PROJECT MANAGEMENT (ARC 3612 / ARC 3614)
PROJECT 1: DEFINING & DOCUMENTING A MODULAR/RESIDENTIAL CONSTRUCTION PROJECT
TUTORAR NAZARUDIN MASAT
TEAM MEMBERSALEX WONG KAI TZE 0303228
GERTRUDE LEE YUE SIEW 0306265KEE TING TING 0310019
NURUL JANNAH MASTURAH 0310210SHARIFAH DIYANA SYED HUSSAIN 1006AH78373
SOH YOU SHING 0308010SURAYYN SELVAN 0309818
CONTENT
1.0 PROJECT INTRODUCTION
2.0 COMPANY PROFILE 2.1 ABOUT US 2.2 SERVICES 2.3 OUR TEAM
3.0 SITE 3.1 SITE INTRODUCTION 3.2 SITE ANALYSIS 3.3 SWOT ANALYSIS
4.0 CLIENT REQUIREMENT 4.1 CLIENT BACKGROUND & REQUIREMENT
5.0 PROJECT APPROACH 5.1 DESIGN IDEAS 5.2 CASE STUDY 5.2.1 KAKKO HOUSE,YYAA 5.2.2 TOWNHOUSE , ELDING OSCARSON
6.0 PROJECT MANAGEMENT 6.1 SUCCESS CRITERIA 6.2 RISK MANAGEMENT 6.3 WORK BREAKDOWN STRUCTURE 6.4 GANNT CHART
7.0 DESIGN 7.1 EXTERIOR PERSPECTIVE 7.2 DRAWING 7.3 PROPOSED DRAWING 7.4 TENDER DRAWING
8.0 INTERIOR DESIGN 8.1 INTERIOR PERSPECTIVE 8.2 FLOOR FINISHING 8.3 FINISHING SCHEDULE 8.4 FURNITURE LAYOUT PROPOSAL 8.5 FURNITURE SCHEDULE
9.0 LANDSCAPE DESIGN 9.1 LANDSCAPE LAYOUT 9.2 SPECIES SPECIFICATION 9.3 LANDSCAPE PERSPECTIVE
10.0 CIVIL & STRUCTURE 10.1 STRUCTURAL MEMBERS 10.1.1 EXISTING AND NEW COLUMNS 10.1.2 EXISITNG AND NEW BEAMS 10.1.3 LOAD BEARING WALLS 10.2 STRUCTURAL LOAD 10.2.1 LOAD DISTRIBUTION DIAGRAM 10.2.2 LOAD OF ADDITIONAL STRUCTURE 10.3 ROOF SYSTEM 10.4 STAIRCASE 10.5 SEWAGE SYSTEM 10.6 DRAINAGE SYSTEM
11.0 MECHANICAL & ELECTRICAL 11.1 EXISTING ELECTRICAL SYSTEM 11.2 ELECTRICAL SYSTEM 11.2.1 GENERAL ELECTRICAL SYSTEM 11.2.2 SOCKET PLACEMENT 11.2.3 LIGHTING PLACEMENT 11.2.4 SWITCH PLACEMENT 11.2.5 MECHANICAL VENTILATION PLACEMENT 11.3 EXISTING WATER SUPPLY 11.4 PROPOSED WATER SUPPLY SYSTEM 12.0 COSTING 12.1 PROPERTY VALUE 12.2 CONSTRUCTION COSTING 12.3 CONSTRUCTION COSTING SUMMARY 12.4 PIE CHART SUMMARY 12.5 OPTIONAL COSTING 12.6 OPTIONAL COSTING SUMMARY 12.7 EXPENSES AND INCOME
13.0 APPENDIX 13.1 CCM MINUTES 13.2 REFERENCES
1.0 PROJECT INTRODUCTION
1.0 PROJECT INTRODUCTION
PROJECT BRIEFAs a team of 7, PR Architects are to design and manage a simple construction project with regards to criteria such as cost, quality, and time. Components that are focused on includes introduction, design and conclusion. Organisational chart, work breakdown structure and risk analysis should also be taken into consideration. Through the proposed project site by the client, we are to study the residential usage, as well as advising on the pros and cons of the project. We are needed to identify the market segment and population demographic that could potentially be attracted by the site. To conduct cost and viability comparison between our proposal and a standard type of building within the same market segment as a reference for the client.
CLIENT PROFILEMs. Fernn Ang
A qualified Financial Risk Manager with more than eight years experience in multiple large corporations. Currently a real estate negotiator with Juste Land. Her venture into the real estate industry stems from her passion in property investments.
2.0 COMPANY PROFILE
2.0 COMPANY PROFILE 2.1 ABOUT US
Founded in 2003 by Ar. Surayyn Selvan and Ar. Kee Ting Ting, PR Architects is a design intensive architecture firm located in Subang Jaya. The firm is committed to excellence in design with construction management experience. Our design values are modern, expression of materials, clean lines and forms that allow the architecture itself and inhabitants to thrive. The company has had 22 projects thus far that range from renovation works, design development, residential and commercial developments, as well as interior designs.
Our company vision is promoting environmental awareness and sustainability in architecture. We explore in integration between architecture and technology. We strive for creativity, professionalism and integrity in our work culture. PR architects realizes design solutions between space, program, form, budget and materials.
Our aim and mission is to enhance the quality of our built environment for the comfort of our clients. Our team provides determination consistently deliver quality product within the financial and time restraint of the client’s brief with a strong regard for environmental issues. This way we are able to design places, spaces and environments that offer the end users quality life choices and add value to their lives.
2.0 COMPANY PROFILE 2.2 SERVICES
ARCHITECTURAL
Attention to detailed design and presentation of projects. Planning, designing and constructing buildings and other structures.
INTERIOR DESIGN
Creating a look that represents your style. Producing themed plans and mood boards. Partially and fully furnished layout.
LANDSCAPE
Specialising in landscaping design and ideas. Composing, edging and paving with landscape supplies on gardens and backyard.
LOCATION : NO. 1 JALAN TAYLOR’S, 47500 SUBANG JAYA, SELANGOR DARUL EHSAN, MALAYSIA.
EMAIL : [email protected]
CONTACT : +60166597383
2.0 COMPANY PROFILE 2.3 OUR TEAM
We are a dynamic team of creative individuals with expertise in our own fields. We offer more than just creating great designs and specialize in communication practices. Focusing on Architectural, Interior and Landscaping Design, we aim to deliver quality materials with international standards. Project management are provided to ensure that the design we create achieve your desired goals.
Our team has experiences and understanding of the local and international market regarding design trends. We are fully equipped to meet the standards and state-of-the-art communication technology. We aim to provide our clients with innovative and conceptualized designed solutions.
AR. SURAYYN SELVANProject Architect
M. ArchitectureManchester School of Architecture ‘96
B. Sc. ArchitectureUniversity of Malaya ‘93
AR. KEE TING TINGSenior Architect
M. ArchitectureUniversity of Malaya ‘98
B. Sc. ArchitectureUniversity of Malaya ‘95
IR. SOH YOU SHINGM&E Engineer
M. Sc. Mechanical EngineeringUniversity of Aberdeen ‘06
B. Eng. ( Electrical & Mechanical )University of Malaya ‘05
JANNAH JAILANICivil Engineer
M. Civil EngineeringUniversity of Nottingham ‘13
B. Civil EngineeringInfrastructure University KL ‘11
SR. GERTRUDE LEEQuantity Surveyor
MSc. Quantity SurveyorUniversity of Portsmouth ‘01
B. Quantity SurveyorUniversity of Malaya ‘99
DIYANA HUSSAINInterior Designer
M. Interior DesignMonash University ‘07
B. Interior DesignRMIT University ‘04
LR. ALEX WONGLandscape Architect
M. Landscape Arch.University of Washington ‘10
B. Landscape Arch.University of Washington ‘96
3.0 PROJECT INTRODUCTION
3.0 PROJECT INTRODUCTION3.1 SITE INTRODUCTION
Property type : An end double-storey terraced house which has been extended
SiteShape : RectangularProvisional Land Area : 71.8117 sq. meters (about 773 sq. feet)Terrain : Flat and lies at the same level as the frontage roadFencing & gate : Chain link fencing further secured with a pair of metal swing gate
BuildingStructure : Reinforced concrete frameworkWalls : Plastered and painted brickwallsCeiling : Fair faced concrete / asbestos free ceiling sheetsFloor Finishes : Ceramic tiles / Terrazzo / mosaic tiles / parquet woodblocksRoof : Timber pitched roof covered with concrete roof tilesMain Entrance : Aluminium framed casement / adjustable & fixed glass louversAccommodation : Ground floor
Terrace living area, dining area, bath/W.C. and kitchen First floor Master bedroom attached with bath/W.C. and balcony and bedroom 2
Approximate Built-up Area : Main floor area: 66.89 sq. metres (about 720 sq. feet)Wall tiles : Glazed wall tiles ceiling height in kitchen and 5’ feet height for bath/W.C.Remarks : The rear portion of the subject building has been extended on the ground floor to
accommodate a bigger kitchen
3.0 PROJECT INTRODUCTION
1) ENVIRONMENTAL ANALYSIS
3.2 SITE ANALYSIS
The warm season occurs from the month of April to the month of June and the cold seasons lasts from November to January with an average temprature of below 32 degrees Celcius.
The air is driest in the moth of February and is most humid In November.
Subang Jaya recieves the most amount of rainfall in October and Decemeber whereas in June and July there is very little rainfall. There is an average rainfall of 200mm each month.
