  • 8/2/2019 Project Report on Sudhir Generator Set

    1/89

    INDUSTRIAL TRAINING AND

    PROJECT

    REPORT

    ON

    FAULTY TRACING IN DG SETS

    PROJECT REPORT SUBMITTED IN PARTIAL FULFILLMENT OF

    REQUIREMENT FOR THE AWARDS OF PROJECT YEAR DEGREE IN

    MECHANICAL ENGG. OF THE PUNJAB TECHINCAL UNIVERSITY

    SUBMITTED BY

    CHETAN SUNDAN (80603514003)

    SUBMITTED TO

    DEPTT. OF MECHANICAL ENGG.

  • 8/2/2019 Project Report on Sudhir Generator Set

    2/89

    BABA KUMA SINGH JI ENGINEERING COLLEGE

    HOSHAIR NAGAR AMRITSAR

    PREFACE

    If you know the laws of buoyancy it doesnt mean that you know how to swim. It is only

    through jumping in the water that you get the feel of the depth. This is applicable to every

    aspect of life. Therefore practical training is of utmost importance.

    The object of undergoing this training was to get familiar with the weary waters of the industry

    and to learn how to put theory into practice. I have been greatly privileged to have undergone

    training at SUDHIR GENSETS LTD., JAMMU.

    This report contains the extract of things I have learned during my training period.

    Chetan Sundan

  • 8/2/2019 Project Report on Sudhir Generator Set

    3/89

    ACKNOWLEDGEMENT

    Any endeavor cannot lead to success unless and until a proper platform is provided for the

    same. This is the reason I find myself very fortunate to have undergone my industrial training

    of six months at SUDHIR GENSETS LTD.,JAMMU. The persons of my department and allother departments have extended a warm and helping hand.

    I am very fortunate to have had a chance to feel the gravity of what role mechanical

    engineering plays in the industry. It was a golden opportunity for me to get a chance to

    experience what it feels to be in a company wgere disciple, quality and hard work are the

    motto. This training helped me a lot in bridging the gap between the theoretical and practical

    aspects of my knowledge.

    First of all I would like to thank Mr. Jangbir Singh for his valuable guidance and

    encouragement as a teacher and a friend throughout my training period.

    I am also thankful to Mr. Shami Sharma for giving me an opportunity to undergo training in

    such a renowned company.

    My heartily thanks to Er. Vinod Sharma who was my project manger and my guide through

    the project works. They always went out their to help me at all times. Their experience andknowledge motivated me to bring out the best in times.

    I am sure that the knowledge and information that I have gained during this period would be of

    immense value for my growth in the field of Mechanical Engineering.

  • 8/2/2019 Project Report on Sudhir Generator Set

    4/89

    Chetan Sundan

    DECLERATION

    I hereby certify that the project report submitted for the award of degree in Mechanical Engg. It

    is the record of work carried out by me during the period Jan-2011 to June-2011 under the

    guidance of Er. Vinod Sharma at SUDHIR GENSETS LIMITED, JAMMU.

    Signature of Candidate

  • 8/2/2019 Project Report on Sudhir Generator Set

    5/89

    CERTIFICATE

    BABA KUMA SINGH JI ENGINEERING COLLEGE

    HOSHAIR NAGAR AMRITSAR

    (RECOGNIZED BY THE PUNJAB GOVT. ANDAFFILIATED TO THE PUNJAB TECHNICAL

    UNIVERSITY APPROVED BY ALL INDIA COUNCIL OF

    TECHNICAL EDUCATION)

    This is to certify that project work entitled Industrial Training

    And Project Report on FAULT TRACING IN DG SETS has

    been carried out by :-

    CHETAN SUNDAN (80603514003)

    The student of 8th Sem. B. Tech in Mechanical Engineering

    under our Supervision and guidance have submitted in the

    partial fulfillment of the Requirement for the degree in

    Mechanical Engineering during the Academic Session 2007-

    2011.

  • 8/2/2019 Project Report on Sudhir Generator Set

    6/89

    Principal Project Guide :

    Dr. P. S. Sandhu Mrs. Meenakshi Madam

    Examiner

    INDEX

    ABOUT SUDHIR GROUP

    INFRASTRUCTURE

    PLANTS

    PRODUCTS RANGE

    PARTNERS

    WORK CULTURE

    SERVICES

    GENSETS OVERVIEW

    SUDHIR GENSETS OVERVIEW

    ENGINE OPERATIONS

    TESTING

    FAULT TRACING IN DG SETS

    CONCLUSION OF TRAINING

  • 8/2/2019 Project Report on Sudhir Generator Set

    7/89

  • 8/2/2019 Project Report on Sudhir Generator Set

    8/89

    ABOUTSUDH IR

    GROUP

    ABOUT SUDHIR GROUP

  • 8/2/2019 Project Report on Sudhir Generator Set

    9/89

    Sudhir is a name synonymous with Power. It stands tall in the Indian Power Generation Sector,

    providing complete turnkey Electrical solutions from GENERATION, DISTRIBUTION TO

    ELECTRIFICATION.

    An Industry leader in the field of setting up Diesel base Captive Power Plants upto 20MW

    having its corporate office in Gurgaon & revenue of over INR 1000 Crs, it has leveraged its

    relationship with Cummins Ltd. To capture a majority market share.

    The Company has a wide blue-chip customer base and operates through multiple

    manufacturing facilities across India and focuses & Gas Generators,

    HT & LT Switchboards, Transformers and Turnkey EPC contracts.

