PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO...
Transcript of PROPOSED INVESTMENT PLAN OF GETCO NETWORK …getco.co.in/getco_new/pages/files/PETITION1415/GETCO...
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14
A
400/220 KV Halvad s/s
400/220KV s/s with 2x315 MVA
X'mer, 400KV FB - 6, 220KV FB -
6 400 KV, 63MVAR Bus Reactor
220/66 KV system & 100 MVA
ICT and 3 nos of 66KV FB
105.05 24.35 2.71 -
400KV D/C Vadavi- Halvad
line400KV line (D/C) (120) 110.40 11.04 22.08 22.08
400KV FB - 2 Nos. at Vadavi 400KV FB 8.06 1.94 - -
400KV s/c Adani-Hadala
LILO at Halvad400KV line (D/C) (55) 50.60 7.91 11.87 -
66 KV interconnection from
400 KV Halvad substation66 KV D/C line - Panther 6.60 5.98 - -
Total: 6.60 51.21 36.65 22.08
B - - - -
LILO of 220KV S/C
Talangpore - Navsari line at
Utran
220KV D/C line 18.50 9.25 - -
220KV Kosamba-Mobha
(D/C)220KV line (D/C) (87.6) 32.56 - - -
220KV Gavasad - Salejada
(D/C) (Instead of Gavasad-
Waghodia line)
220KV line (D/C) - AL-59 51.12 15.33 15.33 10.22
220KV FB - 4 Nos. at Mobha
& 2 Nos. at Salejada s/s220KV FB 8.40 3.92 1.68 -
Total: 110.58 28.50 17.01 10.22
220KV LILO of single ckt of
D/C Jamnagar - Jetpur at Sikka220KV line (1xD/C)(59.8+ 57.2) 22.13 8.85 13.28 -
220KV Sikka - Motipaneli 220KV line (D/C) 39.18 15.67 23.51 -
220KV FB - 2 Nos. at
Motipaneli220KV FB 2.80 1.12 1.68 -
Total: 64.11 25.64 38.46 -
400KV Ukai - Kosamba 400KV line (D/C) 55.25 - - -
400KV Kosamba - Choraniya 400KV line (D/C) 185.48 13.79 7.39 -
400KV FB - 2 Nos. at
Chorania400KV FB 8.06 0.81 - -
Total: 248.79 14.60 7.39 -
220KV LILO of Karmsad -
Vartej at Dhuvaran220KV line (D/C) 17.63 1.11 0.56 -
220KV LILO of Kasor - Botad
at Dhuvaran220KV line (D/C) 11.10 3.83 - -
Total : 28.73 4.94 0.56 -
400KV Adani - Zerda line-2 400KV line (D/C) 222.14 38.11 12.70 12.70
400KV Adani - Zerda line-1 400KV line (D/C) 222.14 20.46 10.23 20.46
400KV FB - 4 Nos. at Zerda 400KV FB 16.12 7.90 3.39 -
400KV X'mer Bay - 1 No. at
Zerda400KV X'mer Bay 4.03 0.81 3.22 -
400KV X'mer - 1 No. at Zerda 400KV X'mer. - 315 MVA 10.42 2.08 8.34 -
BID - II Total : 474.85 69.36 37.88 33.16
400KV Essar-Amreli line 400KV line (1xD/C) 117.32 5.46 12.75 -
400KV FB - 2 Nos. at Amreli 400KV FB 8.06 2.42 5.64 -
400KV X'mer Bay - 1 No. at
Hadala400KV X'mer bay 4.03 1.21 2.82 -
400KV X'mer - 1 No. at
Hadala400KV X'mer. - 315 MVA 10.42 3.13 7.30 -
Total : 139.83 12.22 28.51 -
220KV Padva - Botad 220KV line (D/C) 31.96 8.55 12.82 -
220KV Padva - Palitana 220KV line (D/C) 13.94 4.88 - -
220KV LILO of Savarkundla -
Vartej at Padva (Single ckt)220KV line (D/C) 10.20 1.02 - -
220KV FB (2-Botad, 2-
Palitana)220KV FB - 4 Nos. 5.60 2.52 - -
Total : 61.70 16.97 12.82 -
8BECL, Padva,
(2x300 MW)
5Dhuvaran CCPP
- III, 360 MW
6
Adani Project,
Mundra - Bid -
II (1000 MW)
7
ESSAR Power,
Vadinar - 1000
MW
Evacuation Schemes
2Utran CCPP
Extn. - 360 MW
3Sikka Extn. 3 &
4, 2x250 MW
4Ukai Extn, 490
MW
FY 2014-15 FY 2015-16
400 KV & 220 KV Sub Stations
1400KV Halvad
s/s
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 50
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14 FY 2014-15 FY 2015-16
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
220KV GSEG, Hazira - Mota 220KV line (D/C) 25.28 2.35 - -
220KV FB - 2 Nos. at Mota 220KV FB - 2 Nos. 2.80 - - -
Total : 28.08 2.35 - -
C City Development Plan - - - -
Bhavnagar 33.00 15.00 - -
Jamnagar 35.00 13.00 21.00 -
Ahmedabad 2.30 - - -
Baroda 21.62 - 3.00 -
Rajkot 1.89 - - -
Total : 93.81 28.00 24.00 -
D R & M Works - - - -
11 R & M Works Total : 839.86 106.95 132.55 132.55
E - - - -
400 KV substation for
upcoming generation
400/220 KV, 1x315 MVA X'mers
GIS with 4 Nos. 400 KV FB120.00 - - 6.00
400 KV D/C Chhara - Keshod
line400 KV D/C line (100 RKM) 211.00 - - 10.55
Total : 331.00 - - 16.55
400 KV substation for
upcoming generation
400/220 KV, 1x315 MVA X'mers
GIS with 4 Nos. 400 KV FB120.00 - - 6.00
400 KV D/C Pipavav - Amreli
line400 KV D/C line (75 RKM) 158.25 - - 7.91
400 KV FB - 2 Nos. at Amreli 400 KV FB - 2 8.06 - - 0.40
Total : 286.31 - - 14.32
400 KV substation for
upcoming generation
400/220 KV, 1x315 MVA X'mers
GIS with 4 Nos. 400 KV FB120.00 - 6.00 24.00
400 KV D/C Bhogat - Kalavad
line400 KV D/C line (120 RKM) 253.20 - 12.66 50.64
Total : 373.20 - 18.66 74.64
400/220/66 KV Kalavad s/s 400/220 KV, 2x315 MVA X'mers,
400 KV FB - 6, 220 KV FB - 691.50 9.15 18.30 27.45
220/66 KV, 1 x 100 MVA Xmer, 66
KV FB - 68.60 0.86 1.72 2.58
LILO of one 400 KV D/C
Essar - Hadala line at Kalavad
substation
400 KV line (D/C) (2x25 RKM) 46.00 4.60 9.20 13.80
220 KV D/C Kalavad -
Kangasiali line220 KV line (D/C) (80 RKM) 30.80 3.08 6.16 9.24
220KV FB - 2 Nos. at
Kangasiali220 KV FB 2.80 0.28 0.56 0.84
66 KV D/C interconnection
lines and bays for Kalavad
substation
66KV line (D/C-Panther) (40
RKM)8.80 0.88 1.76 2.64
66 KV FB - 6 Nos. 2.10 0.21 0.42 0.63
Total : 190.60 19.06 38.12 57.18
400/220 KV Keshod s/s 400/220 KV, 2x315 MVA X'mers,
400 KV FB - 4, 220 KV FB - 678.44 - - 3.92
400 KV D/C Kalavad -
Keshod line400 KV line (D/C) (110 RKM) 232.10 - - 11.61
400 KV FB - 2 Nos. at
Kalavad400 KV FB - 2 8.06 - - 0.40
220 KV D/C Keshod (400 KV)
- Keshod line220 KV line (D/C) (5 RKM) 2.80 - - 0.14
220 KV D/C Keshod (400 KV)
- Timbdi line220 KV line (D/C) (70 RKM) 39.20 - - 1.96
220 KV D/C Keshod (400 KV)
- Visavadar line220 KV line (D/C) (60 RKM) 33.60 - - 1.68
220 KV FB - 2 Nos. each at
Keshod, Timbdi and Visavadar
substations
220 KV FB - 6 Nos. 8.40 - - 0.42
Total : 402.60 - - 20.13
400/220 KV Fedra s/s 400/220 KV, 2x315 MVA X'mers,
400 KV FB - 6, 220 KV FB - 686.50 - 8.65 17.30
LILO of proposed 400 KV
D/C Kasor - Amreli line at
Fedra
400 KV line (D/C) (2x20 RKM) 84.40 - 8.44 16.88
17
400 KV Fedra
substation, Dist:
Ahmedabad
14400 KV Bhogat,
Dist: Jamnagar
15
400 KV Kalavad
substation, Dist:
Rajkot
16
400 KV Keshod
substation, Dist:
Junagadh
400 KV, 220 KV and 66 KV Substations and Transmission lines:
12400 KV Chhara,
Dist: Junagadh
13
400 KV
Pipavav, Dist:
Amreli
9GSEG, Hazira
(Extn), 350 MW
10
City
Development
Plan
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 51
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14 FY 2014-15 FY 2015-16
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
400 KV D/C Kosamba - Fedra
line instead of earlier approved
400 KV D/C Kosamba -
Chorania line
400 KV line (D/C) (260 RKM) 36.80 - 3.68 7.36
220 KV D/C Fedra - Botad
line220 KV line (D/C) (60 RKM) 33.60 - 3.36 6.72
LILO of 220 KV S/C Kasor -
Vartej line at Fedra substation220 KV line (D/C) (10 RKM) 3.70 - 0.37 0.74
LILO of 220 KV S/C
Karamsad - Vartej line at
Fedra substation
220 KV line (D/C) (10 RKM) 3.70 - 0.37 0.74
220 KV FB - 2 Nos. at Botad 220 KV FB - 2 Nos. 2.80 - 0.28 0.56
Total : 251.50 - 25.15 50.30
400/220 KV Sankhari s/s 400/220 KV, 2x315 MVA X'mers,
400 KV FB - 8, 220 KV FB - 694.56 - 18.91 18.91
LILO of proposed 400 KV
D/C Adani, Mundra - Zerda
line at Sankhari
400 KV line (D/C) (2x50 RKM) 92.00 - 18.40 18.40
LILO of proposed 400 KV
D/C Vadavi - Zerda line at
Sankhari (Reliance line -
IPTC)
400 KV line (D/C) (2x25 RKM) 46.00 - 9.20 9.20
LILO of proposed 220 KV
D/C Sankhari - Jangral line at
Sankhari (400 KV) substation
220 KV line (D/C) (2x25 RKM) 18.50 - 3.70 3.70
LILO of 220 KV S/C
Radhanpur - Mehsana line at
Sankhari (400 KV) substation
220 KV line (D/C) (25 RKM) 9.25 - 1.85 1.85
Total : 260.31 - 52.06 52.06
220/66 KV s/s with 1x100 MVA
X'mer; 220 KV FB-2, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
24.90 - - 1.25
220/132 KV, 1 x 100 MVA X'mer
& 2 Nos. 132 KV FB9.50 - - 0.48
220 KV D/C Amreli - Jasdan
line220 KV line (D/C) (55 RKM) 30.80 - - 1.54
LILO of 132 KV S/C Jasdan -
Gondal line at 220 KV Jasdan
substation
132 KV line (D/C) (10 RKM) 2.50 - - 0.13
220 KV FB - 2 Nos. at Amreli 220 KV FB - 2 Nos. 2.80 - - 0.14
66KV line (D/C-Panther) (40
RKM)8.80 - - 0.44
66 KV FB - 6 Nos. 2.10 - - 0.11
Total : 81.40 - - 4.07
220/132/66 KV Sarla (Chotila)
s/s
220/66 KV s/s with 1x100 MVA
X'mer; 220 KV FB-4, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6 & 220/132 KV ICT
37.20 - - -
220 KV D/C Halvad (400 KV) -
Sarla line220 KV line (D/C) (45 RKM) 21.28 6.38 - -
LILO of 220 KV S/C Chorania
- Gondal line at 220 KV Sarla
substation instead of Halvad
(400 KV)
220 KV line (D/C) (20 RKM) 10.80 3.24 - -
LILO of 132 KV S/C
Wankaner - Limdi line at 220
KV Chotila s/s
132 KV line (D/C) (15 RKM) 3.75 1.13 - -
220 KV FB - 2 Nos. at Halvad
(400 KV)220 KV FB - 2 Nos. 2.80 0.84 - -
66KV line (D/C-Panther) (40
RKM)8.80 2.64 - -
66 KV FB - 6 Nos. 2.10 0.63 - -
Total : 86.73 14.86 - -
220/132 KV Bhatia substation
220/132 KV substation with 2 x
100 MVA X'mers; 220 KV FB - 2
Nos., 132 KV FB - 2 Nos.
