Project Presentation 19122013
-
Upload
pham-thu-trang -
Category
Documents
-
view
215 -
download
0
Transcript of Project Presentation 19122013
-
8/11/2019 Project Presentation 19122013
1/49
-
8/11/2019 Project Presentation 19122013
2/49
International name as VIJA GROUP. Operating fields: production, services, transportation and te
VIJA GROUP has 5 companies, many brands and large distsystem over Vietnam.
Strong human resources with more than 600 employees.
Vision: Become one of the biggest Steel manufacturing, T
Technology and Service company in Vietnam.
Mission: Bring the best quality and service to customers.
-
8/11/2019 Project Presentation 19122013
3/49
Chief of Organization (CEO):
MR. NGUYEN VAN BINH Born in 1957;
Graduated Business Bachelor in Russia;
Graduated Foreign Trade University in Vietnam;
Delegate of Vietnamese National Assembly 12 th;
Delegate of Vietnamese Fatherland Front -Term VI, Term VII;
Delegate of Haiphong Town Council Term XIII, Member of
Economic and Budget Division;
Top-100 most successful business man of Vietnam award;
-
8/11/2019 Project Presentation 19122013
4/49
General Director
MR: ANG VIET BACH
Born in 1978;
Graduated in Hanoi University of Technology -
Automation faculty;Concurrent General Director of Vija-Tech.,Jsc Po
Top-100 most young successful business man
Vietnam award;
-
8/11/2019 Project Presentation 19122013
5/49
-
8/11/2019 Project Presentation 19122013
6/49
VietnamJapan
Corporation
VietnamJapan Steel
.Jsc
HaiNguyenTransport
and LogisticCo,.Ltd
VietnamJapan
Section SteelCompany
VietnamJapan
Technology.Jsc
Dong-AShipbuilding
IndustryCompany
-
8/11/2019 Project Presentation 19122013
7/49
MEMBER OF VIETNAM JAPAN CORPORATION
1. Vietnam Japan Steel Joint Stock Company (HPS)
- Including:
* Vietnam Japan Steel Rolling Factory.
* Steel making and Ferrous Metals making Factory.
- Address: Km9, Quan Toan Street, Hong Bang District, Hai Pho- Charter Capital: 302 mil VND / Grossrevenue in 2009: 1,150
- Main operating Field: Metals Trading and Manufacturing.
- Management System: ISO 9001:2000; ISO14001:2004; VLAS
-
8/11/2019 Project Presentation 19122013
8/49
2. Vietnam Japan Technolog y Joint Stock Company (VIJATE
- Address: B2/26 Le Duc Tho Street, Tu Liem District, Ha Noi
- Charter Capital : 60 mil VND/ Grossrevenue in 2009: 2100
- Main operating Field: Metals Trading; Consult, Implement a
Commissioning Automation Project.
- Management System: ISO 9001:2000.
MEMBER OF VIETNAM JAPAN CORPORATION
-
8/11/2019 Project Presentation 19122013
9/49
3. Vietnam Japan Sect ion Steel Company (HASCOM)
- Address: 118 Hanoi street, Thuong Ly, Hong Bang, Hai Phon
- Charter Capital: 69,5 mil VND / Grossrevenue in 2009: 200 m
- Main operating Field: Metals Trading and Manufacturing.
- Management System: ISO 9001:2000.
MEMBER OF VIETNAM JAPAN CORPORATION
-
8/11/2019 Project Presentation 19122013
10/49
4. Hai Nguy en Transpo rt & Log ist ic Co.,Ltd
- Address: No.02 Ha Noi Street, Thuong Ly Ward, Hong Ban
Hai Phong City.
- Charter Capital: 30 mil VND/ Grossrevenue in 2009: 50 m
- Main operating Field: Logistic and Equipment Trading.
MEMBER OF VIETNAM JAPAN CORPORATION
-
8/11/2019 Project Presentation 19122013
11/49
5. Dong-A Sh ipbu ild ing Indus t ry Company
- Address: Km17+500, No.5 National Road, Le Thien Ward, A
District, Hai Phong City.
- Charter Capital: 9 mil VND/ Grossrevenue 2009: 250 mil V
- Main operating Field: Shipbuilding and Ship-service.
MEMBER OF VIETNAM JAPAN CORPORATION
-
8/11/2019 Project Presentation 19122013
12/49
2008 2009 2010 2011
65 mil
USD
95 milUSD
150 milUSDGross revenue:
-
8/11/2019 Project Presentation 19122013
13/49
-
8/11/2019 Project Presentation 19122013
14/49
HUMAN RESOURCES
-
8/11/2019 Project Presentation 19122013
15/49
-
8/11/2019 Project Presentation 19122013
16/49
-
8/11/2019 Project Presentation 19122013
17/49
-
8/11/2019 Project Presentation 19122013
18/49
-
8/11/2019 Project Presentation 19122013
19/49
Some Outstanding project which Vija-Group supplied.