    The product line includes the widest range of Diesel Gensets 15-3000 KVA with a fuel option

    of Gas, Transformers, Packaged Substations, complete range of HT 11KV & 33KV Panels, LT

    Switchboards, Turnkey EPC contracts covering electrical and mechanical services of

    DISTRIBUTION TO ELECTRIFICATION.

    Indeed, we have achieved and leapfrogged towards unprecedented growth. But to us this is just

    another step in our ongoing journey to greater goals and broader horizons.

  • 8/2/2019 Project Report on Sudhir Generator Set

    10/89

  • 8/2/2019 Project Report on Sudhir Generator Set

    11/89

    INFRASTRUCTURE

    INFRASTRUCTURE

    All our manufacturing units are equipped with the very latest technological machineries. From

    customized designing and computer aided design system to qualified team of experienced

    engineers, these facilities add to credibility and superiority of our products and services.

    DESIGN

    Customized designing as per customer's requirement

    Computer aided design system.

    Qualified team of experienced engineers.

    Customized to suit broad array of application

  • 8/2/2019 Project Report on Sudhir Generator Set

    12/89

    FABRICATION

    Amada CNC turret punch press (aries - 255)

    Amada CNC press brake (rg 80)

    SURFACE TREATMENT & PAINTING

    11 tank metal pre-treatment for degreasing, derusting, phosphating, water rinsing and

    passivation.

    State of art modern powder coating plant

    All shades possible as per customer requirements

    Most suited for coastal areas and for alkaline environment.

  • 8/2/2019 Project Report on Sudhir Generator Set

    13/89

    TESTING

    ISO 9001:2000 certified by DNV

    100% incoming inspection

    All tests as per IS/IEC codesStringent quality test at every stage from inspection of inward material till despatch.

    Equipped to carryout primary current engine up to 3000 Amp.

  • 8/2/2019 Project Report on Sudhir Generator Set

    14/89

  • 8/2/2019 Project Report on Sudhir Generator Set

    15/89

    PLANTS

    PLANTS

    a) Corporate office, Gurgaon b) Athal plant

  • 8/2/2019 Project Report on Sudhir Generator Set

    16/89

    c) Jammu plant d) Gurgaon palnt

  • 8/2/2019 Project Report on Sudhir Generator Set

    17/89

    PRODUCTS RANGE

    PRODUCTS RANGE

  • 8/2/2019 Project Report on Sudhir Generator Set

    18/89

    Cummins Powered

    Diesel and Gas Gensets

    Ranging from 15 - 3000 KVA

    Our complete range of Generators are useful in providing Power in areaswhere conventional power supply infrastructure is unreliable. Our product

    line includes the widest range of Gensets ranging from 15KVA to 3000

    KVA, with a fuel option of Diesel or gas, a complete range of intelligent

    switchboards, design & build end to end power solutions for your Captive

    Power Plants.

    All our manufacturing units are equipped with the very latest technologicalmachineries. From customized designing and computer aided design

    system to qualified team of experienced engineers, these facilities add to

    credibility and superiority of our products and services.

    GensetControllers

  • 8/2/2019 Project Report on Sudhir Generator Set

    19/89

    The Power Command Control, is a microprocessor based generator

    set monitoring, metering, protection and control system. It offers

    advanced levels of functions for reliability and optimum genset

    performance. The power command control with digital parallelingcontrol devices such as synchronizers and load sharing controls,

    and KVAR / Power factor controls.

    DG SET SPECIFICATION

  • 8/2/2019 Project Report on Sudhir Generator Set

    20/89

    KVA MODEL NO.

    1) 30 S3.8G3

    2) 35 S3.8G3

    3) 40 S3.8G4

    4) 50 S3.8G6

    5) 62.50 S3.8G7

    6) 82.50 6BT5.9-G1

    7) 100 6BTA5.9-G1

    8) 125 6BTAA5.9-G3

    9) 160 6BTAA5.9-G5

    10) 180 6CTA-8.3-G2

    11) 200 6CTAA-8.3-G1

    12) 250 6CTAA-8.3-G4

    13) 320 NTA-855-G2-1

    14) 380 NTA-14-G3

    15) 500 KTA-19-G9

  • 8/2/2019 Project Report on Sudhir Generator Set

    21/89

    16) 600 VTA-28-G3-1

    17) 625 VTA-28-G5-1

    18) 750 KTA-38-G2-1

    19) 750 QSK QSK23-G3

    20) 1010 KTA-38-G5

    21) 1250 KTA-50-G3

    22) 1500 KTA-50-G8-1

  • 8/2/2019 Project Report on Sudhir Generator Set

    22/89

    PARTNERS

    PARTNERS

  • 8/2/2019 Project Report on Sudhir Generator Set

    23/89

    We serve some of the largest, most prestigious and demanding clients

    across India, including many Fortune companies. Read further, for a

    description of our clients and to understand what we do for.

