PROJECT MANAGEMENT
Chu Eu Ho
Dept. of Civil and Environmental Engineering
Massachusetts Institute of Technology
![Page 2: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/2.jpg)
Some Observations from Chase an Engineer Reports
What a Project Manager is most concerned with:-
Financial Issues
a. Engineering Designb. Construction Schedulingc. Control of Revenue Flow
“Engineers don’t make good financial decisions”
![Page 3: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/3.jpg)
“Scheduling is very important”
“The faster you finish, the more you save on fixed costs and interests”
Fixed Costs
- Salary
- Overheads : Property
Office Rental
Equipment
Utilities
Variable Costs
- Bank Loans
- Professional Liability Insurance
- Performance Bond
- Payment Bond
![Page 4: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/4.jpg)
Basement ConstructionInstrumentation
Slurry wall installation
Jet grouting
Foundation installation
King posts and decking erection
Excavation
Strut installation + preloading
Excavation
Strut installation + preloading
Cutting off pileheads
Casting Pilecaps
Casting base slab
Casting columns + intermediate floor slabs
Casting columns + intermediate floor slabs
Casting ground floor slab
![Page 5: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/5.jpg)
NETWORK SCHEDULING
Activity NetworkA graphical representation describing connections between all activities in a project
Activity Path
A continuous string of activities within the network from beginning to end
Critical Path
The activity path with the longest duration, in which any delay of one activity causes a similar delay to the entire project completion
![Page 6: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/6.jpg)
ACTIVITY RELATIONSHIPS
Finish-Start FS = Activity j may start units of
time after finishing activity i
Normal FS = 0 Activity j may start immediately
after finishing activity i
Start-Start SS = Activity j may start units of
time after starting activity i
Finish-Finish FF = Activity j may finish units of
time after finishing activity i
![Page 7: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/7.jpg)
TIME TO START/FINISHActivity Duration di The estimated duration of each activity
Earliest Start ESi The earliest time that activity i may start
Earliest Finish EFi The earliest time that activity i may finish
EFi = ESi + di
Latest Start ESi The latest time that activity i may start
Latest Finish EFi The latest time that activity i may finish
LSi = LFi - di
![Page 8: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/8.jpg)
FLOAT TIME
Total Float TFi The total time that activity i may be
postponed without delaying project
completion
TFi = LSi - ESi or LFi - EFi
Free Float FFi The maximum time that activity i may
be postponed without delaying the
earliest start (ESj) or earliest finish
(EFj) of any following activity j
![Page 9: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/9.jpg)
ACTIVITY SYMBOLS
Activity i Activity j
ESi EFi ESj EFj
di dj
LSi LFi LSj LFj
TFi CODEi FFi TFj CODEj FFj
Type of Relationship
( FS, SS or FF)
![Page 10: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/10.jpg)