- 95% amont of Thanh Tri Brid
(Japan Contractor)
- Vinh Tuy Bridge Hanoi (Japan
- Dong Tru Bridge
- Binh Bridge Hai Phong (Japan
- Khoe Brid
- Hai Phong
- Cai Len Po
- Na Duong- Hai Phong
- Quang Nin
- Son La Hydraulic Power Plant
- Hai Van mountain pass- Chi Lang Stadium
- National Conference Centre
- Hue Hospital
-All Building of Trung Hoa Nhan Chinh Urban Area
-SupPly exclusively for the highest building in
Vietnam KEANGNAM with Grade SD490
Rolling Mill and Steel Making Line
-
8/11/2019 Project Presentation 19122013
20/49
Rolling Mill and Steel Making Line Total investing capital: 30.000.000 usd (Thir ty million USD)
Japanese Technology.
Rolling capacity : 240.000 tons/yearMaking steel capacity: 120.000 tons/year
Production Range: from D6 to D41
Standard: Japan(JIS); Vietnam(TCVN); USA(ASTM); English(BS)
Billet Furnace 45t/h Rolling Mill Line Outpu
Apply Science and Technology in Manufacturing and Trading Progress.
Register intellectual property on each production
ISO 14001: 1996 was certified by TUV Federal Republic of Germany in 2003
ISO 14001: 2004 was certified by NQA United Kingdom of Great Britain and Nort
ISO 9001: 2000 was certified by TUV Federal Republic of Germany in 2003
ISO 9001: 2004 was certified by NQA United Kingdom of Great Britain and North
VLAS 156 ISO/IEC 17025:2005
High-grade steel making and Ferrous Metals making Fact
-
8/11/2019 Project Presentation 19122013
21/49
High-grade steel making and Ferrous Metals making Fact
Total investing capital : 156 mil VND
Making capacity: 120.000 tons/year
Production Range: Billet SD290; SD390; SD490
Standard: Japan(JIS); Vietnam(TCVN); USA(ASTM)Furnace
Billet Casting
Continuous Casting
O
-
8/11/2019 Project Presentation 19122013
22/49
-
8/11/2019 Project Presentation 19122013
23/49
Vietnam Japan Sect ion Steel Company
Total investing capital : 300 mil VND
Rolling mill capacity : 160.000 tons/year
Production Range: Section U;I;V;H
Standard: Japan (JIS); Vietnam(TCVN); USA(ASTM); En
Section Rolling Line Output Product
-
8/11/2019 Project Presentation 19122013
24/49
DONG-A SHIPBUILDING INDUSTRY COMP
-
8/11/2019 Project Presentation 19122013
25/49
DONG-A SHIPBUILDING INDUSTRY COMPI nf rastructure, rail -way, workshop
- Total Area: 30,5 ha
- Workshop And Substation:
Shell Workshop:Area12.200m
2
(There are many Cranes and Bridge Cranes fromthe workshop, subject iron and steel to preliminary treatment, machine treatment
segments together, finishing progress)
Mechanical Workshop, Motive Workshop:Area1.917 m2
Assembling ground No1: Area 5.800 m2
Assembling ground No2: Area 4.800 m2
Assembling ground No3: Area 8.000 m2
Substation:Air-system, feed-fuel station, worker hostel, mess-room, maintenan
port, car-park, warehouse...
Building slip system:
Slipway : Shipbuilding and Service for 12.500 DWT (Width: 28m; Length 2
Berth : Berth vessel up to12.000 DWT (length: 300m)
Mooring buoy 7.000T: Berthing vessel up to12.000 DWT.
Some views of manufacturing and floating.
-
8/11/2019 Project Presentation 19122013
26/49
g g
Hung Cuong fl oating occassion 168 - 5200 Dwt
Length of the vessel 91,94m; Width15,3m; Height of B
Calculating sink Dimension 6,30m; Total capacity(GT
(DW) 5200; Capacity of main Machine1765KW; Num
Hull, machine and equipment is manufactured followi
Register shipping standard and to be supervised by Br
Ming Cong fl oating occassion 68 - 5200 Dwt
Project in Progress
- Thai Binh Duong vessel 7200tons
- Quang Vinh vessel 685200tons
- Giang Hai vessel 115200 tons
-
8/11/2019 Project Presentation 19122013
27/49
-
8/11/2019 Project Presentation 19122013
28/49
Total capacity of the Complex : 1.000.000 tons/year.