    Realty

    DLF EMAAR MGF Unitech Uppal Housing VatikaBPTP Alpha G Corp Essel Housing Ansal

    Mahindra Gescom

    OmaxeRaheja Developers Aerens Bestech Eros

    Vipul SMCC TDI Ashiana Advance IndiaJMD Ambiance ERA Infra V3S KLJ

    BAANI Sahara Anant Raj Ind

    Hotels

    Taj Jaypee Palace Eros Bristol Bharat HotelsTrident Hotel Oberoi Hotel Hans Plaza Maurya Sheraton Qutab Hotel

    The Claridge Radisson Lodhi Hotel Ashoka Hotel Hotel Imperial

    IHHR Nehru Palace

    Hotel

    Hospitals

    AIIMS Safdarjung Sir Gangaram Lady Harding FortisUmkal Max Columbia Asia Dr, B. L. Kapoor Jaipur Golden

    ApolloRajiv Gandhi

    Cancer Institute

    Dharamshila

    Cancer Hospital

    Moolchand

    Medicity

    Ram Manohar

    Lohia

    LNJP Medicity Paras Batra PGI Chandigarh ArtimisEscorts

    Educational

    Modern School DPSSalwan Public

    School

    Manav Sthali

    School

    G.D. Goenka

    Public SchoolDAV Public SchoolDelhi University

  • 8/2/2019 Project Report on Sudhir Generator Set

    24/89

    ITeS

    Convergys Wipro SpectramindDaksh e-Services HCL

    IT

    HP Wipro Genpact HCL NIIT

    IBM Patni Computer TCS Flextronix

    Food Chain/ Restaurants

    Barista Caf Coffee Day Haldiram Bikanerwala Nirulas

    Dominos MC-Donald

    Pharmaceutical

    Ranbaxy Nectar LifesciencesGlaxosmithklineTorrent

    PharmaceuticalsCipla

    Panacea Biotech Cadila Dabur

    Telecom

    Bharti Reliance VSNL MTNL Voda PhoneESSAR ZTE Alcatel

    Insurance

    Max Newyork Tata AigIDBI Fortis Life

    Insurance

    HDFC Standard

    InsuranceICICI Prudencial

    Retail Outlets

    Vishal Retail Bharti RetailHariyali Kissan

    Bazzar

    Big Bazar Aditya Birla Retail

    Reliance Fresh Pantaloon Raymonds Gokul Mega Mart

    Institutional

    DMRC IOCL NDMC CPWD PWD

    IOCL BPCL PDD C-Dot

  • 8/2/2019 Project Report on Sudhir Generator Set

    25/89

    Export Houses

    Apparel Export

    Promotion CouncilOrient Craft Modelama Export Shahi Export SPl Ind

    Beverages/ Distilleries

    Radico NV Distilleries Pepsi Coca Cola

    Banks

    ICICI HDFC Citi Bank Axis Kotak Mahindra

    Automobile

    Maruti Hero HondaHonda Motorcycle

    & ScooterHero Cycle TVS

    Yamha Motors MICO/ BOSCH General Motors Amtek Auto JCB

    Imperial Auto Competent AG Industries Bajaj Motors Hema EngineeringLumax Hero Cycle Munjal Auto Hero Motors Rockman Cycle

    Hyghway Cycle Munjal Showa Sunbeam Auto Satyam Auto RICO Auto

    Minda Ind Omax Auto Hi-Tech Gear Subros TVS Motor Exide GE Motor Atlas Krishna Maruti

    Others

    Jaypee L&T ABB Parle Bhushan Steel

    Lakhani Relaxo Amul Dairy Vardhman Group Chinab Textile

    Adani GroupBennett &

    ColemannHindustan Times GMR-DIAL MBD

    Kajaria Surya Roshni Jindal Nahar Spinning T-Series

  • 8/2/2019 Project Report on Sudhir Generator Set

    26/89

    WORK CULTURE

  • 8/2/2019 Project Report on Sudhir Generator Set

    27/89

    WORK CULTURE

    The SUDHIR GENSETS seeks to create a culture where each employee, vendor, and dealer

    feels himself responsible and integral part of the enterprises. The work culture at SUDHIR

    GENSETS is open and participative Learning is encouraged in the company. Every member

    respects 5 F formulas

    1. Fast

    2. Fair

    3. Focused

    4. Friendly

    5. Fun

    This governs its approach to business and relationships within the organization. It has

    designee: its management structure in response to the needs of quick decision-making and

    operational flexibility even through hierarchies and designation does exit. It is highly informal

  • 8/2/2019 Project Report on Sudhir Generator Set

    28/89

    organization where communication moves in all direction, decision-making is quick and to a

    large extent delegated.

    Every member respects 5 s formulas also:

    1. Seiri

    2. Seiton

    3. Seiso

    4. Seikets

    5. Shitsuk

    5s stands for the first five letters of the japenese words:

    S.No. JAPANESE

    WORD

    MEANING

    1s SEIRI Sorting out, clearing, segregation, proper selection,

    remove the waste

    2s SEITON Systematic arrangement, keeping things at a proper

    place, a place for every thing and every thing in its

    place

    3s SEISO Cleaning (spick and span) quality by the cleaniless.

    Keep clean all area, equipment and work place

    4s SEIKETSU Standardizing, environment, cleanliness, light,

    noise, punctuality

  • 8/2/2019 Project Report on Sudhir Generator Set

    29/89

    5s SHITSUKE Maintain discipline and standards to maintain above

    4s, respect of rules.

    The 5s are also five operations to keep a good behaviour for every work place 5s program

    started in SUDHIR GENSETS LTD. From feb 2002 achieving clean floor and organized racks

    is not an end in itself. The ultimate goal of house keeping through 5s is to reduce the cost of

    product by increasing productivity and contributing to total quality.

    How to achieve 5 s:-

    5s can be achieved very easily by every employee by having close look at his work-place, he

    is ensure that:

    By organizing of work place and surrounding area in a better way.

    No rejected! Unwanted items are lying at his work place.

    By keeping all items, equipments at identified place.

    Everybody should co-operate with each other in keeping his and others area clean.

    Follow and respect of rules and regulations and maintain required standards.

    PLEASE CHECK:

    Do you have any unwanted things around you?

  • 8/2/2019 Project Report on Sudhir Generator Set

    30/89

    Are all the required things kept at their allocated places? Are you following

    timings and set norms?

