Page 3 AAC, February 3, 2009 – Arkadiy Klebaner System Scope Cryogenic Plant – compressors, helium refrigerators, oil removal, gas management, internal purifiers, nitrogen exchanger, valve boxes, plant controls, etc. Cryogenic Distribution System – feed boxes, bayonet boxes, feed caps, end caps, cryogenic transfer lines, headers, over pressure protection devices, cryogenic load instrumentation, etc. Ancillary Systems – gas and liquid storage, recovery compressors, cooling towers, dryers, purification system, etc.

Transcript of Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 1: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Project X RD&D PlanCryogenics

Arkadiy KlebanerAAC Meeting

February 3, 2009

Page 2: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 2AAC, February 3, 2009 – Arkadiy Klebaner

Outline

• Description of the scope of the system• Performance specification of the system• Primary technical issues and the strategy to address them• Open items• Goals of the plan by year• Role of outside collaborators

Page 3: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 3AAC, February 3, 2009 – Arkadiy Klebaner

System Scope

• Cryogenic Plant – compressors, helium refrigerators, oil removal, gas management, internal purifiers, nitrogen exchanger, valve boxes, plant controls, etc.

• Cryogenic Distribution System – feed boxes, bayonet boxes, feed caps, end caps, cryogenic transfer lines, headers, over pressure protection devices, cryogenic load instrumentation, etc.

• Ancillary Systems – gas and liquid storage, recovery compressors, cooling towers, dryers, purification system, etc.

Page 4: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 4AAC, February 3, 2009 – Arkadiy Klebaner

Cryogenic Load

• Low Energy Linac– Superconducting Solenoids and Spoke Cavities– Components are cooled by two-phase helium

• High Energy Linac– Superconducting Quads and Elliptical Cavities– Components are cooled by superfluid helium

• Beam Screens– Screens are cooled by a cryogenic fluid

Page 5: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 5AAC, February 3, 2009 – Arkadiy Klebaner

Basic Scheme

Page 6: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 6AAC, February 3, 2009 – Arkadiy Klebaner

System Requirements

• Operating Parameters• Operating Modes• Availability• Safety

Page 7: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 7AAC, February 3, 2009 – Arkadiy Klebaner

Operating Parameters

Low Energy Linac High Energy Linac Beam Screens

Cavity/Solenoid Thermal Shields Cavity/Quad Thermal Shields Thermal Screens

Temperature, [K] 4.5 80 2.0 5 – 8 40 – 80 80 – 100

Pressure, [MPa] 0.13 0.4 0.0031 2 2 TBD

Heat Load, [W] 500 5,000 400 750 9,000 1,000

Page 8: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 8AAC, February 3, 2009 – Arkadiy Klebaner

Operating Modes

• Steady state– Beam ON

• Transient– Beam ON/OFF– RF ON/OFF– Cooldown/Warm-up– Fault Scenarios– Maintenance – Commissioning

Page 9: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 9AAC, February 3, 2009 – Arkadiy Klebaner

Availability

• Plant availability – 98%• Cryogenic System availability – TBD

Page 10: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 10AAC, February 3, 2009 – Arkadiy Klebaner

Safety

• Full compliance with Fermilab ES&H requirements– Pressure vessels: ASME BPV Code or PED 97/23– Pressure piping: ASME/ANSI B31 – Oxygen Deficiency Hazard (ODH) mitigation

Page 11: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 11AAC, February 3, 2009 – Arkadiy Klebaner

Technical Issues

1. Cryogenic Distribution and Segmentation 2. Capital and Operational Cost Optimization3. Heat Load Analysis4. Testing Infrastructure

Page 12: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 12AAC, February 3, 2009 – Arkadiy Klebaner

Distribution and Segmentation

SCB Picture is courtesy of DESY colleagues

Page 13: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 13AAC, February 3, 2009 – Arkadiy Klebaner