Total investments: 2.151 tVN.
High-grade steel making plant Capacity 500.000 tons/year.
Manufacture high-grade billet like: SD390, SD490, Grade60
High-grade steel bar and coil rolling-mill plant Capacity 300.000 tons/year.
Manufacture high-grade steel bar from D10 to D53.
Manufacture high-grade coil from 5,5 to 12.
Section steel plant Capacity 200.000 tons/year.
Manufacture high-grade section steel like H, I, U, V.
Commercial port Length is 430m; Goods yard is 3,8ha.
Double port, each port is 26m long.
-
8/11/2019 Project Presentation 19122013
29/49
-
8/11/2019 Project Presentation 19122013
30/49
-
8/11/2019 Project Presentation 19122013
31/49
-
8/11/2019 Project Presentation 19122013
32/49
-
8/11/2019 Project Presentation 19122013
33/49
-
8/11/2019 Project Presentation 19122013
34/49
-
8/11/2019 Project Presentation 19122013
35/49
-
8/11/2019 Project Presentation 19122013
36/49
STAGE 1:
Invest high-grade steel making plant Capacity 500.000 tons/year.
Manufacture high-grade billet: SD390, SD490, Grade60
start work on 18th, March 2010.
Estimate to take one year for this stage.
Investing capital for the first stage is 1.024 mil VND.
Invest commercial port first stage Invest 200m-long port, 1.5-ha goods yard, 50-ton Crane.
Up to now 90% task of the first stage is finished and availa
loading/unloading activity.
Original investments is 150 mil VND.
-
8/11/2019 Project Presentation 19122013
37/49
-
8/11/2019 Project Presentation 19122013
38/49
61%17%
7%6%
6%
1% 1% 1%
Allocating capital to main items of Steel making Plant mil
Equipment: 626
Construction: 17
Freight Cost: 76
Installation and
Production Platf
Project managem
Consulting: 10,7
Insurance and OTotal investment: 1.024 tVN
-
8/11/2019 Project Presentation 19122013
39/49
-
8/11/2019 Project Presentation 19122013
40/49
STAGE 2:
Invest high-grade steel bar and coil rolling-mill plant
Capacity 300.000 tons/year. Manufacture high-grade steel bar from D10 to D53.
Manufacture high-grade steel coil from 5,5 to 12.
Main manufacturing grade are SD390 and SD490.
Work start in the first quarter of 2011.
Estimating time is 10 months.
Total investment is about: 457,6 mil VND.
Commercial port second stage
Build more than 250m-length port, finish 3.8ha goods yard
more than 30-tons Crane and 50-tons Crane.
Total investment of Commercial port in second stage is 200
-
8/11/2019 Project Presentation 19122013
41/49
-
8/11/2019 Project Presentation 19122013
42/49
45%
20%6%
4%
9%
1%2%
13%
Allocating capital to main items of Rolling mill Plant (mil VND)
Equipment 2
Construction
Freight cost:
Installation a20,2Production p
Project mana
Consulting: 8
Insurance an60
Total investment: 457 mil VN
-
8/11/2019 Project Presentation 19122013
43/49
STAGE 3:
Invest section steel Plant Capacity 200.000 tons/year.
Manufacture high-grade section steel like: H, I, U, V.
Section steel up to 200mm.
Manufacture pre-engineering Building (PEB) steel.
Plan to start-work at the first stage 2012.
Estimate investment time: 10 months. Total investment: 318 mil VND.
-
8/11/2019 Project Presentation 19122013
44/49
-
8/11/2019 Project Presentation 19122013
45/49
45%
22%6%
4%
6%1%
2%14%
Allocating capital to main items of Section steel Plant (mil VND)
Equipment: 14
Construction: 7
Freight cost: 17
Installation and
Production pla
Project manage
Consulting: 6,2
Insurance and Total investment: 318 tVN
-
8/11/2019 Project Presentation 19122013
46/49
-
8/11/2019 Project Presentation 19122013
47/49
All infrastructure for the complex;
Completed 200m length of the port and ready t
Completed and has been operating the high-gra
making plant since May 2012.
Total investment: 100 mil USD.
-
8/11/2019 Project Presentation 19122013
48/49
-
8/11/2019 Project Presentation 19122013
49/49
VIETNAM JAPAN STEEL COR-PORATIONHEAD OFFICE: KM9, QUAN TOAN, HONG BANG, HAI PHONG
TEL: +84 313 749998 FAX: +84 313 749051HANOI OFFICE: B2-26 LE UCTHO, MY INH,TU LIEM. HANOI
TEL: +84 4 3783 0623 FAX: +84 4 3783 0624
WEBSITE: HTTP://WWW.VIJAGROUP.COM.VN