    Are you following the operation standards?

    Are you regularly reviewing 5s

    5s objectives:-

    Productivity high

    Quality high

    Cost down

    Delivery on time

    Safe work place

    Moral high

    FUTURE PLANS:

    1. To provide superior quality gensets over all the country with new technology at

    reasonable rates, and to become NO.1 in gensets industry within five years.

    2. SUDHIR GENSETS LTD. Have plans to market 10000 gensets during financial

    year.

    ACHIEVEMENTS

    Company, which has shown about 30% increase in turnover within a period of 1 year.

    Company has increased its production of diesel gensets.

    The company has obtained ISO 9001 certification.

  • 8/2/2019 Project Report on Sudhir Generator Set

    31/89

    Company has also obtained ISO 14001:2004 certification.

  • 8/2/2019 Project Report on Sudhir Generator Set

    32/89

    SERVICES

    SERVICES

    It is a part of our mission to provide solutions that create value for our customers. Product

    support is an important of our mission. Valuable owners of SUDHIR GENSETS LTD. Gensets

    rely on uninterrupted power 247.

    The success of your business demands solution that minimize downtime, reduce costs and keep

    your equipment running at peak performance.

    Whether its helping you select the right equipment for your job or utilizing the latest

    technology to monitor your equipment SUDHIR GENSETS LTD. Are always there for you.

  • 8/2/2019 Project Report on Sudhir Generator Set

    33/89

    By offering a wide range of solutions, services and products, we help you in lower costs,

    increase productivity and manage your business more effectively.

    In addition, our expert techinicans have the experience, knowledge, training and tooling

    necessary to handle all your maintenance and repair needs. We have around 100 nos. ofworkforce, which cater services in different parts of the country so as to reduce downtime.

  • 8/2/2019 Project Report on Sudhir Generator Set

    34/89

    GENSETS OVERVIEW

    GENSETS OVERVIEW

  • 8/2/2019 Project Report on Sudhir Generator Set

    35/89

  • 8/2/2019 Project Report on Sudhir Generator Set

    36/89

    Other DG sets while power cuts eats into your profits, an inefficient DG set will simply add to

    your losses, the SUDHIR GENSETS DG have been designed to ensure you an efficient power

    supply. This also assures you years of hassle free operations.

    Generates peace of mind

    Its recovery time, easily the best in its category, gurrantees a seamless switchover to the back-

    up power. Moreover, its effective governing system controls the voltage fluctuations, thus

    ensuring completely safety of your equipments.

    Performance unmatched

    Its got one of the most preferred engines fitted inside- the CUMMINS ENGINE. Compact and

    low on vibration, this engine has the smallest footprint as compared to other engines of

    identical ratings.

    Silence certified

    Each and every SUDHIR DG set compiles with the most stringent noise and emission norms

    stipulated by the central pollution control board of India (CPCB)

    No compromise technology

    Its got the other advantage too. Like, its transported through the SUDHIR Transport

    solutions, it is installed and commissioned through a SUDHIR authorized dealer. It even comes

    with an annual maintenance contract. It is the most fuel efficient in its class. It offers zero-leak

    engines.

    Preferred by all

    A SUDHIR DG set can be used in the Telecom, Defence and railway sectors. It can also be

    installed at places like petrol pumps, hospitals, super markets and banks.

  • 8/2/2019 Project Report on Sudhir Generator Set

    37/89

    GENERAL DESCRIPTION OF GENSET

    The Genset package includes a diesel engine, Alternator, control system and Canopy.

    Gensets components Systems/Parts Function

    Canopy Fabricated structure

    Noise suppressing

    material

    Control noise level of

    generating set housing

    Base Fabricated structure

    Anti vibration

    mountings

    Mount Engine+Alternator

    Fuel tank Fabricated tank and

    accessories

    Store fuel

    Battery Battery

    Leads

    Cables

    Support direct current

    Engine-Direct injection Air system

    Cooling system

    Fuel system

    Exhaust system

    Electrical system

    Up-fitting parts

    Produce mechanical

    power

  • 8/2/2019 Project Report on Sudhir Generator Set

    38/89

    Alternator-Brushless Stator

    Rotor

    Exciter

    Rectifiers

    Voltage regulator

    Ventilation fan

    Mounting arrangements

    Produce electrical power

    Control panel Measuring instruments

    Controlling safeties

    Logic controller

    Meter power

    Control power

    Provide safeties

    BEST FEATURES OF YOUR GENSET

    Sr.No. SPECIFICATIONS PROPERTIES/ADVANTAGES

    1. Modular in construction Easy for dismantling & assembly.

    Easy for

    shipment/handlings/installations

    2. Lowest sound level in the series Lowest sound level of the rugged

    M & M engines. CPCB certified

  • 8/2/2019 Project Report on Sudhir Generator Set

    39/89

    3. Compact in size with proper air

    passage.

    Advanced design with sufficient

    breathing and air movement for

    great performance. Techanically

    advanced.

    4. Low fuel consumption in the

    series.

    Rugged and high fuel economy

    5. Rust proof- powder coated &

    weather proof

    Long life- durable and branded for

    good appeal for out door usage

    without any additional sheets/

    infrastructures.

    6. Fire retardant and high noise

    absorbent insulations.

    UL94 & HF1 Grade insulation

    foam used for fire

    retardation/noise absorption.

    7. Easy accessibility for services All parts of the equipments

    accessible for easy serviceability

    with enclosure illumination for

    lightning at night in DG.