36.50 - - -
220/132/66 KV Jasdan s/s
66 KV D/C interconnection
lines and bays for Jasdan
substation
20
220 KV Sarla
(Chotila)
substation, Dist:
Surendranagar
66 KV D/C interconnection
lines and bays for Sarla
substation
21220 KV Bhatia,
Dist: Jamnagar
17
400 KV Fedra
substation, Dist:
Ahmedabad
18
400 KV
Sankhari
substation,
Patan
19
220 KV Jasdan
substation, Dist:
Rajkot
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 52
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14 FY 2014-15 FY 2015-16
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
220 KV D/C Bhatia - Kalavad
line220 KV line (D/C) (80 RKM) 66.64 13.33 13.33 39.98
132 KV D/C Bhatia (220 KV) -
Bhatia line132 KV line (D/C) (10 RKM) 2.50 - - -
132 KV FB - 2 Nos. at Bhatia 132 KV FB 1.50 - - -
Total : 107.14 13.33 13.33 39.98
220/66 KV Bhachau s/s
220/66 KV s/s with 1x100 MVA
X'mer; 220 KV FB-4, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
25.20 - - -
220 KV D/C Varsana -
Bhachau line220 KV line (D/C) (30 RKM) 17.47 6.99 10.48 -
220 KV D/C Bhachau -
Radhanpur line220 KV line (D/C) (170 RKM) 95.20 38.08 38.08 19.04
220 KV FB - 2 Nos. each at
Varsana and Radhanpur
substations
220 KV FB - 4 Nos. 5.60 2.24 3.36 -
66KV line (D/C-Panther) (40
RKM)8.80 3.52 5.28 -
66 KV FB - 6 Nos. 2.10 0.84 1.26 -
Total : 154.37 51.67 58.46 19.04
220/66 KV Mokha s/s220/66 KV s/s with 1x100 MVA
X'mer; 220 KV FB-2, 66 KV FB - 622.40 5.77 - -
220 KV D/C Varsana - Mokha
line220 KV line (D/C) (55 RKM) 30.80 12.32 18.48 -
220 KV FB - 2 Nos. at
Varsana220 KV FB - 2 Nos. 2.80 1.12 1.68 -
66KV line (D/C-Panther) (40
RKM)8.80 3.52 5.28 -
66 KV FB - 6 Nos. 2.10 0.84 1.26 -
Total : 66.90 23.57 26.70 -
220/66 KV Suva s/s
220/66 KV s/s with 1x100 MVA
X'mer; 220 KV FB-2, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
22.40 3.49 2.33 -
LILO of one circuit of 220 KV
D/C Kosamba - Mobha line at
Suva substation
220 KV line (D/C) (30 RKM) 11.10 3.26 2.17 -
66KV line (D/C-Panther) (40
RKM)8.80 1.82 1.22 -
66 KV FB - 6 Nos. 2.10 1.26 0.84 -
Total : 44.40 9.83 6.56 -
220/66 KV Bhestan s/s
220/66 KV s/s with 1x100 MVA
X'mer; 220 KV FB-2, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
22.40 2.36 - -
LILO of 220 KV S/C Navsari -
Vav line at proposed
substation near Bhestan
220 KV line (D/C) (25 RKM) 9.25 3.91 - -
66KV line (D/C-Panther) (40
RKM)8.80 3.52 - -
66 KV FB - 6 Nos. 2.10 0.84 - -
Total : 42.55 10.63 - -
220/66 KV Navera s/s
220/66 KV s/s with 1x100 MVA
X'mer; 220 KV FB-2, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
22.40 6.42 14.98 -
LILO of 220 KV S/C Navsari -
Bhilad line at Navera220 KV line (D/C) (30 RKM) 11.10 4.44 6.66 -
66KV line (D/C-Panther) (40
RKM)8.80 3.52 5.28 -
66 KV FB - 6 Nos. 2.10 0.84 1.26 -
Total : 44.40 15.22 28.18 -
220/66 KV Jarod s/s
220/66 KV s/s with 1x100 MVA
X'mer; 220 KV FB-4, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
25.20 5.66 13.22 -
Termination of one D/C line of
220 KV 2 x D/C Achhalia -
Jambuva lines at Jarod
220 KV line (D/C) (30 RKM) 11.84 9.47 2.37 -
26
220 KV Navera
substation, Dist:
Valsad
(upgradation
from 132 KV) 66 KV D/C interconnection
lines and bays for Navera
substation
27
220 KV Jarod
substation, Dist:
Vadodara
24
220 KV Suva
substation near
Dahej, Dist:
Bharuch
66 KV D/C interconnection
lines and bays for Suva
substation
25
220 KV
substation near
Bhestan, Dist:
Surat
66 KV D/C interconnection
lines and bays for Bhestan
substation
22
220 KV
Bhachau
substation, Dist:
Kutch
66 KV D/C interconnection
lines and bays for Bhachau
substation
23
220 KV Mokha
substation, Dist:
Kutch
66 KV D/C interconnection
lines and bays for Mokha
substation
21220 KV Bhatia,
Dist: Jamnagar
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 53
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14 FY 2014-15 FY 2015-16
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
LILO of one circuit of 220 KV
D/C Wanakbori - Asoj line at
Jarod
220 KV line (D/C) (10 RKM) 3.70 2.96 0.74 -
66KV line (D/C-Panther) (40
RKM)8.80 7.04 1.76 -
66 KV FB - 6 Nos. 2.10 1.68 0.42 -
Total : 51.64 26.82 18.50 -
F - - - -
28 400 KV line (D/C) (200 RKM) 213.85 50.66 50.66 25.33
29 400 KV line (D/C) (110 RKM) 100.10 20.02 40.04 40.04
30 400 KV FB - 8 Nos. 32.24 2.90 3.86 9.67
Total : 346.19 73.58 94.56 75.04
G Vadodara City Development Plan - - - -
31 Total : 232.00 40.00 30.00 30.00
H - - - -
LILO of one ckt. Of 400 KV
D/C Kosamba-Chorania line at
Fedra instead of Termination
of Kosamba-Chorania line at
Fedra
400 KV D/C line 22.40 - 4.48 17.92
Additional Cost Total : 22.40 - 4.48 17.92
4 GIS + 3 AIS substations 66 KV Substation 99.40 24.85 - -
300mm2 (3+1) U/G cable 66 KV U/G Cable 35.60 8.90 - -
S/C line - Dog 66 KV S/C line 0.43 0.11 - -
Total : 135.43 33.86 - -
400 KV D/C Wanakbori TPS
(Unit No.8) - Soja line400 KV D/C line - Twin Moose 92.00 18.40 46.00 27.60
2 Nos. of 400 KV feeder bays
at Soja substation400 KV FB 8.06 1.61 4.03 2.42
Interconnection between
existting & new switchyard400 KV D/C line - Twin Moose 0.92 0.18 0.46 0.28
LILO of existing 400 KV S/C
Wanakbori – Soja line at 400
KV Dehgam (PGCIL)
substation
400 KV D/C line - Twin Moose 12.88 2.58 6.44 3.86
2 Nos. of 400 KV feeder bays
at Dehgam (PGCIL) substation400 KV FB 8.06 1.61 4.03 2.42
400 KV D/C Soja - Zerda line 400 KV D/C line - Twin Moose 128.80 25.76 38.64 64.40
2 Nos. of 400 KV feeder bays
each at Soja & Zerda
substations
400 KV FB 16.12 3.22 4.84 8.06
Total : 266.84 53.37 104.44 109.04
400 KV D/C EPGL generating
station - Halvad line400 KV D/C line - Twin Moose 161.00 32.20 48.30 80.50
2 Nos. of 400 KV feeder bays
at Halvad substation400 KV FB - 2 Nos. 8.06 1.61 4.03 2.42
Total : 169.06 33.81 52.33 82.92
400 KV D/C Shapoorji Pallonji
generating station - Amreli line400 KV D/C line - Twin Moose 101.20 20.24 30.36 30.36
2 Nos. of 400 KV feeder bays
at Amreli substation400 KV FB - 2 Nos. 8.06 1.61 2.42 2.42
Total : 109.26 21.85 32.78 32.78
I - - - -
400/220 KV, 2x315 MVA X'mers,
400 KV FB - 6, 220 KV FB - 8, 63
MVAR Bus Reactor
99.30 - 9.93 39.72
220/66 KV s/s with 2x100 MVA
X'mer; 66 KV FB - 617.10 - 3.42 6.84
LILO of 400 KV S/C SSP -
Asoj & SSP-Kasor lines at
Achhalia substation
400 KV D/C line - Twin Moose 36.80 - 7.36 14.72
400 KV D/C Kosamba -
Achhalia line400 KV D/C line - Twin Moose 64.40 - 12.88 25.76
400 KV FB - 2 Nos. at
Kosamba400 KV FB - 2 8.06 - 1.61 3.22
LILO of 220 KV D/C Ukai
(Th) - Achhalia line at 400 KV
Achhalia
220 KV D/C line - ACSR Zebra 3.70 - 0.74 1.48
38
400 KV
Achhalia
substation, Dist:
Bharuch
35
EPGL, Salaya
Phase-II, (3240
MW), 800 MW
PPA-GUVNL
36
Shapoorji
Pallonji,
Kodinar, (2x660
MW), 800 MW
PPA-GUVNL
Comprehensive Plan (Comprehensive Plan-III )
37
400 KV
Achhalia
substation, Dist:
Bharuch
400/220/66 KV Achhalia s/s
32
LILO of one
ckt. Of 400 KV
D/C Kosamba -
Chorania line at
Fedra B.R. No.
