PROP FM 1560 STA 107+69.06 STA 95+42 · project layout s h 1 6 s h 1 6 r i g g s n r o a d f m 1 5...
Transcript of PROP FM 1560 STA 107+69.06 STA 95+42 · project layout s h 1 6 s h 1 6 r i g g s n r o a d f m 1 5...
![Page 1: PROP FM 1560 STA 107+69.06 STA 95+42 · project layout s h 1 6 s h 1 6 r i g g s n r o a d f m 1 5 6 0 (e x is t) h e l o t e s c c r e e k i r c l e1 a t r a i l p r o p bf m 1 5](https://reader033.fdocuments.net/reader033/viewer/2022041500/5e216aff4e7fe979c303eb73/html5/thumbnails/1.jpg)
PROJECT LAYOUT
SH 1
6
SH 16
RIG
GS R
OA
D
FM 1560 (EXIST)
HE
LO
TES C
RE
EK
CIR
CLE A T
RAIL
PROP FM 1
560
1"=200'
N
PC11+6
2.25
1 OF 1
STA 118+75.63
\ SH 16
BEGIN CONSTRUCTION
STA 141+48.87
\ SH 16
END CONSTRUCTION
IRO
N H
OR
SE
WA
Y
4
STA 107+69.06\ PROP FM 1560END PROJECT
STA 95+42.65\ PROP FM 1560BEGIN PROJECT
FED.RD.
DIV.NO.
STATE
CONT. SECT. JOB
SHEET
NO.
HIGHWAY NO.
COUNTYDIST.
6
TEXAS SAT
Texas Department of Transportationc
SHEET
FEDERAL AID PROJECT
SCALE:
pw:\\txdot.project
wiseonline.co
m:
Tx
DO
T4\
Docu
ments\15 -
SA
T\
Design
Projects\223001.018\4 -
Design\
Plan
Set\1.
General\f
m1560
PRJ.dgn
1/13/2017
8:07:05
AM
2230 01 018 FM 1560
BEXAR
2016 TxDOT
FM 1560
S
TATE OF TEXA
S
PR
O
FESSIONAL ENGI
N
EER
107864
DATE
P.E.
DANIEL D. WORDEN
DANIEL D. WORDEN
NECL
S DEI
BO
RE #8
BO
RE #7
BO
RE #2
BO
RE #1
BO
RE #3
BO
RE #4
BORE #5
BORE #6
RI
GG
S
RD
FM 15
60
120
+00
125+00
130+00
135+00
140+00
PT140
+20.24
POT10+0
0.00
10
+00
PC11+6
2.25
PT14
+31.69
15+00
PO
T16
+01.36
PT099
+99.97
100+00
PC101
+66.82
PT104+47.38
105+0
0
PO
T107+69.06
PO
T0
+00.00
0+00
PO
T0
+15.94
PO
T0
+60.84
POT0+00.00
0+00
POT0+17.00
POT0+58.84
POT0+00.00
0+00
POT0+11.00
POT0+75.14
PO
T0+00.00
0+00
PO
T0+28.83
PO
T0+65.46
01/18/2017
![Page 2: PROP FM 1560 STA 107+69.06 STA 95+42 · project layout s h 1 6 s h 1 6 r i g g s n r o a d f m 1 5 6 0 (e x is t) h e l o t e s c c r e e k i r c l e1 a t r a i l p r o p bf m 1 5](https://reader033.fdocuments.net/reader033/viewer/2022041500/5e216aff4e7fe979c303eb73/html5/thumbnails/2.jpg)
LIV
EO
AK
23"
LIV
EO
AK
19"
LIV
EO
AK
20"
(BA
ND
ER
A HIG
HW
AY)
S.H. 1
6
T
W
W
T
WW
W
W
W
W
W
W
T
1
2
T
W
W
W
W
T
W
W E
T
T
T
W
T
P
RO
PO
PS
ED
E
XIS
TIN
G
SCALE
FED.RD.
DIV.NO.
STATE
CONT. SECT. JOB
SHEET
NO.
HIGHWAY NO.
COUNTYDIST.
6
TEXAS SAT
Texas Department of Transportationc
SHEET
FEDERAL AID PROJECT
pw:\\txdot.project
wiseonline.co
m:
Tx
DO
T4\
Docu
ments\15 -
SA
T\
Design
Projects\223001.018\4 -
Design\
Plan
Set\3.
Road
way\
FM1560pp_01.dgn
1/13/2017
9:50:03
AM
HORIZONTAL:
VERTICAL:
PROFILE
PLAN
2230 01 018 FM 1560
BEXAR
2016 TxDOT
FM 1560
997.04
VPI
ST
A. 102
+21.65
EL
EV
ATI
ON997.82
+0.35%
175.00' V.C.
