projects 2

1
12 0 A Tool For Easy Estimation Of Garment Cost Ms.Vijitha Ratnayake Dr.T.S.S.Jayawardana 13 0 Productivity Improovement Through Wastage Minimisation Ms.Vijitha Ratnayake 14 0 Job Shop Scheduling Ms.Vijitha Ratnayake Dr.T.S.S.Jayawardana 15 0 Proper Utilisation Of Fabrics In The Garment Industry Ms.Vijitha Ratnayake Dr.T.S.S.Jayawardana 16 1986 Suggestion To Upgrade Operator Performance While Reducing Cost By Introducing New Payment Scheme 17 1993 Dyeing Behaviour Of Open-End And Ring Spun Yarn Mr.N.G.H De Silva Mr.L.K.Lenaduwa 18 1994 Productivity Through Total Quality Management Prof.Lakdas D.Fernando Dr.Nirmali Perera 19 1994 A Study Of Two Production Lines Of A Garments Factory with A View To Improve The Quality Control System Dr.Nirmali Perera 20 1994 Evaluvation Of Re-Cut Costing In Garment Industry Mr.N.L.Wanigatunga Mr.L.K.Lenaduwa

description

Textile eng

Transcript of projects 2

Page 1: projects 2

12 0 A Tool For Easy Estimation Of Garment Cost

Ms.Vijitha Ratnayake

Dr.T.S.S.Jayawardana

13 0 Productivity Improovement Through Wastage Minimisation

Ms.Vijitha Ratnayake

14 0 Job Shop Scheduling Ms.Vijitha Ratnayake

Dr.T.S.S.Jayawardana

15 0 Proper Utilisation Of Fabrics In The Garment Industry

Ms.Vijitha Ratnayake

Dr.T.S.S.Jayawardana

16 1986 Suggestion To Upgrade Operator Performance While Reducing Cost By Introducing New Payment Scheme

17 1993 Dyeing Behaviour Of Open-End And Ring Spun Yarn

Mr.N.G.H De Silva Mr.L.K.Lenaduwa

18 1994 Productivity Through Total Quality Management

Prof.Lakdas D.Fernando

Dr.Nirmali Perera

19 1994 A Study Of Two Production Lines Of A Garments Factory with A View To Improve The Quality Control System

Dr.Nirmali Perera

20 1994 Evaluvation Of Re-Cut Costing In Garment Industry

Mr.N.L.Wanigatunga Mr.L.K.Lenaduwa