61.18/932 dtd.
23.02.10
33
66 KV
substations,
appproved under
R-APDRP
scheme Part-B
34
GSECL,
Wanakbori TPS,
expansion Unit
No.8
Transmission lines:
400 KV D/C Amreli - Kasor line
400 KV D/C Varsana - Halvad line
400 KV FB - 2 Nos. each at Amreli, Kasor,
Vadodara City Development Plan
System strengthening Schemes
27
220 KV Jarod
substation, Dist:
Vadodara
66 KV D/C interconnection
lines and bays for Jarod
substation
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 54
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14 FY 2014-15 FY 2015-16
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
Termination of 220 KV D/C
GPEC - Haldarva line at
Achhalia (400 KV) instead of
Haldarva substation
220 KV D/C line - ACSR Zebra 16.65 - 3.33 6.66
220 KV D/C Suva - Achhalia
(400 KV) line220 KV D/C line - (AL-59) 31.50 - 6.30 12.60
220 KV FB - 2 Nos. at Suva
substation220 KV FB - 2 Nos. 2.80 - 0.56 1.12
66KV D/C line - ACSR Panther 8.80 - 1.76 3.52
66 KV FB - 6 Nos. 2.10 - 0.42 0.84
Total : (a) 291.21 - 48.31 116.48
400/220 KV, 1 x 315 MVA
ICT at Jetpur (without bay)
due to declaration of 315
MVA ICT No.1 at Jetpur as
failed
1 x 315 MVA ICT without bay 10.42 - 10.42 -
400/220 KV, 1 x 315 MVA
ICT (3rd
) at Vadavi (with bay)
considering loading
1 x 315 MVA ICT with bay 14.45 14.45 - -
400/220 KV, 1 x 315 MVA
ICT (2nd
) at Kosamba (with
bay) considering reliability as
initially only one ICT is
proposed at Kosamba
1 x 315 MVA ICT with bay 14.45 - - -
Total : (b) 39.32 14.45 10.42 -
J - - - -
220/66 KV system along with
2 x 100 MVA ICT at Hadala
substation
2 x 100 MVA ICTs with bay 15.00 7.50 - -
6 Nos. of 66 KV feeder bays at
400 KV Hadala substation66 KV FB - 6 Nos. 2.10 - - -
LILO of 66 KV D/C Nyara -
Navagam line (both ckt.) at
Hadala substation
66 KV D/C line - ACSR Panther
(2x11 Km)4.84 4.84 - -
LILO of 66 KV S/C Nyara -
Popatpara - Navagam line at
Hadala substation and
termination of Hadala - Nyara
line at Ghanteshwar substation
through existing tap line
66 KV D/C line - ACSR Panther 2.42 2.42 - -
1 No. of 66 KV feeder bay at
Ghanteshwar S/S66 KV FB - 1 No. 0.35 0.35 - -
Total : (d-i) 24.71 15.11 - -
132/66 KV s/s with 2x50 MVA
X'mer; 132 KV FB-2, 66 KV FB-711.40 - - 9.12
66/11 KV, 15 MVA ICT at
Padavala substation1.05 - - 0.84
LILO of 132 KV S/C
Dhandhuka - Paliad - Vikram
line at Padavala substation
132 KV D/C line - ACSR Panther 1.25 - - 1.00
LILO of 66 KV Hadmatla -
Kotda'S' line at Padavala
substation
66 KV D/C line - ACSR Panther 2.42 - - 1.94
66 KV D/C line - ACSR Panther 2.42 - - 1.94
66 KV S/C line - ACSR Panther 0.75 - - 0.60
1 No. of 66 KV feeder bay at
Tramba S/S66 KV FB - 1 No. 0.35 - - 0.28
66 KV, 630 sq.mm. (6+1)
Padavala - Veraval-II u/g
cable line
66 KV, 630 Sq.mm. (6+1) u/g cable 10.72 - - 8.58
66 KV, 630 sq.mm. (6+1)
Veraval-II - Veraval u/g cable
line
66 KV, 630 Sq.mm. (6+1) u/g cable 5.36 - - 4.29
40
220/66 KV
system at 400
KV Hadala
substation
41
132/66/11 KV
Padavala
substation
132/66/11 KV Padavala s/s
42
132/66/11 KV
Padavala
substation
66 KV D/C line from Padavala
- one ckt. tap to 66 KV S/C
Sardhar - Faddang line and
2nd ckt. To Tramba with 66
KV S/C line
38
400 KV
Achhalia
substation, Dist:
Bharuch
66 KV D/C interconnection
lines and bays for 400 KV
Achhalia substation
39
Augmentation of
400 KV
substations
Rajkot City Development Plan
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 55
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14 FY 2014-15 FY 2015-16
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
4 Nos. of 66 KV feeder bays at
Veraval-II and 2 Nos. of 66
KV feeder bays at Veraval
substations
66 KV FB - 6 No. 2.10 - - 1.68
66 KV, 630 sq.mm. (3+1)
Padavala - Shapar u/g cable
line
66 KV, 630 Sq.mm. (3+1) u/g cable 11.20 - - 8.96
1 No. of 66 KV feeder bay at
Shapar S/S66 KV FB - 1 No. 0.35 - - 0.28
Total : (d-ii) 49.37 - - 39.50
220/66 KV Metoda s/s
220/66 KV s/s with 2x100 MVA
X'mer; 220 KV FB-2, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
8
32.32 - - 9.70
LILO of 220 KV S/C Jetpur -
Rajkot line at Metoda
substation
220 KV D/C line - ACSR Zebra 1.85 - - 0.56
66 KV D/C line - ACSR Panther 8.80 - - 2.64
66 KV FB - 8 Nos. 2.80 - - 0.84
Total : (d-iii) 45.77 - - 13.73
220/66 KV Rajkot-II s/s
220/66 KV s/s with 2x100 MVA
X'mer; 220 KV FB-4, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
8
35.12 - - 7.02
LILO of 220 KV S/C Chorania
- Gondal line at Rajkot-II
substation
220 KV D/C line - ACSR Zebra 9.25 - - 1.85
220 KV D/C Hadala - Rajkot-
II line220 KV D/C line - AL-59 11.25 - - 2.25
66 KV D/C line - ACSR Panther 8.80 - - 1.76
66 KV FB - 8 Nos. 2.80 - - 0.56
Total : (d-iv) 67.22 - - 13.44
66/11 KV, GIS substations at
Nana Mava (Shastrinagar) &
Mota Mava (Ambika Park)
66/11 KV, 15 MVA GIS substations 40.00 - - 4.00
66 KV, 630 sq.mm. (6+1)
Mavdi - Nana Mava u/g cable
line
66 KV, 630 Sq.mm. (6+1) u/g cable 12.06 - - 1.21
66 KV, 630 sq.mm. (6+1)
Kangasiyali - Mavdi u/g cable
line
66 KV, 630 Sq.mm. (6+1) u/g cable 18.76 - - 1.88
66 KV, 630 sq.mm. (6+1)
Nana Mava - Mota Mava u/g
cable line
66 KV, 630 Sq.mm. (6+1) u/g cable 13.40 - - 1.34
66 KV feeder bays - 2 Nos. at
Mavdi and 1 No. each at
Kangasiyali & Nana Mava
substations
66 KV FB - 4 Nos. 1.40 - - 0.14
Total : (d-v) 85.62 - - 8.56
66 KV, 630 sq.mm. (6+1)
Kangasiyali - Punitnagar u/g
cable line by dismentalling 66
KV D/C Vikram - Punitnagar
line from Punitnagar end upto
Vavdi substation
66 KV, 630 Sq.mm. (6+1) u/g cable 18.76 1.88 7.50 5.63
66 KV, 630 sq.mm. (6+1)
Ganteshwar - Raiyadhar u/g
cable line
66 KV, 630 Sq.mm. (6+1) u/g cable 13.40 1.34 5.36 4.02
Conversion of 66 KV D/C
Nyara - Ganteshwar line from
Dog to Panther conductor
Conversion of 66 KV D/C line from
Dog to Panther0.76 0.08 0.30 0.23
Conversion of 66 KV
Dudhsagar - Wankaner H-
frame line in 630 sq.mm (3+1)
u/g cable (1 to 20 Loc. From
Dudhsagar)
66 KV, 630 Sq.mm. (3+1) u/g cable 9.60 3.84 - -
66 KV Dudhsagar -
Sindhavadr line tap to
Kuvadva substation
66 KV S/C line - Panther 1.50 0.60 - -
45
New 66 KV GIS
substations at
Nana Mava
(Shastrinagar)
and Mota Mava
(Ambika Park)
46Strengthening of
existing lines
43
220 KV Metoda
substation, Dist:
Rajkot
66 KV D/C interconnection
lines and bays for Metoda
substation
44
220 KV Rajkot-
II substation,
Dist: Rajkot
66 KV D/C interconnection
lines and bays for Rajkot-II
substation
42
132/66/11 KV
Padavala
substation
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 56
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14 FY 2014-15 FY 2015-16
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
66 KV feeder bays - 2 Nos.
each at Punitnagar,
Ganteshwar & Raiyadhar and
1 No. each at Navagam,
Dudhsagar & Kuvadva
substations
66 KV FB - 9 Nos. 3.15 1.26 - -
Total : (d-vii) 47.17 8.99 13.17 9.88
132 KV S/C Achhalia -
Tilakwada line (ACSR
Panther)
132 KV S/C - ACSR Panther 6.65 1.33 2.66 2.66
132 KV S/C Tilakwada -
Chhotaudepur line (ACSR
Panther)
