Proposed Remedial Works for: Imperial Gardens Apartments · RC\RA187 Imperial Gardens_ RC.pln sheet...

1
I H G F E D C B A -3,080 Upper Basement ±0 Ground Floor +3,155 Level 1 +6,115 Level 2 +9,075 Level 3 +12,035 Level 4 +14,995 Level 5 +17,955 Level 6 +20,915 Level 7 +23,875 Level 8 +26,835 Level 9 +29,795 Level 10 +32,755 Level 11 +35,715 Level 12 +38,895 Roof 2.02.11 Existing Balustrade Demolition 2.02.22 Existing ACM Parapet Capping Demolition 2.02.06 Existing Upper Storey Joinery Demolition 2.02.22 Existing ACM Parapet Capping Demolition 2.02.11 Existing Balustrade Demolition 2.02.07 Existing Podium Level Joinery Demolition 2.02.07 Existing Podium Level Joinery Demolition 2.02.21 Existing ACM Cladding Demolition 2.02.22 Existing ACM Parapet Capping Demolition 2.02.22 Existing ACM Parapet Capping Demolition Approximate outline of existing neighbouring builiding dashed Approximate outline of existing neighbouring builiding dashed Approximate outline of existing neighbouring builiding dashed Approximate existing Volcanic Viewshaft infringement hatched. Refer proposed Elevations for extent of proposed minor change. HOBSON STREET E10 Volcanic Viewshaft 06 E10 Volcanic Viewshaft 05 E10 Volcanic Viewshaft 05 E10 Volcanic Viewshaft 04 E10 Volcanic Viewshaft 03 E10 Volcanic Viewshaft 06 Notes 2 SITE 2.02.06 Existing Upper Storey Joinery Demolition Remove existing aluminium joinery from level 1 to level 12 to Eastern Elevation (Hobson Street façade), Western Elevation (Podium façade), Northern Elevation (Podium façade) and dispose off site. Including steel wall framing and linings over to the underside of the floor above. 2.02.07 Existing Podium Level Joinery Demolition Remove all existing podium level aluminium joinery, where affected by the new podium membrane works and dispose off site. 2.02.11 Existing Balustrade Demolition Remove existing aluminium and glass infill handrails to decks on level 1 to level 12 to Eastern Elevation (Hobson Street façade), Western Elevation (Podium façade), Northern Elevation (Podium façade) and dispose off site. 2.02.21 Existing ACM Cladding Demolition Remove existing ACM alucobond cladding from level 1 to level 12 to Eastern Elevation (Hobson Street façade), Western Elevation (Podium façade), Northern Elevation (Podium façade) and dispose off site. 2.02.22 Existing ACM Parapet Capping Demolition Remove existing ACM cladding at roof level, forming the parapet roof capping, to Eastern Elevation (Hobson Street façade), Western Elevation (Podium façade), Northern Elevation (Podium façade) and dispose off site. 02-1 Ex1 North Elevation - Existing 1:100 Note: Refer RC-30 for Plan View of Volcanic View Shafts crossing over building RevID Issue ChID Comments Date 01 02 Resource Consent Issue Resource Consent Issue 02-1 Existing Roof Height Adjusted to Survey 08-Nov-18 22-May-19 rev n#: dwg n#: drawn: checked: job n#: date created: date plotted: issue: scale: @A1 NOTE: Drawings are ½ scale @ A3 RC 22-May-19 22-May-19 RA187 MB RC-22 CAD ref: MarkBZ:\Projects\100-1000\187 - BBCL 3488047 Imperial Gardens\3. RC\RA187 Imperial Gardens_ RC.pln sheet title: North Elevation - Existing project title: Proposed Remedial Works for: Imperial Gardens Apartments for: Body Corporate 348047 135 Hobson Street Auckland CBD, Auckland DESIGN AND DRAWINGS ARE COPYRIGHT OF CREATIVE ARCH LTD CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCING WORK ALL RESTRICTED BUILDING WORK TO BE CARRIED OUT BY LICENSED BUILDING PRACTITIONERS LBP# BP101470 Level 2, 33 Sale Street Freemans Bay PO Box 78 282 Grey Lynn Auckland p:+64 9 368 2130 f: +64 9 309 6035 [email protected] www.resolutionarch.co.nz 02 MC RESOURCE CONSENT ISSUE ONLY

Transcript of Proposed Remedial Works for: Imperial Gardens Apartments · RC\RA187 Imperial Gardens_ RC.pln sheet...

