Proposed New CMS Conference Room on first floor of SHL (currently the SX5 visitors gallery)
-
Upload
jaden-bowers -
Category
Documents
-
view
30 -
download
0
description
Transcript of Proposed New CMS Conference Room on first floor of SHL (currently the SX5 visitors gallery)
![Page 1: Proposed New CMS Conference Room on first floor of SHL (currently the SX5 visitors gallery)](https://reader038.fdocuments.net/reader038/viewer/2022110211/568132c4550346895d99891d/html5/thumbnails/1.jpg)
Proposed New CMS Conference Room on first floor of SHL
(currently the SX5 visitors gallery)
J.Osborne CEMESTE 18 June 2008
![Page 2: Proposed New CMS Conference Room on first floor of SHL (currently the SX5 visitors gallery)](https://reader038.fdocuments.net/reader038/viewer/2022110211/568132c4550346895d99891d/html5/thumbnails/2.jpg)
Main access
![Page 3: Proposed New CMS Conference Room on first floor of SHL (currently the SX5 visitors gallery)](https://reader038.fdocuments.net/reader038/viewer/2022110211/568132c4550346895d99891d/html5/thumbnails/3.jpg)
18m
10m
Floor area approx. 180m2
![Page 4: Proposed New CMS Conference Room on first floor of SHL (currently the SX5 visitors gallery)](https://reader038.fdocuments.net/reader038/viewer/2022110211/568132c4550346895d99891d/html5/thumbnails/4.jpg)
Existing wall to be removed
![Page 5: Proposed New CMS Conference Room on first floor of SHL (currently the SX5 visitors gallery)](https://reader038.fdocuments.net/reader038/viewer/2022110211/568132c4550346895d99891d/html5/thumbnails/5.jpg)
Existing floor to be replaced, carpet ?
Existing duct will have to be removed and new CV system installed
![Page 6: Proposed New CMS Conference Room on first floor of SHL (currently the SX5 visitors gallery)](https://reader038.fdocuments.net/reader038/viewer/2022110211/568132c4550346895d99891d/html5/thumbnails/6.jpg)
Second access/egress
![Page 7: Proposed New CMS Conference Room on first floor of SHL (currently the SX5 visitors gallery)](https://reader038.fdocuments.net/reader038/viewer/2022110211/568132c4550346895d99891d/html5/thumbnails/7.jpg)
Change in level to be rectified
![Page 8: Proposed New CMS Conference Room on first floor of SHL (currently the SX5 visitors gallery)](https://reader038.fdocuments.net/reader038/viewer/2022110211/568132c4550346895d99891d/html5/thumbnails/8.jpg)
False ceiling,lights ?
![Page 9: Proposed New CMS Conference Room on first floor of SHL (currently the SX5 visitors gallery)](https://reader038.fdocuments.net/reader038/viewer/2022110211/568132c4550346895d99891d/html5/thumbnails/9.jpg)
Glazed facade
![Page 10: Proposed New CMS Conference Room on first floor of SHL (currently the SX5 visitors gallery)](https://reader038.fdocuments.net/reader038/viewer/2022110211/568132c4550346895d99891d/html5/thumbnails/10.jpg)
No new window openings proposed
![Page 11: Proposed New CMS Conference Room on first floor of SHL (currently the SX5 visitors gallery)](https://reader038.fdocuments.net/reader038/viewer/2022110211/568132c4550346895d99891d/html5/thumbnails/11.jpg)
Width of existing stairs & doors need to be confirmed if acceptable > 50 people = 1.4m ?
1.2m
![Page 12: Proposed New CMS Conference Room on first floor of SHL (currently the SX5 visitors gallery)](https://reader038.fdocuments.net/reader038/viewer/2022110211/568132c4550346895d99891d/html5/thumbnails/12.jpg)
•Conference Room must be considered as a ‘non public area’.
![Page 13: Proposed New CMS Conference Room on first floor of SHL (currently the SX5 visitors gallery)](https://reader038.fdocuments.net/reader038/viewer/2022110211/568132c4550346895d99891d/html5/thumbnails/13.jpg)
New door may be required ?
![Page 14: Proposed New CMS Conference Room on first floor of SHL (currently the SX5 visitors gallery)](https://reader038.fdocuments.net/reader038/viewer/2022110211/568132c4550346895d99891d/html5/thumbnails/14.jpg)
SHL Draft Cost Estimate
CE works : Glazed wall along SX, partition wall at top of 2nd staircase, false ceiling, architect (assumes existing external staircase is ok)
J.Osborne
150-200kchf
Replace false flooring, carpet.
D.Parchet
50kchf
Modifications to existing Ventilation systems
200chf/m2
B.Pirollet
40kCHF
Internet
E.Sallaz
?
Electrical modifications, new lighting, power
R.Lassausaie
?
Safety equipment :
Water Mist
Smoke Detection
C.Schaefer
?
Furniture/computers etc
?
?
Total 240-290kchf