3.0 PROJECT INTRODUCTION
2) PROPERTY 1 ANALYSIS
3.2 SITE ANALYSIS
LOT 123 JALAN SS19/6a
Location of property
ASKING PRICE RM 1,100,000 ( RM 405 psf)
BUILT-UP (sf) 2720
LISTING For Sale
FURNISHING Semi-Furnished
LAYOUT 4 bedroom, 3 bathroom
TENURE Freehold
Double-storey end lot with extended master bedroom, living area and kitchen- Guraded community
3.0 PROJECT INTRODUCTION
2) PROPERTY 2 ANALYSIS
3.2 SITE ANALYSIS
LOT 123 JALAN SS19/6a
Location of property
ASKING PRICE RM 518,000 ( RM 720 psf)
BUILT-UP (sf) 720 sf
LISTING For Sale
FURNISHING Semi-Furnished
LAYOUT 2 bedroom, 2 bathroom
TENURE Freehold
Double storey end lot terrace house- Fully extended kitchen with built in cabinets- Renovated unit
3.0 PROJECT INTRODUCTION
2) PROPERTY 3 ANALYSIS
3.2 SITE ANALYSIS
LOT 123 JALAN SS19/6a
Location of property
ASKING PRICE RM 1400 / month
BUILT-UP (sf) 36 x 45
LISTING For Resnt
FURNISHING Semi-Furnished
LAYOUT 3 bedroom, 2 bathroom
TENURE -
Double storey terrace corner house- Move in condition- Newly painted
STRENGTHS WEAKNESSESOPPORTUNITIES THREATS
• Excellent ventilation
• Simple layout to work with
• Structurally sound and stable
• Poorly maintained
• Limited parking space
• Spatial constraint for bedrooms
• Nearby park for user comfort
• Many nearby amenities
• Strategically located
• Start a new trend for sustainable housing and small houses
• Very low security
• Government building requirements
• Limited entry / access points
• Real estate crisis
SWOT ANALYSIS
3.0 PROJECT INTRODUCTION3.3 SWOT ANALYSIS
4.0 CLIENT REQUIREMENT
4. 0 CLIENT REQUIREMENT4.1 CLIENT REQUIREMENT
ObjectiveTo design a comfortable living space that would provide yield enhancement (rental) or capital gain (sale).
Usage TypeResidential (Long Term or Short Stay i.e. Airbnb type)
Market Value and RentalMarket Value – RM 420,000; Rental RM 1,000 per month, yield of 2.85%
Expected Return Post Redesign- Capital Gain of at least 20% per annum or- Rental Yield of at least 3.5% for Long Term or at least 6.5% for Short Stay
BudgetUp to RM 100,000
Project TimelineUp to 6 months (upon receiving the relevant approvals)
Functional Specifications- Parking- Room min 3, max 4- Bathrooms min 2, max 4
Other Key Requirements- Easy maintenance- Durable- Good air circulation- Natural Lighting- Eco friendly (optional)
5.0 DESIGN APPROACH
5.0 PROJECT APPROACH5.1 DESIGN IDEAS
MINIMALSIMDESIGN WITH SIMPLE LINES
INCOOPERATE WITH NATURAL ELEMENTS
5.0 DESIGN APPROACH5.2 CASE STUDY
CASE STUDY 1 : KAKKO HOUSE, YYAA LOCATION : OSAKA, OSAKA PREFECTURE, JAPAN
Located in a densely built-up area of Osaka, Japan, the owner of this house is a couple with their child. The size of the site is 3.4m x 13m. The house is framed in exposed structural steel, covered with thin fire - resistant adiabatic panels . The expanded metal stair connects each floors and spreads the sun light inside. In this house, they are living like birds swinging from branch to branch.
It contains six floors with split levels :- Level 1 (Basement Level) : BedroomLevel 2 (Ground Level): GarageLevel 3 (First Level) : Bedroom (For the little girl)Level 4 (Second Level ) : Living SpaceLevel 5 (Third Level) : Bathroom Level 6 (Roof) : Roof Terrace
5.2.1 KAKKO HOUSE,YYAA
Diagram 1: Natural Lighting Diagram 2: Natural Ventilation
CASE STUDY 2 : TOWNHOUSE, ELDING OSCARSONLOCATION : LANDSKRONA,SWEDENThe site, 75 m2, is sandwiched between very old neighbouring buildings in Landskrona, Sweden. The building relates to the surroundings in scale, proportion and rhythm of low and tall buildings in the street. Our aim is to use small means to create an array of different spatial experiences in this very small project to create a razor sharp contrast, to express inherent clarity, but more importantly to highlight the beauty of the surroundings. Compressed slab construction, unconventional ceiling heights, and the ground floor flush to the street level, allows three floors into a volume aligned with the neighbouring roof tops. The openness to all directions generates a building both monolithic and transparent.
Interior consists of a single space, softly partitioned by three exposed steel slabs. They are divided by programs : -1. Kitchen2. Dining3. Living4. Bed5. Bath6. Roof Terrace
5.0 DESIGN APPROACH5.2 CASE STUDY
5.2.2 TOWNHOUSE,ELDING OSCARSON
Diagram 1: Natural Lighting Diagram 2: Natural Ventilation
6.0 PROJECT MANAGEMENT
6.0 PROJECT MANAGEMENT
The success of our project will be determined by the following criterias :-
QUALITY1. The project completed must have a high level of client/end user satisfaction2. The proejct completed must meet all the clients requirements as provided in the project brief.3. The project completed must be finished with no accidents, high helath awareness and safety precautions should be
considered on site4. The project completed must have no defects and carefully executed by the professionals in their fields at all times.
TIME 5. The project must be completed withing the clients timeline which is 6 months, and set to a maximum of three months
instead to avoid higher exposures and risks.6. The transportation of the materials and the monitioring of site must be strictly adhered to.7. The construction workers must be supervised by the project manager and architect to ensure a smooth construction
timeline that meets the project work flow8. The construction and installation of building components are to be completed as scheduled in the relevant Gantt chart.
COST9. The project must be completed within the clients budget of RM 100,000 and should not exceed beyond RM 120,000.10. The company’s consultants must work within the budget by attaining the lowest cost for long-term usable materials for
building structures and furnitures that include lightweight materials.11. The materials for the project should be sourced locally to reduce cost of transportation.
6.1 SUCCESS CRITERIA
6.0 PROJECT MANAGEMENT6.2 RISK MANAGEMENT
RISK SEVERITY
LIKELIHOOD
COST IMPACT STRATEGY AND MITIGATION
Building Renovationi) Damage on existing
wiring ii) Damage on existing
plumbingiii) Disturbance to immediate
residents of the site
22
1
11
2
LowLow
No Cost
i) Cost will occur to amend the cables and possible electrocutions
ii) Extra cost for piping amendmentsiii) A slow down in the construction timeline
- Should attain precise physical data on site from the authority and receive all relevant legal requirements
Consultants Liabilityi) Unclear construction
specificationsii) Incorrect cost estimation
3
2
5
4
Medium
Medium
i) Result in a delay of the project’s timelineii) The project’s budget will be exceeded
- Ensure all drawings are detailed with the supervision of the architect and engineers on site
Labouri) Injuries of workers on siteii) Death of workers on siteiii) Insufficient workers on
site
344
222
MediumHighHigh
i) Lawsuits, fines and compensationii) Lawsuits, fines and compensationiii) Delay of heavy construction work and
contracted fines
- Project managers has to ensure that all safety requirements are met
- Sufficient workers must be provided to meet the project’s timeline
Construction of Additional Floori) Incorrect installationsii) Client’s change in designiii) Overrun of timeiv) Maintenance risksv) Unavailable utilities
23321
21111
MediumHighMediumLowMedium
i) Extra labour, materials costs and will result in a delay in the project’s schedule
ii) Extra labour, materials costs and will result in a delay in the project’s schedule
iii) Fines and extra labour costsiv) Extra amenities and services costv) Water and electricity from main supply are
stopped which would result in extra cost for outsourcing
- Site manager must ensure that the construction of the additional level must meet the drawing specifications
- The project managers has to ensure that the client’s requirements does not violate any of the authorities requirements while keeping within the budget
Building Materialsi) Lack of materialsii) Extra materialsiii) Delay in delivery timeiv) Material defectsv) Theft of materials
11111
21122
MediumUnaffectedLowMediumMedium
i) Project’s budget will be exceededii) Waste of project’s budgetiii) A delay in the project’s timelineiv) Additional costs on materialsv) Additional costs on materials
- Ensure that all suppliers are reliable and security of the site should be considered
- Additional costing should be considered during the preliminary costs in the event of additional materials
Natural Conditionsi) Heavy rainfallii) High humidity on site
11
41
LowLow
i) Will result in a delay in the project schedule and will cause defects on certain materials and structural members
ii) Will results in the defect of certain materials and structural members
- Ensure proper storage and protection of materials
- Roof level should be constructed as soon as possible
Othersi) Sudden cut in client’s
budgetii) On site security
52
41
HighLow
i) Project will be suspendedii) Project cost will be exceeded and a delay in
the project timeline will occur
- Thorough background check on the client’s financial stability should be conducted, obtaining legal advice
- Construction workers should be reliable
LIKELIHOOD SEVERITY
1 Remote 1 Minimal or no impact
2 Unlikely 2 Additional resources required
3 Likely 3 Minor slip in key milestone, not able to meet schedule
4 Very likely 4 Major slip in key milestone, critical path impacted
5 Near certainty
5 Can’t achieve key term or major program milestone
6.0 PROJECT MANAGEMENT6.3 WORK BREAKDOWN STRUCTURE
Task No.
Task Name Description of construction method and processes
Resources
Materials Labour
1.0 Analytical Studies- Cost Management- Labour Costs- Surveying- Site Surveying- Site Analysis
Studies are to be conducted to ensure a smooth construction schedule. All legal requirements must be identified to prevent a delay in the project schedule.
