New Ringgold Middle School
Project SlideshowJanuary 6, 2017
Building Areas
Pour Concrete Floor – Kitchen – Area A
Pour Concrete Floor – Kitchen – Area A
Prep for Concrete Floor – Cafeteria – Area A
Prep for Concrete Floor – Mech. Room – Area A
Pour Concrete Floor – Mech. Room – Area A
Concrete Slab on Grade Progress
Brick Installation – Area A
Brick Installation – Area A
Brick Installation – Area A
Masonry Installation – Area A
Masonry Installation – Area A
Masonry Installation – Area A
Stud Wall Framing – Area A
Work Progress – 1st Floor - Area A
Masonry Installation - 2nd Floor – Area A
Masonry Installation - 2nd Floor – Area A
Work Progress – 2nd Floor – Area A
Masonry Installation – 2nd Floor- Area B
Masonry Installation – 2nd Floor- Area B
Masonry Installation – 2nd Floor- Area B
Decking Installation – Area B
Work Progress – 2nd Floor - Area B
Brick Installation – Area C
Work Progress – 1st Floor - Area C
Bar Joist Detailing – Area C
Decking Installation – Area C
Work Progress – 2nd Floor - Area C
Steel Detailing – Area D
Masonry Installation – Area D
Masonry Installation – Area D
Work Progress – Area D
Steel – Area A
Bar Joist Installation – Cafeteria – Area A
Bar Joist Installation – Cafeteria – Area A
Bar Joists at Loading Dock Area – Area A
Roof Decking – Mech. Room – Area A
Roof Progress
Continue Setting Door Frames
Masonry Installation – Fitness Center
Masonry Installation – Fitness Center
Door Cut – Fitness Center
Underground Electric – Cafeteria – Area A
Transformer Pad Set
Plumbing Through Wall Penetrations
• Continue Masonry Installation – Areas A, B, C & D• Complete Brick Installation - Courtyard• Continue Plumbing & Electrical Wall Rough In• Concrete Slabs on Grade – Cafeteria - Area A• Concrete Slab on Deck – Area B & C• Continue Roof Decking – Area A• Continue Steel Erection – Area D• Roofing – Area A• Continue Stud Wall Installation• Installation of Switchgear• Set Transformer• HVAC Piping Installation – Area A• Steel Erection at Fitness Center• Installation of Anti Seep Collar at Retention Tank #2
Scheduled Work for Next Few Weeks