    PROJECT PLAN

    Vietnamese days in Lahti:

    Document Revision #:

    Date of Issue:

    Project Manager:

    Dang Viet Linh

  • 8/14/2019 Project Plan Final

    2/24

    Project Plan Vietnamese day in Lahti

    Approval Signatures

    Approved by: Business Project Leader Approved by: IM/IT Project Leader

    Prepared by: Business Project Manager Prepared by: IM/IT Project Manager

    Reviewed by: Quality Assurance Manager

    9 November 2009 Ver.1 Page i

  • 8/14/2019 Project Plan Final

    3/24

    Project Plan Vietnamese day in Lahti

    Table of Contents

    1. Project Overview.....................................................................................1

    1.1 Purpose, Scope, and Objectives............................................................................1

    1.2 Assumptions, Constraints and Risks......................................................................2

    1.3 Project Deliverables................................................................................................2

    1.4 Schedule and Budget Summary.............................................................................3

    Activities .............................................................................................................. .......3

    Spending ..................................................................................................................3

    Labor training .............................................................................................................3

    2120 ................................................................................................................. ..........3

    Purchasing goods .......................................................................................................3

    3000 ................................................................................................................. ..........3

    Freight .................................................................................................................... ....3

    1200 ................................................................................................................. ..........3

    Building .......................................................................................................................3

    1030 ................................................................................................................. ..........3

    Decorating ................................................................................................................. .3

    300 3

    Advertising ..................................................................................................................3

    2300 ................................................................................................................. ..........3

    Communication and invitation ....................................................................................3

    280 3Hiring devices and back ups .......................................................................................3

    2250 ................................................................................................................. ..........3

    Beverages and foods ..................................................................................................3

    200 3

    Risk cost......................................................................................................................3

    2900..................................................................................................................... .......3

    Total cost ....................................................................................................................3

    15660................................................................................................................ ..........3

    2. Project Organization...............................................................................4

    2.1 External Interfaces..................................................................................................4

    2.2 Internal Structure....................................................................................................4

    .......4

    2.3 Stake holder analysis......................................................................................... ....5

    Lahti University of Applied SciencesFaculty of Business Studies

    Title/Subject Number

    Owner Approved by Date 09/11/2009 Version

  • 8/14/2019 Project Plan Final

    4/24

    Project Plan Vietnamese day in Lahti

    3. Managerial Process Plans......................................................................6

    3.1 Start-up Plan.............................................................................................. ............6

    3.1.1 Estimates....................................................................................................................6

    3.1.2 Staff training...............................................................................................................6

    3.2 Work Plan...............................................................................................................6

    3.2.1 Work Breakdown Structure........................................................................................6

    3.2.2 Schedule Allocation....................................................................................................8

    3.2.3 Resource Allocation...................................................................................................9

    3.2.4 Budget Allocation.....................................................................................................10

    3.3 Risk Management Plan.................................................................................. ......12

    3.4 Communication Plan:...................................................................................... .....14

    4. Technical Process Plans......................................................................17

    4.1 Fishbone diagram.................................................................................................17

    4.2 Interrelation digraph..............................................................................................18

    .......18

    4.3 Infrastructure........................................................................................................18

    4.4 Product Acceptance............................................................................................ .18

    Annex A.....................................................................................................19

    Annex B.....................................................................................................20

    Lahti University of Applied SciencesFaculty of Business Studies

    Title/Subject Number

    Owner Approved by Date 09/11/2009 Version

  • 8/14/2019 Project Plan Final

    5/24

    Project Plan Vietnamese days in Lahti

    1. Project Overview

    1.1 Purpose, Scope, and Objectives Purpose : Allow locals and foreigners to understand and know about Vietnam, its friendly

    people and its newly-emerging country

    Goal: Create Vietnamese day in Lahti in April in 2010

    Scope :