K = 38
ex = 1.02'
+5.0
0%
+5.0
0%
VPI
ST
A. 106
+26.55
EL
EV
ATI
ON1,018.06
+5.0
0% -4.00%
170.00' V.C.
K = 19
ex = -1.91'
1,014.51
POT10+00
.0010
+00
PC11+62
.25
PT14+31.69
15+00
PO
T16+01.36
PO
T95
+42.65
PC95
+85.05
PT099
+99.97
100+00
PC101
+66.82
PT104
+47.38
105+0
0
PO
T107
+69.06
25
+00
30+00
DW16-3
R
2230-01-018 CSJ: SUMMARYQUANTITY
ITEM UNIT QUANTITY
ROWPREPARING STA 15.06
(MISC) CONCREMOVE SY 0
(0-4") PAV ASPH AND BASE STABREMOVING SY 0
ROAD ABONDONEDOBLITERATING SY 340
ROADWAYEXCAVATION CY 867
COMP)(TYB) (FINAL)(ORDEMBANKMENT CY 5,042
(4") TOPSOIL MANUFCOMPOST SY 2,840
C) (TY 1) (CL BLANKETS RETENTIONSOIL SY 2,840
(PERM)(URBAN)(CLAY) SEED MULCHSTRAW/HAY SY 3,179
COOL) OR (WARM (TEMP) SEEDDRILL SY 3,179
WATERINGVEGETATIVE MG 50
5)(6") OR 1-2 GR D (TY PLC) IN (CMP BSFL SY 8,267
(MC-30) COATPRIME GAL 1,654
GR-3) (TY-BAGGR CY 90
CRS2P) OR CHFRS2P (AC-15P,ASPH GAL 3,128
64-22 PG B TY (SQ) HMAD-GR TON 0
70-22 PG B SAC D TY (SQ) HMAD-GR TON 2,144
76-22 PG (ASPHALT)TOM TON 0
SAC-A AGGREGATETOM-C TON 0
3") TO (0" PAV CONC ASPHPLANE SY 362
B)(4") (CONC)(CLRIPRAP 0 54
IN) (4 MOWSTRIPRIPRAP CY 8
T221) (TYRAIL CY 457
C221) (TYRAIL LF 424
I) (TY CURBCONC LF 2,179
(MOUNTABLE) CURBCONC LF 0
(CONC)DRIVEWAYS SY 0
2) (ACP)(TYPEDRIVEWAYS SY 0
(5") SIDEWALKSCONC SY 441
2) (TY RAMPSCURB EA 2
POST) (TIM FEN GD W-BEAMMTL LF 63
(T101) TRANS FEN GD BEAMMTL EA 2
SECTION TERM ANCHORDOWNSTREAM EA 1
FENCE GUARD BEAM METALREMOVE LF 155
SECTION ANCHOR TERMINALREMOVE EA 2
(INSTALL) TREATMENT ENDGUARDRAIL EA 1
TY1 (TWG-POST) INSTALL-SMAILBOX EA 1
PROTECTION)(18") (STONERIPRAP CY 0
B) (TY HANDRAILRAIL LF 259
2230-01-018 CSJ: SUMMARYQUANTITY
ITEM UNIT QUANTITY
3") TO (0" PAV CONC ASPHPLANE SY 1,008
(24") UNDERSEAL JTPAV LF 320
JOINTS EXISTCLEANING LF 400
JOINT EXPANSION TYPEHEADER CF 20
SEALANTJOINT LF 400
GR-3) (TY-BAGGR SY 7
105+00
997.39
998.32
1006.73
1011.73
1015.83
1015.09
101+00 102+00 103+00 104+00 106+00 107+00
1000
1010
10201001.74
1000
1010
1020
997.4
9
997.6
6
998.1
4
1000.7
8
1002.4
8
1009.6
4
1013.3
9
N
990990
100+00
997.0
4
P
RO
PO
PS
ED
E
XIS
TIN
G
1"=100'
1"=10'
1 OF 1
RIGGS RD
FM 1560
RIG
GS R
D
ALIGN "RIGGS"
EXISTING GROUND
PROPOSED GROUND
RIPRAP MOWSTRIP (4 IN) EST @ 8 CY
GUARDRAIL END TREATMENT (INSTALL) EST @ 1 EA
DOWNSTREAM ANCHOR TERM SECTION EST @ 1 EA
MTL BEAM GD FEN TRANS (T101) EST @ 2 EA
MTL W-BEAM GD FEN (TIM POST) EST @ 63 LF
REMOVE TERMINAL ANCHOR SECTION EST @ 2 EA
REMOVE METAL BEAM GUARD FENCE EST @ 155 LF
EST @ 297 SY
CONC SIDEWALKS (5")
SAWCUT
EXIST ROW
EXIST ROW
PROP ROW
PROP ROW
PROP ROW
SH 16 N
OR
TH
BO
UN
D