132 KV S/C - ACSR Panther 9.50 1.90 3.80 3.80
132 KV feeder bays - 1 No.
each at Achhalia &
Chhotaudepur and 2 Nos. at
Tilakwada substations
132 KV FB - 4 Nos. 3.00 0.60 1.20 1.20
Total : (e) 19.15 3.83 7.66 7.66
400/220 KV, 2x315 MVA X'mers,
400 KV FB - 4, 220 KV FB - 4, 63
MVAR Bus Reactor
85.64 - 4.28 21.41
220/66 KV s/s with 2x100 MVA
X'mer; 66 KV FB - 617.10 - 0.86 4.28
LILO of one ckt. of proposed
400 KV D/C Wanakbori - Soja
line at Prantij substation
400 KV D/C line - Twin Moose 36.80 - 1.84 9.20
400 KV D/C Sankhari - Prantij
line400 KV D/C line - Twin Moose 92.00 - 4.60 23.00
400 KV FB - 2 Nos. at
Sankhari400 KV FB - 2 8.06 - 0.40 2.02
220 KV D/C Prantij - Agiyol
line (AL-59)220 KV D/C line - AL-59 13.50 - 0.68 3.38
220 KV D/C Prantij -
Dhansura line (AL-59)220 KV D/C line - AL-59 15.75 - 0.79 3.94
220 KV FB - 2 Nos. each at
Agiyol & Dhansura substations220 KV FB - 4 Nos. 5.60 - 0.28 1.40
66KV D/C line - ACSR Panther 8.80 - 0.44 2.20
66 KV FB - 6 Nos. 2.10 - 0.11 0.53
Total : (f) 285.35 - 14.27 71.34
220 KV D/C line - AL-59 48.23 28.94 19.29 -
220 KV FB - 2 Nos. 3.00 1.80 1.20 -
400/220 KV switchyard along
with 2x315 MVA ICTs at
Solar Park
400/220 KV s/s with 2x315 MVA
X'mer; 400 KV FBs - 2 Nos.61.08 - 12.22 48.86
400 KV D/C line - Twin Moose 92.00 - 18.40 73.60
400 KV FB - 2 Nos. 8.06 - 1.61 6.45
Total : 212.37 30.74 52.72 128.91
K - - - -
220/66 KV Bagasara s/s
220/66 KV s/s with 1x100 MVA
X'mer; 220 KV FB-2, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
22.40 - 2.24 11.20
LILO of 220 KV S/C
Savarkundla - Visavadar line
at Bagasara substation
220 KV line (D/C) (5 RKM) 1.85 - 0.19 0.93
66KV line (D/C-Panther) (30
RKM)6.60 - 0.66 3.30
66 KV FB - 6 Nos. 2.10 - 0.21 1.05
Total: (a-i) 32.95 - 3.30 16.48
220/66 KV Talaja substation
220/66 KV s/s with 1x100 MVA
X'mer; 220 KV FB-2, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
22.40 - - 4.48
220 KV D/C Palitana - Talaja
line220 KV line (D/C) (45 RKM) 20.25 - - 4.05
220 KV FB - 2 Nos. at
Palitana220 KV FB - 2 Nos. 2.80 - - 0.56
66 KV S/C Talaja - Talaja (220
KV) line66 KV line (S/C) - Panther 0.73 - - 0.15
66 KV S/C Dihor - Talaja (220
KV) line66 KV line (S/C) - Panther 2.03 - - 0.41
52220 KV Talaja,
Dist: Amreli
53220 KV Talaja,
Dist: Amreli
50
Charanka Solar
Park-1, (590
MW),
220 KV D/C pooling station –
Jangral line (AL-59) with 2
Nos. of 220 KV feeder bays at
400 KV D/C pooling station –
Sankhari (proposed) line (Twin
Moose) with 2 Nos. of 400 KV
feeder bays at 400 KV
12 Hrs. Agri. Supply -New Substation
51
220 KV
Bagasara
substation, Dist:
Amreli
66 KV D/C interconnection
lines and bays for Bagasara
substation
48
132 KV Link
lines for 2nd
Source
49
400 KV Prantij
substation, Dist:
Sabarkantha
400/220 KV Prantij s/s
66 KV D/C interconnection
lines and bays for Prantij
substation
46Strengthening of
existing lines
47
132 KV Link
lines for 2nd
Source
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 57
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14 FY 2014-15 FY 2015-16
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
66 KV S/C Manar - Talaja
(220 KV) line66 KV line (S/C) - Panther 1.74 - - 0.35
66 KV S/C Tansa - Talaja
(220 KV) line66 KV line (S/C) - Panther 3.63 - - 0.73
66 KV S/C Pasvi - Talaja (220
KV) line66 KV line (S/C) - Panther 1.74 - - 0.35
66 KV feeder bay 1 No. each
at Talaja, Dihor, Manar, Tansa
and Pasvi
66 KV FB - 6 Nos. 2.10 - - 0.42
Total: (a-ii) 57.41 - - 11.48
54
220 KV Modasa
substation, Dist:
Mehsana
220/66 KV Modasa S/S
220/66 KV s/s with 1x100 MVA
X'mer; 220 KV FB-2, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
22.40 - - 4.48
LILO of 220 KV D/C Kadana -
Dhansura line at 220 KV
Modasa substation
220 KV line (D/C) (2 x 25 RKM) 18.50 - - 3.70
66KV line (D/C-Panther) (40
RKM) 8.80 - - 1.76
66 KV FB - 6 Nos. 2.10 - - 0.42
Total: (a-iv) 51.80 - - 10.36
220/66 KV Asodar s/s
220/66 KV s/s with 1x100 MVA
X'mer; 220 KV FB-2, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
22.40 - 8.96 8.96
LILO of 220 KV D/C Jambuva
- Karamsad line at Asodar
substation
220 KV line (D/C) (2 x 1 RKM) 0.74 - 0.30 0.30
66KV line (D/C-Panther) (40
RKM) 8.80 - 3.52 3.52
66 KV FB - 6 Nos. 2.10 - 0.84 0.84
Total: (a-v) 34.04 - 13.62 13.62
L 12 Hrs. Agri. Supply -New Transmission Lines - - - -
220 KV D/C Visavadar -
Timbdi line220 KV D/C line - AL-59 27.00 - 2.70 5.40
220 KV D/C Chorania - Botad
line220 KV D/C line - AL-59 36.00 - 3.60 7.20
LILO of 220 KV S/C
Kangasiyali - Nyara line at
Hadala substation
220 KV D/C line - ACSR Zebra 6.29 - 0.63 1.26
220 KV D/C Chikhli - Bhilad
line220 KV D/C line - AL-59 38.25 - 3.83 7.65
220 KV feeder bays - 2 Nos.
each at Visavadar, Timbdi,
Chorania, Botad, Hadala,
Chikhli & Bhilad substations
220 KV FB - 14 Nos. 19.60 - 1.96 3.92
Total: (b-i) 127.14 - 12.71 25.43
LILO of one ckt. of 132 KV
D/C Dhuvaran - Vatwa line at
Mahemdabad substation
132 KV D/C line - ACSR Panther 5.00 - 0.50 1.00
132 KV D/C Achhalia -
Miyagam line132 KV D/C line - ACSR Panther 12.50 - 1.25 2.50
132 KV feeder bays - 2 Nos.
each at Achhalia, Miyagam &
Mahemdabad substations
220 KV FB - 6 Nos. 4.50 - 0.45 0.90
Total: (b-ii) 22.00 - 2.20 4.40
M 12 Hrs. Agri. Supply - Substation Augmentation - - - -
220/66 KV 650 MVA 51.74 48.16 5.17 15.52
132/66 KV 150 MVA 6.93 48.16 0.69 2.08
132/11 KV 12.5 MVA 2.00 48.16 0.20 0.60
66/22 KV 10 MVA 1.05 48.16 0.11 0.32
66/11 KV 705 MVA 53.50 48.16 5.35 16.05
Total: (b-ii) 115.22 240.80 11.52 34.57
N - - - -
220/66 KV s/s with 2x100
MVA X'mer; 220 KV FB-2,
220 KV BC bay-1, 220 KV
TBC - 1, 66 KV FB - 8
220/66 KV, 2x100 MVA
substation + 2 Nos. 220 KV FBs +
8 Nos. 66 KV FBs
32.32 - 1.62 8.08
LILO of one circuit of 220 KV
D/C Salejada - Bhat line at
Kerala substation
220 KV D/C line - ACSR Zebra 1.85 - 0.09 0.46
58 132 KV lines
59Substation
Augmentation
60220 KV Kerala
substation
Ahmedabad City Development Plan
66 KV D/C interconnection
lines and bays for Modasa
substation
56
220 KV Asodar
substation, Dist:
Anand
66 KV D/C interconnection
lines and bays for Asodar
substation
57 220 KV lines
53220 KV Talaja,
Dist: Amreli
55
220 KV Modasa
substation, Dist:
Mehsana
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 58
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14 FY 2014-15 FY 2015-16
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
66 KV D/C line - ACSR Panther 8.80 - 0.44 2.20
66 KV FB - 8 Nos. 2.80 - 0.14 0.70
Total : 1(c) 45.77 - 2.29 11.44
LILO of 66 KV Bopal -
Sanand line at Vadavi and
Santej substations
66 KV D/C line - ACSR Panther 7.70 7.70 - -
66 KV D/C Khatraj - Santej
line66 KV D/C line - ACSR Panther 0.66 0.66 - -
LILO of Salejada - Bavala line
to Juval Rupavati substation
instead of existing tap
66 KV S/C line - ACSR Panther 0.48 0.48 - -
66 KV FBs - 4 Nos. at Santej,
2 Nos. each at Vadavi &
Khatraj and 1 No. at Juval
Rupavati substations
66 KV FB - 9 Nos. 3.15 - - -
Total : (d) 11.99 8.84 - -
66 KV S/C Dehgam - Vehlal
line
Conversion of 66 KV S/C line from
Dog to Panther 1.33 1.33 - -
66 KV S/C Ranasan - Reliance-
1 line
Conversion of 66 KV S/C line from
Dog to Panther 0.28 0.28 - -
66 KV S/C Sanand - Bopal lineConversion of 66 KV S/C line from
Dog to high Amp. Conductor 8.71 8.71 - -
66 KV S/C Salejada - Juval
Rupavati line
Conversion of 66 KV S/C line from
Dog to Panther 0.98 0.98 - -
66 KV S/C Salejada - Juval
Rupavati - Bavala line
Conversion of 66 KV S/C line from
Dog to Panther 1.26 1.26 - -
66 KV S/C Adalaj - Dhanaj
line by using Sabarmati tap
line
Conversion of 66 KV S/C line from
Dog to high Amp. Conductor 3.35 3.35 - -
66 KV S/C Bhadaj - Dhanaj
line up to LILO point
Conversion of 66 KV S/C line from
Dog to Panther 0.70 0.70 - -
Total : (e) 16.61 16.61 - -
6366/11KV s/s with 10 MVA X'mer;
FB-1 & X'mer Bay-1 192.00 69.00 - -
66KV associated line (15 CKM per
S/S) 80.00 28.75 - -
Total : 272.00 97.75 - -
O - - - -
66/11KV s/s with 10 MVA X'mer;
FB-1 & X'mer Bay-1 222.00 135.00 87.00 -
66 KV S/C line 57.28 34.83 22.45 -
66 KV D/C line 64.38 61.58 2.80 -
Total : 343.66 231.41 112.25 -
66 KV lines & feeder bays 58.00 - - -
Total : 58.00 - - -
P Strengthening of network around Morbi area - - - -
44 Nos. of new 66 KV
substations under Morbi
(O&M) area
