Project Long TomOTTR
TeamAnnette Collins
Tom Kinnear
Jeff Scott
AdvisorDr. Aziz Inan
Dr. Peter Osterberg
Industry RepresentativeMr. Mike Desmith
IntelFebruary, 2006University of Portland School of Engineering
![Page 2: Project Long Tom OTTR](https://reader035.fdocuments.net/reader035/viewer/2022062423/568145b1550346895db2b311/html5/thumbnails/2.jpg)
Overview
• Milestones
• Scorecard
• Prototype
• Plans
• Issues/Concerns
• Conclusions
February, 2006University of Portland School of Engineering
![Page 3: Project Long Tom OTTR](https://reader035.fdocuments.net/reader035/viewer/2022062423/568145b1550346895db2b311/html5/thumbnails/3.jpg)
Milestones
Number
Description Original 11/6/05
Previous 1/30/05
Present 2/30/06
1 Project Approval 9/13/05 9/13/05 9/13/05
2 Plan Approval 10/28/05 10/28/05 11/6/05
3 MOSIS Due 11/23/05 11/23/05 11/23/05
4 Design Release 12/9/05 12/9/05 12/9/05
5 Hardware Design Complete (All) 12/16/05 12/16/05 12/16/05
6 TOP Approval 2/24/06 2/24/06 2/24/06
7 Software Design Complete 3/3/05 3/3/05 3/3/05
8 Macro model Complete 3/10/05 3/10/05 3/10/05
9 Prototype Release 4/7/06 4/7/06 4/7/06
10 Founder’s Day 4/11/06 4/11/06 4/11/06
11 Final Report 4/21/06 4/21/06 4/21/06
February, 2006University of Portland School of Engineering
![Page 4: Project Long Tom OTTR](https://reader035.fdocuments.net/reader035/viewer/2022062423/568145b1550346895db2b311/html5/thumbnails/4.jpg)
Scorecard
ALL COMPLETED!!!• Wrote programming for CPLDs in ABEL• TOP Approved• Continued work on all programming
– Serial– Data logging
February, 2006University of Portland School of Engineering
![Page 5: Project Long Tom OTTR](https://reader035.fdocuments.net/reader035/viewer/2022062423/568145b1550346895db2b311/html5/thumbnails/5.jpg)
Additional Accomplishments
• Serial programming 95% complete
• Data logging programming 75% complete
• Sensors wired to connectors
• Solved heat problem on 5V regulator
February, 2006University of Portland School of Engineering
![Page 6: Project Long Tom OTTR](https://reader035.fdocuments.net/reader035/viewer/2022062423/568145b1550346895db2b311/html5/thumbnails/6.jpg)
7 Segment Displays
7 Segment Decoders
UART
CPLDs
Clock (4.8 KHz)
Clock (60 Hz)Sensor Voltage Regulator
+5V & +9V Voltage Regs
Heat Sync
![Page 7: Project Long Tom OTTR](https://reader035.fdocuments.net/reader035/viewer/2022062423/568145b1550346895db2b311/html5/thumbnails/7.jpg)
Plans for March
• Put ABEL programming onto CPLDs
• Complete serial programming
• Complete data logging programming
• Buy a new sensor – one broke
• Make data cable to connect bread boards
• FINISH PROJECT BEFORE
SPRING BREAK!!!
January, 2006University of Portland School of Engineering
![Page 8: Project Long Tom OTTR](https://reader035.fdocuments.net/reader035/viewer/2022062423/568145b1550346895db2b311/html5/thumbnails/8.jpg)
Concerns/Issues
• None
January, 2006University of Portland School of Engineering
OTTR’s new snake skin boots and hat provided by Team Snake!!
![Page 9: Project Long Tom OTTR](https://reader035.fdocuments.net/reader035/viewer/2022062423/568145b1550346895db2b311/html5/thumbnails/9.jpg)
Conclusions
• Completed all tasks planned for February
• +90% of project completed
January, 2006University of Portland School of Engineering