATE:

SURVEY MARKS:

LIST OF REVISIONSREV. DATE OFFICER

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

AMENDMENT DETAILS APPROVED - Manager Technical Services

DATE:

DESIGNED:

DATE:

SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage

DRAWN:

DATE:

SERVICESGas:

Electricity:

Water:

Sewer:

TelComm Local Cable:

TelComm Major or Optic Fibre:

LEGENDLOCATIONS

Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas,electricity, water andtelecommunications serviceproviders, including the RMS,for most recent servicelocations and precautionsthat may be necessary

ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE

Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529

PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE

FILE:

PLAN No:

REVISION

SHEET:

76 CYGNET AVENUE(Cnr Cygnet & College Avenue)

POSTAL ADDRESS

140.

00

150.

00

152.

85

9.84 9.58

9.50

130.

0010

.10

110.

00

120.

00

10.6

3

10.3

7

90.0

0

100.

00

11.1

6

10.8

9

70.0

0

80.0

0

B=333°32'14"D=152.85

11.6

5

11.4

1

50.0

0

60.0

0

12.1

2

11.8

9

40.0

012

.34

Chainage

Alignment Details

DESIGN LIP

NATURAL (EB)

Datum RL 8

11.6

5

12.1

2

11.8

9

12.3

4

10.6

3

10.3

7

11.1

6

10.8

9

11.4

1

9.84

9.58

9.50

10.1

0

66.5

0

151.

50

INVERT RL10

.74

11.1

2

8.43

2.3%

2.6%

375mm Ø RRJ RCP

375mm Ø RRJ RCP

600?mm Ø RRJ RCP to pit 'A'

ch. 150

ch. 140

ch. 130

ch. 120

ch. 110

ch. 100

ch. 90

ch. 80

HYD

LightEP

TP

11.7

411

.74

9.53

9.53

Cast in-situ 900mm x 900mm stormwater drainagegully pit with 'Rocla' precast EKI (including steel grate)

as per RMS R0220-01 & Aus-spec ASD 300Standard Drawings

Cast in-situ 900mm x 900mm stormwater drainagegully pit with 'Rocla' precast EKI (including steel grate)

as per RMS R0220-01 & Aus-spec ASD 300Standard Drawings

PIT

OFF

SET

4.7

m L

EFT

OF

LIP

CO

NTR

OL

LIN

E

Cast in-situ 900mm x 900mm stormwater drainagegully pit with 'Rocla' precast EKI (including steel grate)

as per RMS R0220-01 & Aus-spec ASD 300Standard Drawings

HYD

To existing stormwater drainagejunction pit 'A', dimensions andinvert RL unknown - subject to

confirmation by survey

A

DESIGN LIP OF KERB LONGSECTIONH 1:200 @ A1, 1:400 @ A3V 1:20 @ A1, 1:40 @ A3

1:125 @ A11:250 @ A3

57911

DP 246171

475474473472

CROOME ROAD

As Shown

G.P.S.

MS

October 2018PCW

PCW

O

2 of 10

PROPOSED SHAREWAYCROOME ROAD to PRINCES HIGHWAY

via. STATION ROADALBION PARK RAIL

7C65

W:\Design Projects\2018_2019 DesignProjects\7C65 - Proposed Shareway,Croome Road to Princes Highway viaStation Road, APR\7C65.dwg

November 2018

November 2018

November 2018

BDY

BDY

Install kerb ramp inaccordance with AS 1428.1

Page 3: PROPOSED SHAREWAY CROOME ROAD to PRINCES HIGHWAY … · g6. u.n.o. standards/codes referenced shall be those current at the date drawings were approved. g7. service locations shown

E

W

S

T

MOF

G

SCALES

SURVEYEDOFFICER:

DATE:

SURVEY MARKS:

LIST OF REVISIONSREV. DATE OFFICER

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

AMENDMENT DETAILS APPROVED - Manager Technical Services

DATE:

DESIGNED:

DATE:

SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage

DRAWN:

DATE:

SERVICESGas:

Electricity:

Water:

Sewer:

TelComm Local Cable:

TelComm Major or Optic Fibre:

LEGENDLOCATIONS

Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas,electricity, water andtelecommunications serviceproviders, including the RMS,for most recent servicelocations and precautionsthat may be necessary

ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE

Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529

PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE

FILE:

PLAN No:

REVISION

SHEET:

76 CYGNET AVENUE(Cnr Cygnet & College Avenue)

POSTAL ADDRESS

10.00

10.00

10.00

9.00

9.00

9.00

8.00

8.00

7.00

6.02

4.50

3.52

3.21

3.15

2.22

0.65

0.50

0.45

0.07

0.00

2.69

3.48

4.00

7.00

4.99

4.44

3.62

3.61

3.57

3.15

0.65

0.50

0.45

0.09

0.00

1.51

3.48

4.00

7.00

6.53

6.23

5.31

4.79

3.67

3.48

3.15

0.69

0.65

0.50

0.45

0.08

0.00

1.45

3.48

4.00

7.00

6.62

5.61

4.61

3.47

3.15

2.08

0.65

0.50

0.45

0.08

0.00

3.14

3.42

4.00

7.00

6.43

5.73

4.30

3.86

3.15

1.19

0.65

0.50

0.45

0.11

0.00

1.94

3.49

4.00

7.00

6.66

5.69

5.04

4.78

3.15

2.62

0.65

0.50

0.45

0.23

0.00

0.77

3.46

4.00

7.00

5.62

5.53

4.86

4.77

4.31

3.15

0.65

0.50

0.45

0.24

0.00

2.18

3.46

4.00

7.00

5.43

5.08

4.99

4.26

4.14

3.73

3.15

0.65

0.50

0.45

0.21

0.00

2.91

3.53

4.00

80.00

90.00

100.00

110.00

120.00

130.00

140.00

150.00

0.35

0.29

0.19

0.18

-0.0

2-0

.00

0.00

0.35

0.19

0.18

-0.0

2-0

.01

-0.0

0

0.40

0.19

0.19

0.18

-0.0

2-0

.00

0.00

0.45

0.33

0.20

0.19

-0.0

1-0

.00

-0.0

0

0.46

0.25

0.20

0.19

-0.0

1-0

.01

-0.0

0

0.41

0.37

0.20

0.19

-0.0

2-0

.01

-0.0

0

0.40

0.19

0.18

-0.0

2-0

.01

-0.0

0

0.37

0.19

0.18

-0.0

2-0

.01

-0.0

0

11.3

8

11.3

9

11.4

2

11.3

0

11.2

611

.27

11.3

1

11.3

811

.39

11.3

911

.41

11.4

1

11.5

0

11.5

2

11.1

4

11.1

6

11.0

5

10.9

911

.00

11.0

011

.02

11.1

311

.13

11.1

411

.15

11.1

6

11.2

0

11.2

6

10.9

1

10.9

1

10.9

1

10.9

2

10.8

1

10.6

710

.68

10.7

1

10.8

610

.86

10.8

710

.87

10.8

910

.89

10.9

3

10.9

9

10.6

610

.67

10.6

8

10.5

5

10.3

7

10.4

0

10.4

9

10.5

910

.60

10.6

010

.63

10.6

3

10.7

310

.74

10.3

7

10.4

0

10.4

2

10.1

9

10.0

6

10.1

2

10.3

0

10.3

310

.34

10.3

410

.37

10.3

7

10.4

3

10.4

8

10.0

710

.07

10.1

2

9.88

9.79

9.90

9.93

10.0

610

.07

10.0

810

.09

10.1

0

10.1

2

10.2

1

9.84

9.83

9.79

9.55

9.55

9.57

9.65

9.80

9.81

9.82

9.83

9.84

9.91

9.96

9.93

9.61

9.60

9.43

9.41

9.37

9.37

9.38

9.41

9.55

9.55

9.56

9.57

9.58

9.68

9.72

9.70

11.6

2

11.5

711

.57

11.3

7

11.4

1

11.3

7

11.3

211

.32

11.1

2

11.1

6

11.1

0

11.0

511

.05

10.8

5