66/11KV s/s with 10 MVA X'mer;
FB-1 & X'mer Bay-1 132.00 18.00 114.00 -
66 KV S/C line - ACSR Dog 35.64 4.86 30.78 -
66 KV D/C line - ACSR Dog 39.60 5.40 34.20 -
Conversion of approved 66
KV Vasant Baug substation
from AIS to GIS
66 KV GIS substation 20.00 10.00 - -
Total : (a) 227.24 38.26 178.98 -
220/66 KV Sartanpar s/s
220/66 KV s/s with 2x100 MVA
X'mer; 220 KV FB-4, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
13
36.87 18.44 3.69 -
LILO of both circuits of 220
KV D/C Hadala - Halvad line
(under construction) at
Sartanpar substation
220 KV D/C line - ACSR Zebra - 2
x 12 RKM 8.88 6.22 - -
66 KV D/C Sartanpar (220KV
S/S) - Sartanpar (existing) line66 KV D/C line - ACSR Panther 0.44 0.44 - -
67New 66 KV
substations
Associated transmission lines
(15 Km per substation)
68
220 KV
Sartanpar
substation
Creation of 74 Nos. of new 66 KV substations
65
66 KV substations
66 KV lines
66
Tentative investment required for integration of
total 274 MW Solar Power Capacity into
GETCO Grid from 20 Nos. developers under
61 New link lines
62Strengthening of
existing lines
66 KV substations
64 66 KV lines
60220 KV Kerala
substation
66 KV D/C interconnection
lines from Kerala and feeder
bays at far end substations
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 59
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14 FY 2014-15 FY 2015-16
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
LILO of 66 KV S/C Sartanpar -
Lakaddhar line at 220 KV
Sartanpar substation
66 KV D/C line - ACSR Panther 0.44 0.44 - -
66 KV D/C Sartanpar (220KV
S/S) - Dungarpur line with one
circuit LILO at proposed
Manekwada S/S
66 KV D/C line - ACSR Panther 3.08 1.54 - -
66 KV D/C Sartanpar (220KV
S/S) - Rafleshwar line66 KV D/C line - ACSR Panther 1.32 0.66 - -
66 KV D/C Sartanpar (220KV
S/S) - proposed Rajgadh line66 KV D/C line - ACSR Panther 2.64 1.32 - -
66 KV D/C Sartanpar (220KV
S/S) - Kalikanagar line with
one circuit LILO at proposed
Ratavirda S/S
66 KV D/C line - ACSR Panther 1.10 0.55 - -
Conversion of 66 KV S/C
Sartanpar (existing) -
Lakaddhar line into D/C line
Conversion of 66 KV S/C (Panther)
into D/C (Panther) line 0.45 0.23 - -
66 KV feeder bays: 3 Nos. at
Sartanpar (existing), 2 Nos.
each at Dungarpur,
Rafleshwar, Rajgadh
(proposed), Kalikanagar and 1
No. at Lakaddhar substations
66 KV FB - 12 Nos. 4.20 2.10 - -
Total : (b) 59.42 31.93 3.69 -
220/66 KV Charadava s/s
220/66 KV s/s with 2x100 MVA
X'mer; 220 KV FB-4, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
10
35.82 3.58 14.33 17.91
Termination of LILO of one
circuit of 220 KV D/C Halvad -
Morbi line to Bhimasar (PG) at
Charadava substation
220 KV D/C line - ACSR Zebra 1.85 0.19 0.74 0.93
220 KV D/C Halvad (400 KV) -
Charadva line220 KV line (D/C) (30 RKM) 13.50 1.35 5.40 6.75
220 KV FB - 2 Nos. at Halvad
(400 KV)220 KV FB - 2 Nos. 2.80 0.28 1.12 1.40
66 KV D/C (Panther) link line
from 220 KV Charadava s/s to
existing Charadava,
Dungarpur, Morbi - Charadava
lilo line, proposed Mathak,
Ishwernagar & Sarambhada s/s
66 KV D/C line - ACSR Panther 1.54 0.15 0.62 0.77
66 KV S/C (Panther) link line
from 220 KV Charadava s/s to
existing Charadava - Chupani
line and from Ishwarnagar tap
to Ishwernagar & Sarambhada
s/s
66 KV S/C line - ACSR Panther 3.77 0.38 1.51 1.88
66 KV S/C Ishwarnagar -
Devlia line66 KV S/C line - ACSR Panther 0.79 0.08 0.31 0.39
66 KV S/C Sarambhada -
Sundaribhavani line66 KV S/C line - ACSR Panther 1.26 0.13 0.50 0.63
66 KV S/C Khareda -
proposed Unchi Mandal line66 KV S/C line - ACSR Panther 1.26 0.13 0.50 0.63
66 KV feeder bays: 2 Nos.
each at Charadava (existing),
Ishwarnagar, Sarambhada &
Mathak (proposed) and 1 No.
each at Devalia, Khareda,
proposed Sundari Bhavani and
Unchi Mandal substations
66 KV FB - 12 Nos. 4.20 0.42 1.68 2.10
69
220 KV
Charadava
substation
68
220 KV
Sartanpar
substation
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 60
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14 FY 2014-15 FY 2015-16
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
Total : (c) 66.78 6.68 26.71 33.39
220/66 KV Shapar s/s
220/66 KV s/s with 2x100 MVA
X'mer; 220 KV FB-4, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
10
35.82 17.91 14.33 3.58
LILO of 220 KV S/C Chorania
- Sarla and Sarla - Gondal lines
(due to LILO of 220 KV S/C
Chorania - Gondal line at Sarla
substation) at Shapar
substation
220 KV D/C line - ACSR Zebra (2
x 10 RKM) 7.40 3.70 2.96 0.74
66 KV D/C Shapar - Than line
(one circuit to be extended to
Than and other circuit to be
terminated to proposed Than-
II substation)
66 KV D/C line - ACSR Panther 4.40 2.20 1.76 0.44
66 KV, 630mm2 (3+1) u/g
cable for temination of line
from Shapar at Than
substation
66 KV, 630mm2 (3+1) u/g cable 3.20 1.60 1.28 0.32
66 KV S/C Shapar - Chotila
line66 KV S/C line - ACSR Panther 2.20 1.10 0.88 0.22
LILO of 66 KV S/C Chotila -
Thikariyali line at Shapar
substation
66 KV D/C line - ACSR Dog 2.25 1.13 0.90 0.23
Conversion of 132 KV
Sitagadh substation into 66 Kv
level along with 66/11 KV, 2 x
15 MVA ICTs
66/11 KV, 2 x 15 MVA ICTs 2.40 1.20 0.96 0.24
66 KV D/C Shapar - Sitagadh
line66 KV D/C line - ACSR Panther 1.10 0.55 0.44 0.11
LILO of 66 KV S/C Wankaner
- Than - Tarnetar line at Than-
II substation
66 KV D/C line - ACSR Dog 0.45 0.23 0.18 0.05
66 KV feeder bays: 3 Nos. at
Than-II (proposed), 2 Nos. at
Sitagadh and 1 No. each at
Than and Chotila substations
66 KV FB - 7 Nos. 2.45 1.23 0.98 0.25
Total : (d) 61.67 30.83 24.67 6.17
220/66 KV Navlakhi s/s (SIR-
Zone)
220/66 KV s/s with 2x100 MVA
X'mer; 220 KV FB-2, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
31.62 - - 6.32
LILO of 220 KV S/C Tappar -
Hadala line at Navlakhi
substation
220 KV D/C line - ACSR Zebra 1.85 - - 0.37
66 KV D/C line - ACSR Panther 8.80 - - 1.76
66 KV FB - 6 Nos. 2.10 - - 0.42
Total : (f) 44.37 - - 8.87
73
New link lines
for ring main
system
66KV Transmission line Total : (g) 59.57 - - -
74Strengthening of
existing lines66 KV transmission lines Total : (h) 23.78 - - -
Q - - - -
220/66 KV s/s near Gondal
220/66 KV s/s with 2x100 MVA
X'mer; 220 KV FB-2, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
31.62 - - 6.32
220 KV D/C Jasdan (proposed
substation) - Gondal line
220 KV line (D/C) (50 RKM) : AL-
59 conductor 22.50 - - 4.50
220 KV FB - 2 Nos. at Jasdan
(400 KV)220 KV FB - 2 Nos. 2.80 - - 0.56
66KV line (D/C-Panther) (30
RKM) 6.60 - - 1.32
66 KV FB - 6 Nos. 2.10 - - 0.42
Total: i 65.62 - - 13.12
Strengthening scheme for Tatkal & Special Agriculture connections- New Sub-
station
75
220 KV
substation near
Gondal
66 KV D/C interconnection
lines and bays for proposed
substation
71220 KV Shapar
substation
72
220 KV
Navlakhi
substation
66 KV D/C interconnection
lines and bays for Navlakhi
substation
69
220 KV
Charadava
substation
70220 KV Shapar
substation
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 61
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14 FY 2014-15 FY 2015-16
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
220/66 KV s/s near
Khambhalia
220/66 KV s/s with 2x100 MVA
X'mer; 220 KV FB-4, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
34.42 - - 6.88
LILO of 220 KV D/C Bhatia -
Kalavad - Kangasiyali line at
proposed substation
220 KV line (D/C) (2x10 RKM) :
AL-59 conductor 9.00 - - 1.80
66KV line (D/C-Panther) (30
RKM) 6.60 - - 1.32
66 KV FB - 6 Nos. 2.10 - - 0.42
Total : ii 52.12 - - 10.42
R - - - -
67 Nos. of new 66 KV
substations under Morbi
(O&M) area
66/11KV s/s with 10 MVA X'mer;
FB-1 & X'mer Bay-1 201.00 - 144.00 57.00
66 KV S/C line - ACSR Dog 54.27 - 38.88 15.39
66 KV D/C line - ACSR Dog 60.30 - 43.20 17.10
Total : D 315.57 - 226.08 89.49
S - - - -
78 66.00 33.00 33.00 -
79 10.50 2.10 - -
80 10.20 2.04 - -
Total 86.70 37.14 33.00 -
T - - - -
220 KV S/C Kawas -
Ichchhapur line
220 KV S/C line (Conductor
replacement) 1.17 - - 1.17
220 KV D/C Hadala - Nyara
line
220 KV D/C line (Conductor
replacement) 4.38 - - -
5.55 - - 1.17
400/220 KVShapar s/s
400/220 KV, 2 x 315 MVA ICTs, 4
Nos. of 400 KV & 4 Nos. of 220
KV feeder bays and 400 KV, 125
MVAR switchable bus reactor
82.48 - - 8.25
400 KV D/C Hadala –
Chorania line with both
circuits LILO at Shapar
substation (Twin Moose