SH 16 S
OU
TH
BO
UN
D
ALIGN "FM 1560"
NOTES:
3. SEE SH 16 PLAN LAYOUTS FOR SH 16 QUANTITIESLEGEND
AND/OR TOPSOIL
VEGETATION ESTABLISHMENT
OVERLAY LIMITS
TRAFFIC DIRECTION
EST @ 5 CY
W/ RIPRAP (CONC) (CL B) (4")
EST @ 86 LF*
CONC CURB (TY I)
EST @ 438 LF
CONC CURB (TY I)
EST @ 457 LF
RAIL (TY T221)
72
FOR TY 1 CURB DETAILS
*1. REFER TO SAN ANTONIO DISTRICT STANDARD
ARE SUBSIDIARY TO PREP ROW
REMOVED IN BETWEEN RET WALLS
2. ALL SIZE TREES (4" - 24" DIA.) TO BE
EST @ 7 CY
W/ RIPRAP (CONC) (CL B) (4 IN)
EST @ 314 LF*
CONC CURB (TY I)
EST @ 42 CY
W/ RIPRAP (CONC) (CL B) (4")
EST @ 774 LF*
CONC CURB (TY I)
EST @ 567 LF*
CONC CURB (TY I)
DRIVEWAY # 2
HELOTES CREEK BRIDGE QUANTITIES
EST @ 2 EA
CURB RAMPS (TY 2)
EST @ 144 SY
CONC SIDEWALKS (5")
DETAIL SHEET FOR MORE INFORMATION.
100, PREPARING ROW. SEE TREE PROTECTION
PROTECTION IS CONSIDERED SUBSIDIARY TO ITEM
IN FM1560 NEW LOCATION CONSTRUCTION. TREE
IN IMMEDIATE VICINITY OF CONSTRUCTION ZONE
4. TREE PROTECTION AREAS CONSIST OF TREES NOT
D-GR HMA (SQ) TY D SAC B PG 70-22
PLANE 1.5" OFF OF BRIDGE AND REPLACE WITH 1.5" OF
IN PLAN LAYOUT QUANTITY
HOTMIX QUANTITY FOR BRIDGE OVERLAY IS INCLUDED
EST @ 259 LF
W/HANDRAIL (TY B)
EST @ 424 LF
RAIL (TY C221)
S
TATE OF TEXA
S
PR
O
FESSIONAL ENGI
N
EER
107864
DATE
P.E.
DANIEL D. WORDEN
DANIEL D. WORDEN
NECL
S DEI
EST @ 1 EA
(TWG-POST) TY1
MAILBOX INSTALL-S
01/18/2017
![Page 3: PROP FM 1560 STA 107+69.06 STA 95+42 · project layout s h 1 6 s h 1 6 r i g g s n r o a d f m 1 5 6 0 (e x is t) h e l o t e s c c r e e k i r c l e1 a t r a i l p r o p bf m 1 5](https://reader033.fdocuments.net/reader033/viewer/2022041500/5e216aff4e7fe979c303eb73/html5/thumbnails/3.jpg)
RIGGS RD
105
+00
10+00 11+00 12+00 13+00 14+00 15+00 16+00
RIGGS R
D
FM 1
560
N
1,0
01.8
4
1,0
01.0
9
1,0
00.3
5
999.9
0
999.3
3
998.0
8
998.6
3
999.9
5
1,0
01.1
4
1,0
02.3
4
1,0
04.0
7
1,0
05.8
8
1,0
07.3
8
1,0
01.8
4
1,0
01.0
9
1,0
00.3
5
999.8
5
1,0
00.0
2
1,0
01.6
7
1,0
01.5
7
1,0
01.0
8
1,0
01.2
6
1,0
02.3
3
1010
1000
990
980980
990
1000
1010
1"=10'
1"=100'
1 OF 1
EXISTING GROUND
PROPOSED GROUND
PROP ROW
PR
OP R
OW
PR
OP R
OW
EXIST
ROW
NOTES:
PURPOSES ONLY.
RIGGS ROAD QUANTITIES. THIS SHEET IS FOR GEOMETRIC
1. SEE FM 1560 PLAN AND PROFILE SHEETS FOR
PROFILE
PLAN
RIGGS ROAD
73
S
TATE OF TEXA
S
PR
O
FESSIONAL ENGI
N
EER
107864
DATE
P.E.
DANIEL D. WORDEN
DANIEL D. WORDEN
NECL
S DEI
PO
T10
+00.00
10+00
PC11
+62.25
PT14
+31.69
15+0
0
PO
T16
+01.36
PT099+99.97
100+0
0
PC101+66.82
PT104+47
.38
105
+00
W
W
T
W
W
W
W
W
T
W
W
T
W
W
T
W
W
E
T
T
T
W
T
P
RO
PO
PS
ED
E
XIS
TIN
G
SCALE
FED.RD.