    Contact Vietnamese around Lahti to discuss, plan what to do

    Bring traditional costume, food, games

    Divide works for each persons: MC, director , actors, guards..etc

    Asking permission from city government

    Finding suitable place and time

    Invite foreigners to join and take part in the works

    Advertisement : leaflets, newspaper , school noticeboard, posters

    Arrange souvenirs shop, entertainment shop involved with Viet Nam

    Ask for capitals , donation from Vietnamese in Europe

    Hire multimedia devices, stage and clothes

    Inviting famous actors, politicians

    Objectives

    Attract about 10 000 visitors traveling to Viet Nam

    More than 150 actors and performers participate

    Over 1million investment to Viet Nam

    This event will eventually lead Finnish investment as well as visitors to come to Viet Nam. It

    also is a bridge for other Vietnamese day in European countries and a stepping stone for manyinvestment and trades contracts. For examples, after Vietnamese day in Sweden, about 29

    contract were signed and Vietnam still has good reputation in the eye of Nordic countries

  • 8/14/2019 Project Plan Final

    6/24

    Project Plan Vietnamese days in Lahti

    1.2 Assumptions, Constraints and RisksProject assumptions :

    World economy is recovering after the recent recession. Vietnam hope to find a cooperate

    in techincal field, especially in ship constructing. Besides, export maritime product is our

    advantages and we are seeking partner in this field.Thus , we want to create this event tointroduce a new Vietnam in your views and hope to hvae a long relationship in business

    field

    Project constraints :

    The main resources is only in Viet Nam and the project may be dalayed if there is

    insufficient time. Besides, this is the first time the project team implement so there mightbe some unknown problems occuring during the event. Moreover, weather is a main factor

    that can affect the project, especially in April when there is doubtful of snow and rain.

    1.3 Project DeliverablesAs the project develope, we hope that through the event, project deliverables are brought to

    the local people on time and people can see our development continuously through it.

    Project deliverables

    o Goods transported in high quality

    o An attractive stage for cultural performance

    o Tents for artworks auction and for introducing Vietnams culture

    o Formal letter inviting V.I.P to take part in the event

    o Meaningful logo for the event.

    o A website about Vietnam culture on the Internet

    o A comprehensive view on Vietnams economy and its culture

    Delivery dates : 30 /3 10/4

    Delivery location : Lahti Central Square

    Delivery media : TV , radio , Internet newspaper

  • 8/14/2019 Project Plan Final

    7/24

    Project Plan Vietnamese days in Lahti

    1.4 Schedule and Budget Summary

    Activities Spending

    Labor training 2120

    Purchasing goods 3000

    Freight 1200

    Building 1030

    Decorating 300

    Advertising 2300

    Communication and invitation 280

    Hiring devices and back ups 2250

    Beverages and foods 200

    Risk cost 2900

    Total cost 15660

  • 8/14/2019 Project Plan Final

    8/24

    Project Plan Vietnamese days in Lahti

    2. Project Organization

    2.1 External InterfacesThis is a non-profit event which only seeks for co-operation between the 2 countries.

    Besides, we ask for investment from sponsor to implement the project. The main labour is

    mainly Vietnamese and few Finnish friend in charge of communication

    The sponsor : VASEP, Sonera, city goverment

    The customer : local people, city goverment

    Subcontracted company : advertising company

    Other organizational entities that interact with the project : racism organization,

    advetising company

    2.2 Internal Structure

    Project team

    Legal issues

    Linh

    Advertising

    Ngan

    Workforce

    Viet

    Technical

    issues

    Linh

    Event

    organization

    Viet, Ngan

    Communicat

    ion

    Ngan

  • 8/14/2019 Project Plan Final

    9/24

    Project Plan Vietnamese days in Lahti

    2.3 Stake holder analysis

    Stakeholder Stake in the project

    Potential

    impact on

    Project

    Responsibility

    Linh, Ngan , Viet

    Execute action indirectly

    Manages all macro things,

    allocate position and hiring

    High Project team

    Vietnamese studentAssociation in Finland

    (VSAF)