    8. Draw out type fuel tank of easy

    serviceability

    Easy maintenance type fuel tank

    for both routine maintenance and

    sludge removals.

    9. Low vibration to ground Technically tested anti vibration

    mountings to arrest unnecessary

    vibrations of equipment to

    ground/structures.

    10. High safety features for operator and equipment

    Emergency stop from outsidecanopy. High canopy temperatures

    switch and low fuel level switch-

    alarm as optional.

  • 8/2/2019 Project Report on Sudhir Generator Set

    40/89

  • 8/2/2019 Project Report on Sudhir Generator Set

    41/89

    SUDHIR GENSETS

    OVERVIEW

    SUDHIR GENSETS OVERVIEW

    In Sudhir Gensets LTD., jammu, there are two units:-

    1.) UNIT 1

    2.) UNIT 2

    In UNIT 1, Manufacturing of canopies and base frames whereas in UNIT 2,assembly of genset

    is done and then it is sent to testing area where testing is done before packing and delivering it

    to the customers

  • 8/2/2019 Project Report on Sudhir Generator Set

    42/89

    UNIT 1

    MANUFACTURING PROCESS FLOW CHART OF CANOPY

    Raw Material

    Inward inspection

    Shearing

    Punching

  • 8/2/2019 Project Report on Sudhir Generator Set

    43/89

    Welding

    Grinding/Sanding

    Stage Inspection

    Pre-treatment

    Stage Inspection

    Powder Coating

    Stage Inspection

    Stuffing

    Stage Inspection

    To Assembly

    DESIGN OF CANOPY:-

    A) Back View

  • 8/2/2019 Project Report on Sudhir Generator Set

    44/89

    b) Front View:-

  • 8/2/2019 Project Report on Sudhir Generator Set

    45/89

    c) L.H.Side View:-

  • 8/2/2019 Project Report on Sudhir Generator Set

    46/89

    d) R.H.Side View:-

  • 8/2/2019 Project Report on Sudhir Generator Set

    47/89

    MANUFACTURING PROCESS FLOW CHART OF BASE FRAME

  • 8/2/2019 Project Report on Sudhir Generator Set

    48/89

    Raw Material

    Inward inspection

    Shearing

    Punching

    Bending

    Welding

    Grinding

    Leakage test

    Pre-treatment

    Stage inspection

    Painting

    To assembly( UNIT 2)

    BASE FAME FOR 1250 KVA

  • 8/2/2019 Project Report on Sudhir Generator Set

    49/89

    SIZE OF BASE FRAME

  • 8/2/2019 Project Report on Sudhir Generator Set

    50/89

    SIZE(mm) KVA

    1) 250 250, 380

    2) 300 500, 625, 750

    250mm base frames are used for silent sets. For example, for gensts of 250 or 380 KVA.

    UNIT 2

    MANUFACTURING PROCESS FLOW CHART OF SILENT DG SET

  • 8/2/2019 Project Report on Sudhir Generator Set

    51/89

    1) Base Frame 2) Engine 3) AT & Other

    __________________________________________________________________

    Placement of base frame

    Assembly of DG set on frame

    Assembly of AE components

    Alignment of doorsAlignment of roofs

    Assembly of control panel Exhaust connection

    a) Power cable connection Silencer fitting

    b) Electrification of acoustic Cladding control panel

    c) Fittement of battery

    _____________________________________________________________________

    Fittment of lube oil, coolant, blow by drainagePreparation for testing

    Checking of service accessibility

    Checking of lube oil and coolant levelConnection for testing

    Checking of aesthetic Test in gidle

    Load test

    Cleaning of silent DG set

    aspects and stickering

    Documentation

    Dispatch

    DRAWING OF 1010KVA GENSETS

  • 8/2/2019 Project Report on Sudhir Generator Set

    52/89

    DRAWING OF 1010 KVA GENSET BASE FRAME

  • 8/2/2019 Project Report on Sudhir Generator Set

    53/89

    DRAWING OF 1250 KVA GENSET

  • 8/2/2019 Project Report on Sudhir Generator Set

    54/89

    DRAWING OF 1250 KVA GENSET BASE FRAME

    DRAWING OF 1500 KVA GENSET

    DRAWING OF 1500 KVA BASE FRAME

  • 8/2/2019 Project Report on Sudhir Generator Set

    55/89

    DRAWING OF QSK GENSET

  • 8/2/2019 Project Report on Sudhir Generator Set

    56/89

    DRAWING OF QSK BASE FRAME

    DIFFERENT VIEWS OF BASE FRAMES

    a) FRONT VIEW

  • 8/2/2019 Project Report on Sudhir Generator Set

    57/89

    b) SIDE VIEW (Radiator Side)

  • 8/2/2019 Project Report on Sudhir Generator Set

    58/89

    c) SIDE VIEW (Alternator Side)

  • 8/2/2019 Project Report on Sudhir Generator Set

    59/89

  • 8/2/2019 Project Report on Sudhir Generator Set

    60/89

    d) TOP VIEW

  • 8/2/2019 Project Report on Sudhir Generator Set

    61/89

    INSTALLATION

    1. Installation

    Most gensets installations must be engineered so the generator will function at

    optimum output under the expected load conditions

    Importance of proper installation of DG set:

    a) improved reliability and durability

    b) Better fuel economy

    c) Easy serviceability

    d) Improved aesthetic of genset room

    e) High up time of genset

    f) Better working conditions

    LOCATION

    Selecting a location for genset is very important part of any installation procedure.

