    Project Estimate for Nagpal Dental Centre

    S.no Item Quantity Unit Cost/Unit Total Amount

    1 Tiling

    a Ofce Flooring 427 sq.t 50 21350

    b Toilet Flooring 23 sq.t 50 1150

    c Toilet Walls 183.33 sq.t 40 7333

    2 Painting 1108.92 sq.t 12 13307

    3 abinetr! 221 sq.t 150 331504 Pl"#bing Wor$ l"#% s"# 10000

    5 &%'olster! l"#% s"# 10000

    ( )isc. ar%entr! l"#% s"# 15000

    7 *+tension to *+a#ination 'a#ber

    a )asonr! l"#% s"# 7500

    b ,tone-or$ l"#% s"# 5000

    8 F"rnis'ing l"#% s"# 7500

    9 *lectricals an/ ig'ting 10000

    10 False eiling Wor$ 7500

    8 )isc. *+%enses 10 o ot'er costs 14879.0333333

    Total *sti#ate !"!!#."!!!$

  • 7/21/2019 Project Estimate

    2/4

    T*) &* O,T&6T

    Total Floor rea 450

    Toilet Floor rea 23

    Toilet Wall rea 183.33333

    Wall rea (58.91((7

    eiling rea 450abinetr! Front rea 221

  • 7/21/2019 Project Estimate

    3/4

    TOT )O&6T

  • 7/21/2019 Project Estimate

    4/4

    "ll all leng'ts 218 rea 418.91(7

    132

    3(

    71

    457

    in/o all lengt's 70 rea 240

    107

    17(

    127

    480

    toilet all lengt' 200 rea 183.3333

    Total eilingea (5141 rea 452.3(81

    cabinetr! all lengt 17(

    107

    29

    312