    Help and support with labor

    and spiritMedium Support team

    Local people Cheer and join , encourage High Customer

    Itella , FinCargoTransport goods, devices to

    right destination in right timeMedium Logistics

    Sonera ,City government

    Invest and deal with the

    finance with the exchange ofimage broadcasting for the

    whole festival

    High Sponsor

    Advertising company

    Propagate the event with

    designed posters and leaflets ,

    video clip

    Medium Marketing

    Famous Vietnamese and

    Finnish actors,

    politicians

    Cultural exchange and

    introduce about each

    countries and people

    Low Guest

    Vietnam Association of

    Seafood Exporters and

    Producers (VASEP)

    Introducing and marketingproducts to Finnish

    counterparts, also back the

    project

    MediumSponsor,Export

    company

    GangsterDamage and harass during the

    festivalMedium Terminator

    Racist organizationEncourage people to boycott

    and oppose to the festivalHigh Opposition

  • 8/14/2019 Project Plan Final

    10/24

    Project Plan Vietnamese days in Lahti

    3. Managerial Process Plans

    3.1 Start-up Plan3.1.1 Estimates

    The project cost, schedule and resource requirements is based on several similar events

    held before in other countries like : Sweden, Enalnd and France. Although it is not

    orginal but we have made some uniques features that best suit the Finnish culture andtradition. Besdies, we have examined the time, location which is suitable for the event

    through reasearch in Finnish habbits.

    The data above is estimated from internet and information from our friends in Viet Nam

    and Finland as well os that the cost is reasonable and we have enough financial and

    labour backup. We also have schedule for re-estimation after a project milestone to

    evaluate the influence by Bottom-Up Technique as the level of details and projectdevelopes or by Cost review and Update Review some sudden chage in cost may

    cause the project to collapse

    3.1.2 Staff training

    About training staff, we will have 3 teams to train in each different fields. Besides, wehave contact with Lahti UAS to train staff for us in media, web programing and health

    care. For the internal staff, we have Ngan as a representative and MC leading the event

    and Viet and Linh as technical support.. In detail :

    the types of training to be provided : Intensice course training,

    numbers of personnel to be trained : 21

    entry and exit criteria for training : completion and pass the course

    the training method, for example: lectures, consultations for welcome group,

    practicing for medical team, computer-assisted training for IT staffs

    With these teams, we will have things settle down and have enough support for the

    event to run in a proper way

    3.2 Work Plan3.2.1 Work Breakdown Structure

    1.. Asking for permission and donation

    1.1 Negotiating

    1.2 Signing contract

    2. Materials

    2.1 Purchasing

  • 8/14/2019 Project Plan Final

    11/24

    Project Plan Vietnamese days in Lahti

    2.2 Transport from Vietnam

    2.2.1 Flight

    2.2.2 Ship

    2.3.3 Warehousing

    2.3 Transport from Finland

    2.3.1 Truck

    3. Training staff

    3.1 Finding

    3.2 Rehearsal

    3.3 Testing

    4. Construction and preparation

    4.1 Cement Pad

    4.2 Framing

    4.3 Walls

    4.4 Roofs

    4.5 Electricals

    4.6 Insulation

    4.7 Interior finishing (paints, wallpapers, fixtures, etc..)

    5 Communications

    5.1 Guest and participants welcoming

    5.2 Inviting famous Vietnamese and Finnish

    5.2.1 Flight

    5.2.2 Taxi. Cars

    6. Advertisements

    6.1 TV

    6.2 Leaflets

    6.3 Internet website

  • 8/14/2019 Project Plan Final

    12/24

    Project Plan Vietnamese days in Lahti

    7. Event organization and management

    7.1 Artwork gallery

    7.2 Traditional folk music

    7.3 Cultural exchanges

    7.4 Movie exhibition

    7.5 Potentials of Vietnams economy

    3.2.2 Schedule Allocation

    PhasesMajor Activities Duration Milestones

    Who is

    responsible

    Finding labor,support

    Asking for permission fromcity goverment

    Project team

    Finding sponsor, donation M1 Linh

    Contact Vietnamese to plan,

    duty allocation, staff trainingLinh, Viet

    Logistics Finding suitable place andtime

    M2 Ngan

    Buying goods, costumes,

    pictures, handicrafts(in VietNam)