    Always locate the genset in the area that will provide:

    a) Adequate ventilation

    b) Clean, dry and bgood drainage capabilites.

    c) Physical protection

    d) Space for carry out services and also major repairs

    e) Doors must be seized to allow access in & out for the complete generator set

    anmd major accessories

    FOUNDATION

  • 8/2/2019 Project Report on Sudhir Generator Set

    62/89

    An inadequate foundation may lead to excessive genset vibrations resulting in

    radiator leaks, failure of the auto electrical and safety system or failure of gauge,

    coupling or other engine parts.

    a) Genset should be kept on leveled surface.

    b) Use of anti vibration mountings are recommended to isolate vibrations or

    transmitting to floor. These are placed in between engine/alternator and base

    frame.

    c) The length and breadth of foundation should be atleast 150-300mm more

    than the base rail length and breadth respectively.

    d) It is recommended to have foundation height about 100-150mm above

    ground level.

    3. LIFTING/ UNLIFTING OF DG SET

    a) Provision for genset lifting is provided on base rails. Unload the genset

    from base rail by lifting with proper lifting tackle or nylon sling/ steel

    rope of suitable capacity and crane so as to ensure no damage to oil

    sump, air cleaner, radiator pipes etc.

    b) Do not lift the genset from the engine hook and alternator hook.

    ROOF TOP INSTALLATION

    a) Structure of the roof area should be suitable for the entire weight, size

    and shape of the enclosure

    b) Floating floor of the structural steel platform across the main building

    main columns can be a one of the solution] Ensure usingc) AVMs and also other installation techniques so that vibrations are not

    transmitted to the building.

  • 8/2/2019 Project Report on Sudhir Generator Set

    63/89

    GENERAL MAINTENANCE

    1. VENTILATION

    Ventilation inside the enclosure is necessary to remove heat and fumes diddipated

    by the engine, alternator and its accessories and to provide clean and fresh air for

    combustion. Additional ventilation arrangements may be required for gensets

    installed in rooms. Radiator cooled engines may create slight negative pressure

    inside the genset room/ enclosure. Maximum static restriction should not increase

    6mm water column. Maximum allowed temperature rise above ambient in genset

    room/ enclosed is 5 degree Celsius.

    2. EXHAUST SYSEM

    The exhaust system is used to direct exhaust to non-confined areas and to reduce

    the noise to tolerable levels.

    a) Ensure joints for

    Proper clamping at the joint of exhaust and below

    Proper clamping at the joint of exhaust pipe and silencer elbow No exhaust gas leak from any joint

    b) Ensure alignment for

    Exhaust bellow must have its free length, when installed with exhaust

    pipe

    Proper alignment of bellow and pipe

    Ensure that bellow is not installed tilted or compressed

    Ensure proper support to piping and silencer

    c) Ensure free movement of exhaust pipe and silencder

    d) Exhaust pipe lagging is must

    e) Ensure exhaust back pressure limit is not exceeded in any case.

  • 8/2/2019 Project Report on Sudhir Generator Set

    64/89

    3. AIR SYSTEM

    a) Engine inlet air must be adequate, clean and as cool as possible. This will

    help to achieve best possible performance and expected life of the genset.

    b) Heavy duty air cleaner should be used for dusty environment. Please note

    that gensets are supplied with medium/heavy duty air cleaner

    c) Negative pressure(vaccum) inside the enclosure is not advisable. If it

    exists/created, thyen value should not exceed 6mm of water column.

    4. FUEL SYSTEM

    a) Ensure leak proof joints

    b) Piping should not restrict fuel flow to engine, accessibility to service points

    and ventilation air flow.

    c) Fuel can be cleaned or diesel can be drained without obstruction.

    d) Provide diesel filling capacity from outside enclosure.

    e) Provide level indicator and trip for low fuel level.

    5. FUEL TANKS AND PIPES

    a) The fuel delivery line carrying fuel to the engine and fuel return line

    for carrying excessive fuel back to the tank should be no smaller than the

    fitting sizes on the engine. For longer runs or extremely low ambient

    temperatures increase the size of these lines to ensure adequate flow

    b) Size to suit at least one shift operations or maximum 990 ltrs.

    c) Drain fittings to bleed water condensate at lowest point of tank.d) Fill neck to be provided to allow min 5% expansion space

    e) Use pipe sealant LOCTITE-577 for all connections for sealing. No Teflon

    tape to be used

    f) Suction line and return line to be separated by atleast n300mm

  • 8/2/2019 Project Report on Sudhir Generator Set

    65/89

    g) Galvanizing not recommended inside fuel tank. Copper and GI pipes react

    with diesels cant be used.

    h) Wire mesh filter at suction point.

    i) The fuel return line should be designed with minimum amount of bends or

    dips to prevent air lock in the system.

    j) Flexible fuel pipes should be used at a point between the tank and engine to

    avoid the potential damage that could be created by vibration.

    k) All standard genset with acoustic enclosure are provided with tank fitted in

    the base frame. This tank will produce a ready fuel supply.

    6. ENGINE BREATHER VENTS

    a) Crankcase gases should be piped outside the engine room so that oil dont

    accumulate on the engine/radiator.

    b) Vent tube / hose should continuously slope downwards to avoid oil

    accumulation.

    7. SERVICE ACCESSIBILITY

    a) Engine control panel should be visible from outside the enclosure

    b) Service check should be possible without dismantling acoustic enclosure

    c) In case of any major repairs, it may be required to dismantle the enclosure

    and sufficient space around the enclosure should be available to carry out

    the work

    d) To avoid recirculation of hot air, durable sealing between radiator and

    canopy is must.e) There should be provision for oil and coolant drain. Fuel tank have

    provision for cleaning.