10.8

9

10.8

4

10.7

910

.79

10.5

9

10.6

3

10.5

8

10.5

310

.53

10.3

3

10.3

7

10.3

1

10.2

610

.26

10.0

6

10.1

0

10.0

5

10.0

010

.00

9.80

9.84

9.79

9.74

9.74

9.54

9.58

HT. DIFF

11.00

10.00

7.00

6.33

4.14

4.07

3.66

3.16

3.15

2.15

0.65

0.50

0.45

0.00

0.07

2.03

3.55

4.00

7.00

6.18

4.41

4.29

4.24

4.02

3.15

3.05

0.65

0.52

0.50

0.45

0.00

0.00

0.39

3.53

4.00

60.00

70.00

0.42

0.34

0.20

0.19

-0.0

1

0.00

0.37

0.38

0.19

0.18

0.18

-0.0

2-0

.00

-0.0

0

11.8

4

11.8

4

11.7

411

.74

11.6

9

11.6

911

.69

11.7

5

11.8

511

.86

11.8

6

11.8

911

.90

11.9

5

12.0

0

11.6

2

11.6

4

11.6

311

.63

11.6

511

.62

11.4

911

.48

11.6

211

.63

11.6

311

.63

11.6

511

.65

11.6

7

11.7

6

NATURAL

12.1

0

12.0

512

.05

11.8

5

11.8

9

11.8

6

11.8

1

11.8

111

.61

11.6

5

DESIGN

H 1:50 @ A1, 1:100 @ A3V 1:50 @ A1, 1:100 @ A3

BD

Y

FCE

BD

YFCE

BD

YFCE

BD

Y

FCE

BD

YFCE

BD

Y

FCE

BD

Y

FCE

BD

YFCE

BD

YFCE

BD

Y

FCE

1 in 4

1 in 4

1 in 4

1 in 4

1 in 4

1 in 41 in 4

1 in 4

1 in 4

1 in 4

G.P.S.

MS

October 2018PCW

PCW

O

3 of 10

PROPOSED SHAREWAYCROOME ROAD to PRINCES HIGHWAY

via. STATION ROADALBION PARK RAIL

7C65

W:\Design Projects\2018_2019 DesignProjects\7C65 - Proposed Shareway,Croome Road to Princes Highway viaStation Road, APR\7C65.dwg

November 2018

November 2018

November 2018

Page 4: PROPOSED SHAREWAY CROOME ROAD to PRINCES HIGHWAY … · g6. u.n.o. standards/codes referenced shall be those current at the date drawings were approved. g7. service locations shown

E

W

S

T

MOF

G

SCALES

SURVEYEDOFFICER:

DATE:

SURVEY MARKS:

LIST OF REVISIONSREV. DATE OFFICER

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

AMENDMENT DETAILS APPROVED - Manager Technical Services

DATE:

DESIGNED:

DATE:

SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage

DRAWN:

DATE:

SERVICESGas:

Electricity:

Water:

Sewer:

TelComm Local Cable:

TelComm Major or Optic Fibre:

LEGENDLOCATIONS

Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas,electricity, water andtelecommunications serviceproviders, including the RMS,for most recent servicelocations and precautionsthat may be necessary

ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE

Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529

PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE

FILE:

PLAN No:

REVISION

SHEET:

76 CYGNET AVENUE(Cnr Cygnet & College Avenue)

POSTAL ADDRESS

5

59

92

94

93

91

578

577

573

571

475

DP 246171

300

DP 1223037

DP 246171

HYD

HYD

Light

EP

TP

TP

DM

SMH

SMH

CRO

OM

ERO

AD

MAPLE STREET

ExistingPit

1:125 @ A11:250 @ A3

G.P.S.