DIV.NO.
STATE
CONT. SECT. JOB
SHEET
NO.
HIGHWAY NO.
COUNTYDIST.
6
TEXAS SAT
Texas Department of Transportationc
SHEET
FEDERAL AID PROJECT
pw:\\txdot.project
wiseonline.co
m:
Tx
DO
T4\
Docu
ments\15 -
SA
T\
Design
Projects\223001.018\4 -
Design\
Plan
Set\3.
Road
way\
FM1560pp_02.dgn
1/13/2017
9:51:00
AM
HORIZONTAL:
VERTICAL:
2230 01 018 FM 1560
BEXAR
2016 TxDOT
1,0
01.8
4
VPI
ST
A. 11
+48.6
5
EL
EV
ATIO
N999.6
2
-1.49%
+0.77%
VPI
ST
A. 12
+07.9
0
EL
EV
ATIO
N1,0
00.0
8
VPI
ST
A. 12
+48.1
3
EL
EV
ATIO
N1,0
01.6
7
+3.95
%
VPI
ST
A. 12
+89.8
0
EL
EV
ATIO
N1,0
01.6
7
-1.00%
VPI
ST
A. 13
+82.7
9
EL
EV
ATIO
N1,0
00.7
4
+2.37%
80.00' V.C.
1,0
02.4
2
+0.00%
V.C.
80.00'
01/18/2017
![Page 4: PROP FM 1560 STA 107+69.06 STA 95+42 · project layout s h 1 6 s h 1 6 r i g g s n r o a d f m 1 5 6 0 (e x is t) h e l o t e s c c r e e k i r c l e1 a t r a i l p r o p bf m 1 5](https://reader033.fdocuments.net/reader033/viewer/2022041500/5e216aff4e7fe979c303eb73/html5/thumbnails/4.jpg)
US
SU
RV
EY
FE
ET
UNIT
S
OF
ME
AS
UR
E:
GE
OID
03
GE
OID
MO
DE
L
US
ED:
NA
VD88
VE
RTIC
AL
DA
TU
M:
SO
UT
H
CE
NTR
AL
ZO
NE
TE
XAS
PR
OJE
CT
ZO
NE:
CS
F:1.0
0017
HO
RIZ
ON
TA
L
ADJ
US
TM
EN
TS:
NA
D83
HO
RIZ
ON
TA
L
DA
TU
M:
CO
OR
DIN
ATES
AR
E
SU
RF
AC
E
CO
OR
DIN
ATES
SSI
EE
GT
S
2230-01-018 CSJ: SUMMARYQUANTITY
ITEM UNIT QUANTITY
ROWPREPARING STA 5.24
(MISC) CONCREMOVE SY 12
(0-4") PAV ASPH AND BASE STABREMOVING SY 317
ROAD ABONDONEDOBLITERATING SY 0
ROADWAYEXCAVATION CY 703
COMP)(TYB) (FINAL)(ORDEMBANKMENT CY 646
(4") TOPSOIL MANUFCOMPOST SY 2,154
C) (TY 1) (CL BLANKETS RETENTIONSOIL SY 2,154
(PERM)(URBAN)(CLAY) SEED MULCHSTRAW/HAY SY 2,154
COOL) OR (WARM (TEMP) SEEDDRILL SY 2,154
WATERINGVEGETATIVE MG 33
5)(6") OR 1-2 GR D (TY PLC) IN (CMP BSFL SY 1,959
(MC-30) COATPRIME GAL 393
GR-3) (TY-BAGGR CY 39
CRS2P) OR CHFRS2P (AC-15P,ASPH GAL 1,358
64-22 PG B TY (SQ) HMAD-GR TON 835
70-22 PG B SAC D TY (SQ) HMAD-GR TON 246
76-22 PG (ASPHALT)TOM TON 31
SAC-A AGGREGATETOM-C TON 438
3") TO (0" PAV CONC ASPHPLANE SY 919
B)(4") (CONC)(CLRIPRAP 24
IN) (4 MOWSTRIPRIPRAP CY 20
T221) (TYRAIL CY 0
C221) (TYRAIL LF 0
I) (TY CURBCONC LF 1,037
(MOUNTABLE) CURBCONC LF 0
(CONC)DRIVEWAYS SY 224
2) (ACP)(TYPEDRIVEWAYS SY 0
(5") SIDEWALKSCONC SY 0
2) (TY RAMPSCURB EA 0
POST) (TIM FEN GD W-BEAMMTL LF 200
(T101) TRANS FEN GD BEAMMTL EA 0
SECTION TERM ANCHORDOWNSTREAM EA 2
FENCE GUARD BEAM METALREMOVE LF 0
SECTION ANCHOR TERMINALREMOVE EA 0
(INSTALL) TREATMENT ENDGUARDRAIL EA 2
TY1 (TWG-POST) INSTALL-SMAILBOX EA 1
PROTECTION)(18") (STONERIPRAP CY 0
FED.RD.
