PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
description
Transcript of PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
PROJECT SCOPE, SCHEDULE, AND RESOURCE MANAGEMENT
TRIPLE CONSTRAINTSProject Management Triple Constraints or “Iron Triangle” is a model of constraints of project management
PROJECT SCOPE MANAGEMET
SCOPE MANAGEMENT PROCESSES
Collect Requirements: Determining and documenting stakeholder needsDefine Scope: Developing detailed description of project and productCreate WBS: Subdividing project deliverables and project work into smaller, more manageable parts
WORK BREAKDOWN STRUCTURE
(WBS)
WHAT IS WBS?Project Management Inctitute (PMI) defines WBS as:
“A hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the required deliverables”
WHAT IS WBS?Wikipedia defines WBS as:“A work breakdown structure (WBS), in project management and systems engineering, is a deliverable oriented decomposition of a project into smaller components. It defines and groups a project's discrete work elements in a way that helps organize and define the total work scope of the project.”
“A work breakdown structure element may be a product, data, service, or any combination.”
WBS TYPESApproaches to break activities into detail by:
Product component approachExamples: Design documents, manuals, the running system
Functional approachAnalysis, design, implementation, integration, testing, delivery, reviews
Geographical area Examples: TUM team, CMU team, off-shore team, ...
Organizational approachResearch, product development, marketing, sales
WBS LEVELS Each level of WBS represents an increasingly
detailed definition of project
WBS lays out the individual elements that will
construct the project
Each element must be numbered
Lowest level elements are called “Work Packages”
WBS LEVELS AND NUMBERINGMajor project deliverables or activities are identified
Codes assigned to each WBS componentLevel 0 - project itselfLevel 1 - major deliverablesLevel 2 - individual components of each deliverableEtc.Final level – work package
WBS NUMBERING SYSTEM
Work Packages are individual project activities
05-11
1.0
1.2 1.3 1.4
1.2.1
1.2.2
1.2.3
1.3.1
1.3.2
1.2.3.1
1.2.3.2
Deliverables are major project components
Sub-deliverables are supporting deliverables
The project is the overall project under development
PRODUCT WBS
PROCESS WBS
WBS PURPOSEProject Scope: Shows all project activities that will be necessary to doProject Chart: Project organization shows structural hierarchy of project team. WBS shows structural hierarchy of project work to be doneProject Time & Cost Estimation: Work packages are used to estimate time & cost, and they are rolled-up (aggregated) upwardsProject Measurement & Control: Each work package is assigned a cost account, and its status is tracked
WBS DESIGNTop-DownBottom-UpBoth Top-Down & Bottom-UpRolling Wave – greater decomposition occurs as project components becomes more defined over timeEach level should contain around +/- 7 elements
WORK PACKAGEWork packages should contain activities that are short in duration (1 or 2 weeks) Work package activities can be completed by an individual or a small teamAll work packages should be similar in size or effort needed unless work package is being outsourced to another company
WBS REPRESENTATIONOrganization Chart (Tree-Structued like in previous examples)Indented ListBubble-Chart
PROJECT TIME MANAGEMENT
TIME MANAGEMENT PROCESSESDefine Activities: Identify specific actions to be performed to produce project deliverablesSequence Activities: Identifying relationships among project activitiesEstimate Activity Resources: Estimate type of quantities of material, human resources, equipment, or supplies to perform each activityEstimate Activity Durations: Estimate number of hours to complete each activityDevelop Schedule: Analyze activity sequences, durations, resource requirements, and schedule constraints to create schedule model
DEFINE ACTIVITIES Break down work packages into activities that provide a basis for estimating, scheduling, executing, monitoring, and controlling Activity definitions include description, name, identifier, WBS (Work Package) ID, predessor & successor activities, leads & lags, resource requirements, imposed dates, constraints, and assumptions, person responsible, etc.
ACTIVITIES IN MS PROJECT