- Project Manager- Architect- Interior Designer- M&E Engineer- C&S Engineer- Landscape Architect- -Quantity Surveyor
2.0 Design Development A comprehensive design development should be taken into account and translated into clear tender drawings to be awarded and for the clarity of the client
- Project Manager- Architect- Interior Designer- M&E Engineer- C&S Engineer- Landscape Architect- -Quantity Surveyor
3.0 Permit Applications Submission for authority approval should be adhered to to to ensure smooth flow in the project schedule
- Project Manager- Architect
4.0 External Works- Hoarding- External walls- Windows- External door
Demolition and construction of existing structures must adhere to the construction timeline and should be carefully executed
- Autoclaved Aerated Concrete Blocks
- Mortar- Window and Door fixtures- Steel beam and column- Exterior paint
- Contractor- Skilled workers- Semi-skilled Workers- Site Supervisor- Architect- Project Manager
5.0 Internal Works- Internal Walls- Floors- Ceiling- Internal Doors- Staircase
Demolition and construction of existing structures must adhere to the construction timeline and should be carefully executed
- Autoclaved Aerated Concrete Blocks
- Autoclaved Aerated Concrete Panels
- Mortar- Window and Door fixtures- Built-in furniture- Interior paint- New staircase structures- Lighting and new plumbing
fixtures
- Contractor- Skilled workers- Semi-skilled Workers- Site Supervisor- Interior Designer- Architect- Project Manager
6.0 Roof- Roof frames- Roof cladding
Demolition and construction of existing structures must adhere to the construction timeline and should be carefully executed
- Steel roof structures- Metal decking- Skylight fixtures- Roof insulation
- Contractor- Skilled workers- Semi-skilled Workers- Site Supervisor- Architect- Project Manager- C&S Engineer
6.0 PROJECT MANAGEMENT6.3 WORK BREAKDOWN STRUCTURE
Task No.
Task Name Description of construction method and processes
Resources
Materials Labour
7.0 Landscaping Works- Excavation- Landscaping
Excavation of the existing site must adhere to the schedule and should be done carefully. Planting of the chosen vegetation should be taken care of.
- Soil- Gardening plants
- Contractor- Skilled workers- Semi-skilled Workers- Site Supervisor- Project Manager- Architect- Landscape Architect
8.0 Services- Wiring- Plumbing
The mechanical and electrical as well as plumbing services should be installed in accordance to the schematic design by the M&E Engineer.
- Sanitary fittings and wares- Hangers and brackets- PVC pipes- Electrical Wirings- Wall switches and fixtures
- Contractor- Skilled workers- Semi-skilled Workers- Site Supervisor- Project Manager- Architect- M&E Engineer
9.0 Site Clearance Dumping and residues from the construction are to be managed properly before handing over
- Contractor- Skilled workers- Semi-skilled Workers- Site Supervisor
6.0 PROJECT MANAGEMENT6.3 WORK BREAKDOWN STRUCTURE
DESCRIPTION START DATE DURATION (days) END DATEDesign Development 1.1 Design Proposal 31/09/2015 43 12/10/15Permit Application 2.1 Permit Approval 12/10/15 10 26/10//2015External Works 3.1 Walls 3.1.1 Demolition 26/10/2015 5 30/10/20153.1.2 Construction 2/11/15 14 16/11/20153.2 Windows 3.2.1 Removal 26/10/2015 7 30/10/20153.2.2. Installation 9/11/15 7 16/11/20153.3 Doors 3.3.1 Removal 26/10/2015 7 30/10/20153.3.2 Installation 9/11/15 7 16/11/2015Internal Works 4.1 Walls 4.1.1 Demolition 26/10/2015 7 30/10/20154.1.2 Construction 9/11/15 14 16/11/20154.1.3 Finishes 16/11/2015 7 23/11/20154.2 Floors 4.2.1 Demolition 26/10/2015 7 30/10/20154.2.2 Construction 9/11/15 14 16/11/20154.2.3 Finishes 16/11/2015 7 23/11/20154.3 Ceiling 4.3.1 Demolition 26/10/2015 7 30/10/20154.3.2 Construction 9/11/15 7 16/11/20154.3.3 Finishes 16/11/2015 7 23/11/20154.4 Staircase 4.1 Installation 9/11/15 7 16/11/20154.2 Finsihes 16/11/2015 7 23/11/2015Roof 5.1 Framing 5.1.2 Demolition 26/10/2015 7 30/10/20155.1.3 Installation 9/11/15 7 16/11/20155.2 Cladding 5.2.1 Removal 26/10/2015 7 30/10/20155.2.2 Installation 9/11/15 7 16/11/2015Landscaping 6.1 Excavation 16/11/2015 4 19/11/20156.2 Planting 20/11/2015 4 23/11/2015Services 6.1 Wiring 28/09/2015 57 23/11/20156.2 Plumbing 9/11/15 15 23/11/2015
6.0 PROJECT MANAGEMENT6.4 GANTT CHART
7.0 DESIGN
7.0 DESIGN7.1 EXTERIOR PERSPECTIVE
DAYTIME PERSPECTIVE 1
7.0 DESIGN7.1 EXTERIOR PERSPECTIVE
DAYTIME PERSPECTIVE 2
7.0 DESIGN7.1 EXTERIOR PERSPECTIVE
DAYTIME PERSPECTIVE 3
7.0 DESIGN7.1 EXTERIOR PERSPECTIVE
DAYTIME PERSPECTIVE 4
7.0 DESIGN7.1 EXTERIOR PERSPECTIVE
NIGHT TIME PERSPECTIVE
GROUND FLOOR PLANSCALE 1:100
FIRST FLOOR PLANSCALE 1:100
7.0 DESIGN7.2 EXISTING DRAWINGS
FRONT ELEVATIONSCALE 1:100
BACK ELEVATIONSCALE 1:100
7.0 DESIGN7.2 EXISTING DRAWINGS
SIDE ELEVATIONSCALE 1:100
SECTION A-ASCALE 1:100
7.0 DESIGN7.2 EXISTING DRAWINGS
GROUND FLOOR PLANSCALE 1:100
FIRST FLOOR PLANSCALE 1:100
SECOND FLOOR PLANSCALE 1:100
7.0 DESIGN7.2 EXISTING DRAWINGS
ROOF PLANSCALE 1:100
7.0 DESIGN7.3 PROPOSED DRAWINGS
FRONT ELEVATIONSCALE 1:100
7.0 DESIGN7.3 PROPOSED DRAWINGS
SIDE ELEVATIONSCALE 1:100
7.0 DESIGN7.3 PROPOSED DRAWINGS
BACK ELEVATIONSCALE 1:100
7.0 DESIGN7.3 PROPOSED DRAWINGS
SECTION A-ASCALE 1:100
7.0 DESIGN7.3 PROPOSED DRAWINGS
7.0 DESIGN7.3 PROPOSED DRAWINGS
7.0 DESIGN7.4 TENDER DRAWING
8.0 INTERIOR DESIGN
8.0 INTERIOR DESIGN8.1 INTERIOR PERSPECTIVE
TERRACE
8.0 INTERIOR DESIGN8.1 INTERIOR PERSPECTIVE
LIVING
8.0 INTERIOR DESIGN8.1 INTERIOR PERSPECTIVE
DINING + KITCHEN
8.0 INTERIOR DESIGN8.1 INTERIOR PERSPECTIVE
BEDROOM 1
8.0 INTERIOR DESIGN8.1 INTERIOR PERSPECTIVE
BEDROOM 2
8.0 INTERIOR DESIGN8.1 INTERIOR PERSPECTIVE
BEDROOM 3
8.0 INTERIOR DESIGN8.1 INTERIOR PERSPECTIVE
BATH
8.0 INTERIOR DESIGN8.1 INTERIOR PERSPECTIVE
BALCONY
GROUND FLOOR PLANNTS
8.0 INTERIOR DESIGN8.2 FLOOR FINISHING
SECOND FLOOR PLANNTS
FIRST FLOOR PLANNTS
Light grey ceramic tiles
Marble aggregate tiles
Cement
Dark grey ceramic tiles
Mahogany wood
White ceramic tiles
ITEM NO. SPECIFICATION UNIT PRICE(PER UNIT)
SUPPLIER
1Location: Car Porch, Terrace, Balcony
Cement• Raw natural finish• 26 an y12 (40kg)
14 RM 90.00
LAFARGH
Bangunan TH Uptown 3, Jalan SS 21/39, Damansara
Utama, 47400 Petaling Jaya,
Malaysia
2Location: Living
Marble Aggregate Tiles• Polished finish 1 RM 1000.00 Maintaining existing
tiles
3Location: Dining, Kitchen
Light Grey Ceramic Tiles• Polished finish 1 RM 1000.00 Maintaining existing
tiles
4 Location: Bedroom 1, Bedroom 2, Bedroom 3
White Ceramic Tiles• Matte finish• 600 x 600 mm
