Project Server 2007 - Organizational Budget and Cost Modeling

20
Microsoft Project Server 2007 - Organizational Budget and Cost Modeling Prepared for: WW EPM Community Prepared by: EPM Global Practice Architecture Team

Transcript of Project Server 2007 - Organizational Budget and Cost Modeling

Page 1: Project Server 2007 - Organizational Budget and Cost Modeling

8/8/2019 Project Server 2007 - Organizational Budget and Cost Modeling

http://slidepdf.com/reader/full/project-server-2007-organizational-budget-and-cost-modeling 1/19

Page 2: Project Server 2007 - Organizational Budget and Cost Modeling

8/8/2019 Project Server 2007 - Organizational Budget and Cost Modeling

http://slidepdf.com/reader/full/project-server-2007-organizational-budget-and-cost-modeling 2/19

EPM Global Practices

Page ii

Page 3: Project Server 2007 - Organizational Budget and Cost Modeling

8/8/2019 Project Server 2007 - Organizational Budget and Cost Modeling

http://slidepdf.com/reader/full/project-server-2007-organizational-budget-and-cost-modeling 3/19

EPM Global Practices

Page iii

Copyright

The information contained in this document represents the current view of Microsoft Corporation on

the issues discussed as of the date of publication. Because Microsoft must respond to changing

market conditions, it should not be interpreted to be a commitment on the part of Microsoft, and

Microsoft cannot guarantee the accuracy of any information presented after the date of publication.

This White Paper is for informational purposes only. MICROSOFT MAKES NO WARRANTIES,

EXPRESS, IMPLIED OR STATUTORY, AS TO THE INFORMATION IN THIS DOCUMENT.

Complying with all applicable copyright laws is the responsibility of the user. Without limiting the

rights under copyright, no part of this document may be reproduced, stored in or introduced into a

retrieval system, or transmitted in any form or by any means (electronic, mechanical,

photocopying, recording, or otherwise), or for any purpose, without the express written permission

of Microsoft Corporation.

Microsoft may have patents, patent applications, trademarks, copyrights, or other intellectual

property rights covering subject matter in this document. Except as expressly provided in any

written license agreement from Microsoft, the furnishing of this document does not give you any

license to these patents, trademarks, copyrights, or other intellectual property.

Unless otherwise noted, the companies, organizations, products, domain names, e-mail addresses,

logos, people, places, and events depicted in examples herein are fictitious. No association with

any real company, organization, product, domain name, e-mail address, logo, person, place, or

event is intended or should be inferred.

2009 Microsoft Corporation. All rights reserved.

Microsoft, the Office logo, SharePoint, SQL Server, and Windows are trademarks of the Microsoft

group of companies.

All other trademarks are property of their respective owners.

Page 4: Project Server 2007 - Organizational Budget and Cost Modeling

8/8/2019 Project Server 2007 - Organizational Budget and Cost Modeling

http://slidepdf.com/reader/full/project-server-2007-organizational-budget-and-cost-modeling 4/19

EPM Global Practices

Page iv

Table of Contents

 Introduction ................................................................................................................. 1 Purpose ......................................................................................................................... 1 Audience ........................................................................................................................ 1 Example Set Up ............................................................................................................. 2 Department .................................................................................................................... 3 Lookup Table ± Department ............................................................................................. 3 Custom Field ± Department ............................................................................................. 4 

Location ......................................................................................................................... 5 Lookup Table ± Location .................................................................................................. 5 Custom Field ± Location .................................................................................................. 6 

Budget Variance .............................................................................................................. 7 Custom Field ± Budget Variance ....................................................................................... 7 

Budget Indicator .............................................................................................................. 8 Custom Field ± Budget Indicator ....................................................................................... 8 

Cost Resources ................................................................................................................ 9 Project Budget and Cost Tracki n g ................................................................................ 10 Portfolio Budget and Cost Tracki n g .............................................................................. 11 Budget & Cost Alignment by Department View .................................................................... 11 Budget & Cost Alignment by Location View ......................................................................... 12 Data Analysis ................................................................................................................ 13 Budget vs Cost Analysis ................................................................................................ 13 

 Additional Con sideration s............................................................................................ 14 Work Resource Rates .................................................................................................... 14 External System Integration .......................................................................................... 14 References ................................................................................................................. 15  

Page 5: Project Server 2007 - Organizational Budget and Cost Modeling

8/8/2019 Project Server 2007 - Organizational Budget and Cost Modeling

http://slidepdf.com/reader/full/project-server-2007-organizational-budget-and-cost-modeling 5/19

EPM Global Practices

Page 1

INTRODUCTION 

Purpose

This document is intended as a ³how-to´ guide for budget and cost modeling using Microsoft Office

Project Server 2007. Microsoft Office Project Server 2007 is a great tool for coordinating and

managing project schedules and resources. While many users know the schedule and resource

management capabilities of Project Server 2007, most users are not familiar with the budget and

cost management capabilities of Project Server 2007. With Project Server 2007, you can set a

budget to a project, and track costs against the set budget. You can also group the projects so

that budgets and costs can roll up to a program or portfolio level.