DIV.NO.
STATE
CONT. SECT. JOB
SHEET
NO.
HIGHWAY NO.
COUNTYDIST.
6
TEXAS SAT
Texas Department of Transportationc
SHEET
FEDERAL AID PROJECT
SCALE:
pw:\\txdot.project
wiseonline.co
m:
Tx
DO
T4\
Docu
ments\15 -
SA
T\
Design
Projects\223001.018\4 -
Design\
Plan
Set\3.
Road
way\
SH16
PL
N_01.dgn
1/13/2017
9:52:12
AM
2230 01 018 FM 1560
BEXAR
2016 TxDOT
LEGEND
TRAFFIC DIRECTION
OVERLAY LIMITS
AND/OR TOPSOIL
VEGETATION ESTABLISHMENT
MOWSTRIP OR DRIVEWAY
CONCRETE: RIPRAP OR
S
TATE OF TEXA
S
PR
O
FESSIONAL ENGI
N
EER
107864
DATE
P.E.
DANIEL D. WORDEN
DANIEL D. WORDEN
NECL
S DEI
115+00
120+00
PO
T10
+00.00
SH 16
MA
TC
H
LI
NE
ST
A 124
+00.00
SH 16
PLAN LAYOUT
N
1"=100'
1 OF 3
74
EXIST ROW
EXIST ROW
SH 16 NORTHBOUND
SH 16 SOUTHBOUND
100'
100'
STA 116+81
BEGIN OVERLAY
STA 116+81
BEGIN OVERLAY
FOR RIPRAP QTY)
(SEE DRAINAGE SHEETS
EST @ 12 SY
REMOVE CONC (MISC)
EST @ 317 SY
AND ASPH (0-4")
REMOVING STAB BASE
EST @ 1 EA
MAILBOX INSTALL S (TWG-POST) TY I
ALIGN "SH 16"
SAWCUT LINE
SAWCUT LINE
EST @ 10 CY
W/ RIPRAP (CONC) (CL B) (4")
EST @ 117 LF
CONC CURB (TY 1)
MEDIAN 1:
EST @ 870 LF
CONC CURB (TY I)
EST W/ TOE DITCH @ 7 CY
W/ RIPRAP (CONC) (CL B) (4")
EST @ 50 LF
CONC CURB (TY I)
MEDIAN 1:
EST @ 919 SY
(0" TO 3")
PLANE ASPH CONC PAV
RIPRAP CONC (MOWSTRIP) (4 IN) EST @ 10 CY
DOWNSTREAM ANCHOR TERM SECTION EST @ 1 EA
GUARDRAIL END TREATMENT (INSTALL) EST @ 1 EA
MTL W-BEAM GD FEN (TIM POST) EST @ 100 LF
RIPRAP CONC (MOWSTRIP) (4 IN) EST @ 10 CY
DOWNSTREAM ANCHOR TERM SECTION EST @ 1 EA
GUARDRAIL END TREATMENT (INSTALL) EST @ 1 EA
MTL W-BEAM GD FEN (TIM POST) EST @ 100 LF
EST W/ TOE DITCH @ 7 CY
RIPRAP (CONC) (CL B) (4")
DRIVEWAY # 1
EST @ 224 SY
DRIVEWAYS (CONC)
LEVEL UP DETAIL AND LOCATIONS.
4. SEE MISCELLANEOUS ROADWAY DETAILS FOR SH 16
3. SEE DRIVEWAY LAYOUTS FOR DRIVEWAY DETAILS.
LOCATIONS IN THE FEILD.
2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING UTILITY
LINE AND MAINTAIN EXISTING CROSS SLOPE.
1. FOR SH 16 WIDENING, BEGIN WIDENING AT SAWCUT
NOTES:
01/18/2017
![Page 5: PROP FM 1560 STA 107+69.06 STA 95+42 · project layout s h 1 6 s h 1 6 r i g g s n r o a d f m 1 5 6 0 (e x is t) h e l o t e s c c r e e k i r c l e1 a t r a i l p r o p bf m 1 5](https://reader033.fdocuments.net/reader033/viewer/2022041500/5e216aff4e7fe979c303eb73/html5/thumbnails/5.jpg)
FED.RD.
DIV.NO.
STATE
CONT. SECT. JOB
SHEET
NO.
HIGHWAY NO.
COUNTYDIST.