400 KV D/C line - Twin Moose 119.60 - - 11.96
220 KV D/C Shapar – Tankara
line (AL-59)220 KV D/C line - AL-59 22.50 - - 2.25
220 KV D/C Shapar – Jasdan
line (AL-59)220 KV D/C line - (AL-59) 13.50 - - 1.35
400 KV FB - 2 Nos. each at
Hadala and Chorania S/s400 KV FB - 2 Nos. 8.06 - - 0.81
400 KV FB - 2 Nos. at
Vadodara (PG) substations400 KV FB - 2 Nos. 8.06 - - 0.81
220 KV FB - 2 Nos. each at
Tankara and Jasdan S/s220 KV FB - 4 Nos. 5.60 - - 0.56
259.80 - - 25.98
400/220 KV Chharodi s/s
400/220 KV, 2x315 MVA X'mers,
400 KV FB - 4, 220 KV FB - 4, 80
MVAR Bus Reactor
86.14 8.61 17.23 34.46
220/66 KV, 2 x 100 MVA Xmer, 66
KV FB - 6 17.10 1.71 3.42 6.84
LILO of one circuit of 400 KV
D/C Halvad – Vadavi line at
400 KV Chharodi substation
(ACSR Twin Moose – 30
RKM)
400 KV D/C line - Twin Moose (30
RKM) 27.60 2.76 5.52 11.04
KV D/C Kosamba – Chorania
line at 400 KV Chharodi
substation (ACSR Twin Moose
– 20 RKM)
400 KV D/C line - Twin Moose (20
RKM) 18.40 1.84 3.68 7.36
82
400 KV Shapar
substation, Dist:
Rajkot; B.R. No
81.21/1279
Total :
83
400 KV
Chharodi
substation (Near
Sanand)
400 KV, 1 x 125 MVAR switchable bus reactor at 400 KV Chorania, Hadala, Zerda,
Amreli, Vadavi and Varsana substations
400 KV, 1 x 80 MVAR switchable bus reactor at 400 KV Kosamba substations
400 KV, 1 x 63 MVAR switchable bus reactor at 400 KV Jetpur substation
Conductor strengthening
81Conductor
strengthening
Total :
Additional 66 KV substations - DISCOM's requirement
77New 66 KV
substations Associated transmission lines
(15 Km per substation)
Bus Reactor
76
220 KV
substation near
Khambhalia
66 KV D/C interconnection
lines and bays for Charadva
substation
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 62
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14 FY 2014-15 FY 2015-16
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
LILO of both circuits of 220
KV D/C Viramgam-Bhat line
at 400 KV Chharodi substation
220 KV D/C line - ACSR Zebra (2
x 20 RKM) 14.80 1.48 2.96 5.92
66 KV D/C line - ACSR Panther 8.80 0.88 1.76 3.52
66 KV FB - 6 Nos. 2.10 0.21 0.42 0.84
174.94 17.49 34.99 69.98
220/66 KV Karjan substation
220/66 KV s/s with 2x100 MVA
X'mer; 220 KV FB-2, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
31.62 22.13 9.49 -
LILO of one circuit of 220 KV
D/C SLPP Mangrol - Gavasad
line at Karjan substation
220 KV D/C line - ACSR Zebra 3.70 2.59 1.11 -
66 KV D/C line - ACSR Panther 8.80 6.16 2.64 -
66 KV FB - 6 Nos. 2.10 1.47 0.63 -
46.22 32.35 13.87 -
132/66 KV Chandkheda
substation
132/66 KV substation with 2 x 50
MVA X'mer; 132 KV FB - 2 Nos.,
66 KV FB - 5 Nos.
11.05 7.74 3.32 -
66/11 KV, 15 MVA ICT at
Chandkheda substation 2.10 1.47 0.32 -
LILO of one circuit of 132 KV
D/C Ranasan - Sabarmati line
at Chandkheda substation
132 KV line (D/C) 0.10 0.07 0.02 -
66 KV D/C line - ACSR Panther 6.60 4.62 0.07 -
66 KV FB - 6 Nos. 2.10 1.47 0.11 -
21.95 15.37 3.82 -
66 KV
substations
66/11KV s/s with 10 MVA X'mer;
FB-1 & X'mer Bay-1 354.00 70.80 70.80 70.80
66 KV lines 66 KV S/C line 95.58 19.12 19.12 19.12
66 KV D/C line 53.10 10.62 10.62 10.62
Total : 502.68 100.54 100.54 100.54
400/220 KV, 1x315 MVA
X'mers, 400 KV FB - 2, 220
KV FB - 4 each at Pipavav,
Chhara and Bhogat substations
400/220 KV, 1x315 MVA X'mers 75.30 - - 7.53
220 KV D/C Bhogat - Bhatia
line220 KV line (D/C) - AL-59 9.00 - - 0.90
220 KV D/C Bhogat -
Ranavav line220 KV line (D/C) - AL-59 18.00 - - 1.80
220 KV D/C Chhara - Timbdi
line220 KV line (D/C) - AL-59 4.50 - - 0.45
220 KV D/C Chhara -
Dhokadava line220 KV line (D/C) - AL-59 20.25 - - 2.03
220 KV D/C Pipavav - Otha
line220 KV line (D/C) - AL-59 11.25 - - 1.13
220 KV D/C Pipavav -
Bagasara line220 KV line (D/C) - AL-59 18.00 - - 1.80
220 KV FB - 2 Nos. each at
Bhatia, Ranavav, Timbdi,
Dhokadava, Otha and
Bagasara substations
220 KV FB - 12 Nos. 16.80 - - 1.68
173.10 - - 17.31
400 KV D/C Kosamba - Vapi
(PG) line400 KV D/C line - Twin Moose 101.20 - - 30.36
400 KV FB - 2 Nos. each at
Kosamba and Vapi (PG)
substations
400 KV FB - 4 Nos. 16.12 - - 4.84
117.32 - - 35.20
220 KV D/C Dhasa - Botad
line220 KV D/C line - AL-59 20.25 - 4.05 16.20
220 KV FB - 2 Nos. each at
Dhasa and Botad substations220 KV FB - 4 Nos. 5.60 - 1.12 4.48
25.85 - 5.17 20.68
220 KV D/C Jamnagar -
Hadala line220 KV D/C line - AL-59 33.75 - 3.38 13.50
89220 KV Dhasa -
Botad line
Total :
90
220 KV
Jamnagar -
Hadala line
86
87
400/220 KV, 1 x
315 MVA ICT
at Pipavav,
Chhara and
Bhogat
substations
Total :
88
400 KV
Kosamba - Vapi
line
Total :
84220 KV Karjan
substation
66 KV D/C interconnection
lines and bays for Karjan
substation
Total :
85
132 KV
Chandkheda
substation
66 KV D/C interconnection
lines and bays for Karjan
substation
Total :
83
400 KV
Chharodi
substation (Near
Sanand)
66 KV D/C interconnection
lines and bays for 400 KV
Chharodi substation
Total :
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 63
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14 FY 2014-15 FY 2015-16
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
220 KV FB - 2 Nos. each at
Jamnagar and Hadala
substations
220 KV FB - 4 Nos. 5.60 - 0.56 2.24
39.35 - 3.94 15.74
220 KV D/C Suva - Dahej line 220 KV D/C line - ACSR Zebra 5.55 - 1.11 2.22
LILO of one circuit of 220 KV
D/C Haldarwa - IPCL line at
Suva substation
220 KV D/C line - ACSR Zebra 5.55 - 1.11 2.22
220 KV FB - 4 Nos. at Suva
and 2 Nos. at Dahej
substations
220 KV FB - 6 Nos. 8.40 - 1.68 3.36
19.50 - 3.90 7.80
U - - - -
220/66 KV Gariyadhar
substation
220/66 KV s/s with 2x100 MVA
X'mer; 220 KV FB-4, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
34.42 - - 6.88
LILO of 220 KV S/C
Savarkundla - Sagapara line at
Gariyadhar substation
220 KV D/C line - Zebra 2.59 - - 0.52
LILO of one circuit of 220 KV
D/C Amreli - Dhasa line at
Gariyadhar
220 KV D/C line - Zebra 14.80 - - 2.96
66 KV D/C line - Panther 8.80 - - 1.76
66 KV FB - 6 Nos. 2.10 - - 0.42
62.71 - - 12.54
220/66 KV Vallabhipur
substation
220/66 KV s/s with 2x100 MVA
X'mer; 220 KV FB-4, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
8
35.12 21.07 14.05 -
LILO of 220 KV S/C
Dhuvaran - Fedra - Botad line
at Vallabhipur substation
220 KV D/C line - Zebra 0.37 0.22 0.15 -
LILO of one circuit of 220 KV
D/C BECL - Botad line at
Vallabhipur substation
220 KV D/C line - Zebra 3.70 2.22 1.48 -
66 KV D/C line - Panther 13.20 7.92 5.28 -
66 KV FB - 6 Nos. 2.80 1.68 1.12 -
55.19 33.11 22.08 -
220/66 KV Patan substation
220/66 KV s/s with 2x100 MVA
X'mer; 220 KV FB-2, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
31.62 - - 3.16
220 KV GIS / Hybrid system
at Patan220 KV GIS / Hybrid 21.75 - - 2.18
LILO of one circuit of 220 KV
D/C Sankhari - Jangral line at
Patan
220 KV D/C line - Zebra 3.70 - - 0.37
57.07 - - 5.71
220/66 KV Deesa substation
220/66 KV s/s with 2x100 MVA
X'mer; 220 KV FB-2, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
31.62 - - 3.16
220 KV GIS / Hybrid system
at Deesa220 KV GIS / Hybrid 21.75 - - 2.18
LILO of one circuit of 220 KV
D/C Zerda - Jangral line at
Deesa substation
220 KV D/C line - Zebra 5.55 - - 0.56
58.92 - - 5.89
220/66 KV Bechraji substation
220/66 KV s/s with 2x100 MVA
X'mer; 220 KV FB-2, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
31.62 15.81 3.16 6.32
220 KV D/C Mitha (Jotana) -
Bechraji line220 KV D/C line - AL-59 11.25 5.63 1.13 2.25
2 Nos. 220 KV feeder bays at
Mitha substation220 KV FBs - 2 Nos. 2.80 1.40 0.28 0.56
66 KV D/C line - Panther 8.80 4.40 0.88 1.76
66 KV FB - 6 Nos. 2.10 1.05 0.21 0.42
56.57 28.29 5.66 11.31
96220 KV Bechraji
substation
66 KV D/C interconnection
lines and bays for Bechraji
substationTotal :
94
Up-gradation of
132 KV Patan
substation to
220 KV level
Total :
95
Up-gradation of
132 KV Deesa
substation to
220 KV level
Total :
66 KV D/C interconnection
lines and bays for Gariyadhar
substation (interconnection Total :
93
Up-gradation of
132 KV
Vallabhipur
substation to
220 KV level
66 KV D/C interconnection
lines and bays for Vallabhipur
substation (interconnection Total :
91
220 KV Suva -
Dahej line &
LILO of one
ckt. of 220 KV
Haldarwa -
IPCL line at
Suva
Total :
System Strengthening scheme for 12th FYP
92
220 KV
Gariyadhar
substation
90
220 KV
Jamnagar -
Hadala line
Total :