    Ngan, Viet

    Goods transportation from

    VietnamLinh

    Building Site preparations : Hall,Square, StreetM3 Viet

    Ground construction,

    decoration ,

    Communicationmission

    Invitation card for famousperson (politicians, actors,

    Vietnam ambassador)

    Ngan

  • 8/14/2019 Project Plan Final

    13/24

    Project Plan Vietnamese days in Lahti

    International relation

    responsibility

    Advertising Hiring design company,Internet advertisement

    M4 Linh

    Video clip on TVViet

    Leaflet to every houses

    Technical issues Hiring multimedia devices :comuters, speakers, lights,

    orchestra sound

    M5

    LinhReady for back up devices,

    Prepared for maintainingtechnical devices in case of

    emergency

    Event

    organization

    Artworks exhibition Viet

    Traditional folkperformances

    NganCultural outdoor activities

    ,cuisine

    Information on currentpotentials from Vietnams

    economy

    M6 Ngan

    3.2.3 Resource Allocation

    Activities Resources needed

    Asking for permission and donation A group of staff has persuasive skill and good

    communication skill

    Means of transport, detailed project plan with software

    repuirement (Microsoft Office 2007)

    Materials, goods Budget , reprentative of our team (Ngan), contack person in

  • 8/14/2019 Project Plan Final

    14/24

    Project Plan Vietnamese days in Lahti

    Viet Nam

    Staff training Intensive course from Lahti UAS and other facilities

    Our team member will open group work for teams

    Construction and preparation Materials and decoration things bought in Finland

    7 persons working for this field. (They are also trained inadvance)

