Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks...

22
Project Management Tools MHA 6350 Dr. Burton

Transcript of Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks...

Page 1: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

Project Management Tools

MHA 6350

Dr. Burton

Page 2: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

Page 3: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

Tools

• GANTT Charts

• PERT/CPM

Page 4: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

GANTT CHARTS

• Developed by Charles Gantt in 1917.• The layout of a Gantt Chart uses

information in columns on the left of a matrix to identify tasks, task managers, duration and in some cases cost.

• To the right of each task in the matrix is a bar that denotes to duration of the task.

• Project management software employs Gantt charts.

Page 5: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

Project: Constructing a Home

Task (Activity)

(a) Excavating

(b) Pour Foundation

c) Outside Plumbing

(d) Framing

(e) Inside Plumbing

(f) Wiring

(g) Roofing

(h) Brickwork

(i) Plumbing Inspection

(j) Shingling

(k) Cover Walls

(l) Interior Finishing

(m) Exterior Finishing

(n) Landscaping

Page 6: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

Project: Constructing a HomeTask (Activity) Preceding

ActivityExpected time to complete

(a) Excavating -- 5 days

(b) Pour Foundation a 2

c) Outside Plumbing a 6

(d) Framing b 12

(e) Inside Plumbing d 10

(f) Wiring d 9

(g) Roofing d 5

(h) Brickwork b 9

(i) Plumbing Inspection c, e 1

(j) Shingling g 2

(k) Cover Walls f, i, j 3

(l) Interior Finishing k 9

(m) Exterior Finishing h, g 7

(n) Landscaping m 8

Page 7: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

Project: Constructing a HomeTask (Activity)

(a) Excavating

(b) Pour Foundation

c) Outside Plumbing

(d) Framing

(e) Inside Plumbing

(f) Wiring

(g) Roofing

(h) Brickwork

(i) Plumbing Inspection

(j) Shingling

(k) Cover Walls

(l) Interior Finishing

(m) Exterior Finishing

(n) Landscaping

10/5 10/10 10/15 10/20 10/25 10/30 11/4 11/9 11/14 11/19 11/24 11/29

Page 9: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

13-28

1

3

4

5

6

2

12

3

4

5

7

1110

8

9

6

7

8 9

10

11

12

13

14

15

16

Page 10: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

Program Evaluation and Review Technique(PERT)

May also be referred to as:

Critical Path Method (CPM)

Developed in the late 50s by the Navy.Was used the Polaris program for submarined launched ballistic missiles.Originally adopted by the Department of Defense for large projects.Later was adopted by construction industry.

PERT uses work groupings called activities.Activities are measured in time.Each activity is represented by an arrow.

Page 11: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

Project: Constructing a Home

Task (Activity) Preceding Activity Expected time to complete

(a) Excavating -- 5 days

(b) Pour Foundation a 2

c) Outside Plumbing a 6

(d) Framing b 12

(e) Inside Plumbing d 10

(f) Wiring d 9

(g) Roofing d 5

(h) Brickwork b 9

(i) Plumbing Inspection c, e 1

(j) Shingling g 2

(k) Cover Walls f, i, j 3

(l) Interior Finishing k 9

(m) Exterior Finishing h, g 7

(n) Landscaping m 8

Page 12: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

3 4

5

6

2 8

7

1

9

10 11

Outside plumbing

Source: Lapin, 1994

Start

aExcavating

A PERT network for constructing a home.

Inside plumbing

Plumbing inspection

FINISH

bFoundation

dFraming

fWiring

kWalls

lInteriorFinish

h 9

Brickwork

Roof- ing

Landscaping

ExteriorFinishing 7 m

0

j 2

Shingling

n 8

5 2 12 9 3 9

c 6

e 10

i 1

g 5

Page 13: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

3 4

5

6

2 8

7

1

9

10 11

Outside plumbing

Source: Lapin, 1994

Start

aExcavating

A PERT network for constructing a home.

Inside plumbing

Plumbing inspection

FINISH

bFoundation

dFraming

fWiring

kWalls

lInteriorFinish

h 9

Brickwork

Roof- ing

Landscaping

ExteriorFinishing 7 m

0

j 2

Shingling

n 8

5 2 12 9 3 9

c 6

e 10

i 1

g 5

Dummy Activity

Page 14: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

3 4

5

6

2 8

7

1

9

10 11

Outside plumbing

Source: Lapin, 1994

Start

aExcavating

A PERT network for constructing a home.

Inside plumbing

Plumbing inspection

FINISH

bFoundation

dFraming

fWiring

kWalls

lInteriorFinish

h 9

Brickwork

Roof- ing

Landscaping

ExteriorFinishing 7 m

0

j 2

Shingling

n 8

5 2 12 9 3 9

c 6

e 10

i 1

g 5

0

5

29

7 19

11TE Earliest Possible Event Time

Page 15: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

3 4

5

6

2 8

7

1

9

10 11

Outside plumbing

Source: Lapin, 1994

Start

aExcavating

A PERT network for constructing a home.