84 RM 5.20
Venus Ceramic Industry
No. 260 F, 2 1/2 Miles, Jalan Ipoh,
51200, Kuala Lumpur, Malaysia
5Location: Stairs
Timber Planks• Polished finish• 245 x 1050 x 38 mm• 1100 x 2250 x 38 mm• Ft/run
8.574m² RM 8.00
Mikyotech Sdn Bhd
No.21-3, Jalan PJU 8/5D, Bandar
Damansara Perdana,, 47820 Petaling Jaya,
Malaysia
6 Location: Bath 1, Bath 2, Bath 3, Bath 4
Dark Grey Ceramic Tiles• Matte finish• 300 x 300 mm
160 RM 3.00
Mikyotech Sdn Bhd
No.21-3, Jalan PJU 8/5D, Bandar
Damansara Perdana,, 47820 Petaling Jaya,
Malaysia
8.0 INTERIOR DESIGN8.3 FINISHING SCHEDULE
8.0 INTERIOR DESIGN8.4 FURNITURE LAYOUT PROPOSAL
GROUND FLOOR PLANNTS
TV bench
Three-seat sofa
Balcony table with 2 folded chairs
Coffee table
40’ LED TV
Fridge
Dining table set
Water closet & Sink
8.0 INTERIOR DESIGN8.4 FURNITURE LAYOUT PROPOSAL
FIRST FLOOR PLANNTS
Study table and chair
Wardrobe
Queen bed
Single bed
Water Closet & Sink
Wardrobe
8.0 INTERIOR DESIGN8.4 FURNITURE LAYOUT PROPOSAL
SECOND FLOOR PLANNTS Study table and
chair
Queen bed
Water Closet & Sink
Wardrobe
ITEM NO. SPECIFICATION UNIT PRICE(PER UNIT)
SUPPLIER
1
Location: Living
KIVIK Two-seat Sofa• Isunda grey• 1900 x 950 x 850 mm
1 RM 645.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara Damansara, 47820
Petaling Jaya, Selangor, Malaysia
2
Location: Living
LACK Coffee Table• Black-brown• 900 x 550 x 450 mm
1 RM 79.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara Damansara, 47820
Petaling Jaya, Selangor, Malaysia
3
Location: Living
Besta TV Bench• Black-brown• 1800 x 400 x 380 mm
1 RM 795.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara Damansara, 47820
Petaling Jaya, Selangor, Malaysia
4
Location: Living
Samsung 40’’ Full HD• Flat TV H5008 Series 5 1 RM 999.00
SAMSUNG
Persiaran Kewajipan, USJ,47600 UEP, Subang Jaya,
Selangor, Malaysia
5
Location: Dining
Estonia White Wood Table & Cushion Seat• Solid Wood• 1200 x 750 x 745 mm• Fabric Cushion• 460 x 495 x 800 mm
1 RM 1299.00
MF DESIGN
No 26 (1st) , Jalan Perwira 1, Taman
Perwira, 84200 Bakri, Muar, Johor
8.0 INTERIOR DESIGN8.5 FURNITURE SCHEDULE
ITEM NO. SPECIFICATION UNIT PRICE(PER UNIT)
SUPPLIER
6
Location: Kitchen
FYNDIG Kitchen Cabinet• White / Laminate worktop• 36 sqft
1 RM 1319.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara Damansara, 47820
Petaling Jaya, Selangor, Malaysia
7
Location: Kitchen
Panasonic Econavi Fridge• 262 litres• 2 door top freezer• 611 x 600 x 1499 mm
1 RM 1249.00
SENHENG SUNWAY PYRAMID
No 3, Jalan PJS 11/15, Bandar Sunway,
46150, Petaling Jaya, Selangor
8
Location: Bedroom 1, Bedroom 3
TRYSIL Bed Frame• White-light grey• Powder-coated steel• 1550 x 2180 x 1499 mm
2 RM 490.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara Damansara, 47820
Petaling Jaya, Selangor, Malaysia
9
Location: Bedroom 2
BRIMNES Day-bed Frame• White / Foil finish• 860 x 2050 x 57 mm
1 RM 799.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara Damansara, 47820
Petaling Jaya, Selangor, Malaysia
10
Location: Bedroom 1, Bedroom 3
Queen Size Mattress• High density foam• 1525 x 1830 x 128 mm
2 RM 598.00
MF DESIGN
No 26 (1st) , Jalan Perwira 1, Taman
Perwira, 84200 Bakri, Muar, Johor
8.0 INTERIOR DESIGN8.5 FURNITURE SCHEDULE
ITEM NO. SPECIFICATION UNIT PRICE(PER UNIT)
SUPPLIER
11
Location: Bedroom 2
Single Size Mattress• Foam• 850 x 1830 x 128 mm
1 RM 199.00
MF DESIGN
No 26 (1st) , Jalan Perwira 1, Taman
Perwira, 84200 Bakri, Muar, Johor
12
Location: Bedroom 1, Bedroom 3
BRIMNES Wardrobe with 3 Doors• Foil finish / Mirror glass• 1170 x 500 x 1900 mm
1 RM 545.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara Damansara, 47820
Petaling Jaya, Selangor, Malaysia
13
Location: Bedroom 2
ASKVOLL Wardrobe• Foil finish• 800 x 520 x 1890 mm
2 RM 490.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara Damansara, 47820
Petaling Jaya, Selangor, Malaysia
14
Location: Bedroom 1, Bedroom 2, Bedroom 3
LISABO desk & Swivel chair• Ash veneer / Solid birch• 1180 x 450 x 740 mm• White / Plywood• 450 x 390 x 520 mm
3 RM 718.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara Damansara, 47820
Petaling Jaya, Selangor, Malaysia
15
Location: Bedroom 3
KHIND Tower Fan• High density foam• 1525 x 1830 x 128 mm
1 RM 176.00
SENHENG SUNWAY PYRAMID
No 3, Jalan PJS 11/15, Bandar Sunway,
46150, Petaling Jaya, Selangor
8.0 INTERIOR DESIGN8.5 FURNITURE SCHEDULE
ITEM NO. SPECIFICATION UNIT PRICE(PER UNIT)
SUPPLIER
16
Location: Bath 1, Bath 2, Bath 3, Bath 4
GUNNERN Mirror Cabinet• White / Mirror glass• 310 x 124 x 620 mm
3 RM 129.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara Damansara, 47820
Petaling Jaya, Selangor, Malaysia
17
Location: Bath 1, Bath 2, Bath 3, Bath 4
JOHNSON SUISSE Pavia Semi-recessed Basin• White• 555 x 600 x 247 mm
3 RM 423.00
MAJU HOME FURNISHING
Lot 48 & 48, Batu 4 1/2,
Jalan Genting Klang,53300 Setapak, Kuala Lumpur.
18
Location: Bath 1, Bath 2, Bath 3, Bath 4
JOHNSON SUISSE Luton Close-coupled Water Closet• White• Washdown / Dual Flush• 650 x 365 x 785 mm
3 RM 466.00
MAJU HOME FURNISHING
Lot 48 & 48, Batu 4 1/2,
Jalan Genting Klang,53300 Setapak, Kuala Lumpur.
19
Location: Terrace
ASKHOLMEN Balcony Table with 2 Folded Chairs• 700 x 440 x 710 mm• 360 x 490 x 870 mm
3 RM 225.00
IKEA DAMANSARA
Jalan PJU 7/2, Mutiara Damansara, 47820
Petaling Jaya, Selangor, Malaysia
8.0 INTERIOR DESIGN8.5 FURNITURE SCHEDULE
9.0 LANDSCAPE DESIGN
9.1 LANDSCAPE LAYOUT
9.0 LANDSCAPE
Emmenopterys Henyi
Euonymus Fortunei
Bermuda Grass
Pebble Stone
Pebble Stone Path
Morning Glory
9.0 LANDSCAPE9.2 SPECIES SPECIFICATION
ITEM NO. SPECIFICATION UNIT PRICE SUPPLIER
1
Emmenopterys HenyiHeight : 120mmSpread : 1000mmSun : Sun, part sunWatering : Medium
6 RM 80
Glorious Nursery
Jalan PJS 10/2, Bandar Sunway,
Petaling Jaya, Selangor.
2
Euonymus FortuneiHeight : 50-60mmSpread : 1000mmSun : Sun, part sunWatering : Medium
10 RM 12
Glorious Nursery
Jalan PJS 10/2, Bandar Sunway,
Petaling Jaya, Selangor.
3Pebble Stone PathSize : 400x400mmColour : Mixing with black and light pink
24 RM 9
Glorious Nursery
Jalan PJS 10/2, Bandar Sunway,
Petaling Jaya, Selangor.
4Pebble StoneSize : Average medium sizeColour : Mixing with black and light pink
20 RM 21
Glorious Nursery
Jalan PJS 10/2, Bandar Sunway,
Petaling Jaya, Selangor.
5Bermuda GrassSun : Sun, part sunWatering : Medium
1 RM 63
Glorious Nursery
Jalan PJS 10/2, Bandar Sunway,
Petaling Jaya, Selangor.
6Morning Glory SeedSun : Sun, part sunWatering : Medium
1 RM 10
Glorious Nursery
Jalan PJS 10/2, Bandar Sunway,
Petaling Jaya, Selangor.