6
TEXAS SAT
Texas Department of Transportationc
SHEET
FEDERAL AID PROJECT
SCALE:
pw:\\txdot.project
wiseonline.co
m:
Tx
DO
T4\
Docu
ments\15 -
SA
T\
Design
Projects\223001.018\4 -
Design\
Plan
Set\3.
Road
way\
SH16
PL
N_02.dgn
1/13/2017
9:53:19
AM
2230 01 018 FM 1560
BEXAR
2016 TxDOT
LEGEND
TRAFFIC DIRECTION
OVERLAY LIMITS
AND/OR TOPSOIL
VEGETATION ESTABLISHMENT
MOWSTRIP OR DRIVEWAY
CONCRETE: RIPRAP OR
S
TATE OF TEXA
S
PR
O
FESSIONAL ENGI
N
EER
107864
DATE
P.E.
DANIEL D. WORDEN
DANIEL D. WORDEN
NECL
S DEI
2230-01-018 CSJ: SUMMARYQUANTITY
ITEM UNIT QUANTITY
ROWPREPARING STA 12.00
(MISC) CONCREMOVE SY 1,009
(0-4") PAV ASPH AND BASE STABREMOVING SY 187
ROAD ABONDONEDOBLITERATING SY 0
ROADWAYEXCAVATION CY 1,414
COMP)(TYB) (FINAL)(ORDEMBANKMENT CY 1,408
(4") TOPSOIL MANUFCOMPOST SY 2,634
C) (TY 1) (CL BLANKETS RETENTIONSOIL SY 2,491
(PERM)(URBAN)(CLAY) SEED MULCHSTRAW/HAY SY 2,491
COOL) OR (WARM (TEMP) SEEDDRILL SY 2,491
WATERINGVEGETATIVE MG 41
5)(6") OR 1-2 GR D (TY PLC) IN (CMP BSFL SY 5,059
(MC-30) COATPRIME GAL 1,014
GR-3) (TY-BAGGR CY 116
CRS2P) OR CHFRS2P (AC-15P,ASPH GAL 4,007
64-22 PG B TY (SQ) HMAD-GR TON 2,932
70-22 PG B SAC D TY (SQ) HMAD-GR TON 257
76-22 PG (ASPHALT)TOM TON 80
SAC-A AGGREGATETOM-C TON 1,138
3") TO (0" PAV CONC ASPHPLANE SY 187
B)(4") (CONC)(CLRIPRAP 0 40
IN) (4 MOWSTRIPRIPRAP CY 7
T221) (TYRAIL CY 0
C221) (TYRAIL LF 0
I) (TY CURBCONC LF 2,420
(MOUNTABLE) CURBCONC LF 119
(CONC)DRIVEWAYS SY 1,034
2) (ACP)(TYPEDRIVEWAYS SY 0
(5") SIDEWALKSCONC SY 0
2) (TY RAMPSCURB EA 0
POST) (TIM FEN GD W-BEAMMTL LF 54
(T101) TRANS FEN GD BEAMMTL EA 0
SECTION TERM ANCHORDOWNSTREAM EA 0
FENCE GUARD BEAM METALREMOVE LF 0
SECTION ANCHOR TERMINALREMOVE EA 0
(INSTALL) TREATMENT ENDGUARDRAIL EA 1
TY1 (TWG-POST) INSTALL-SMAILBOX EA 2
PROTECTION)(18") (STONERIPRAP CY 447
PB
X
WW W
W
T
W
PB
X
T
PB
X
W
T
PB
X
W
T
PB
X
W
W
W
W
W
PB
X
A-2
A2-A1
C-8
C8-C8A
A-6
A-6
A-5
A-1
A-2
TH-13B
TH-13TH-13C
TH-13A
TH-6
TH-8
TH-7 T
H-9
T
W
W
T
5
6
W
WW
WW
1
23
4
PT14
+31.69
15+0
0
PO
T16
+01.36
PT104+47.
38
105
+00
POT0+58.84
POT0+65.46
125+00
130+00
135+00
POT107+69.
06POT0+00.00
0+00
POT0+11.00
POT0+75.14
W
SH 16
MA
TC
H
LI
NE
ST
A 124
+00.00
SH 16
MA
TC
H
LI
NE
ST
A 136
+00.00
POT107+69.06
N57°46'09.98"
E
CIR
CL
E A T
RAIL
SH 16
PLAN LAYOUT
F
M 1560
N
1"=100'
2 OF 3
(EXIST
FM 15
60)
RIGGS R
D.
