The Future of Air Traffic Control system Present by: AHMED S. ALQAHTANI
  • date post

    14-Sep-2014
  • Category

    Education

  • view

    618
  • download

    1

description

ATC - DEV

Transcript of Project01 atc

Page 1: Project01 atc

The Future of Air Traffic Control system

Present by:AHMED S. ALQAHTANI

Page 2: Project01 atc

Table of Contents

• Abstract• Introduction• ATC system development in future.• Major systems in development • The airport as an operation system.• System development of ATC.• Conclusion• Glossary• Figures• References

Page 3: Project01 atc

Abstract

Air Traffic Control system has developed in predecessor and it’s necessary to developed this system to avoid air traffic collisions, I displayed here in slides the system developed stages and future of ATC system thru satellite .

Page 4: Project01 atc

Introduction

The United States air traffic control system is safest in the world. Federal Aviation Administration and its Air traffic organization work continuously to improve the system.

The next generation will transform the national airspace system from one that is based on ground radars to one that uses satellite technology.

Page 5: Project01 atc

ATC System development in future

NextGen will have the technology and infrastructure necessary to handle the increasing air traffic expected in the coming decades. Satellite-based navigation will allow aircraft to fly more direct routes and navigate around inclement weather which will increase airspace capacity and reduce delays.

Page 6: Project01 atc

There are around 7,000 aircraft in the air over the United States at any given time.

Page 7: Project01 atc

Major systems in development

• 120. Satellite system: a system using earth satellites can provide worldwide navigation coverage with the accuracy associated with line-of-sight frequencies.

• 121. Microwave Landing System: More flexible approach paths in while ILS has served well.

• 123. Collision-Avoidance System: Two aircraft on parallel tracks may pass each other very closely.

Page 8: Project01 atc

The Airport as an operation system

• The airport as system Airport forms an essential part of the air

transport system. therefore, the point of interaction of the three major components of the air transport system:

The airport, including for these discussion purpose the airways control system – The airline – The user.

Page 9: Project01 atc

Source: Airport Operations by Norman Ashford, H. Stanton, and Clifton Moore , chapter 1,Table 1.1

The diagram attempts to show how these interactions produce the prime parameters of operational scale. Passenger demand , airport capacity, and flight capacity.

Page 10: Project01 atc

System development of ATC:

• Stage 1 : Procedural ATC SystemStage 1 ATC system use procedural method, they

requires - flight plan - paper strips - radio system.

• Stage 2: Procedural ATC with radar assistanceIn 1960s ATC began to use radar with surveillance

approach radar (SAR). Radar could be use to monitor aircraft thru Instrument landing system (ILS).

Page 11: Project01 atc

• Stage 3: The first-generation “automated” ATC system.

Radar and computer, radar provide real-time surveillance within ATCC.

• Stage 4: Current generation radar and computer-based ATC system.

A modern automated ATC system is illustrated, with tactical and strategic controllers on modern flight deck.

Page 12: Project01 atc

Source : Hirst, Mike, The Air transport systemThe FDP and RDP functions of the generation have had flow management processor (FMP) capability integrated, and support – information system (SIS) processing function also integrated.

Page 13: Project01 atc

Conclusions

As FAA moved transition of ATC system from radar-based to satellite based. controllers and pilots will have the advantage of this technology.

Satellite-Technology will allow controllers to guide aircraft in more direct routes through the nation's airspace.

Page 14: Project01 atc

GlossaryATC Air traffic control FMS Flight management system PFD Primary flight displayND Navigation displayFIR Flight information regionAFTN Aeronautical fixed telecommunication networkVHF Very high frequency ANSP Air-navigation service providerATCC Air traffic control centerAFCS The automatic flight control systemFMS The flight management systemEFIS The electronic flight instrumentation systemECAM The electronic centralised aircraft monitoring EICAS engine instrumentation and centralised aircraft systemGPWS Ground-proximity warning systemEGPWS Enhanced GPWSTCAS Traffic conflict-alerting systemRDP Radar-data processor FAA Federal Aviation Administration ILS Instrument Landing System ICAO International Civil Aviation Organization

Page 15: Project01 atc

Figures

• 1.2 Fundamentals of Radar Signal Processing, Mark A. Richards.

• 1.3 Airport Operations by Norman Ashford, H. Stanton, and Clifton Moore. Chapter one.

Page 16: Project01 atc

References

• Source : FAA in URL http://www.faa.gov/air_traffic/briefing/• Hirst, Mike, The Air transport system, Part II System elements• Airport Operations by Norman Ashford, H. Stanton, and

Clifton Moore.• Electronics Engineers' Handbook, Donald G. Fink, Sec.25-120,

121, 123.