9.0 LANDSCAPE9.3 LANDSCAPE PERSPECTIVE
BIRD EYE VIEW
9.0 LANDSCAPE9.3 LANDSCAPE PERSPECTIVE
PERSPECTIVE VIEW
10.0 CIVIL & STRUCTURE
10.0 CIVIL & STRUCTURE10.1 STRUCTURAL MEMBERS
STRUCTURAL PLANS
FOUNDATION PLANSCALE 1:100
GROUND FLOOR PLANSCALE 1:100
FIRST FLOOR PLANSCALE 1:100
SECOND FLOOR PLANSCALE 1:100
BALCONY ROOF PLANSCALE 1:100
ROOF PLANSCALE 1:100
11.0 STRUCTURAL MEMBERSSTRUCTURAL PLANS
10.0 CIVIL & STRUCTURE
10.1 STRUCTURAL MEMBERS10.1.1 EXISTING AND NEW
COLUMNS
EXISTING COLUMN NEW COLUMN
FOUNDATION PLANSCALE 1:100
GROUND FLOOR PLANSCALE 1:100
FIRST FLOOR PLANSCALE 1:100
10.0 CIVIL & STRUCTURE
10.1 STRUCTURAL MEMBERS10.1.2 EXISTING AND NEW BEAMS
EXISTING BEAM NEW BEAM
GROUND FLOOR PLANSCALE 1:100
FIRST FLOOR PLANSCALE 1:100
SECOND FLOOR PLANSCALE 1:100
10.0 CIVIL & STRUCTURE
SECOND FLOOR PLANSCALE 1:100
GROUND FLOOR PLANSCALE 1:100
FIRST FLOOR PLANSCALE 1:100
10.1 STRUCTURAL MEMBERS10.1.3 LOAD BEARING WALLS
NEW LOAD BEARING WALL
10.0 CIVIL & STRUCTURE
10.1 STRUCTURAL MEMBERS
NEW LOAD BEARING WALLEXISTING BEAM NEW BEAM
EXISTING COLUMN NEW COLUMN
COLUMNS BEAMS LOAD BEARING WALL
10.0 CIVIL & STRUCTURE
ITEM NO. SPECIFICATION UNIT PRICE(PER UNIT)
SUPPLIER
1
Location : Column F/1
Steel Rectangular Hollow Section - 350mm x 150mm x 4.5mm x 2950mm –
(28kg/m)1 RM 385.00
Kinsteel Berhad
5, Kawasan Perindustrian Ringan
IM 6, Bandar Indera
Mahkota, 25200 Kuantan,
Pahang Darul Makmur, Malaysia
2
Location : Ground floor & first floor, beam 1/E-F
Steel Rectangular Hollow Section - 350mm x 150mm x 4.5mm x 1578mm –
(28kg/m) 2 RM 243.00
Kinsteel Berhad
5, Kawasan Perindustrian Ringan
IM 6, Bandar Indera
Mahkota, 25200 Kuantan,
Pahang Darul Makmur, Malaysia
3
Location : Ground floor & first floor, beam F/1-2
Steel Rectangular Hollow Section - 350mm x 150mm x 4.5mm x 1725mm –
(28kg/m) 2 RM 265.00
Kinsteel Berhad
5, Kawasan Perindustrian Ringan
IM 6, Bandar Indera
Mahkota, 25200 Kuantan,
Pahang Darul Makmur, Malaysia
4
Location : Second floor, beam 1.5/C-D1
Steel Rectangular Hollow Section - 350mm x 150mm x 4.5mm x 1725mm –
(28kg/m) 1 RM 346.50
Kinsteel Berhad
5, Kawasan Perindustrian Ringan
IM 6, Bandar Indera
Mahkota, 25200 Kuantan,
Pahang Darul Makmur, Malaysia
10.1 STRUCTURAL MEMBERS
10.0 CIVIL & STRUCTURE
ITEM NO. SPECIFICATION UNIT PRICE(PER UNIT)
SUPPLIER
1
Location : First floor, second floor
Autoclaved Aerated Concrete (AAC) Block600mm x 200mm x 150mm 910 RM 3.50
Starken AAC Sdn. Bhd.
No.A-1-3A, Pusat Perdagangan Kuchai,No.2, Jalan 1/127, Off Jalan Kuchai Lama,
58200, Kuala Lumpur, Wilayah
Persekutuan,Malaysia.
2
Location : First floor, second floor
Autoclaved Aerated Concrete (AAC) Floor Panel
600mm x 150mm x 3100mm 22 RM 54.50
Starken AAC Sdn. Bhd.
No.A-1-3A, Pusat Perdagangan Kuchai,No.2, Jalan 1/127, Off Jalan Kuchai Lama,
58200, Kuala Lumpur, Wilayah
Persekutuan,Malaysia.
10.1 STRUCTURAL MEMBERS
10.0 CIVIL & STRUCTURE
10.2 STRUCTURAL LOAD10.2.1 LOAD DISTRIBUTION DIAGRAM
GROUND FLOOR PLANSCALE 1:100
FIRST FLOOR PLANSCALE 1:100
SECOND FLOOR PLANSCALE 1:100
10.0 CIVIL & STRUCTURE
10.2 STRUCTURAL LOAD10.2.2 LOAD OF ADDITIONAL STRUCTURE
ROOF PLANSCALE 1:100
ITEM NO.
CALCULATION UNIT
WEIGHT (kN)
ROOF FRAMESLOPE CORRECTION FACTOR = 1.08
1 (1.64 x 0.1)m x 0.1kN/m² x 1.08 = 0.018kN / unit 5 0.09
2 (3.09 x 0.1)m x 0.1kN/m² x 1.08 = 0.033kN / unit 3 0.10
3 (5.09 x 0.1)m x 0.1kN/m² x 1.08 = 0.055kN / unit 2 0.11
4 (4.88 x 0.1)m x 0.1kN/m² x 1.08 = 0.053kN / unit 9 0.48
5 (0.5 x 0.1)m x 0.1kN/m² x 1.08 = 5.4 x 10^-3kN / unit 2 0.01
6 (2.2 x 0.1)m x 0.1kN/m² x 1.08 = 0.24kN / unit 3 0.72
METAL ROOF SHEET
7 (4.88 x 1.64)m x 0.07kN/m² x 1.08 = 0.061kN - 0.06
8 (4.88 x 5.20)m x 0.07kN/m² x 1.08 = 2kN - 2.00
1
2
3
4
5
6
DEAD LOADSteel 78.5kN/m³ Steel Frame Member 0.1kN/m²
AAC Block 7.4kN/m³ AAC Floor Panel 8.04kN/m³
Metal Roof Sheet 0.07kN/m² Polycarbonate Roof Panel 0.03kN/m²
LIVE LOADBedroom 1.5kN/m² Bathroom 2.0kN/m² Balcony 1.5kN/m² Corridor 1.5kN/m²
10.0 CIVIL & STRUCTURE
10.2 STRUCTURAL LOAD10.2.2 LOAD OF ADDITIONAL STRUCTURE
BALCONY ROOF PLANSCALE 1:100
ITEM NO.
CALCULATION UNIT
WEIGHT (kN)
ROOF FRAMESLOPE CORRECTION FACTOR = 1.08
1 (3.2 x 0.1)m x 0.1kN/m² x 1.08 = 0.035kN / unit 5 0.18
2 (4.88 x 0.1)m x 0.1kN/m² x 1.08 = 0.053kN/ unit 3 0.16
POLYCARBONATE ROOF PANEL
3 (4.88 x 3.2)m x 0.03kN/m² x 1.08 = 0.506kN - 0.51
TOTAL LOAD OF ROOF 4.42
1
2
DEAD LOADSteel 78.5kN/m³ Steel Frame Member 0.1kN/m²
AAC Block 7.4kN/m³ AAC Floor Panel 8.04kN/m³
Metal Roof Sheet 0.07kN/m² Polycarbonate Roof Panel 0.03kN/m²
LIVE LOADBedroom 1.5kN/m² Bathroom 2.0kN/m² Balcony 1.5kN/m² Corridor 1.5kN/m²
10.0 CIVIL & STRUCTURE
10.2 STRUCTURAL LOAD10.2.2 LOAD OF ADDITIONAL STRUCTURE
SECOND FLOOR PLANSCALE 1:100
ITEM NO.
CALCULATION UNIT
WEIGHT (kN)
AAC BLOCK WALL
1 (4.73 x 1.5 x 0.15)m³ x 7.4kN/m³ = 7.87kN / unit 1 7.87
2 (6.871 + 5.814 + 0.373)m² x 0.15m x 7.4kN/m³ = 17.12kN / unit 1 17.12
3 (12.62 + 1.076)m² x 0.15m x 7.4kN/m³ = 13.7kN / unit 1 13.70
4 (11.421 + 1.055)m² x 0.15m x 7.4kN/m³ = 13.84kN / unit 1 13.84
5 ((1.57 + 2.916)/2 x 3.1)m² x 0.15m x 7.4kN/m³ = 7.72kN / unit 1 7.72
6 (1.25 x 1.895 x 0.15)m³ x 7.4kN/m³ = 7.63kN / unit 1 7.36
7 (1.5 x 3.63 x 0.15)m³ x 7.4kN/m³ = 6.04kN / unit 1 6.04STEEL BEAM
8 (2.25 x 0.35 x 0.15)m³ x 78.5kN/m³ = 9.27kN / unit 1 9.27
1
2
3
8
5
6
7
4
DEAD LOADSteel 78.5kN/m³ Steel Frame Member 0.1kN/m²
AAC Block 7.4kN/m³ AAC Floor Panel 8.04kN/m³
Metal Roof Sheet 0.07kN/m² Polycarbonate Roof Panel 0.03kN/m²
LIVE LOADBedroom 1.5kN/m² Bathroom 2.0kN/m² Balcony 1.5kN/m² Corridor 1.5kN/m²
10.0 CIVIL & STRUCTURE
SECOND FLOOR PLANSCALE 1:100
ITEM NO.
CALCULATION UNIT
WEIGHT (kN)
AAC FLOOR PANEL
1(4.73 x 2.325 x 0.15)m³ x 8.04kN/m³ = 13.26kN / unitLive load of balcony, (4.73 x 2.325)m² x 1.5kN/m² = 16.5kN
1 29.76
2(2.25 x 1.275 x 0.15)m³ x 8.04kN/m³ = 3.46kN / unitLive load of corridor, (2.25 x 1.275)m² x 1.5kN/m² = 4.3kN
1 7.76
3(1.186 x 3.605 x 0.15)m³ x 8.04kN/m³ = 5.16kN / unitLive load of bedroom, (1.186 x 3.605)m² x 1.5kN/m² = 6.41kN
1 11.57
4(1.273 x 1.166 x 0.15)m³ x 8.04kN/m³ = 1.79kN / unitLive load of bedroom, (1.273 x 1.166)m² x 1.5kN/m² = 2.23kN
1 4.02
5(1.271 x 1.034 x 0.15)m³ x 8.04kN/m³ = 1.58kN / unit Live load of bedroom, (1.271 x 1.034)m² x 1.5kN/m² = 1.97kN
1 3.55
6(1.738 x 3.605 x 0.15)m³ x 8.04kN/m³ = 7.56kN / unitLive load of bedroom, (1.738 x 3.605)m² x 1.5kN/m² = 9.4kN
1 16.96
TOTAL LOAD ON SECOND FLOOR 156.72
DEAD LOADSteel 78.5kN/m³ Steel Frame Member 0.1kN/m²
AAC Block 7.4kN/m³ AAC Floor Panel 8.04kN/m³
Metal Roof Sheet 0.07kN/m² Polycarbonate Roof Panel 0.03kN/m²
LIVE LOADBedroom 1.5kN/m² Bathroom 2.0kN/m² Balcony 1.5kN/m² Corridor 1.5kN/m²
1
2
3
5
6
4
10.2 STRUCTURAL LOAD10.2.2 LOAD OF ADDITIONAL STRUCTURE
10.0 CIVIL & STRUCTURE
FIRST FLOOR PLANSCALE 1:100
ITEM NO.