8 STEPS FOR NETWORK ANALYSIS1. List all the activities
2. Assign duration for each activity
3. Set up Network Diagram
4. Carry out Forward Calculations for ES
and EF
5. Determine Project Completion Time
6. Carry out Backward Calculations for LS
and LF
7. Determine Float available TF and FF
8. Identify Critical Path(s)
![Page 11: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/11.jpg)
Schedule computation
Earliest Start (ESj) and Earliest Finish
(EFj) of the subsequent activity j
1. Calculate all possible ES times for activity j:-
FS relationship, ESj = EFi +
SS relationship, ESj = ESi +
FF relationship, ESj = {EFi + } - dj
2. Select the latest time for ESj
3. Calculate EFj = ESj + dj
![Page 12: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/12.jpg)
Latest Start (LSi) and Latest Finish (LFi)
of the previous activity i
1. Calculate all possible LF times for activity i:-
FS relationship, LFi = LSj -
SS relationship, LFi = {LSj - } + di
FF relationship, LFi = LFj -
2. Select the earliest time for LFi
3. Calculate LSi = LFi - di
![Page 13: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/13.jpg)
CALCULATIONS FOR FLOAT
TOTAL FLOAT
1. Need to know ES, EF, LS and LF for
activity i
2. Calculate TF for activity i
TFi = {LSi– ESi } or {LFi - EFi}
![Page 14: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/14.jpg)
FREE FLOAT
1. Calculate all possible FF between
activity i and j:-
FS relationship, FFi = {ESj - EFi} -
SS relationship, FFi = {ESj - ESi} -
FF relationship, FFi = {EFj - EFi} -
2. Select the smallest time gap for FFi
![Page 15: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/15.jpg)
Network Scheduling
Example Analysis
![Page 16: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/16.jpg)
Set up Network Diagram
FS = 2 FS = 0 5 1
FS = 03 8 H K
FS = 0 FS = 0B D FS = 0
0 2 4 FS = 00 FF = 3 FF = 4 FS = 00 A FS = (-2) G OPEN
FS = 0 5 FS = 0 8FS = (-3) FS = 0
C E 12 FF = 2
SS = 2 J5
FS = 0F
FF = 1
2
I
P1
![Page 17: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/17.jpg)
Carry out Forward Computation for Earliest Start and Earliest Finish
FS = 2 FS = 0 5 1
FS = 02 3 5 5 8 H K
FS = 0 FS = 0B D FS = 0
0 2 2 4 FS = 00 FF = 3 FF = 4 FS = 00 A FS = (-2) G OPEN
FS = 0 5 FS = 0 8FS = (-3) FS = 0
C E 12 FF = 2
SS = 2 J5
FS = 0F
FF = 1
2
I
P2
![Page 18: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/18.jpg)
Carry out Forward Computation for Earliest Start and Earliest Finish
FS = 2 FS = 0 5 1
FS = 02 3 5 5 8 H K
FS = 0 FS = 0B D FS = 0
0 2 2 4 FS = 00 FF = 3 FF = 4 FS = 00 A FS = (-2) G OPEN
FS = 0 3 5 8 FS = 0 8FS = (-3) FS = 0
C E 12 FF = 2
SS = 2 J5
FS = 0F
FF = 1
2
I
P3
![Page 19: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/19.jpg)
Carry out Forward Computation for Earliest Start and Earliest Finish
FS = 2 FS = 0 5 1
FS = 02 3 5 5 8 13 H K
FS = 0 FS = 0B D FS = 0
0 2 2 4 FS = 00 FF = 3 FF = 4 FS = 00 A FS = (-2) G OPEN
FS = 0 3 5 8 FS = 0 8 8 16FS = (-3) FS = 0
C E 12 FF = 2
SS = 2 J5
FS = 0F
FF = 1
2
I
P4
![Page 20: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/20.jpg)
Carry out Forward Computation for Earliest Start and Earliest Finish