LINE
SAWCUT
EOP
SHT FOR QTY
SEE PREVIOUS
ALIGN "FM1560"
EST @ 1 EA
(TWG-POST) TY 1
MAILBOX INSTALL-S
EST @ 140 SY
REMOV CONC (MISC)
ALIGN "SH16"
(18 IN) EST @ 447 CY
(STONE PROTECTION)
RIPRAP
SH 16 NORTHBOUND
SH 16 SOUTHBOUND
RIPRAP CONC (MOWSTRIP) (4 IN) EST @ 7 CY
GUARDRAIL END TREATMENT (INSTALL) EST @ 1 EA
MTL W-BEAM GD FEN (TIM POST) EST @ 54 LF
REMOVE CONC (MISC) EST @ 62 SY
PR
OP R
OW
PR
OP R
OW
EXIST ROW
EXIST
ROW
EXIST
ROW
EST @ 241 LF
EST @ 249 LF
CONC CURB (TY I)
EST W/ TOE DITCH @ 14 CY
W/ RIPRAP (CONC) (CL B) (4")
CONC CURB (TY I) EST @ 112 LF
MEDIAN 3:
EST W/ TOE DITCH @ 7 CY
W/ RIPRAP (CONC) (CL B) (4")
CONC CURB (TY I) EST @ 86 LF
MEDIAN 4:
EST @ 428 LF
EST @ 422 LF
CONC CURB (TY I)
EST @ 65 LF
CONC CURB (TY I)
EST @ 348 SY
DRIVEWAYS (CONC)
EST @ 150 SY
REMOVE CONC (MISC)
(0" TO 3") EST @ 187 SY
PLANE ASPH CONC PAV
60'
75
EST @ 1 EA
(TWG-POST) TY 1
MAILBOX INSTALL-S
EST W/ TOE DITCH @ 7 CY
W/ RIPRAP (CONC) (CL B) (4")
MEDIAN 6:
EST W/ TOE DITCH @ 7 CY
W/ RIPRAP (CONC) (CL B) (4")
MEDIAN 7:
EST @ 363 LF
EST @ 360 LF
CONC CURB (TY I)
EST @ 187 SY
AND ASPH PAV (0-4")
REMOVING STAB BASE
EST @ 5 CY
W/ RIPRAP (CONC) (CL B) (4")
CONC CURB (TY I) EST @ 94 LF
MEDIAN 5:
LINE
SAWCUT
DRIVEWAY # 4
DRIVEWAY # 2
DRIVEWAY # 3
SAWCUT LINE
EST @ 186 SY
DRIVEWAYS (CONC)
EST @ 500 SY
DRIVEWAYS (CONC)
EST @ 657 SY
REMOVE CONC (MISC)
*DRIVEWAY 05
INFORMATION.
* SEE MISCELLANEOUS ROADWAY DETAIL SHEETS FOR DRIVEWAY O5
AND LOCATIONS.
6. SEE MISCELLANEOUS ROADWAY DETAILS FOR SH 16 LEVEL UP DETAIL
IN FM 1560 PLAN AND PROFILE SHEET.
5. FOR OVERLAY OF OLD FM 1560, HOTMIX QUANTITY IS INCLUDED
4. SEE FM 1560 PLAN AND PROFILE SHEET FOR FM 1560 QUANTITIES.
3. SEE DRIVEWAY LAYOUTS FOR DRIVEWAY DETAILS.
LOCATIONS IN THE FIELD.
2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING UTILITY
LINE AND MAINTAIN EXISTING CROSS SLOPE.
1. FOR SH 16 WIDENING, BEGIN WIDENING AT SAWCUT
NOTES:
EST @ 119 LF
(MOUNTABLE)
CONC CURB
01/18/2017
![Page 6: PROP FM 1560 STA 107+69.06 STA 95+42 · project layout s h 1 6 s h 1 6 r i g g s n r o a d f m 1 5 6 0 (e x is t) h e l o t e s c c r e e k i r c l e1 a t r a i l p r o p bf m 1 5](https://reader033.fdocuments.net/reader033/viewer/2022041500/5e216aff4e7fe979c303eb73/html5/thumbnails/6.jpg)
WWW
W
W
G
T
T
PBX
T
T TT T T
W
WW
W
WVB
W
2230-01-018 CSJ: SUMMARYQUANTITY
ITEM UNIT QUANTITY
ROWPREPARING STA 11.49
(MISC) CONCREMOVE SY 0
(0-4") PAV ASPH AND BASE STABREMOVING SY 0
ROAD ABONDONEDOBLITERATING SY 96
ROADWAYEXCAVATION CY 433
COMP)(TYB) (FINAL)(ORDEMBANKMENT CY 386
(4") TOPSOIL MANUFCOMPOST SY 1,845
C) (TY 1) (CL BLANKETS RETENTIONSOIL SY 1,531
(PERM)(URBAN)(CLAY) SEED MULCHSTRAW/HAY SY 1,627