MS

October 2018PCW

PCW

O

4 of 10

PROPOSED SHAREWAYCROOME ROAD to PRINCES HIGHWAY

via. STATION ROADALBION PARK RAIL

7C65

W:\Design Projects\2018_2019 DesignProjects\7C65 - Proposed Shareway,Croome Road to Princes Highway viaStation Road, APR\7C65.dwg

JOIN

LINE

6

6

EKIP

Install kerb ramp inaccordance with AS 1428.1

November 2018

November 2018

November 2018

BDY

BDY

Page 5: PROPOSED SHAREWAY CROOME ROAD to PRINCES HIGHWAY … · g6. u.n.o. standards/codes referenced shall be those current at the date drawings were approved. g7. service locations shown

GAS GAS GAS GASGAS GAS GAS GAS GAS

GAS GAS GAS GAS GAS GASGAS GAS GAS GAS GAS

GAS GAS GAS GAS GASGAS GAS GAS GAS GAS GAS

GAS GAS GAS

TT

TT

T T T T T T T TT

TT

TT

TT

TT

TT

TT

TT

T

T T T

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

W

GAS GAS GASGAS GAS GAS GAS GAS

GAS GAS GAS GAS GASGAS GAS GAS GAS GAS GAS

GAS GAS GAS GAS GASGAS GAS GAS GAS GAS GAS

GAS GAS GAS GAS GAS

GAS

GAS

GAS

GAS

GA

SG

AST T T T T T T T

TT

TT

TT

TT

TT

TT

TT

T TT

TT

TT

TT

TT

TT

TT

TT

WW

WW

W

E

W

S

T

MOF

G

SCALES

SURVEYEDOFFICER:

DATE:

SURVEY MARKS:

LIST OF REVISIONSREV. DATE OFFICER

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

AMENDMENT DETAILS APPROVED - Manager Technical Services

DATE:

DESIGNED:

DATE:

SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage

DRAWN:

DATE:

SERVICESGas:

Electricity:

Water:

Sewer:

TelComm Local Cable:

TelComm Major or Optic Fibre:

LEGENDLOCATIONS

Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas,electricity, water andtelecommunications serviceproviders, including the RMS,for most recent servicelocations and precautionsthat may be necessary

ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE

Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529

PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE

FILE:

PLAN No:

REVISION

SHEET:

76 CYGNET AVENUE(Cnr Cygnet & College Avenue)

POSTAL ADDRESS

91

89

8785

83

81

7977

75

73

71

578

579

580 581582

583 584 585

586587

588

DP 246171

DP 246171

SMH

PP

TP

PP

PP

PP

TP

TP

TP

TP

TP

HYDSV

TONGARRAROAD

TONGARRA

ROAD

EL

EL

1:125 @ A11:250 @ A3

G.P.S.

MS

October 2018PCW

PCW

O

5 of 10

PROPOSED SHAREWAYCROOME ROAD to PRINCES HIGHWAY

via. STATION ROADALBION PARK RAIL

7C65

W:\Design Projects\2018_2019 DesignProjects\7C65 - Proposed Shareway,Croome Road to Princes Highway viaStation Road, APR\7C65.dwg

JOINLINE 6

6

JOIN

LIN

E

7

7

JOIN

LIN

E

7

7

EKIP

EKIP

EL

A10

A10

November 2018

November 2018

November 2018

JOIN

LIN

E

8

8BDY

BDYR8

Page 6: PROPOSED SHAREWAY CROOME ROAD to PRINCES HIGHWAY … · g6. u.n.o. standards/codes referenced shall be those current at the date drawings were approved. g7. service locations shown

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

WW

GAS GAS GAS GAS GASGAS GAS GAS GAS GAS

GAS GAS GAS GAS GAS GASGAS GAS GAS GAS GAS

GAS GAS GAS GAS

GAS

GAS

GAS

GA

SG

AS

GAS

GAS

GAS

GA

SG

AS

T

T

T

T

T

T

TT T

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

TT

T

TT

T

T

T

T

T

T

T

T

W W W W W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

GASGAS

GASGAS

GASGAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

GAS

E

W

S

T

MOF

G

SCALES

SURVEYEDOFFICER:

DATE:

SURVEY MARKS:

LIST OF REVISIONSREV. DATE OFFICER

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

AMENDMENT DETAILS APPROVED - Manager Technical Services

DATE:

DESIGNED:

DATE:

SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage

DRAWN:

DATE:

SERVICESGas:

Electricity:

Water:

Sewer:

TelComm Local Cable:

TelComm Major or Optic Fibre:

LEGENDLOCATIONS

Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas,electricity, water andtelecommunications serviceproviders, including the RMS,for most recent servicelocations and precautionsthat may be necessary

ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE

Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529

PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE

FILE:

PLAN No:

REVISION

SHEET:

76 CYGNET AVENUE(Cnr Cygnet & College Avenue)

POSTAL ADDRESS

7169

67

23

232911DP

1:125 @ A11:250 @ A3

G.P.S.