FS = 2 FS = 0 16 5 21 23 1 24
FS = 02 3 5 5 8 13 H K
FS = 0 FS = 0B D FS = 0
0 2 2 4 FS = 00 FF = 3 FF = 4 FS = 00 A FS = (-2) G OPEN
FS = 0 3 5 8 FS = 0 8 8 16FS = (-3) FS = 0
C E 12 FF = 2
SS = 2 J5
FS = 0F
FF = 1
2
I
P5
![Page 21: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/21.jpg)
Carry out Forward Computation for Earliest Start and Earliest Finish
FS = 2 FS = 0 16 5 21 23 1 24
FS = 02 3 5 5 8 13 H K
FS = 0 FS = 0B D FS = 0
0 2 2 14 4 18 FS = 00 FF = 3 FF = 4 FS = 00 A FS = (-2) G OPEN
FS = 0 3 5 8 FS = 0 8 8 16FS = (-3) FS = 0
C E 13 12 25 FF = 2
SS = 2 J5
FS = 0F
FF = 1
2
I
P6
![Page 22: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/22.jpg)
Carry out Forward Computation for Earliest Start and Earliest Finish
FS = 2 FS = 0 16 5 21 23 1 24
FS = 02 3 5 5 8 13 H K
FS = 0 FS = 0B D FS = 0
0 2 2 14 4 18 FS = 00 FF = 3 FF = 4 FS = 00 A FS = (-2) G OPEN
FS = 0 3 5 8 FS = 0 8 8 16FS = (-3) FS = 0
C E 13 12 25 FF = 2
SS = 2 J13 5 18
FS = 0F
FF = 1
2
I
P7
![Page 23: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/23.jpg)
Carry out Forward Computation for Earliest Start and Earliest Finish
FS = 2 FS = 0 16 5 21 23 1 24
FS = 02 3 5 5 8 13 H K
FS = 0 FS = 0B D FS = 0
0 2 2 14 4 18 FS = 00 FF = 3 FF = 4 FS = 00 A FS = (-2) G OPEN
FS = 0 3 5 8 FS = 0 8 8 16FS = (-3) FS = 0
C E 13 12 25 FF = 2
SS = 2 J13 5 18
FS = 0F
FF = 1
17 2 19
I
P8
![Page 24: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/24.jpg)
Carry out Forward Computation for Earliest Start and Earliest Finish
FS = 2 FS = 0 16 5 21 23 1 24
FS = 02 3 5 5 8 13 H K
FS = 0 FS = 0B D FS = 0
0 2 2 14 4 18 FS = 0 25 250 FF = 3 FF = 4 FS = 00 A FS = (-2) G OPEN
FS = 0 3 5 8 FS = 0 8 8 16FS = (-3) FS = 0
C E 13 12 25 FF = 2
SS = 2 J13 5 18
FS = 0F
FF = 1
17 2 19
I
P9
![Page 25: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/25.jpg)
Carry out Backward Computation for Latest Start and Latest Finish
FS = 2 FS = 0 16 5 21 23 1 24
FS = 0 252 3 5 5 8 13 H K
FS = 0 FS = 0B D FS = 0
0 2 2 14 4 18 FS = 0 25 250 FF = 3 FF = 4 FS = 0 25 25 250 A FS = (-2) G OPEN
FS = 0 3 5 8 FS = 0 8 8 16FS = (-3) FS = 0
C E 13 12 25 FF = 2 25
SS = 2 J13 5 18
FS = 0F
FF = 1
17 2 1925
I
P10
![Page 26: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/26.jpg)
Carry out Backward Computation for Latest Start and Latest Finish
FS = 2 FS = 0 16 5 21 23 1 24
FS = 0 24 252 3 5 5 8 13 H K
FS = 0 FS = 0B D FS = 0
0 2 2 14 4 18 FS = 0 25 250 FF = 3 FF = 4 FS = 0 21 25 25 250 A FS = (-2) G OPEN
FS = 0 3 5 8 FS = 0 8 8 16FS = (-3) FS = 0
C E 13 12 25 FF = 2 13 25
SS = 2 J13 5 18
FS = 0F
FF = 1
17 2 1923 25
I
P11
![Page 27: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/27.jpg)
Carry out Backward Computation for Latest Start and Latest Finish
FS = 2 FS = 0 16 5 21 23 1 24
FS = 0 17 22 24 252 3 5 5 8 13 H K
FS = 0 FS = 0B D FS = 0
0 2 2 14 4 18 FS = 0 25 250 FF = 3 FF = 4 FS = 0 21 25 25 250 A FS = (-2) G OPEN
FS = 0 3 5 8 FS = 0 8 8 16FS = (-3) FS = 0
C E 13 12 25 FF = 2 13 25
SS = 2 J13 5 1819 24 FS = 0
FFF = 1
17 2 1923 25
I
P12
![Page 28: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/28.jpg)
Carry out Backward Computation for Latest Start and Latest Finish