  • 8/2/2019 Project Report on Sudhir Generator Set

    66/89

    8. COOLING SYSTEM

    a) Systems are designed for ambient temperature of 500 degree Celsius.

    b) Water used in the cooling systems should have properties as mentioned in

    below table. If properties are beyond the limits then it can result in

    Scale formation

    Over heating

    Corrosion

    c) radiator fan flow should be free from any obstructions.

    9. BATTERY / ELECTRICAL SYSTAM

    a) 12V electrical system is used in SUDHIR engines upto 62.5 KVA.

    b) Battery provided with the genset is maintenance free charged battery.

    c) Battery should be placed on stands.

    d) For AMF applications, a static battery charger working on main supply is

    recommended to keep the batteries charged at all times.

    e) Ensure polarity of the battery connections are correct.

    10.ELECTRICAL CONNECTIONS

    a) Ensure that only qualified electricans carry out installtion work

    b) Use flexible cable to avoid vibrations and possible damages to the

    alternator or circuit breaker terminals.

    c) Ensure that the cable is laid in a cable tray and minimum bending radius

    reference is followed.

    d) Use correct size and type of cable to suit applied voltage, maximum current

    and allowance should be made from maximum temperature inside the

    enclosure.

  • 8/2/2019 Project Report on Sudhir Generator Set

    67/89

    e) All electrical work should be carried out in accordance with any applicable

    national, local standards, codes or regulations.

    f) Protect the generating set from overload / short circuit by using circuit

    breaker.

    g) Maintain the power factor to 0.8 lagging by using inductive load or

    capactiors depending upon the load type.

    h) Never attempt to work on the living wire

    i) Ensure balanced load is applied on the genset.

    11.CABLING

    a) Use only recommended cable sizes.

    b) Use flexible wires.

    c) Avoid any tension on the bolts / bus bars while terminating the cables.

    d) Maintain R Y B phase notation in the alternator and control panel for ease in

    maintenance.

    e) Crimped cables should be connected to alternator and contol panel through

    cable gland.

    f) Strictly avoid loose thumbing / undersize cables.

    g) Use armoured copper cable of right size for control cabling.

    h) Support the cables such that weight of the cable should not fall on alternator

    / base rail.

    12.EARTHING

    a) Generated set + associated control and switchgears panels must be earthedproperly.

    b) Earthing must be done on engine / alternator and not on base rail.

    c) Earthing should be checked with multi-meter and ensure resistance is

    maintained in prescribed limit (1).

  • 8/2/2019 Project Report on Sudhir Generator Set

    68/89

    d) Copper GI strips of suitable size may be used.

    e) Generating set should be earthed two distinct points through a conductor

    heavy enough to carry the short circuit current without burning out.

    f) Earthing must be in accordance with applicable national, local code or

    regulation.

    13.FIRE PRECAUTION

    a) Install recommended type fire extinguishers.

    b) Keep the room / enclosure free from accumulated rubbish which cab be fire

    hazardous.

    14.GENEST WITH ACOUSTIC ENCLOSURE

    a) Engine control panel should be visible from outside the enclosure.

    b) Service check should be possible without dismantling acoustic enclosure.

    c) For major repairs / overhaul it may be required to dismantle the acoustic

    enclosure.

    d) To avoid recirculation of hot air, durable sealing between radiator and

    canopy is must.

    e) Sufficient capacity ventilation fans are required if radiator fan flow is not

    sufficient. Fan flows in acoustic enclosure will be less due to higher

    restrictions.

    f) Exhaust piping inside the enclosure must be lagged

    g) Temperature rise inside the enclosure should not be more than 50 degree

    Celsius.

    h) Radiator cooled engines may create slight negative pressure inside the

    enclosure.

    i) There should be provision for oil and coolant drain.

  • 8/2/2019 Project Report on Sudhir Generator Set

    69/89

    15.SUCCESS KEYS

    a) Adhere to central pollution board (CPCB) and other applicable national and

    local codes, norms and regulations.

    b) During installation, for dismantling of the acoustic enclosure and generating

    set components, and then reassembly, ensure that both the processes are

    done strictly as per manufacturers recommendations and by the authorized

    work force.

    c) Use only authorized channels for supply, installation and commissioning

    and operation and maintenance.

    d) Use genuine spares only.

    e) Do operation and maintenance as per manufacturers recommendations and

    through authorized service network. Maintain log book and other related

    records. This will be useful during troubleshooting.

    f) Insure right quality and quantity of air, fuel, lubricating oil and coolant. This

    is more critical in case of AMF operations.

    g) When generating set stops because of a fault, rectify 100% before start.

  • 8/2/2019 Project Report on Sudhir Generator Set

    70/89

    ENGINE OPERATIONS

  • 8/2/2019 Project Report on Sudhir Generator Set

    71/89

  • 8/2/2019 Project Report on Sudhir Generator Set

    72/89

  • 8/2/2019 Project Report on Sudhir Generator Set

    73/89

  • 8/2/2019 Project Report on Sudhir Generator Set

    74/89

  • 8/2/2019 Project Report on Sudhir Generator Set

    75/89

  • 8/2/2019 Project Report on Sudhir Generator Set

    76/89

  • 8/2/2019 Project Report on Sudhir Generator Set

    77/89

    TESTING

  • 8/2/2019 Project Report on Sudhir Generator Set

    78/89

    TESTING

  • 8/2/2019 Project Report on Sudhir Generator Set

    79/89

  • 8/2/2019 Project Report on Sudhir Generator Set

    80/89

  • 8/2/2019 Project Report on Sudhir Generator Set

    81/89

  • 8/2/2019 Project Report on Sudhir Generator Set

    82/89

  • 8/2/2019 Project Report on Sudhir Generator Set

    83/89

    ROJECT REPORT

    ON

    FAULT TRACING

    IN

    DG set

  • 8/2/2019 Project Report on Sudhir Generator Set

    84/89

    Sr.