Technical Strategy

• Cryogenic Segmentation (Technical Issue 1) – Study existing cryomodule thermal cycling experience – Development cryogenic process: 2K heat exchanger, steady state,

transient, fault, maintenance, and commissioning scenarios– Define tunnel distribution components capacities and location– Conduct components over pressure protection study– Define cryogenic string length limits and segmentation– Develop liquid helium level control strategy– Develop tunnel ODH mitigation strategy

Page 14: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 14AAC, February 3, 2009 – Arkadiy Klebaner

Cryogenic Plant

Photos are courtesy of LHC and SNS colleagues

Page 15: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 15AAC, February 3, 2009 – Arkadiy Klebaner

Technical Strategy (cont’d)

• Capital and Operating Cost Optimization (Technical Issue 2) – Thermal shield operating parameter optimization– Cryogenic plant cycle optimization– System lifecycle cost optimization– Study effective utilization of existing Fermilab cryogenic assets

Page 16: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 16AAC, February 3, 2009 – Arkadiy Klebaner

Technical Strategy (cont’d)

• Heat Load Analysis (Technical Issue 3) – Investigate static and dynamic loads for all components and sub

systems– Define operational overcapacity and heat load estimate uncertainty

factors– Fault scenarios heat flux study

Excerpts from TESLA and XFEL work

Page 17: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 17AAC, February 3, 2009 – Arkadiy Klebaner

Technical Strategy (cont’d)

• Testing Infrastructure (Technical Issue 4) – Determine SRF testing requirements (type, cryogenic capacity,

throughput, etc.)– Define infrastructure needs– Infrastructure optimization (location, equipment selection, etc.)

Page 18: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 18AAC, February 3, 2009 – Arkadiy Klebaner

Open Items

Finalize External Input Requirements

• Cryogenic system lifecycle and reliability requirements

• SRF accelerating component requirement specifications

• Commissioning scenarios

• Future upgrade scenarios

Page 19: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 19AAC, February 3, 2009 – Arkadiy Klebaner

Goals and Timeline

Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4

1.7.1. Cryogenic Distribution and Segmentation 1.7.1.1. Study existing cryomodules thermal cycling experience 1.7.1.2. Process development 1.7.1.3. Tunnel distribution components capacities and location definition1.7.1.4. Components over pressure protection study1.7.1.5. Define cryogenic string size limits and segments1.7.1.6. Liquid helium level control strategy development1.7.1.7. Development of tunnel ODH mitigation strategy 1.7.1.8. Cryogenic Instrumentation

1.7.2 Capital and Operational Cost Optimization1.7.2.1. Shields operating parameters optimization1.7.2.2. Cryogenic Plant Cycle1.7.2.3. System lifecycle cost optimization1.7.2.4. Effective utilization of existing Fermilab cryogenic assets

1.7.3 Heat Load Analysis1.7.3.1. Investigate static and dynamic loads for all components1.7.3.2. Define overcapacity and uncertainty factors1.7.3.3. Fault scenarios heat flux study

1.7.4 Testing infrastructure 1.7.4.1. Determine cryogenic testing requirements1.7.4.2. Define infrastructure needs1.7.4.3. Infrastructure optimization

DescriptionWBS

Project X Cryogenic System RD&D PlanFY09 FY10 FY11 FY12

Page 20: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 20AAC, February 3, 2009 – Arkadiy Klebaner

Collaborators

• TJNAF cryogenic group, in principal, has agreed to lead the Cost Optimization task and to contribute to other tasks at ~0.25 FTE/year level.

Page 21: Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.

Page 21AAC, February 3, 2009 – Arkadiy Klebaner

Summary

• Project X Cryogenic System RD&D plan will lead to completion of design requirements and will optimize costs

• The plan is technically feasible. Technical risks deemed to be either low or medium/low.

• Timely resolution of the Open Items is essential to the successful execution of the plan

• TJNAF collaborators role requires further definition