MS

October 2018PCW

PCW

O

6 of 10

PROPOSED SHAREWAYCROOME ROAD to PRINCES HIGHWAY

via. STATION ROADALBION PARK RAIL

7C65

W:\Design Projects\2018_2019 DesignProjects\7C65 - Proposed Shareway,Croome Road to Princes Highway viaStation Road, APR\7C65.dwg

TP

TP

PP

PP

TP

STAT

ION

RO

AD

TONGARRA

ROAD

TP

SV

PP

TP

PARK

McDONALD

EL

EL

EL

EL

EL

BB

TB

BB

EF

EB

EB

Setout of pedestrianrefuge & blister islands

by Surveyor

2.5

Install kerb ramp inaccordance with AS 1428.1

November 2018

November 2018

November 2018

JOIN

LIN

E

8

8

Install pedestrian refuge inaccordance RMS Technical

direction TDT 2011/01

BDY

BDY

R10

R5R4

R20

Page 7: PROPOSED SHAREWAY CROOME ROAD to PRINCES HIGHWAY … · g6. u.n.o. standards/codes referenced shall be those current at the date drawings were approved. g7. service locations shown

E

W

S

T

MOF

G

SCALES

SURVEYEDOFFICER:

DATE:

SURVEY MARKS:

LIST OF REVISIONSREV. DATE OFFICER

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

AMENDMENT DETAILS APPROVED - Manager Technical Services

DATE:

DESIGNED:

DATE:

SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage

DRAWN:

DATE:

SERVICESGas:

Electricity:

Water:

Sewer:

TelComm Local Cable:

TelComm Major or Optic Fibre:

LEGENDLOCATIONS

Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas,electricity, water andtelecommunications serviceproviders, including the RMS,for most recent servicelocations and precautionsthat may be necessary

ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE

Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529

PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE

FILE:

PLAN No:

REVISION

SHEET:

76 CYGNET AVENUE(Cnr Cygnet & College Avenue)

POSTAL ADDRESS

1:125 @ A11:250 @ A3

G.P.S.

MS

October 2018PCW

PCW

O

7 of 10

PROPOSED SHAREWAYCROOME ROAD to PRINCES HIGHWAY

via. STATION ROADALBION PARK RAIL

7C65

W:\Design Projects\2018_2019 DesignProjects\7C65 - Proposed Shareway,Croome Road to Princes Highway viaStation Road, APR\7C65.dwg

STATION ROAD

STATION ROAD

STATION ROAD

PPPPPP

EL

PPPP

PPPP

TP

TP

TP

TP

TPTP

EKIP

EKIP

JOIN

LIN

E

1

1

JOIN

LIN

E

1

1

JOIN

LIN

E

2

2

JOIN

LIN

E

2

2

EL

EL

Restore barrier kerb inlocation of existing ramp

Install kerb ramp inaccordance with AS 1428.1

BLA

CK

S

TRE

ET

3533

33 31 29 27 25

1 DP 1095167

4 5

DP 21337DP 21337

31

DP 1120853SP 97820

SP 97820DP 213371

PARKMcDONALD

PARKMcDONALD

B10

B10

November 2018

November 2018

November 2018

BDY

BDY

R10

Page 8: PROPOSED SHAREWAY CROOME ROAD to PRINCES HIGHWAY … · g6. u.n.o. standards/codes referenced shall be those current at the date drawings were approved. g7. service locations shown

E

W

S

T

MOF

G

SCALES

SURVEYEDOFFICER:

DATE:

SURVEY MARKS:

LIST OF REVISIONSREV. DATE OFFICER

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

AMENDMENT DETAILS APPROVED - Manager Technical Services

DATE:

DESIGNED:

DATE:

SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage

DRAWN:

DATE:

SERVICESGas:

Electricity:

Water:

Sewer:

TelComm Local Cable:

TelComm Major or Optic Fibre:

LEGENDLOCATIONS

Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas,electricity, water andtelecommunications serviceproviders, including the RMS,for most recent servicelocations and precautionsthat may be necessary

ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE

Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529

PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE

FILE:

PLAN No:

REVISION

SHEET:

76 CYGNET AVENUE(Cnr Cygnet & College Avenue)

POSTAL ADDRESS

1:125 @ A11:250 @ A3

G.P.S.

