Project

H2Go

Houston, TX

Tyler Gentry – Fall09

(REVISION2)

Page 2: Project H 2 G o Houston, TX T yler G entry – F all 09 (REVISION2)

Analysis• In order to make a calculation of water tank capacity requirements for the micro area

of study, we will look directly at the Buffalo Bayou.• The drainage area of the Buffalo Bayou is 103 square miles. • The population in that drainage area is over 410,000.• The open stream is 116 miles.• During Hurricane Allison, a gauge on the Buffalo Bayou read 23.54 inches of water in 5

days, 14.45 inches of that were in 2 days. • If the entire area of the Buffalo Bayou’s drainage system received 7.3 inches of rain in a

day, that would amount to:• 1 sq. mile = (5280x5280) or 27,878,400 s.f.• 7.3” = .6083333 of 1 foot• This equates to (.6083333x27,878,400/.6083333) 16,959,360 cubic ft. of water per

mile.• This is (1 US Gal = .133680556 cubic ft.) or 126,865,350 Gallons per mile.• The total gallons in the Buffalo Bayou Drainage system through the day would then be

(126,865,350x103) or 13,067,131,059 Gallons in a 24 hour period.

Page 3: Project H 2 G o Houston, TX T yler G entry – F all 09 (REVISION2)

Images of Process

Page 4: Project H 2 G o Houston, TX T yler G entry – F all 09 (REVISION2)

Images of Process Cont’d

Page 5: Project H 2 G o Houston, TX T yler G entry – F all 09 (REVISION2)

Analysis Cont’d

• From these analysis images, we can assume that approximately 60% of the land in this area is impervious cover.

• If we assume that at least 60% of the total gallons per day must drain through the bayou, this is still (13,067,131,059 Gallons*60%) 7,840,278,635 gallons per day or 326,678,277 gallons per hour flowing into the buffalo bayou.

Page 6: Project H 2 G o Houston, TX T yler G entry – F all 09 (REVISION2)

• As seen in the above diagram, the flood areas along the Buffalo bayou are divided into 7 approximately equivalent areas for implementation flood control systems.• Each area’s tanks would need to be capable of containing 2,240,079,610 gallons.

Page 7: Project H 2 G o Houston, TX T yler G entry – F all 09 (REVISION2)

Size Requirements• 500,000 s.f. footprint• 2,240,079,610 gallons need to be removed /

contained to prevent the 2 day long 500 year flood as seen in Tropical Storm Allison

• 1 US Gal = .133680556 cubic ft.• We need to contain 299,454,962 cubic feet of water. • With this footprint, the

structure needs to be approximately 600’ feet tall.

Page 8: Project H 2 G o Houston, TX T yler G entry – F all 09 (REVISION2)

The Design H2Go

• The structure is a set of modules that use the center of each structural support column (10’ diameter) for either suction tentacles or electrical supply.

• The structure is to act as a gauge of the flooding throughout each region. • The levels are segmented so that if the water is flooding upstream, the

left hand side of the gauge / collection tank displays to the city that this is happening.

• If it downstream, we see the opposite. • Below is an example of flood waters coming in from upstream.

Page 9: Project H 2 G o Houston, TX T yler G entry – F all 09 (REVISION2)

Re-Calculation • The following analysis is in order to determine the amount of water the

natural bayou system can contain.• From numerous section studies, it is determined that the bayou has an

average collection of 22’ deep x 145’ wide along 116 miles (612,480 l.f.) can contain an additional 1,953,811,200 cubic feet of water through the natural system.

• This number can be divided by the (7) tanks along the bay, giving us a reduction of 279,115,886 cubic feet of required containment.

• The new required containment is 299,454,962 - 279,115,886 = 20,339,076 cubic feet of water at (7) locations along the Buffalo bayou.

Page 10: Project H 2 G o Houston, TX T yler G entry – F all 09 (REVISION2)

Precedents

Page 11: Project H 2 G o Houston, TX T yler G entry – F all 09 (REVISION2)

Critical Components - Redesign

• Pump• Tubes• Tank

Page 12: Project H 2 G o Houston, TX T yler G entry – F all 09 (REVISION2)

Tank Potential Base Shapes

Page 13: Project H 2 G o Houston, TX T yler G entry – F all 09 (REVISION2)

Critical Order

• The pump/vacuum must be above the tank.• The tank must be 50’ above ground at the

lowest point in order to have water pressure.• The tank requires columns.• The tentacles must come from the top as they

have to connect to the pump / vacuum.• The entire system must be modular.

Page 14: Project H 2 G o Houston, TX T yler G entry – F all 09 (REVISION2)

Resources

• http://www.vacuum-guide.com/images/nash_904-vacuum-pump.jpg

• http://www.allgreen.com.au/images/Water%20Tanks.jpg

• http://www.lamidesign.com/blog/imgs/tubing.jpg

• http://www.bchslahore.com/images/homes/Pleasant%20View%20Water%20Tank%20008.JPG

• http://www.timboucher.com/journal/wp-content/uploads/2007/05/liberty-dam-free-flow4.gif

• http://www.ucsusa.org/assets/images/ce/impoundment-final.jpg

• http://www.sciencebuddies.org/science-fair-projects/project_ideas/Math_img080a.jpg