CALCULATION UNIT
WEIGHT (kN)
AAC BLOCK WALL
1 (0.75 + 4.176)m² x 0.15m x 7.4kN/m³ = 5.47kN / unit 1 5.47
2 (3.391 x 2.983 x 0.15)m³ x 7.4kN/m³ = 11.23kN / unit 1 11.23
3 (4.729 x 2.983 x 0.15)m³ x 7.4kN/m³ = 15.66kN / unit 1 15.66
4 (2.342 x 2.983 x 0.15)m³ x 7.4kN/m³ = 7.75kN / unit 1 7.75
5 (1.273 x 2.983 x 0.15)m³ x 7.4kN/m³ = 4.22kN / unit 1 4.22
6 (3.607 x 2.983 x 0.15)m³ x 7.4kN/m³ = 11.94kN / unit 1 11.94
7 (1.778 x 2.983 x 0.15)m³ x 7.4kN/m³ = 5.88kN / unit 1 5.88
STEEL BEAM
8 (1.778 x 0.35 x 0.15 )m³ x 78.5kN/m³ = 7.33kN / unit 1 7.33
9 (1.579 x 0.35 x 0.15 )m³ x 78.5kN/m³ = 6.51kN / unit 1 6.51
AAC FLOOR PANEL
10(1.725 x 1.778 x 0.15)m³ x 8.014kN/m³ = 3.7kNLive load of bedroom, (1.725 x 1.778)m² x 1.5kN/m² = 4.6kN
1 8.30
1
2
3
4
7
8
5
6
9
10
DEAD LOADSteel 78.5kN/m³ Steel Frame Member 0.1kN/m²
AAC Block 7.4kN/m³ AAC Floor Panel 8.04kN/m³
Metal Roof Sheet 0.07kN/m² Polycarbonate Roof Panel 0.03kN/m²
LIVE LOADBedroom 1.5kN/m² Bathroom 2.0kN/m² Balcony 1.5kN/m² Corridor 1.5kN/m²
10.2 STRUCTURAL LOAD10.2.2 LOAD OF ADDITIONAL STRUCTURE
10.0 CIVIL & STRUCTURE
GROUND FLOOR PLANSCALE 1:100
ITEM NO.
CALCULATION UNIT
WEIGHT (kN)
STEEL COLUMN
1 (2.95 x 0.35 x 0.15)m³ x 78.5kN/m³ = 12.15kN / unit 1 12.15
STEEL BEAM
2 (1.778 x 0.35 x 0.15 )m³ x 78.5kN/m³ = 7.33kN / unit 1 7.33
3 (1.579 x 0.35 x 0.15 )m³ x 78.5kN/m³ = 6.51kN / unit 1 6.51
TOTAL LOAD IMPOSED ON GROUND AND FIRST FLOOR 110.28
DEAD LOADSteel 78.5kN/m³ Steel Frame Member 0.1kN/m²
AAC Block 7.4kN/m³ AAC Floor Panel 8.04kN/m³
Metal Roof Sheet 0.07kN/m² Polycarbonate Roof Panel 0.03kN/m²
LIVE LOADBedroom 1.5kN/m² Bathroom 2.0kN/m² Balcony 1.5kN/m² Corridor 1.5kN/m²
2
1
3TOTAL LOAD OF THE ADDITIONAL STRUCTURE 271.42 kN
The proposed structure utilizes lightweight materials like AAC blocks and panels, in order to minimise the additional resulting load as it is unsure whether the existing structure is able to withstand a great amount of load.
10.2 STRUCTURAL LOAD10.2.2 LOAD OF ADDITIONAL STRUCTURE
10.0 CIVIL & STRUCTURE
10.3 ROOF SYSTEM
ROOF STRUCTURE AWNING STRUCTURE
10.0 CIVIL & STRUCTURE
ITEM NO. SPECIFICATION UNIT PRICE(PER UNIT)
SUPPLIER
1
Location : Roof
Steel Rectangular Hollow Section - 100mm x 50mm x 4.1mm 1630mm –
(6.4kg/m)5 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan Perindustrian Ringan
IM 6, Bandar Indera
Mahkota, 25200 Kuantan,
Pahang Darul Makmur, Malaysia
2
Location : Roof
Steel Rectangular Hollow Section – 100mm x 50mm x 4.1mm x 2647mm –
(6.4kg/m) 2 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan Perindustrian Ringan
IM 6, Bandar Indera
Mahkota, 25200 Kuantan,
Pahang Darul Makmur, Malaysia
3
Location : Roof
Steel Rectangular Hollow Section – 100mm x 50mm x 4.1mm x 1800mm –
(6.4kg/m) 2 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan Perindustrian Ringan
IM 6, Bandar Indera
Mahkota, 25200 Kuantan,
Pahang Darul Makmur, Malaysia
4
Location : Roof
Steel Rectangular Hollow Section – 100mm x 50mm x 4.1mm x 5156mm –
(6.4kg/m) 3 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan Perindustrian Ringan
IM 6, Bandar Indera
Mahkota, 25200 Kuantan,
Pahang Darul Makmur, Malaysia
10.3 ROOF SYSTEM10.0 CIVIL & STRUCTURE
ITEM NO. SPECIFICATION UNIT PRICE(PER UNIT)
SUPPLIER
1
Location : Roof
Steel Rectangular Hollow Section - 100mm x 50mm x 4.1mm 5000mm –
(6.4kg/m)2 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan Perindustrian Ringan
IM 6, Bandar Indera
Mahkota, 25200 Kuantan,
Pahang Darul Makmur, Malaysia
2
Location : Roof, balcony roof
Steel Lip Channel Section – 100mm x 50mm x 3mm x 4880mm –
(6.4kg/m) 12 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan Perindustrian Ringan
IM 6, Bandar Indera
Mahkota, 25200 Kuantan,
Pahang Darul Makmur, Malaysia
3
Location : Balcony roof
Steel Rectangular Hollow Section – 100mm x 50mm x 4.1mm x 3200mm –
(6.4kg/m) 10 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan Perindustrian Ringan
IM 6, Bandar Indera
Mahkota, 25200 Kuantan,
Pahang Darul Makmur, Malaysia
4
Location : Balcony roof
Steel Rectangular Hollow Section – 100mm x 50mm x 4.1mm x 3050mm –
(6.4kg/m) 3 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan Perindustrian Ringan
IM 6, Bandar Indera
Mahkota, 25200 Kuantan,
Pahang Darul Makmur, Malaysia
10.3 ROOF SYSTEM10.0 CIVIL & STRUCTURE
10.4 STAIRCASE
STAIRCASE STRUCTURE & DETAILS
NTS
10.0 CIVIL & STRUCTURE
ITEM NO. SPECIFICATION UNIT PRICE(PER UNIT)
SUPPLIER
1
Location : New staircase
Timber tread - 245mm x 38mm x 1050mm 18 RM 8 per ft run
Mikyotech Sdn. Bhd.
Lot 2, Jalan TUDM, Kg. Baru Subang,40150 Shah Alam,
Selangor.
2
Location : New staircase
Steel Rectangular Hollow Section – 120mm x 50mm x 3.8mm – (6.4kg/m) 21m RM 5.50 per kg
Kinsteel Berhad
5, Kawasan Perindustrian Ringan
IM 6, Bandar Indera
Mahkota, 25200 Kuantan,
Pahang Darul Makmur, Malaysia
3
Location : New Staircase
Timber handrail75mm x 30mm 7.1m RM 8 per ft run
Mikyotech Sdn. Bhd.
Lot 2, Jalan TUDM, Kg. Baru Subang,40150 Shah Alam,
Selangor.