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 64
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14 FY 2014-15 FY 2015-16
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
220/66 KV Barejadi substation
220/66 KV s/s with 2x100 MVA
X'mer; 220 KV FB-4, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
34.42 10.33 3.44 13.77
220 KV GIS / Hybrid system
at Barejadi220 KV GIS / Hybrid 21.75 6.53 2.18 8.70
LILO of one circuit of 220 KV
D/C Karamsad - Ranasan line
at Barejadi
220 KV D/C line - Zebra 4.44 1.33 0.44 1.78
220 KV D/C Pirana (PG) -
Barejadi line220 KV D/C line - AL-59 11.25 3.38 1.13 4.50
630 Sq.mm., (6+1) U/g cable
for interconnection with
existing 66 KV bus
66 KV U/g cable : 630 sq.mm.
(6+1) 2.79 0.84 0.28 1.12
66 KV D/C line - Panther 8.80 2.64 0.88 3.52
66 KV FB - 6 Nos. 2.10 0.63 0.21 0.84
85.55 25.67 8.56 34.22
220/66 KV Abdasa substation
220/66 KV s/s with 2x100 MVA
X'mer; 220 KV FB-6, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
37.22 - - 7.44
LILO of both circuits of 220
KV D/C Jamanwada (Suzlon)
wind farm - Varsana line at
Abdasa substation
220 KV D/C line - AL-59 (2 x 15
RKM) 13.50 - - 2.70
220 KV D/C Abdasa -
Nakhatrana line220 KV D/C line - AL-59 36.00 - - 7.20
220 KV D/C Varsana -
Charanka line220 KV D/C line - AL-59 56.25 - - 11.25
220 KV FB - 2 Nos. each at
Nakhatrana, Varsana &
Charanka substations
220 KV FB - 6 Nos. 8.40 - - 1.68
66 KV D/C line - Panther 8.80 - - 1.76
66 KV FB - 6 Nos. 2.10 - - 0.42
162.27 - - 32.45
220/66 KV Umargaon
substation
220/66 KV s/s with 2x100 MVA
X'mer; 220 KV FB-4, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
34.42 - - 3.44
220 KV GIS / Hybrid system
at Umargaon220 KV GIS / Hybrid 21.75 - - 2.18
LILO of 220 KV S/C Tarapur -
Vapi line at Umargaon220 KV D/C line - Zebra 3.70 - - 0.37
LILO of 220 KV S/C Tarapur -
Bhilad line at Umargaon220 KV D/C line - Zebra 3.70 - - 0.37
Monopole structures 220 KV D/C structure 5.00 - - 0.50
5.00 - - 0.50
66 KV D/C line - Panther 8.80 - - 0.88
66 KV FB - 6 Nos. 2.10 - - 0.21
84.47 - - 8.45
220/66 KV, 2 x 100 MVA
ICTs at Karamsad
220/66 KV s/s with 2x100 MVA
X'mer; 66 KV FB - 6 20.54 16.43 4.11 -
132 KV Transformer bay for
shifting132/66 KV ICT bay 0.50 0.40 0.10 -
66 KV D/C line - Panther 8.80 7.04 1.76 -
66 KV FB - 6 Nos. 2.10 1.68 0.42 -
31.94 25.55 6.39 -
220/66 KV, 2 x 100 MVA
ICTs at Kasor
220/66 KV s/s with 2x100 MVA
X'mer; 66 KV FB - 6 20.54 10.27 10.27 -
66 KV D/C line - Panther 8.80 4.40 4.40 -
66 KV FB - 6 Nos. 2.10 1.05 1.05 -
31.44 15.72 15.72 -
220/66 KV, 2 x 100 MVA
ICTs at Jambuva
220/66 KV s/s with 2x100 MVA
X'mer; 66 KV FB - 6 20.54 10.27 10.27 -
66 KV D/C line - Panther 8.80 4.40 4.40 -
66 KV FB - 6 Nos. 2.10 1.05 1.05 -
31.44 15.72 15.72 -
220/132 KV, 2 x 150 MVA
ICTs at Sikka220/132 KV, 2x150 MVA 20.00 - 20.00 -
20.00 - 20.00 -
103
220/132 KV, 2 x
150 MVA ICTs
at Sikka TPS Total :
101
220/66 KV, 2 x
100 MVA ICTs
at Kasor
66 KV D/C interconnection
lines and bays for Kasor
substation
Total :
102
220/66 KV, 2 x
100 MVA ICTs
at Jambuva
66 KV D/C interconnection
lines and bays for Jammbuva
substation
Total :
Total :
100
220/66 KV, 2 x
100 MVA ICTs
at Karamsad66 KV D/C interconnection
lines and bays for Karamsad
substation
Total :
98
220 KV Abdasa
substation
(Kutch)
66 KV D/C interconnection
lines and bays for Abdasa
substation Total :
99
Up-gradation of
66 KV
Umargaon
substation to
220 KV level
Modifications in existing 66 KV substations and demolition and 66 KV D/C interconnection
lines and bays for Umargaon
substation
97
Up-gradation of
66 KV Barejadi
substation to
220 KV level
66 KV D/C interconnection
lines and bays for Barejadi
substationTotal :
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 65
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14 FY 2014-15 FY 2015-16
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
220 KV switchyard with 4
Nos. of 220 KV feeder bays
220 KV switchyard and 4 Nos. of
feeder bays 10.60 - - -
220 KV D/C Tappar - Varsana
line220 KV D/C line - AL-59 1.80 - - -
2 Nos. of 220 KV Feeder bays
at 220 KV Tappar substation220 KV FB - 2 Nos. 2.80 - - -
400 KV, 50 MVAR Bus
Reactor with bay400 KV, 50 MVAR Reactor 10.00 - - -
LILO of one circuit of 400 KV
D/C APL Mundra - Zerda line
at Varsana
400 KV D/C line - Twin Moose 2.76 2.76 - -
2 Nos. of 400 KV feeder bays
at Varsana substation400 KV FB - 2 Nos. 8.06 8.06 - -
400/220 KV, 1 x 315 MVA
ICT at Split-bus
400/220 KV, 315 MVA ICT along
with bay 14.45 14.45 - -
50.47 25.27 - -
LILO of one circuit of 220 KV
D/C Nanikhakhar - Tappar line
at Mokha
220 KV D/C line - Zebra 4.07 4.07 - -
220 KV FBs at Mokha 220 KV FB - 2 Nos. 2.80 2.80 - -
6.87 6.87 - -
LILO of 220 KV S/C
Bhimasar - Morbi line at
Bhachau S/S
220 KV D/C line - Zebra 1.85 1.85 - -
220 KV FBs at Bhachau 220 KV FB - 2 Nos. 2.80 2.80 - -
4.65 4.65 - -
220/132 KV, 2 x 100 MVA
ICTs at Bhestan220/132 KV, 2x100 MVA 21.50 10.75 10.75 -
220/66 KV, 1 x 100 MVA
(2nd ) ICT at Bhestan220/66 KV, 1x100 MVA 9.22 4.61 4.61 -
LILO of both circuits of 132
KV D/C Navsari - Bhestan line
at 220 KV Bhestan
132 KV D/C line - ACSR Panthar
(2 x 10 RKM) 5.00 2.50 2.50 -
132 KV FBs at Bhestan 132 KV FB - 4 Nos. 3.00 1.50 1.50 -
38.72 19.36 19.36 -
220/66 KV, 1 x 100 MVA
(2nd ) ICT at Bhestan220/66 KV, 1x100 MVA 9.22 4.61 4.61 -
220 KV GIS system 220 KV GIS 21.75 10.88 10.88 -
220 KV D/C Navsari (PG) -
Atul line220 KV D/C line - AL-59 31.50 15.75 15.75 -
2 Nos. 220 KV FBs each at
Bhestan & Navsari (PG)
substations
220 KV FB - 4 Nos. 5.60 2.80 2.80 -
68.07 34.04 34.04 -
220/132 KV, 2 x 100 MVA
ICTs at Sartanpar220/132 KV, 2x100 MVA 21.50 10.75 10.75 -
220 KV & 132 KV GIS /
Hybrid system220 KV & 132 KV GIS 21.75 10.88 10.88 -
LILO of 220 KV S/C Morbi -
Lalpar line at 220 KV
Sartanpar substation
220 KV D/C line - Zebra 3.33 1.67 1.67 -
LILO of 132 KV S/C Lalpar -
Wankaner line at 220 KV
Sartanpar substation
132 KV D/C line - Panther 2.00 1.00 1.00 -
2 Nos. 220 KV FBs at
Sartanpar220 KV FB - 2 Nos. 2.80 1.40 1.40 -
2 Nos. 132 KV FBs at
Sartanpar132 KV FB - 2 Nos. 1.50 0.75 0.75 -
52.88 26.44 26.44 -
220/66 KV, 2 x 100 MVA
ICTs at Bhatia
220/66 KV, 2 x 100 MVA ICTs
including bays & 6 Nos. of 66 KV
FBs
20.54 16.43 4.11 -
66 KV D/C line - Panther 8.80 7.04 1.76 -
66 KV FB - 6 Nos. 2.10 1.68 0.42 -
31.44 25.15 6.29 -
220/66 KV, 1 x 100 MVA
(2nd) ICT at 220 KV Mokha,
Bhachau, Suva, Jarod and
Halvad (400 KV S/s)
substations
220/66 KV, 1 x 100 MVA ICT
along with bay 46.10 - - 13.83
46.10 - - 13.83
111
220/66 KV, 1 x
100 MVA
additional (2nd)
ICT
Total :
109
Additional
scheme for 220
KV Sartanpar
S/S
Total :
110
Additional
scheme for 220
KV Bhatia S/S66 KV D/C interconnection
lines and bays for Bhatia
substationTotal :
107
Additional
scheme for 220
KV Bhestan S/S
Total :
108
Additional
scheme for 220
KV Atul S/S
Total :
105
Additional
scheme for 220
KV Mokha S/S
Total :
106
Additional
scheme for 220
KV Bhachau S/S
Total :
104
Additional
scheme for 400
KV Varsana S/S
Total :
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 66
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14 FY 2014-15 FY 2015-16
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
132/66 KV s/s with 2x50 MVA
X'mer; 132 KV FB-2, 66 KV FB-4 10.35 2.07 4.14 4.14
132/11 KV, 2x25 MVA ICT at
Makansar substation 4.00 0.80 1.60 1.60
LILO of 132 KV S/C
Sartanpar - Wankaner line at
Makansar S/s
132 KV D/C line - Panther 0.25 0.05 0.10 0.10
66 KV D/C line - Panther 6.60 1.32 2.64 2.64
66 KV FB - 4 Nos. 1.40 0.28 0.56 0.56
22.60 4.52 9.04 9.04
132/66 KV s/s with 2x50 MVA
X'mer; 132 KV FB-2, 66 KV FB-4 10.35 2.07 4.14 4.14
132/11 KV, 2x25 MVA ICT at
Vaghasia substation 4.00 0.80 1.60 1.60
LILO of 132 KV S/C
Sartanpar - Wankaner line at
Vaghasia substation
132 KV D/C line - Panther 0.25 0.05 0.10 0.10
66 KV D/C line - Panther 6.60 1.32 2.64 2.64
66 KV FB - 4 Nos. 1.40 0.28 0.56 0.56
22.60 4.52 9.04 9.04
132 KV D/C Ode - Manusar
line
132 KV D/C line - Panther
conductor 8.75 0.88 1.75 1.75
2 Nos. 132 KV feeder bays
each at 132 KV Ode &
Manjusar substations
132 KV FB - 4 Nos. 3.00 0.30 0.60 0.60
11.75 1.18 2.35 2.35
400/220 KV, 1 x 315 MVA
OR 1 x 500 MVA ICT
400/220 KV, 315 MVA OR 500
MVA ICT with bay 72.25 - - -
220/132 KV OR 220/66 KV, 1
x 100 MVA ICT (five
substations each year)
220/132 KV OR 220/66 KV, 100
MVA ICT along with bay 230.50 46.10 23.05 46.10
132/66 KV, 1 x 50 MVA ICT
(three substations each year)
132/66 KV, 50 MVA ICT along
with bay 41.25 8.25 8.25 8.25
344.00 54.35 31.30 54.35
66 KV S/C Sagbara - Nizar line 66 KV S/C line - Panther 6.00 3.60 2.40 -
1 No. 66 KV feeder bay each
at 66 KV Sagbara & Nizar
substations
66 KV FB - 2 Nos. 0.70 0.42 0.28 -
6.70 4.02 2.68 -
new 66 KV substations (41
Nos. in MGVCL + 19 Nos.