MS

October 2018

November 2018

PCW

PCW

O

8 of 10

PROPOSED SHAREWAYCROOME ROAD to PRINCES HIGHWAY

via. STATION ROADALBION PARK RAIL

7C65

W:\Design Projects\2018_2019 DesignProjects\7C65 - Proposed Shareway,Croome Road to Princes Highway viaStation Road, APR\7C65.dwg

TPEKIP

Restore barrier kerb inlocation of existing ramp

Install kerb ramp inaccordance with AS 1428.1

BLA

CK

S

TRE

ET

23

EL STATION ROAD

JOIN

LIN

E

3

3

JOIN

LIN

E

3

3

JOIN

LIN

E

4

4

JOIN

LIN

E

4

4

JOIN

LIN

E

5

5

EL

EL

STATION ROAD

STATION ROAD

TP TP

TP

TP

TP TP

TP

TP

TP

TP

TP

PPPP

PP PP

PP

SV

SMH

SMH

SMH

EKIP

EKIP

EKIPEKIP

V-Drain

Culvert

21 1917 15

1513 11 9 7

5 51

1A

71 DP 11478258 9 10

11

11 12

DP 21337

DP 21337DP 21337 SP 74951 SP 76542

SP 95437 SP 95437 DP 21337

14

18SP 37379

B10

B10

November 2018

November 2018

BDY

BDY

BDY

Page 9: PROPOSED SHAREWAY CROOME ROAD to PRINCES HIGHWAY … · g6. u.n.o. standards/codes referenced shall be those current at the date drawings were approved. g7. service locations shown

E

W

S

T

MOF

G

SCALES

SURVEYEDOFFICER:

DATE:

SURVEY MARKS:

LIST OF REVISIONSREV. DATE OFFICER

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

AMENDMENT DETAILS APPROVED - Manager Technical Services

DATE:

DESIGNED:

DATE:

SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage

DRAWN:

DATE:

SERVICESGas:

Electricity:

Water:

Sewer:

TelComm Local Cable:

TelComm Major or Optic Fibre:

LEGENDLOCATIONS

Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas,electricity, water andtelecommunications serviceproviders, including the RMS,for most recent servicelocations and precautionsthat may be necessary

ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE

Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529

PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE

FILE:

PLAN No:

REVISION

SHEET:

76 CYGNET AVENUE(Cnr Cygnet & College Avenue)

POSTAL ADDRESS

1:125 @ A11:250 @ A3

G.P.S.

MS

October 2018

November 2018

November 2018

November 2018

PCW

PCW

O

9 of 10

PROPOSED SHAREWAYCROOME ROAD to PRINCES HIGHWAY

via. STATION ROADALBION PARK RAIL

7C65

W:\Design Projects\2018_2019 DesignProjects\7C65 - Proposed Shareway,Croome Road to Princes Highway viaStation Road, APR\7C65.dwg

JOIN

LINE

5

5

STATION

ROAD

LP

SMH

LP

HYD

SV's

EP

EP

Vent

BUSSHELTER

ExistingVehicular

U -

Turn

Bay

Horsley Creek2B

JAMES

PARK

SP 68912

ILLAWARRA

REGIONAL

AIRPORT

EL

LP

TSP

PR

INC

ES

H

WY

.