4
Location : New staircase
Steel Square Hollow Section - 20mm x 20mm x 2.5mm x 900mm –
(5.3kg/m) 18 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan Perindustrian Ringan
IM 6, Bandar Indera
Mahkota, 25200 Kuantan,
Pahang Darul Makmur, Malaysia
5Location : New staircase
Steel flat bar connector – 50mm x 2.6mm x 142mm – (0.375kg/m) 34 RM 5.50 per kg
Kinsteel Berhad
5, Kawasan Perindustrian Ringan
IM 6, Bandar Indera
Mahkota, 25200 Kuantan,
Pahang Darul Makmur, Malaysia
10.5 SEWAGE SYSTEMSEWAGE LAYOUT PLAN
GROUND FLOOR PLANNTS
FIRST FLOOR PLANNTS
SECOND FLOOR PLANNTS
10.0 CIVIL & STRUCTURE
10.5 SEWAGE SYSTEMSEWAGE SCHEMATIC DIAGRAM
10.0 CIVIL & STRUCTURE
10.6 DRAINAGE SYSTEM
PERIMETER DRAINDOWN PIPE
GUTTERDRAIN PIPE
ROOF PLANNTS
DOWNPIPE PLANFROM SECOND FLOOR DOWN TO FIRST
FLOORNTS
GROUND FLOOR PLANNTS
10.0 CIVIL & STRUCTURE
11.0 MECHANICAL & ELECTICAL
Types of spaces No. of existing switch
No. of existing lighting
No. of existing fan
No. of existingsocket
Living room 4 1 1 4Dining area 2 2 - 5
Kitchen 0 1 - 3Bathroom
(Ground Floor)2 (including heater) 1 - -
Master Bedroom 4 2 (including balcony)
1 1
Bedroom 1 1 1 - 1Bathroom (First
Floor)1 1 - -
Corridor 1 1 - -
11.1 EXISTING ELECTRICAL SYSTEM11.0 MECHANICAL &
ELECTRICAL
MASTER BEDROOM
BATHROOM
KITCHEN
LIVING HALL BEDROOM 1
BEDROOM 1
11.1 EXISTING ELECTRICAL SYSTEM11.0 MECHANICAL &
ELECTRICAL
11.0 MECHANICAL & ELECTRICAL1121 ELECTRICAL SYSTEM
ELECTRICAL LAYOUT GROUND
FLOOR PLANNTS
ELECTRICAL LAYOUT FIRST FLOOR PLAN
NTS
ELECTRICAL LAYOUT SECOND
FLOOR PLANNTS
11.2.1 GENERAL ELECTRICAL SYSTEM
ELECTRICAL LAYOUT GROUND
FLOOR PLANNTS
ELECTRICAL LAYOUT FIRST FLOOR PLAN
NTS
ELECTRICAL LAYOUT SECOND
FLOOR PLANNTS
11.0 MECHANICAL & ELECTRICAL11.2 ELECTRICAL SYSTEM
11.2.2 SOCKET PLACEMENT
ITEM NO. SPECIFICATION UNIT PRICE(PER UNIT)
SUPPLIER
1Location: Living hall, Dining hall, Kitchen, Bedroom 1, Bedroom 2, Bedroom 3
Schneider C-Vivace Wall socket 1-gang switched 7 RM 15.00
Schneider Electric Industries (M) Sdn Bhd
Level 18, Tower B, Plaza 33, No 1, Jalan Kemajuan, Seksyen 13, 46200 Petaling
Jaya,Selangor
2 Location: Living HallmDining Hall, Kitchen, Bedroom 1, Bedroom 2, Bedroom 3, Balcony
Schneider C-Vivace Wall socket 2-gang switched 8 RM 18.00
Schneider Electric Industries (M) Sdn Bhd
Level 18, Tower B, Plaza 33, No 1, Jalan Kemajuan, Seksyen 13, 46200 Petaling
Jaya,Selangor
11.0 MECHANICAL & ELECTRICAL1121 ELECTRICAL SYSTEM
11.2.2 SOCKET PLACEMENT
11.0 MECHANICAL & ELECTRICAL1121 ELECTRICAL SYSTEM
ELECTRICAL LAYOUT GROUND
FLOOR PLANNTS
ELECTRICAL LAYOUT FIRST FLOOR PLAN
NTS
ELECTRICAL LAYOUT SECOND
FLOOR PLANNTS
11.2.3 LIGHTING PLACEMENT
ITEM NO. SPECIFICATION UNIT PRICE(PER UNIT)
SUPPLIER
1
Location: Terrace, Staircase, Balcony
Philips LED Light Bulb Warm white• Shape: Standard• Cap/Fitting: E27• Voltage: 220-240V• Lifetime: 15000 (hours)• Wattage equivalent: 40W• Light output: 350 lumen
5 RM 16.90
Philips Electronic (M) Sdn Bhd
Level 8&9, Menara Axis, No. 2, Jalan 51A/223, 46100,
Petaling Jaya, Selangor, 46100,
Malaysia
2Location: Living hall, Dining hall, Bedroom 1, Bedroom 2, Bedroom 3
Philips LED Light Bulb Daylight • Shape: Standard• Cap/Fitting: E27• Voltage: 220-240V• Lifetime: 15000 (hours)• Wattage equivalent: 40W• Light output: 350 lumen
15 RM 16.90
Philips Electronic (M) Sdn Bhd
Level 8&9, Menara Axis, No. 2, Jalan 51A/223, 46100,
Petaling Jaya, Selangor, 46100,
Malaysia
3
Location: Bathroom 1, Bathroom 2, Bathroom 3
Philips LED Genie Stick Cool Daylight• Shape: U shape• Energy Saving: 80%• Cap/Fitting: E14• Voltage: 220-240V• Lifetime: 15000 (hours)• Wattage equivalent: 60W
4 RM 10.90
Philips Electronic (M) Sdn Bhd
Level 8&9, Menara Axis, No. 2, Jalan 51A/223, 46100,
Petaling Jaya, Selangor, 46100,
Malaysia
4
Location: Kitchen
Philips Linear Fluorescent Tube Soft White• Lamp holder:T8• Placement: Ceiling• Length: 600mm• Number of lamps: 1• Luminosity: 1300lm• Wattage: 30 W
1 RM 4.90
Philips Electronic (M) Sdn Bhd
Level 8&9, Menara Axis, No. 2, Jalan 51A/223, 46100,
Petaling Jaya, Selangor, 46100,
Malaysia
11.0 MECHANICAL & ELECTRICAL11.2 ELECTRICAL SYSTEM
11.2.3 LIGHTING PLACEMENT
11.0 MECHANICAL & ELECTRICAL11.2 ELECTRICAL SYSTEM
ELECTRICAL LAYOUT GROUND
FLOOR PLANNTS
ELECTRICAL LAYOUT FIRST FLOOR PLAN
NTS
ELECTRICAL LAYOUT SECOND
FLOOR PLANNTS
11.2.4 SWITCH PLACEMENT
ITEM NO. SPECIFICATION UNIT PRICE(PER UNIT)
SUPPLIER
1 Location: Kitchen, Bath room 1, Bathroom 2, Bathroom 3, Balcony
Schneider C-Vivace Wall switches 1-Gang 1 way 7 RM 7.00
Schneider Electric Industries (M) Sdn Bhd
Level 18, Tower B, Plaza 33, No 1, Jalan Kemajuan, Seksyen 13, 46200 Petaling
Jaya,Selangor, Malaysia.
2Location: Living hall (staircase). Corridor (2nd floor staircase)
Schneider C-Vivace Wall switches 1-Gang 2 way 2 RM 13.00
Schneider Electric Industries (M) Sdn Bhd
Level 18, Tower B, Plaza 33, No 1, Jalan Kemajuan, Seksyen 13, 46200 Petaling
Jaya,Selangor, Malaysia.
3
Location: Living hall, Bedroom 3
Schneider C-Vivace Wall switches 2-Gang 1 way 2 RM 8.00
Schneider Electric Industries (M) Sdn Bhd
Level 18, Tower B, Plaza 33, No 1, Jalan Kemajuan, Seksyen 13, 46200 Petaling
Jaya,Selangor, Malaysia.
4
Location: Corridor (1st floor staircase)
Schneider C-Vivace Wall switches 2-Gang 2 way 1 RM 16.00
Schneider Electric Industries (M) Sdn Bhd
Level 18, Tower B, Plaza 33, No 1, Jalan Kemajuan, Seksyen 13, 46200 Petaling
Jaya,Selangor, Malaysia.
11.0 MECHANICAL & ELECTRICAL11.2 ELECTRICAL SYSTEM
11.2.4 SWITCH PLACEMENT
ITEM NO. SPECIFICATION UNIT PRICE(PER UNIT)
SUPPLIER
5Location: Living hall, Bedroom 1, Bedroom 2
Schneider C-Vivace Wall switches 3-Gang 1 way 3 RM 9.50
Schneider Electric Industries (M) Sdn Bhd
Level 18, Tower B, Plaza 33, No 1, Jalan Kemajuan, Seksyen 13, 46200 Petaling
Jaya,Selangor, Malaysia.
6Location: Bathroom 1, Bathroom 2, Bathroom 3, Bathroom 4
Schneider C-Vivace Wall switches 1 Gang with Neon 4 RM 8.00
Schneider Electric Industries (M) Sdn Bhd
Level 18, Tower B, Plaza 33, No 1, Jalan Kemajuan, Seksyen 13, 46200 Petaling
Jaya,Selangor, Malaysia.