FS = 2 FS = 0 16 5 21 23 1 24
FS = 0 17 22 24 252 3 5 5 8 13 H K
FS = 0 9 17 FS = 0B D FS = 0
0 2 2 14 4 18 FS = 0 25 250 FF = 3 FF = 4 FS = 0 21 25 25 250 A FS = (-2) G OPEN
FS = 0 3 5 8 FS = 0 8 8 168 16 FS = (-3) FS = 0
C E 13 12 25 FF = 2 13 25
SS = 2 J13 5 1819 24 FS = 0
FFF = 1
17 2 1923 25
I
P13
![Page 29: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/29.jpg)
Carry out Backward Computation for Latest Start and Latest Finish
FS = 2 FS = 0 16 5 21 23 1 24
FS = 0 17 22 24 252 3 5 5 8 13 H K
FS = 0 9 17 FS = 0B D FS = 0
0 2 2 14 4 18 FS = 0 25 250 FF = 3 FF = 4 FS = 0 21 25 25 250 A FS = (-2) G OPEN
FS = 0 3 5 8 FS = 0 8 8 163 8 8 16 FS = (-3) FS = 0
C E 13 12 25 FF = 2 13 25
SS = 2 J13 5 1819 24 FS = 0
FFF = 1
17 2 1923 25
I
P14
![Page 30: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/30.jpg)
Carry out Backward Computation for Latest Start and Latest Finish
FS = 2 FS = 0 16 5 21 23 1 24
FS = 0 17 22 24 252 3 5 5 8 13 H K
FS = 0 2 5 9 17 FS = 0B D FS = 0
0 2 2 14 4 18 FS = 0 25 250 FF = 3 FF = 4 FS = 0 21 25 25 250 A FS = (-2) G OPEN
FS = 0 3 5 8 FS = 0 8 8 163 8 8 16 FS = (-3) FS = 0
C E 13 12 25 FF = 2 13 25
SS = 2 J13 5 1819 24 FS = 0
FFF = 1
12 2 1923 25
I
P15
![Page 31: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/31.jpg)
Carry out Backward Computation for Latest Start and Latest Finish
FS = 2 FS = 0 16 5 21 23 1 24
FS = 0 17 22 24 252 3 5 5 8 13 H K
FS = 0 2 5 9 17 FS = 0B D FS = 0
0 2 2 14 4 18 FS = 0 25 250 2 FF = 3 FF = 4 FS = 0 21 25 25 250 A FS = (-2) G OPEN
FS = 0 3 5 8 FS = 0 8 8 163 8 8 16 FS = (-3) FS = 0
C E 13 12 25 FF = 2 13 25
SS = 2 J13 5 1819 24 FS = 0
FFF = 1
12 2 1923 25
I
P16
![Page 32: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/32.jpg)
Calculating Total Float
FS = 2 FS = 0 16 5 21 23 1 24
FS = 0 17 22 24 252 3 5 5 8 13 1 H 1 K
FS = 0 2 5 9 17 FS = 00 B 4 D FS = 0
0 2 2 14 4 18 FS = 0 25 250 2 FF = 3 FF = 4 FS = 0 21 25 25 250 A FS = (-2) 7 G 0 OPEN
FS = 0 3 5 8 FS = 0 8 8 163 8 8 16 FS = (-3) FS = 00 C 0 E 13 12 25
FF = 2 13 25SS = 2 0 J
13 5 1819 24 FS = 06 F
FF = 1
17 2 1923 256 I
P17
![Page 33: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/33.jpg)
Calculating Free Float
FS = 2 FS = 0 16 5 21 23 1 24
FS = 0 17 22 24 252 3 5 5 8 13 1 H 0 1 K 1
FS = 0 2 5 9 17 FS = 00 B 0 4 D 1 FS = 0
0 2 2 14 4 18 FS = 0 25 250 2 FF = 3 FF = 4 FS = 0 21 25 25 250 A 0 FS = (-2) 7 G 7 0 OPEN 0
FS = 0 3 5 8 FS = 0 8 8 163 8 8 16 FS = (-3) FS = 00 C 0 0 E 0 13 12 25
FF = 2 13 25SS = 2 0 J 0
13 5 1819 24 FS = 06 F 0
FF = 1
17 2 1923 256 I 6
P18
![Page 34: PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.](https://reader036.fdocuments.net/reader036/viewer/2022062618/5515023755034693478b65bc/html5/thumbnails/34.jpg)
Identify Critical Path
FS = 2 FS = 0 16 5 21 23 1 24
FS = 0 17 22 24 252 3 5 5 8 13 1 H 0 1 K 1
FS = 0 2 5 9 17 FS = 00 B 0 4 D 1 FS = 0
0 2 2 14 4 18 FS = 0 25 250 2 FF = 3 FF = 4 FS = 0 21 25 25 250 A 0 FS = (-2) 7 G 7 0 OPEN 0
FS = 0 3 5 8 FS = 0 8 8 163 8 8 16 FS = (-3) FS = 00 C 0 0 E 0 13 12 25
FF = 2 13 25SS = 2 0 J 0
13 5 1819 24 FS = 06 F 0
FF = 1
17 2 1923 256 I 6
P19 Critical Path A-B-C-E-J