Project Update - Overview & Schedule

Integrity  ∙  Excellence   ∙  Respect4/15/2019 2

Background• 11 projects underway for improved airport access. Work initiated in 2017.• Public workshop held on May 25, 2017. Presentation of concept designs on October 16, 

2017. Presentation of preferred alternative to Borough Assembly on May 14, 2018.

Construction Project 1 ‐ Revilla Uplands Project• Expanded uplands. More parking, improved vehicle & pedestrian flow, ticketing & vehicle 

staging.• New passenger waiting building and covered pedestrian walkways.

Construction Project 2 ‐ Revilla / Gravina New Ferry Berths & Gravina Upland Improvements• Construct two new ferry berths at Revilla and Gravina shuttle ferry terminals.• Pedestrian and vehicle access improvements at Gravina ferry terminal uplands.

Schedule• Fall, 2019: Complete design/advertise construction contracts.• Fall, 2021: Complete construction. 

Page 3: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Project Introduction

Integrity  ∙  Excellence   ∙  Respect4/15/2019 3

Page 4: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

All Projects - Estimates

4/15/2019 4

Page 5: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Project Overview – Revilla Uplands

4/15/2019 5

VEHICLE STAGING

DROP OFF ZONETAXI LANES

EXITENTRY

WAITING BUILDING

EXITENTRY/EXIT

NEW FERRY BERTH

EXISTING FERRY BERTH

Page 6: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Gravina Walkway Improvements

4/15/2019 6

EXISTING BERTH

NEW BERTH

AIRPORT BUILDING

EXISTING RAMP

NEW DOCK AND COVERED CANOPIES

Page 7: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Construction Phases & Schedule

4/15/2019 7

Phase 1:  Nov 2019 thru May 2020New generator building and deep utilities

Phase 2:  February 2020 thru mid‐June 2020North Tongass Highway reconstruction.

Phase 3:  mid‐June 2020 thru March 2021 (partial winter shutdown)North parking lot expansion, new ferry loading lanes ‐ begin new passenger waiting building, north half of passenger drop‐off canopy.

Phase 4:  March 2021 thru July 2021South half of parking reconstructed, passenger drop‐off canopy and passenger waiting building are completed.

Phase 5:  Aug 2021 thru Dec 2021Ferry exit lane and passenger drop‐off lanes completed.

Page 8: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Pedestrian Detours

4/15/2019 8

Page 9: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Wayfinding & Signage

4/15/2019 9

PEDESTRIAN SIGNAGE PLACED NEXT TO KIOSK AND UNDER CANOPIES AS WINDBREAK 

FEATURES

HIGHLY VISIBLE VEHICULAR SIGNAGE FERRY LANES & LOADING ZONES

Page 10: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Kiosk Systems

4/15/2019 10

Luke 2 kiosk system

Page 11: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Automated Ticketing Concept

4/15/2019 11

VEHICLE TICKETING KIOSKS & PROX CARD READERS

PARKING & FERRY PASSENGER KIOSKS

TICKET KIOSK

Page 12: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Baggage Cart System

4/15/2019 12

Modified ADA Ford Transit

Page 13: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Revilla Marine Work

4/15/2019 13

Page 14: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Gravina Marine Work

4/15/2019 14

Page 15: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Gravina Marine Work

4/15/2019 15

Page 16: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Support Structures - Revilla

4/15/2019 16

1. Waiting Building (Separate Gravina Access SEIS Project) – Provides interior conditioned waiting space and restrooms. Ticket kiosk located in entry vestibule. Provides luggage staging and support vehicle lane

2. Storage Building – Houses Bobcat snowplow & attachments. Other site maintenance items located in building. One ticket kiosk with wayfinding sign located on exterior of building.

3. Generator Building – Houses emergency back up generator 

Page 17: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

4/15/2019 17

Buildings & Site Elements - Revilla

STORAGE BUILDING

CANOPIES

WAITING BUILDING

GENERATOR BUILDING

SIGNAGE

New Berth

Existing Berth

Page 18: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Drop-Off Canopies, Waiting Area & Queuing

4/15/2019 18

ADA DROP ZONE

DROP‐OFF PICK‐UP CANOPIES

RAMP TO NEW BERTH

DRIVE LANE

RAMP TO EXISTING BERTH

TAXI PICK UP AREA

Page 19: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Waiting Building

4/15/2019 19

ENTRY

ENTRY

WAITING

ADA BAGGAGE DROP

VESTIBULE

KIOSKS

Page 20: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

SUPPORT BUILDINGS

4/15/2019 20

STORAGE BUILDING GENERATOR BUILDING

Page 21: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Waiting Building Axo View

4/15/2019 21

RAMP TO NEW BERTH

EXISTING BERTH

Page 22: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

View From Drive Lane @ Main Crossing

4/15/2019 22

Page 23: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

4/15/2019 23

Baggage Drop @ New Waiting

Page 24: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

4/15/2019 24

Canopy Renderings

Page 25: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

4/15/2019 25

Canopy Renderings

Page 26: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

4/15/2019 26

Drop-Off / Pick-up Seating

Page 27: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

4/15/2019 27

Staging Lanes & Storage Building

Page 28: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Gravina Walkway Improvements

4/15/2019 28

EXISTING BERTH

NEW BERTH

AIRPORT BUILDING

EXISTING RAMP

NEW DOCK AND COVERED CANOPIES

Page 29: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Gravina Walkway Improvements

4/15/2019 29

AIRPORT BUILDING BEYOND

NEW DOCK & CANOPIES

IMPROVED EXISTING CANOPIES

Page 30: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Gravina Walkway Renderings

4/15/2019 30

AIRPORT BUILDING BEYOND

NEW DOCK AND COVERED CANOPIESIMPROVE EXISTING CANOPIES

Page 31: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

Gravina Walkway Renderings

4/15/2019 31

NEW DOCK RAIN/WIND PROTECTED PASSENGER 

QUEUING 

Page 32: Project Update - Overview & Schedule - Alaskadot.alaska.gov/sereg/projects/ktn_revilla_upland_berth/...• Public workshop held on May 25, 2017. Presentation of concept designs on

END

Integrity  ∙  Excellence   ∙  Respect4/15/2019 32