COOL) OR (WARM (TEMP) SEEDDRILL SY 1,627
WATERINGVEGETATIVE MG 30
5)(6") OR 1-2 GR D (TY PLC) IN (CMP BSFL SY 2,479
(MC-30) COATPRIME GAL 497
GR-3) (TY-BAGGR CY 61
CRS2P) OR CHFRS2P (AC-15P,ASPH GAL 2,092
64-22 PG B TY (SQ) HMAD-GR TON 1,151
70-22 PG B SAC D TY (SQ) HMAD-GR TON 0
76-22 PG (ASPHALT)TOM TON 48
SAC-A AGGREGATETOM-C TON 675
3") TO (0" PAV CONC ASPHPLANE SY 995
B)(4") (CONC)(CLRIPRAP 0 27
IN) (4 MOWSTRIPRIPRAP CY 8
T221) (TYRAIL CY 0
C221) (TYRAIL LF 0
I) (TY CURBCONC LF 930
(MOUNTABLE) CURBCONC LF 0
(CONC)DRIVEWAYS SY 0
2) (ACP)(TYPEDRIVEWAYS SY 0
(5") SIDEWALKSCONC SY 0
2) (TY RAMPSCURB EA 0
POST) (TIM FEN GD W-BEAMMTL LF 190
(T101) TRANS FEN GD BEAMMTL EA 0
SECTION TERM ANCHORDOWNSTREAM EA 1
FENCE GUARD BEAM METALREMOVE LF 0
SECTION ANCHOR TERMINALREMOVE EA 0
(INSTALL) TREATMENT ENDGUARDRAIL EA 0
TY1 (TWG-POST) INSTALL-SMAILBOX EA 0
PROTECTION)(18") (STONERIPRAP CY 0
FED.RD.
DIV.NO.
STATE
CONT. SECT. JOB
SHEET
NO.
HIGHWAY NO.
COUNTYDIST.
6
TEXAS SAT
Texas Department of Transportationc
SHEET
FEDERAL AID PROJECT
SCALE:
pw:\\txdot.project
wiseonline.co
m:
Tx
DO
T4\
Docu
ments\15 -
SA
T\
Design
Projects\223001.018\4 -
Design\
Plan
Set\3.
Road
way\
SH16
PL
N_03.dgn
1/13/2017
9:54:29
AM
2230 01 018 FM 1560
BEXAR
2016 TxDOT
LEGEND
TRAFFIC DIRECTION
OVERLAY LIMITS
AND/OR TOPSOIL
VEGETATION ESTABLISHMENT
MOWSTRIP OR DRIVEWAY
CONCRETE: RIPRAP OR
S
TATE OF TEXA
S
PR
O
FESSIONAL ENGI
N
EER
107864
DATE
P.E.
DANIEL D. WORDEN
DANIEL D. WORDEN
NECL
S DEI
140+00
PT140
+20.24
145+00
SH 16
MA
TC
H
LI
NE
ST
A 136
+00.00
N
SH 16
PLAN LAYOUT
71ftR
NOTE: COORDINATE DIMENSIONS WITH STRIPING CREW
1"=100'
3 OF 3
STA. 143+80.19
END OVERLAY
STA. 143+80.37
END OVERLAY
OVERLAY LIMIT
EXISTING PAVMENT AREA TO REMAIN
METAL W-BEAM GD FEN (TIM POST) EST @ 19 LF
PAV MRK
4" W(SLD)
71ft
R
4ft
5ft
7ft
8ft
76
SH 16 NORTHBOUND
SH 16 SOUTHBOUND
EXIST ROW
EXIST ROW
ALIGN "SH 16"SAWCUT
(+TOE DITCH) EST @ 7 CY
RIPRAP (CONC) (CL B) (4")
EST @ 96 SY
OBLITERATING ABANDONED ROAD
RIPRAP CONC (MOWSTRIP) (4 IN) EST @ 8 CY
DOWNSTREAM ANCHOR TERM SECT EST @ 1 EA
MTL W-BEAM GD FEN (TIM POST) EST @ 171 LF
EST ON PREVIOUS SHEET
SAWCUT
100'
(+TOE DITCH) EST @ 8 CY
W/ RIPRAP (CONC) (CL B) (4")
EST @ 32 LF
CONC CURB (TY I)
MEDIAN 8:
EST @ 249 LF
EST @ 247 LF
CONC CURB (TY I)
EST @ 12 CY
W/ RIPRAP (CONC) (CL B) (4")
EST @ 402 LF
CONC CURB (TY I)
MEDIAN 9"
100'
(0" TO 3" EST @ 995 SY
PLANE ASPH CONC PAV
3. SEE DRIVEWAY LAYOUTS FOR DRIVEWAY DETAILS.
LOCATIONS IN THE FIELD.
2. CONTRACTOR IS RESPONSIBLE FOR VERIFYING UTILITY
LINE AND MAINTAIN EXISTING CROSS SLOPE.
1. FOR SH 16 WIDENING, BEGIN WIDENING AT SAWCUT
NOTES:
01/18/2017