    Communication Our team representative

    Advertisement Money from budget

    Team member to contact advertisment companay

    A group distribute leaflets and poster

    Event organization and management Staffs trained as MC, securities

    Hired devices mentioned above

    3.2.4 Budget Allocation

    No. Activities Spending

    1 Labor training 2120

    Performers 80*10

    Master of Ceremony 70

    Medical training 50

    Duty appointing 50

    Chef 50*7

    Guide 50*7

    Shop assistant 50*7

    2 Buying goods, costumes, pictures, handicrafts (in VietNam) 3810

    Costumes 1500

    Pictures 1300

    Handicrafts 500

    Water puppetry 810

    Dry foodstuff 300

    3 Goods transportation from Vietnam 1000

    Freight forwarding 700

    Domestic transportation 300

  • 8/14/2019 Project Plan Final

    15/24

    Project Plan Vietnamese days in Lahti

    4 Site preparations : Hall, Square, Street 300

    Street advertising 300

    5 Ground construction, decoration 1030

    Tents 200

    Stages 400

    Table 100

    Chairs 100

    Lanterns 70

    Swag 50

    Carpet 50

    Drapery 50

    6 Invitation card for famous person 280

    - Design 30

    - Printing 50

    Travel cost for famous person 200

    7 International relation 300

    8 Advertising 2300

    Video clip on TV 700

    Leaflets to every houses 500

    Website building : 200

    - Rent a server 40

    - Hire web designers 160

    Posters 400

    Advertisement on newspaper 500

    9 Travels and meetings

    10 Hiring multimedia devices 1250

    Computers, 100

    Loudspeakers, 200

    Lights, 300

    Projector 200

    Orchestra sound 300

    Microphone 50

    Computer 100

    11 Ready for back up devices and maintaining 1000

    12 Cultural outdoor activities ,cuisine 180

    Noodle soup

    Sticky rice 30

    Dumplings 30

    Pancakes 30

    Salad rolls 30

    Sandwiches and pastries 30

  • 8/14/2019 Project Plan Final

    16/24

    Project Plan Vietnamese days in Lahti

    13 Risk cost 2900

    Total cost 15660

    3.3 Risk Management Plan

    Risk

    No.Description Indentification Effect Probality

    Risk

    value

    Risk

    classification

    1Human

    Employees becomeill, staff conflictand disagreement

    Loss of union

    and efficiency3 5

    2Operational

    Flight delay,shortage of

    warehouse , traffic

    jam

    Damaging

    goods , lack of

    preparation

    2 3

    3Project

    Overruns, job delay, shortage of

    employees

    Loss ofinitiation ,

    confidence

    3 4

    4Reputational

    Cultural differences

    , dog-eating hobbit,

    racism ,

    Causing

    misunderstandi

    ng , failure

    4 4

    5Procedural

    Embezzlement,fraud , productivity

    loss

    Influencefinance and

    budget

    2 2

    6Financial

    Recession ,

    unstable stock

    market

    Bad

    performance,miss someparts of the

    program

    3 4

    7Technical

    Limited supplypower, damaged

    speaker and

    microphone

    2 4

    8Natural

    Snowy , heavyrains

    Trafficproblem and

    good damaged

    2 4

  • 8/14/2019 Project Plan Final

    17/24

    Project Plan Vietnamese days in Lahti

    9Political

    Changes in cabinet,anarchy , election

    Postponed,

    delayed orbadly damaged

    2 3

    RiskNo.

    Description Actions Responsibles Costs

    1Human

    Increase salary, encourage about the projectgoal

    Linh, Viet 700

    2Operational

    Find another alternatives, bring the goods 3months earlier

    Linh 1000

    3Project

    Well-managed plan, time scale, enough support

    stuffsNgan. Linh 0

    4Reputational

    Avoid mention to these issues Ngan 0

    5 Procedural Recruit charismatic person, know them well Viet 0

    6Financial

    Sponsor contract signed with tight clauses,

    compensationLinh, Ngan 0

    7Technical

    Prepare well , ready for backup stuffs Viet 300

    8Natural

    Delay the time or build alternative stage, place Team 600

    9Political

    Negotiate, discuss with the newly-selected Linh 300

    Total cost

    2900

  • 8/14/2019 Project Plan Final

    18/24

    Project Plan Vietnamese days in Lahti

    3.4 Communication Plan:As we have mentioned in the Stakeholder Part. Our stakeholders are divided into 12

    categories based on their work and positions in our event. Our communication also emphasizeson our idea about how to communicate with these stakeholders.

    Stakeholders Channels Duration Reason of choosing

    means of communication

    Members of

    the team: Linh,Viet, Ngan and

    others

    - Phone

    - Facebook: Group work site

    - Write E-mails

    - Face to face meeting

    15/10-30/1 -Fast, Easy and Active

    means

    - Especially throughFacebook, we can find

    many supporters

    City and police - Arrange appointments

    - Write e-mails

    1/1-30/1 -Typical and formal ways

    Community of

    Vietnam inFinland

    - Write e-mails and phone to the

    chairman of VietnameseAssociation in Finland

    - Meeting to introduce our plan

    30/11-14/1 - The chairman knows

    deeply and widely almostVietnamese people here

    Logistics team

    in Vietnam

    - Write e-mails

    - Internet calls

    - Send documents by post or e-mails

    1/2 1/3 -Economical and

    effective means

    - Checking the work in

    Vietnam

    Logistics team

    in Finland

    (FinCargo,)

    -Phone calls

    - Write E-mails

    - Send letters and documents bypost

    10/3 20/3 -Kind of typical and

    official ways of

    communicating

    - Checking the schedulesof the deliveries

    Sponsors

    (VietnamAssociation of

    Seafood

    Exporters and

    Producers

    (VASEP) and

    Vietnamese

    - Arrange a meeting the

    headquarters or marketing

    director of VASEP in Vietnam

    - Phones, e-mails to them

    - E-mails and phone the

    20/2 30/2

    due to Tet

    holidays inViet Nam

    -Polite and official means

    of communicating the

    targeted sponsors

    -Get them to involve inour plan

  • 8/14/2019 Project Plan Final

    19/24

    Project Plan Vietnamese days in Lahti

    association in

    Finland) andother

    supporters

    represents of VASEP in Europe

    - Means of communication with

    VAF are mentioned above

    - Connect with other

    organizations through thewebsites and e-mails

    - Informing them issues

    of our plan or ourprocession

    Advertising

    Company

    - Write e-mails

    - Phone

    - Face to face meeting

    18/2 30/2 -Sign the contracts and

    checking the works

    Volunteers andVietnamese

    StudentsAssociation in

    Finland

    (VSAF)