The budget and cost tracking model was used at a federal government agency client site and it can

be applied at many organizations. The model enabled the agency to use Project Server 2007 totrack budgets and costs at a program level in a central location. Previously, the agency had to

access several separate systems (budget in one system, resource costs in another system, fixed

costs in yet another system, etc«) in order to get all of the necessary information to see a clear

picture of the program. Project Server 2007 enabled them to very easily capture and report the

budget and cost information from one central location in addition to providing them day to day cost

and schedule visibility out of the box.

Audience  EPM Community including customers. This document is based on actual customer experience

and is intended to be used as a guide for any organization that wants to do budget and cost

modeling using Project Server 2007.

 

Page 6: Project Server 2007 - Organizational Budget and Cost Modeling

8/8/2019 Project Server 2007 - Organizational Budget and Cost Modeling

http://slidepdf.com/reader/full/project-server-2007-organizational-budget-and-cost-modeling 6/19

EPM Global Practices

Page 2

EXAMPLE SET UP 

An example configuration will be used to better illustrate the budget and cost management

capabilities of Project Server 2007. In this example, FOO is a software company. FOO makes

COTS and custom software, and they have offices in North America and Europe. This guide will

provide step by step instructions and explanations to create and analyze views such as displayed

below.

Budget & Cost Alignment by Location View 

Budget & Cost Alignment by Department View 

Page 7: Project Server 2007 - Organizational Budget and Cost Modeling

8/8/2019 Project Server 2007 - Organizational Budget and Cost Modeling

http://slidepdf.com/reader/full/project-server-2007-organizational-budget-and-cost-modeling 7/19

EPM Global Practices

Page 3

Department

The Department lookup table and custom field represents whether the example project is a custom

development software project or a Commercial Off The Shelf (COTS) software project. This field is

used in the example to group and aggregate totals including budgets and costs.

Lookup Table ± Department

Page 8: Project Server 2007 - Organizational Budget and Cost Modeling

8/8/2019 Project Server 2007 - Organizational Budget and Cost Modeling

http://slidepdf.com/reader/full/project-server-2007-organizational-budget-and-cost-modeling 8/19

EPM Global Practices

Page 4

Custom Field ± Department

Page 9: Project Server 2007 - Organizational Budget and Cost Modeling

8/8/2019 Project Server 2007 - Organizational Budget and Cost Modeling

http://slidepdf.com/reader/full/project-server-2007-organizational-budget-and-cost-modeling 9/19

EPM Global Practices

Page 5

Location

The Location lookup table and custom field represents the location of the software project such as

United States or Canada. This field is used in the example to group and aggregate totals including

budgets and costs.

Lookup Table ± Location

Page 10: Project Server 2007 - Organizational Budget and Cost Modeling

8/8/2019 Project Server 2007 - Organizational Budget and Cost Modeling

http://slidepdf.com/reader/full/project-server-2007-organizational-budget-and-cost-modeling 10/19

EPM Global Practices

Page 6

Custom Field ± Location

Page 11: Project Server 2007 - Organizational Budget and Cost Modeling

8/8/2019 Project Server 2007 - Organizational Budget and Cost Modeling

http://slidepdf.com/reader/full/project-server-2007-organizational-budget-and-cost-modeling 11/19

EPM Global Practices

Page 7

Budget Variance

The budget variance field is a calculated field to measure the difference between the budget cost

and the planned cost. A positive budget variance number indicates that the current planned cost is

less than the budget cost. Conversely, a negative budget variance number indicates that the

current planned cost is greater than the budget cost.

Custom Field ± Budget Variance

Page 12: Project Server 2007 - Organizational Budget and Cost Modeling

8/8/2019 Project Server 2007 - Organizational Budget and Cost Modeling

http://slidepdf.com/reader/full/project-server-2007-organizational-budget-and-cost-modeling 12/19

EPM Global Practices

Page 8

Budget Indicator 

The Budget Indicator is a stop light indicator field keyed on the value of the Budget Variance field.

If Budget Variance is a positive number, then the indicator will display green. If the Budget

Variance is a negative number, then the indicator will display red. This indicator can quickly show

what projects may need more attention with regards to cost management.

Custom Field ± Budget Indicator

Page 13: Project Server 2007 - Organizational Budget and Cost Modeling

8/8/2019 Project Server 2007 - Organizational Budget and Cost Modeling

http://slidepdf.com/reader/full/project-server-2007-organizational-budget-and-cost-modeling 13/19

EPM Global Practices

Page 9

Cost Resources

The following cost resources were set up to capture and track the different types of costs in

addition to the resource labor cost. You can add more resources or use less depending on the

needs of your organization. You can also set up a budget category custom field with values such

as hardware and software and then set each resource to the corresponding budget category in

order to aggregate types of costs.