Inside plumbing

Plumbing inspection

FINISH

bFoundation

dFraming

fWiring

kWalls

lInteriorFinish

h 9

Brickwork

Roof- ing

Landscaping

ExteriorFinishing 7 m

0

j 2

Shingling

n 8

5 2 12 9 3 9

c 6

e 10

i 1

g 5

0

5

29

7 19 30

24

2826

Page 16: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

3 4

5

6

2 8

7

1

9

10 11

Outside plumbing

Source: Lapin, 1994

Start

aExcavating

A PERT network for constructing a home.

Inside plumbing

Plumbing inspection

FINISH

bFoundation

dFraming

fWiring

kWalls

lInteriorFinish

h 9

Brickwork

Roof- ing

Landscaping

ExteriorFinishing 7 m

0

j 2

Shingling

n 8

5 2 12 9 3 9

c 6

e 10

i 1

g 5

0

5

42

7 19 30

24

1624

31

33

39

Page 17: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

Project: Constructing a HomeTask (Activity) Preceding Activity Expected time to complete

(a) Excavating -- 5 days

(b) Pour Foundation a 2

c) Outside Plumbing a 6

(d) Framing b 12

(e) Inside Plumbing d 10

(f) Wiring d 9

(g) Roofing d 5

(h) Brickwork b 9

(i) Plumbing Inspection c, e 1

(j) Shingling g 2

(k) Cover Walls f, i, j 3

(l) Interior Finishing k 9

(m) Exterior Finishing h, g 7

(n) Landscaping m 8

FINISH TOTAL 42 days

Page 18: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

3 4

5

6

2 8

7

1

9

10 11

Outside plumbing

Source: Lapin, 1994

Start

aExcavating

A PERT network for constructing a home.

Inside plumbing

Plumbing inspection

FINISH

bFoundation

dFraming

fWiring

kWalls

lInteriorFinish

h 9

BrickworkRoof- ing

Landscaping

ExteriorFinishing 7 m

0

j 2 Shingling

n 8

5 2 12 9 3 9

c 6

e 10

i 1

g 5

0

5

29

7 19

24

24

31

30 33

42

CRITICAL PATH 29

TL Latest Allowable Event Times

42

Backwards PassSubtract each activity from succeeding TLWhere event is beginning pointfor more than one activity use the smallest difference.

33301975

0

34

27

27

Page 19: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

3 4

5

6

2 8

7

1

9

10 11

Outside plumbing

Source: Lapin, 1994

Start

aExcavating

A PERT network for constructing a home.

Inside plumbing

Plumbing inspection

FINISH

bFoundation

dFraming

fWiring

kWalls

lInteriorFinish

h 9

BrickworkRoof- ing

Landscaping

ExteriorFinishing 7 m

0

j 2 Shingling

n 8

5 2 12 9 3 9

c 6

e 10

i 1

g 5

0

5

29

719

24

24

31

30 3342

CRITICAL PATH29

Event Slack Times = TL - TE

423330

197

5

0

34

27

27TL

3

TE

3

3

000

0

0

00

0

Page 20: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

Planning and ControlActivity Scheduling

• ES=Early Start Time = TE for preceding event.

• EF=Early Finishing Time = ES + t

• LF=Late Finishing Time = TL for succeeding event.

• LS=Late Start Time = LF - t

Page 21: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

Limits for Scheduling

(a) Excavating 5 0 0 5 5

(b) Pour Foundation 2 5 5 7 7

c) Outside Plumbing 6 5 23 11 29

(d) Framing 12 7 7 19 19

(e) Inside Plumbing 10 19 19 29 29

(f) Wiring 9 19 21 28 30

(g) Roofing 5 19 22 24 27

(h) Brickwork 9 7 18 16 27

(i) Plumbing Inspection 1 29 29 30 30

(j) Shingling 2 24 28 26 30

(k) Cover Walls 3 30 30 33 33

(l) Interior Finishing 9 33 33 42 42

(m) Exterior Finishing 7 24 27 31 34

(n) Landscaping 8 31 34 39 42

Activity t

Starting Times Finishing Times ES LS EF LF Preceding TE LF – t ES + t Succeeding TL

Page 22: Project Management Tools MHA 6350 Dr. Burton. How Hillary looks upon a crook vs. how Hillary looks upon an American hero:

Activity Slack time = LF - EF.

(a) Excavating 5 5 0

(b) Pour Foundation 7 7 0

c) Outside Plumbing 29 11 18

(d) Framing 19 19 0

(e) Inside Plumbing 29 29 0

(f) Wiring 30 28 2

(g) Roofing 27 24 3

(h) Brickwork 27 16 11

(i) Plumbing Inspection 30 30 0

(j) Shingling 30 26 4

(k) Cover Walls 33 33 0

(l) Interior Finishing 42 42 0

(m) Exterior Finishing 34 31 3

(n) Landscaping 42 39 3

Activity

Finishing Time

Activity Slack TimeLF EF