    - Write e-mails to theheadquarters of VSAF to invite

    them to our event and help us topopularize our activities to the

    members

    -Write article or post the

    introduction about our event on

    website of VSAF and our need ofvolunteering

    - Open a group on Facebook andinvite our friends and members of

    VSAF to join

    - Invite our international friends

    in Lahti UAS to join by asking theinternational office for a e-mail

    notification to all students

    - Phone calls and e-mails

    - Face to face or online meetings

    20/11 30/3

    Journalists -Face to face meeting at the news

    houses

    - E-mails and phones

    15/3 20/4

  • 8/14/2019 Project Plan Final

    20/24

    Project Plan Vietnamese days in Lahti

    Politicians and

    famous artists

    -Face to face meeting at Vietnam

    Embassy (Vietnamese Politicians)

    - E-mails

    - Letters by post/ Invitation

    Letters

    20/2 30/2

    Technique

    Team

    -E-mails and phones as we intend

    to invite our friends in Finland to

    do that

    10/2 10/4 -Easy and fast

    Souvenirshops and

    cultural

    product shopsin Vietnam

    - E-mails, phone calls

    - Meeting directly through

    logistics team in Vietnam

    18/2 14/3 -Easy and believableways to get them

    Vietnamese

    Artists or

    teamsresponsible for

    volunteering

    culturalperformances

    -Connect through the Embassy of

    Vietnam in Finland

    - Connect by phone or e-mails for

    the capable volunteers through

    VSAF and among Vietnamesestudents in Lahti UAS

    - Open a facebook groups forvolunteers and Vietnamese

    students

    - Meeting offline for practical

    trainings

    14/1- 20/2 -Formal and effective as

    this is a chance to

    introduce Vietnamsculture in Finland

    - Easy and active way toconnect Vietnamese

    students in Lahti

    Above is our plan for communicating and contacting our stakeholders. There is two

    segments we do not mention in this plan because we do not know who they are and how to link

    with them, which are gangsters and racist organizations. They are bad stakeholders to our eventand we have to prepare for a backup plan for meeting them: Ask for the help of police stationand hide a security company to handle with their appearance.

  • 8/14/2019 Project Plan Final

    21/24

    Project Plan Vietnamese days in Lahti

    4. Technical Process Plans

    4.1 Fishbone diagram

  • 8/14/2019 Project Plan Final

    22/24

    Project Plan Vietnamese days in Lahti

    4.2 Interrelation digraph

    4.3 Infrastructure

    Specify the plan for establishing and maintaining the development environment (hardware,operating system, network and software), and the policies, procedures, standards, andfacilities required to conduct the IM/IT project. These resources may include workstations,

    local area networks, software tools for analysis, design implementations, testing, and

    project management, desks, office space, and provisions for physical security,administrative personnel, and janitorial services.

    4.4 Product Acceptance Specify the plan for customer acceptance of the deliverables generated by the IM/IT

    project.

    Specify objective criteria for determining acceptability of the deliverables.

    Reference a formal agreement of the acceptance criteria signed by representatives of

    theIM/ITorganization and the customer.

    Specify any technical processes, methods, or tools required for deliverable acceptance,such as testing, demonstration, analysis and inspection

  • 8/14/2019 Project Plan Final

    23/24

    Project Plan Vietnamese days in Lahti

    Annex A

  • 8/14/2019 Project Plan Final

    24/24

    Project Plan Vietnamese days in Lahti

    Annex B