Page 14: Project Server 2007 - Organizational Budget and Cost Modeling

8/8/2019 Project Server 2007 - Organizational Budget and Cost Modeling

http://slidepdf.com/reader/full/project-server-2007-organizational-budget-and-cost-modeling 14/19

EPM Global Practices

Page 10

PROJECTBUDGET AND COST TRACKING 

Budget and cost can be managed and tracked at the individual project level.

The basic steps to manage budget and cost at the project level are:

1.  Set project budget at the project summary row (you must be in Task Usage view). For

detailed steps to creating a budget for your project, go to:

http://office.microsoft.com/en-us/project/HA101632951033.aspx?pid=CH100666641033  

2.  Enter costs for resources and assign resources to tasks. You can have cost rates and

per-use costs for work and material resources, as well as costs for cost resources. For

detailed steps to entering costs, go to: http://office.microsoft.com/en-

us/project/HA101921281033.aspx?pid=CH100666641033 

3.  Compare budget to cost. You can compare the baseline cost to the current planned cost or

the actual cost. In addition, you can compare the current planned cost to the budget cost.

You can track at the project summary level or at the task level.

ProjectBudget

CostResource

Work

Resource

Page 15: Project Server 2007 - Organizational Budget and Cost Modeling

8/8/2019 Project Server 2007 - Organizational Budget and Cost Modeling

http://slidepdf.com/reader/full/project-server-2007-organizational-budget-and-cost-modeling 15/19

EPM Global Practices

Page 11

PORTFOLIO BUDGET AND COST TRACKING 

Microsoft Office Project Server 2007 allows you to manage budgets and costs at the program or

portfolio level as well as at the project level.

Budget & Cost Alignment by Department View

View Setup

Page 16: Project Server 2007 - Organizational Budget and Cost Modeling

8/8/2019 Project Server 2007 - Organizational Budget and Cost Modeling

http://slidepdf.com/reader/full/project-server-2007-organizational-budget-and-cost-modeling 16/19

Page 17: Project Server 2007 - Organizational Budget and Cost Modeling

8/8/2019 Project Server 2007 - Organizational Budget and Cost Modeling

http://slidepdf.com/reader/full/project-server-2007-organizational-budget-and-cost-modeling 17/19

EPM Global Practices

Page 13

Data Analysis

Data Analysis views can be created to provide further analysis of budget and cost data. The

example below, Budget vs Cost Analysis, illustrates a data analysis view that shows budget vs

actual cost comparison for 2009 aggregated by department. The comparison is further broken

down into the 4 quarters of 2009. This view can also provide project level analysis within the

department as well as drilling down further into the months or weeks level.

Budget vs Cost Analysis

Page 18: Project Server 2007 - Organizational Budget and Cost Modeling

8/8/2019 Project Server 2007 - Organizational Budget and Cost Modeling

http://slidepdf.com/reader/full/project-server-2007-organizational-budget-and-cost-modeling 18/19

EPM Global Practices

Page 14

ADDITIONAL CONSIDERATIONS 

Work Resource Rates

A limitation of Microsoft Office Project Server 2007 is that work resource rates cannot be selectively

hidden. This means that if a PM has the permission to view enterprise resource data, then that PM

can see the resources¶ rates. This poses a dilemma with many organizations because resource

rates are sensitive data that require strict and granular control. There are many ways to get

around this issue but there is no out-of-the box solution. Solutions can involve the use of blended

resource rates, macros to camouflage the work resource rates, or a custom database with custom

permissions and SQL Server Reporting Services to provide reporting.

External System Integration

In many cases, a system of record already exists for budget and cost accounting. These external

systems are useful for accounting purposes, but they rarely provide any utility in day-to-day

management of budget and cost tracking. When a system of record already exists for an

organization, an integration between the external system and Project Server 2007 provides

validation to the budget and cost numbers as well as providing the day-to-day management

capabilities. The Project Server Interface (PSI) provides a way to integrate any system to Project

Server 2007. A simple interface can consist of pulling the budget cost from the system of record

and setting it in Project Server 2007. The actual cost information can be pulled from the Project

Server 2007 side and pushed to the system of record. You can also create much more

sophisticated and complex integration utilizing the PSI.

Page 19: Project Server 2007 - Organizational Budget and Cost Modeling

8/8/2019 Project Server 2007 - Organizational Budget and Cost Modeling

http://slidepdf.com/reader/full/project-server-2007-organizational-budget-and-cost-modeling 19/19

EPM Global Practices

Page 15

REFERENCES 

y Microsoft Enterprise Project Management home page:http://www.microsoft.com/epm 

y EPM Connect: http://www.epmconnect.com/US/Pages/home.aspx 

y Microsoft Enterprise Project Management Solutions :

http://www.epmconnect.com/US/pages/epmsolutiontour.aspx 

y Microsoft Project Server TechCenter (TechNet):http://technet.microsoft.com/en-

us/office/projectserver/default.aspx 

y Microsoft Project Developer Center (MSDN):http://msdn.microsoft.com/en-

us/office/aa905469.aspx 

y Microsoft Project 2007 blog ±http://blogs.msdn.com/project