Page 1: Proposed Remedial Works for: Imperial Gardens Apartments · RC\RA187 Imperial Gardens_ RC.pln sheet title: North Elevation - Existing project title: Proposed Remedial Works for: Imperial

I H G F E D C B A

-3,080Upper Basement

±0Ground Floor

+3,155Level 1

+6,115Level 2

+9,075Level 3

+12,035Level 4

+14,995Level 5

+17,955Level 6

+20,915Level 7

+23,875Level 8

+26,835Level 9

+29,795Level 10

+32,755Level 11

+35,715Level 12

+38,895Roof

2.02.11 Existing BalustradeDemolition

2.02.22 Existing ACM ParapetCapping Demolition

2.02.06 Existing Upper StoreyJoinery Demolition

2.02.22 Existing ACM ParapetCapping Demolition

2.02.11 Existing BalustradeDemolition

2.02.07 Existing PodiumLevel JoineryDemolition

2.02.07 Existing PodiumLevel JoineryDemolition

2.02.21 Existing ACMCladdingDemolition

2.02.22 Existing ACM ParapetCapping Demolition

2.02.22 Existing ACMParapet CappingDemolition

Approximate outline of existingneighbouring builiding dashed

Approximate outline of existingneighbouring builiding dashed

Approximate outline ofexisting neighbouringbuiliding dashed

Approximate existing Volcanic Viewshaftinfringement hatched. Refer proposed

Elevations for extent of proposed minor change.

HOBSON STREET

E10 Volcanic Viewshaft 06

E10 Volcanic Viewshaft 05E10 Volcanic Viewshaft 05

E10 Volcanic Viewshaft 04

E10 Volcanic Viewshaft 03

E10 Volcanic Viewshaft 06 Notes

2 SITE

2.02.06 Existing Upper Storey Joinery DemolitionRemove existing aluminium joinery from level 1 tolevel 12 to Eastern Elevation (Hobson Streetfaçade), Western Elevation (Podium façade),Northern Elevation (Podium façade) and disposeoff site. Including steel wall framing and liningsover to the underside of the floor above.

2.02.07 Existing Podium Level Joinery DemolitionRemove all existing podium level aluminiumjoinery, where affected by the new podiummembrane works and dispose off site.

2.02.11 Existing Balustrade DemolitionRemove existing aluminium and glass infillhandrails to decks on level 1 to level 12 to EasternElevation (Hobson Street façade), WesternElevation (Podium façade), Northern Elevation(Podium façade) and dispose off site.

2.02.21 Existing ACM Cladding DemolitionRemove existing ACM alucobond cladding fromlevel 1 to level 12 to Eastern Elevation (HobsonStreet façade), Western Elevation (Podiumfaçade), Northern Elevation (Podium façade) anddispose off site.

2.02.22 Existing ACM Parapet Capping DemolitionRemove existing ACM cladding at roof level,forming the parapet roof capping, to EasternElevation (Hobson Street façade), WesternElevation (Podium façade), Northern Elevation(Podium façade) and dispose off site.

02-1

Ex1 North Elevation - Existing 1:100

Note:Refer RC-30 for Plan View of VolcanicView Shafts crossing over building

RevID Issue ChID Comments Date

01

02

Resource ConsentIssue

Resource ConsentIssue 02-1 Existing Roof Height Adjusted to

Survey

08-Nov-18

22-May-19

rev n#:

dwg n#:drawn: checked:job n#:date created:date plotted:issue:scale: @A1NOTE: Drawings are ½ scale @ A3

RC22-May-1922-May-19

RA187MB

RC-22

CAD ref: MarkBZ:\Projects\100-1000\187 - BBCL 3488047 Imperial Gardens\3.RC\RA187 Imperial Gardens_ RC.pln

sheet title:North Elevation - Existing

project title:Proposed Remedial Works for:Imperial Gardens Apartmentsfor:Body Corporate 348047135 Hobson StreetAuckland CBD, Auckland

DESIGN AND DRAWINGS ARE COPYRIGHT OF CREATIVE ARCH LTD

CONTRACTOR TO VERIFY ALL DIMENSIONS ON SITE BEFORE COMMENCINGWORK

ALL RESTRICTED BUILDING WORK TO BE CARRIED OUT BY LICENSEDBUILDING PRACTITIONERS