    No.

    DEFECTS REMEDY

    1. FAULTY STARTER SWITCH REPLACE

    2. BATTERY TOO LOW TO TURN

    ENGINE

    CHARGE OR INSTALL NEW

    BATTERY

    3. ENGINE OIL TOO LOW DRAIN OIL AND REFILL WITH

    CORRECT GRADE

    4. STARTER MOTOR INOPERATIVE INSPECT CABLES AND

    TERMINALS

    CHECK FOR TIGHTENING OF

    MOUNTING SCREW

    INSPECT BRUSH GEAR FOR

    WEAR OR DAMAGE AND

    COMMENTATOR FOR DIRT OR

    DRAINAGE

    5. STOPPER KNOB PULLED OUT PUSH THE KNOB IN

    6. FUEL SYSTEM CLOGGED DRAIN SYSTEM, CLEAN AND

    REFILL WITH PROPER FUEL

    7. BATTERIES DISCHARGED CHARGE OR REPLACE

    8. LACK OF COMPRESSION CHECK PUMP FOR

    RESTRICTION IN SYSTEM AND

    CLEAN OUT

    ALSO CHECK VALVES AND

    SPRING*

  • 8/2/2019 Project Report on Sudhir Generator Set

    85/89

    9. LUBRICATING OIL OF WRONG

    VISCOSITY

    DRAIN AND REFILL WITH

    PROPER LUBRICANT

    10. FUEL FEED PUMP INOPERATIVE *

    11. FUEL INJECTION PUMP HAS LOST

    ITS EFFICIENCY

    *

    12. FAULTY HEAT INDICATOR REPLACE

    13. INSUFFICIENT WATER IN THE

    COOLING SYSTEM

    CHECK WATER LEVEL IN THE

    RADIATOR AND ADD WATER IF

    NECESSARY

    14. COOLING SYSTEM CLOGGED CLEAN OUT RADIATOR AND

    ENGINE

    15. FAN AND WATER PUMP BELT

    SLIPPING

    CHECK TENSION AND MAKE

    PROPER ADJUSTMENT

    16. INSUFFICIENT OIL MAINTAIN PROPER OIL LEVEL

    17. DEFECTIVE THERMOSTAT *

  • 8/2/2019 Project Report on Sudhir Generator Set

    86/89

    18. WATER PUMP DEFECTIVE *

    19. FUEL INJECTION TIMING

    INCORRECT

    *

    20. VALVE CLEARANCE INCORRECT ADJUST CORRECTLY

    21. CLUTCH PLATE SLIPPAGE *

    22. DEFECTIVE OIL PRESSURE

    INDICATOR

    REPLACE

    23. BROKEN, LOOSE PIPES REPLACE, CLEAN AND

    TIGHTEN

    24. LOW OIL LEVEL IN THE

    CRANKCASE

    ADD OIL AND CHECK FOR OIL

    LEAKAGE

    25. DEFECTIVE OR DIRTY OIL

    PRESSURE REGULATING VALVE

    *

    26. OIL PUMP NOT WORKING *

    27. WORN BEARINGS *

  • 8/2/2019 Project Report on Sudhir Generator Set

    87/89

    28. CLOGGED OIL FILTER *

    29. TOO MUCH OIL IN AIR CLEANER CORRECT THE OIL LEVEL

    30. INMPROPER GRADE OF FUEL/OIL DRAIN OFF AND REPLACE

    WITH CORRECT GRADE OF FUEL/OIL

    31. AIR CLEANER PIPE CLOGGED REMOVE AND CLEAN

    IF DEFECTIVE REPLACE

    32. INCORRECT VALVE ADJUSTMENT SET VALVE CLEARANCE

    33. FUEL INJECTION PUMP LOST ITS

    EFFICIENCY

    *

    34. LOOSE WIRING OR IMPROPER

    CONNECTIONS CAUSING MALFUNCTIONING

    CHECK WIRING TO SEE THAT

    ALL CONNECTIONS ARE CONNECTIONS ARE CLEAN AND

    TIGHT

    35. BATTERY DEFECTIVE, LOW

    CHARGE OR LOOSE

    CONNECTIONS

    RECHARGE, CLEAN AND

    TIGHTEN CABLE PLUGS OR

    REPLACE WITH NEW, CHECK EARTH

    CABLE

    36. STARTER MOTOR INOPERATIVE CHECK BRUSH GEAR

    37. ALTERNATOR INOPERATIVE CHECK REGULATOR

  • 8/2/2019 Project Report on Sudhir Generator Set

    88/89

    CONCLUSION OF

    TRAINING

  • 8/2/2019 Project Report on Sudhir Generator Set

    89/89

    CONCLUSION OF TRAINING

    My training was the most versatile experience. I had the pleasure to do the work with one of

    the most reputed factory in their field-SUDHIR GENSETS LTD. I received the blend of

    experience in private sector. It was a good learning time during my training as we were

    fortunate to be placed in the department related to manufacturing. I feel training has given me

    exposure to undergo projects in the Manufacturing field as well help me a lot to understand the

    company work culture, working with teams and much more.

    In the end I would like to thank all persons who helped me throughout my training to enhance

    my experience. I also pay my regards to my lecturers for their guidance during my training and

    my academics helped me to do a lot during my training.