BDY

Install kerb ramp inaccordance with AS 1428.1

Install kerb ramp inaccordance with AS 1428.1

Page 10: PROPOSED SHAREWAY CROOME ROAD to PRINCES HIGHWAY … · g6. u.n.o. standards/codes referenced shall be those current at the date drawings were approved. g7. service locations shown

E

W

S

T

MOF

G

SCALES

SURVEYEDOFFICER:

DATE:

SURVEY MARKS:

LIST OF REVISIONSREV. DATE OFFICER

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

.......... ................. ..........

AMENDMENT DETAILS APPROVED - Manager Technical Services

DATE:

DESIGNED:

DATE:

SEDIMENT ANDEROSION CONTROL Provide sediment and erosion control measures in accordance with the'Erosion & Sediment Control'guide by the NSW Office of Environment & Heritage

DRAWN:

DATE:

SERVICESGas:

Electricity:

Water:

Sewer:

TelComm Local Cable:

TelComm Major or Optic Fibre:

LEGENDLOCATIONS

Services shown are those knownto exist at date of design. Prior tocommencement of excavationcontact the relevant gas,electricity, water andtelecommunications serviceproviders, including the RMS,for most recent servicelocations and precautionsthat may be necessary

ADMINISTRATION CENTRESHELLHARBOUR CIVIC CENTRE

Locked Bag 155 SHELLHARBOUR CITY CENTRE NSW 2529

PH: (02) 4221 6111 FAX: (02) 4221 6016 DX26402 SHELLHARBOUR CITY CENTRE

FILE:

PLAN No:

REVISION

SHEET:

76 CYGNET AVENUE(Cnr Cygnet & College Avenue)

POSTAL ADDRESS

1:125 @ A11:250 @ A3

G.P.S.

MS

October 2018

November 2018

November 2018

November 2018

PCW

PCW

O

10 of 10

PROPOSED SHAREWAYCROOME ROAD to PRINCES HIGHWAY

via. STATION ROADALBION PARK RAIL

7C65

W:\Design Projects\2018_2019 DesignProjects\7C65 - Proposed Shareway,Croome Road to Princes Highway viaStation Road, APR\7C65.dwg

Suitable silicon orpolyurethane

sealant

10mm thickcompressible filler

material for fulldepth of pavement

Min. 50mm DBB20or equivalent

Min. 50mm DBB20or equivalent

SL72 reinforcement meshSL82 mesh @ driveway crossings

SL72 reinforcement mesh& cut every 2nd wire

16mmØ dowel with bondbreaking compound

End cap requiredfor expansion

Saw cut, insertor tooled joint

Induced crack

TYPICAL DOWELLED EXPANSION JOINT @ 12mN.T.S.

TYPICAL CONTROL JOINT @ 3m(or Key Joint where a Connolly Key Joint or similar is used)N.T.S.

Min. 125mm;150mm @

dwys

Min. 125mm;150mm @

dwys

NOTES

Where new shareway meets existing concreteworks, a dowelled expansion joint is to beconstructed using a suitable compressiblefiller material with min. 300mm x 16mmØdowels @ 400mm ctrs.

Apply non-slip broom finish to concrete surface,perpendicular to line of travel.

Pathway crossfall - 2.5% to 5%

Trimmed & compacted subgradeMin. 50mm DGB20 (or equivalent) base

Min. 125mm thick N25 concrete sharewaywith SL72 reinforcement mesh;Min. 150mm thick N25 concrete

driveways with SL82 reinforcement meshTYPICAL PATH X - SECTION A - A (along Tongarra Road)1:10 @ A11:20 @ A3

2.5600 ≈ 0.55

BD

Y

Trimmed & compacted subgradeMin. 50mm DGB20 (or equivalent) base

Min. 125mm thick N25 concrete sharewaywith SL72 reinforcement mesh;Min. 150mm thick N25 concrete

driveways with SL82 reinforcement meshTYPICAL PATH X - SECTION B - B (along Station Road)1:10 @ A11:20 @ A3

2.5450 ≈ 0.55

BD

Y

Barrier Kerb & Gutter

Bitumen RoadLip

FOK

BOK

PP

Concrete Shareway

Linemarking

150mm widebitumen around

base of pole

Min. 500mm

≈ 4m

TYPICAL SHAREWAYARRANGEMENT @ POWER POLES1:20 @ A11:40 @ A3