11.0 MECHANICAL & ELECTRICAL11.2 ELECTRICAL SYSTEM
11.2.4 SWITCH PLACEMENT
11.0 MECHANICAL & ELECTRICAL11.2 ELECTRICAL SYSTEM
ELECTRICAL LAYOUT GROUND
FLOOR PLANNTS
ELECTRICAL LAYOUT FIRST FLOOR PLAN
NTS
ELECTRICAL LAYOUT SECOND
FLOOR PLANNTS
11.2.5 MECHANICAL VENTILATION PLACEMENT
ITEM NO. SPECIFICATION UNIT PRICE(PER UNIT)
SUPPLIER
1 Location: Bedroom 1, Bedroom 2, Bedroom 3
York Cooling King L-Series Air Conditioner• Host Power: 1.0• Power Input Cooling: 980W• Total current: 4.38A• Setting Temperature Range: 17℃ - 30℃• Indoor Unit (mm): 288 x 800 x 206• Outdoor Unit (mm): 495 x 600 x 245• Unit weight (indoor): 9kg• Unit weight (outdoor): 25kg• Years of warranty: 5
3 RM 1300.00
DAIKIN Air Conditioning (M) Sdn
Bhd
Lot, 9, Jalan 13/6, Seksyen 13, 46200
Petaling Jaya, Selangor, Malaysia
2
Location: Living hall, Dining hall, :Bedroom 1, Bedroom 2
KDK K12V0 Ceiling Fan• Net Weight: 4.93 kg• Power: 60W• Noise Level: <58dB• Span: 1200mm diameter
4 RM 149.00
KDK Fans (M) Sdn Bhd
15, Jalan Tandang 204a, Seksyen 51,
46050 Petaling Jaya, Selangor, Malaysia
11.0 MECHANICAL & ELECTRICAL11.2 ELECTRICAL SYSTEM
11.2.5 MECHANICAL VENTILATION PLACEMENT
BATHROOM (GROUND FLOOR)with squatting WC
BATHROOM (FIRST FLOOR)with sitting WC pan
11.3 EXISITNG WATER SUPPLY SYSTEM11.0 MECHANICAL &
ELECTRICAL
11.0 MECHANICAL & ELECTRICAL11.4 PROPOSED WATER SUPPLY SYSTEM
WATER SUPPLY LAYOUT GROUND
FLOOR PLANNTS
WATER SUPPLY LAYOUT FIRST FLOOR PLAN
NTS
WATER SUPPLY LAYOUT SECOND
FLOOR PLANNTS
WATER SUPPLY SCHEMATIC DIAGRAM
11.0 MECHANICAL & ELECTRICAL11.4 PROPOSED WATER SUPPLY SYSTEM
ITEM NO. SPECIFICATION UNIT PRICE(PER UNIT)
SUPPLIER
1
Location: Bathroom 1, Bathroom 2, Bathroom 3
alpHa Evo Series Water Heater• Dimensions: 230mm(W) x360mm(L) x
87.80mm(H)• Weight: 1.4kg• Minimum Floor Rate: 3 liter/minute• Minimum Pressure: 20 kPa (0.2 bar/2.9
psi)• Maximum Pressure: 0.38 MPa (3.8 bar/55
psi)
4 RM300.00
Alpha Electric Co Sdn Bhd
6, Jalan Sungai Kayu Ara 32/37, Berjaya Park, Section 32,
40460 Shah Alam, Selangor, Malaysia
2
Location: Balcony
Formosa HR150 Vertical Round Bottom Stainless Steel Water Tank • Material: Stainless steel• Capacity: 1500L/300 gallons 1 RM 450.00
Maxim Bath & Kitchen Gallery Sdn
Bhd
52G, Jalan OP 1/5,One Puchong
Business Park,47610 Puchong
3
Location: Balcony
Peripheral vortex water pump 0.5HP• Power : 375W/ 0.5 HP• Inlet & Outlet Size: 1″x1″ (25mm)• Water Flow : 5-36Litre/min • Max. Head : 36m• Max Suction : 9 meters• Weight : 5.5kg
1 RM 135.00
Iklim Hardware & Machinery Sdn Bhd
No. 23, Jalan 8/91Taman Shamelin
Perkasa56100 Kuala Lumpur
Malaysia
11.0 MECHANICAL & ELECTRICAL11.4 PROPOSED WATER SUPPLY SYSTEM
12.0 COSTING
12.0 COSTING12.1 PREPARE LAND PRICE
NAME SS 19 Subang JayaTYPE ResidentialAVERAGE FOR SALE PRICE (psf)RM 579 September 2015
+ RM 62.70 ( 12.1%)
RM 516 August 2015RM 531 July 2015RM 546 June 2015RM 494 May 2015
For this project, the total built-up area is 1643.17 square feet. By refering to the average land sale price, RM 579 per square feet;
1643.17 sqft X RM 579/sqft = RM 951, 395.40
12.0 COSTING12.1 PREPARE LAND
PRICE
NAME SS 19 Subang JayaTYPE ResidentialAVERAGE FOR SALE PRICE (psf)RM 579 September 2015
+ RM 62.70 ( 12.1%)
RM 516 August 2015RM 531 July 2015RM 546 June 2015RM 494 May 2015
For this project, the total built-up area is 1643.17 square feet. By refering to the average land sale price, RM 579 per square feet;
1643.17 sqft X RM 579/sqft = RM 951, 395.40
12.0 COSTING12.2 CONSTRUCTION COSTING
12.0 COSTING12.2 CONSTRUCTION COSTING
12.0 COSTING12.2 CONSTRUCTION COSTING
12.0 COSTING12.2 CONSTRUCTION COSTING
12.0 COSTING12.2 CONSTRUCTION COSTING
12.0 COSTING12.2 CONSTRUCTION COSTING
12.0 COSTING12.2 CONSTRUCTION COSTING
12.0 COSTING12.2 CONSTRUCTION COSTING
12.0 COSTING12.2 CONSTRUCTION COSTING
12.0 COSTING12.2 CONSTRUCTION COSTING
12.0 COSTING12.2 CONSTRUCTION COSTING
12.0 COSTING12.2 CONSTRUCTION COSTING
12.0 COSTING12.2 CONSTRUCTION COSTING
12.0 COSTING12.2 CONSTRUCTION COSTING
12.0 COSTING12.2 CONSTRUCTION COSTING
12.0 COSTING12.2 CONSTRUCTION COSTING
12.0 COSTING12.2 CONSTRUCTION COSTING
12.0 COSTING12.2 CONSTRUCTION COSTING
12.0 COSTING12.3 CONSTRUCTION COSTING SUMMARY
12.0 COSTING12.4 PIE CHART SUMMARY (WITHOUT LOOSE
FURNITURES)
7%
10%1%
14%
2%
2%
3%
7%1%7%
18%
11%
5%5% 2%
5%
PRELIMINARIES DEMOLITION WORKSSTRUCTURAL PARTITION, WALL AND WALL FIN-
ISHESCEILING WORKS FLOOR AND FLOOR FINISHESSTAIRCASE ROOF WORK AND FINISHESGUTTERS DOORS AND IRONMONGERYWINDOWS M&E WORKSPLUMBING WORKS BUILT IN FURNITURESLANDSCAPE WORKS CONTINGENCY SUM
12.0 COSTING12.5 OPTIONAL COSTING
12.0 COSTING12.5 OPTIONAL COSTING
12.0 COSTING12.5 OPTIONAL COSTING
12.0 COSTING12.5 OPTIONAL COSTING
12.0 COSTING12.6 OPTIONAL COSTING SUMMARY
12.0 COSTING12.7 PIE CHART SUMMARY (WITH LOOSE
FURNITURES)
6%9%
1%
12%2%2%
3%6%
1%6%15%
9%
4%4%
1%
4%
15%PRELIMINARIES DEMOLITION WORKSSTRUCTURAL PARTITION, WALL AND WALL FIN-
ISHESCEILING WORKS FLOOR AND FLOOR FINISHESSTAIRCASE ROOF WORK AND FINISHESGUTTERS DOORS AND IRONMONGERYWINDOWS M&E WORKSPLUMBING WORKS BUILT IN FURNITURESLANDSCAPE WORKS CONTINGENCY SUMLOOSE FURNITURES
12.0 COSTING12.8 EXPENSES AND INCOME
CURRENT ASKING PRICE RM 420,000 ( RM 543 psf )
CURRENT RENTAL RM 1,000 / month
CURRENT YIELD 2.85 %
CURRENT BUILT-UP (sf) 773
CURRENT FURNISHING Semi-Furnished
CURRENT LAYOUT 2 bedroom, 2 bathroom
PROPOSED ASKING PRICE RM 542,840.60 ( RM 330 psf)
PROPOSED RENTAL (without loose furniture )
RM 1,800 / month
PROPOSED RENTAL ( with loose furniture )
RM 2250 / month
PROPOSED YIELD 3.9%
PROPOSED BUILT-UP (sf) 1643.17
PROPOSED FURNISHING Semi-Furnished
PROPOSED LAYOUT 3 bedroom, 4 bathroom
PROPOSED BEDROOM 1 RENTAL
RM 650
PROPOSED BEDROOM 2 RENTAL
RM 500
PROPOSED BEDROOM 3 RENTAL
RM 650
BREAK EVEN POINT
1. Without loose furnitureRM 99,306 / RM 1800 = 4.5 years
2. With loose furnitureRM 114, 225 / RM 2250 = 4.2 years
Proposed Rental Without Loose Furniture
PROPOSED BEDROOM 1 RENTAL
RM 800
PROPOSED BEDROOM 2 RENTAL
RM 650
PROPOSED BEDROOM 3 RENTAL
RM 800
Proposed Rental With Loose Furniture
In conclusion, it would be best for the client to rent out the house at RM 2250 ( inclusive of loose furniture ) because the return would be faster as compared to the rental without loose furniture. This however means that the budget would have to be increased to RM 115, 000 which is RM 15 000 more than the original budget.
13.0 APPENDIX
13.0 APPENDIX13.1 CCM MINUTES
13.0 APPENDIX13.2 REFERENCES
14.0 REFERENCE LIST
14.0 REFERENCE LIST
Alibaba.com. (n.d.). Hollow polycarbonate roofing sheet,clear plastic roofing panels 16mm triple wall polycarbonate hollow sheet, View Hollow polycarbonate roofing sheet, BEIER SOLA Product Details from Yuyao Jiasida Sun Sheet Co., Ltd. on Alibaba.com. Retrieved
from http://jiasida.en.alibaba.com/product/ Akzo Nobel Paints (Malaysia) Sdn Bhd. (n.d.). Interior and Exterior colour
(Dulux). Retrieved from https://www.dulux.com.my/en Malaysia Property and Real Estate Investment | Propwall. (n.d.). Retrieved
September 28, 2015 from http://www.propwall.my/ Furniture Online Sale Malaysia | MF DESIGN - MALAYSIAN FAVOURITE DESIGN.
(n.d.). Retrieved September 8, 2015. How to Create a Gantt Chart in Excel. (2013, July 8). Retrieved September 29, 2015 from https:// www.smartsheet.com/blog/gantt-chart-excel Kinsteel.com.my,. Kinsteel Bhd. Retrieved 6 September 2015, from
http://www.kinsteel.com.my/products_services/our_products.php Mikyotech Sdn. Bhd.,. Strength groupings of timber & its applications. Retrieved
20 September 2015, from http://www.mikyotech.com/resources.html
Malaysia Online Electrical Appliances Mall - Senheng. (n.d.). Retrieved October 2, 2015.
Malaysia Property and Real Estate for Sale and Rent. (n.d.). Retrieved September 29, 2015 from
http://www.iproperty.com.my/ Paling.com.my,. Paling - Building. Retrieved 13 September 2015, from
http://www.paling.com.my/building/ Starken.com.my,. Starken | Standard Blocks. Retrieved 27 August 2015, from
http://www.starken.com.my/standard-blocks/ The 2015 IKEA Catalogue – where the everyday begins and ends - IKEA. (n.d.).
Retrieved September 4, 2015.
Thunghing.com.my,. Thung Hing Group | PU Foam Metal | Roofing Panel. Retrieved 29 August 2015, from http://www.thunghing.com.my/th-pu-foam-metal.php