PGVCL + 7 Nos. UGVCL)
66/11KV s/s with 10 MVA X'mer;
FB-1 & X'mer Bay-1 201.00 - - 100.50
66 KV S/C line 36.18 9.05 9.05 9.05
66 KV D/C line 90.45 22.61 22.61 22.61
327.63 31.66 31.66 132.16
V - - - -
400/220 KV, 2x315 MVA X'mers,
400 KV FB - 4, 220 KV FB - 6, 80
MVAR Bus Reactor
88.94 - - 17.79
220/66 KV, 2 x 100 MVA X'mer,
66 KV FB - 6 20.54 - - 4.11
LILO of one circuit of 400 KV
D/C Kosamba - Vapi (PG) line
at 400 KV Chikhli substation
400 KV D/C line - Twin Moose
(15 RKM) 15.98 - - 3.20
LILO of one circuit of planned
400 KV D/C Ukai -Kosamba
line at new s/s near Chikhli
400 KV D/C line - Twin Moose
(60 RKM) 63.90 - - 12.78
220 KV D/C Chikhli - Chikhli
(400 KV) line220 KV D/C line - (AL-59) 7.28 - - 1.46
220 KV D/C Bhilad - Chikhli
(400 KV) line220 KV D/C line - (AL-59) -- - - -
220 KV D/C Atul - Chikhli
(400 KV) line220 KV D/C line - (AL-59) 19.40 - - 3.88
System Strengthening scheme for 12th FYP
118
400 KV Chikhli
substation at
Dist. Navsari
400/220 KV Chikhli s/s
116
66 KV link line
for Nizar
substation
Total :
11766 KV
substations
66 KV lines
Total :
114
2nd Source of
power supply for
132 KV Ode &
Manjusar
substationsTotal :
115
EHV
Transformer
augmentation
during 12th FYP
Total :
66 KV D/C interconnection
lines and bays for Makansar
substationTotal :
113132 KV
Vaghasia
132/66 & 132/11 KV Vaghasia
s/s
66 KV D/C interconnection
lines and bays for Vaghasia
substationTotal :
112132 KV
Makansar
132/66 & 132/11 KV
Makansar s/s
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 67
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14 FY 2014-15 FY 2015-16
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
220 KV FB - 2 Nos. each at
Chikhli (220 KV),Bhilad and
Atul substations
220 KV FB - 6 Nos. 9.48 - - 1.90
66 KV D/C line - ACSR Panther 10.00 - - 2.00
66 KV FB - 6 Nos. 2.10 - - 0.42
237.61 - - 47.52
220/66 KV Santej substation
220/66 KV s/s with 2x100 MVA
X'mer; 220 KV FB-2, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
31.62 - 6.32 9.49
220 KV Hybrid switchyard 21.75 - 4.35 6.53
LILO of 220 KV S/C Vadavi -
Chhatral line at 220 KV Santej
substation
220 KV D/C Line - AL-59
Conductor 12.13 - 2.43 3.64
66 KV D/C line - ACSR Panther 10.00 - 2.00 3.00
66 KV FB - 6 Nos. 2.10 - 0.42 0.63
77.60 - 15.52 23.28
220/66 KV Balasinor
substation
220/66 KV s/s with 2x100 MVA
X'mer; 220 KV FB-2, 220 KV BC
bay-1, 220 KV TBC - 1, 66 KV FB -
6
31.62 - 6.32 9.49
LILO of one circuit of 220
KV D/C Wanakbori - Asoj line
at 220 KV Balasinor substation
220 KV D/C Line - ACSR Zebra
Conductor 9.20 - 1.84 2.76
66 KV D/C line - ACSR Panther 10.00 - 2.00 3.00
66 KV FB - 6 Nos. 2.10 - 0.42 0.63
52.92 - 10.58 15.88
132/11 KV Vakhatpar
substation
132/11 KV s/s with
2x12.5 MVA X'mer;
132 KV FB-2,
5.93 5.93 - -
LILO of 132KV S/C Sitagadh -
Limbdi line at 132KV
Vakhatpar substation
132 KV D/C Line - ACSR Panther
Conductor 0.02 0.02 - -
5.95 5.95 - -
132/66 KV Pipli substation
132/66 KV s/s with
2x50 MVA X'mer;
132 KV FB-2, 66 KV FB - 6, 66/11
KV, 2 X 15 MVA X'mer
13.55 - - 10.84
LILO of one ckt of
132 KV D/C Dhuvaran -
Dhandhuka line at
132 KV Pipli substation
132 KV D/C Line - ACSR Panther
Conductor 1.20 - - 0.96
66 KV D/C line -
ACSR Panther 10.00 - - 8.00
66 KV FB - 6 Nos. 2.10 - - 1.68
26.85 - - 21.48
28.90 - 2.89 8.67
- - - -
86.70 - 8.67 26.01
- - - -
40.00 - 4.00 12.00
- - - -
155.60 - 15.56 46.68
220 KV FB - 2 Nos. 3.16 - - 1.26
220 KV D/C Line - AL -59
Conductor 19.40 - - 7.76
22.56 - - 9.02
220/132 KV, 2 x 100 MVA
ICTs at Vallabhipur220/132 KV, 2x100 MVA 21.50 8.60 12.90 -
21.50 8.60 12.90 -
220 KV GIS / Hybrid system
at Suva220 KV GIS / Hybrid 21.75 21.75 - -
21.75 21.75 - -
126
220 KV Suva
substation
Dist. Bharuch Total:
124
220 KV D/C
Vataman
(PGCIL) -
Kerala line
220 KV D/C line
Total:
125
220/132 KV
System at 220
KV Vallabhipur
substationTotal:
123
EHV
Augmentation at
400 KV
substation
400/220 KV, 1 X 315 or 1 X
500 MVA ICT with Bay
400/220 KV, 1 X 315 MVA ICT at
400 KV Vadavi, 400 KV Hadala
Total:
121
132/11KV,
2X12.5 MVA
ICTs at
Vakhatpar
substation at
Dist. Surendra-
nagar
Total:
122
132/66KV,
2X50 MVA
ICTs at Pipli
substation at
Dist. Ahmedab-
ad66 KV D/C interconnection
lines and bays for Pipli
substation
Total:
400/220 KV, 1 X 500 MVA ICT at
400 KV Soja, 400 KV Chorania
400/220 KV, 2 X 315 MVA ICT at
400 KV Kosamba, Kasor, Amreli
119
220/66KV,
2X100 MVA
ICTs at 220KV
Santej at Dist.
Gandhinagar
66 KV D/C interconnection
lines and bays for Santej
substation
Total:
120
220/66KV,
2X100 MVA
ICTs at 220KV
Balasinor at
Dist. Kheda
66 KV D/C interconnection
lines and bays for Balasinor
substation
Total:
118
400 KV Chikhli
substation at
Dist. Navsari
66 KV D/C interconnection
lines and bays for 400 KV
Chikhli substation
Total:
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 68
Mid-term Review of Business Plan for FY 2014-15 FY 2015-16
FY 2013-14 FY 2014-15 FY 2015-16
Proposed Capital Expenditure
PROPOSED INVESTMENT PLAN OF GETCO NETWORK DURING FY 2013-14 to FY 2015-16 (Rs. in Crores)
S.
N.
Name of
Project
Name of S/S and
Transmisssion lineWork involved
Estimated
Cost
127
OPGW BR. No.
71.10/1116
dated on 23-2-
11, 81.25/1283
dated 4-7-12,
54.7/476 dated 7-
1-13
Laying and installation of
OPGWOPGW fiber 145.06 7.25 7.25 29.01
145.06 7.25 7.25 29.01
13,497.55 2,210.92 2,232.03 2,411.33
Total:
Grand Total (1 to 127)
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 69