Project Estimate for Nagpal Dental Centre
S.no Item Quantity Unit Cost/Unit Total Amount
1 Tiling
a Ofce Flooring 427 sq.t 50 21350
b Toilet Flooring 23 sq.t 50 1150
c Toilet Walls 183.33 sq.t 40 7333
2 Painting 1108.92 sq.t 12 13307
3 abinetr! 221 sq.t 150 331504 Pl"#bing Wor$ l"#% s"# 10000
5 &%'olster! l"#% s"# 10000
( )isc. ar%entr! l"#% s"# 15000
7 *+tension to *+a#ination 'a#ber
a )asonr! l"#% s"# 7500
b ,tone-or$ l"#% s"# 5000
8 F"rnis'ing l"#% s"# 7500
9 *lectricals an/ ig'ting 10000
10 False eiling Wor$ 7500
8 )isc. *+%enses 10 o ot'er costs 14879.0333333
Total *sti#ate !"!!#."!!!$
-
7/21/2019 Project Estimate
2/4
T*) &* O,T&6T
Total Floor rea 450
Toilet Floor rea 23
Toilet Wall rea 183.33333
Wall rea (58.91((7
eiling rea 450abinetr! Front rea 221
-
7/21/2019 Project Estimate
3/4
TOT )O&6T
-
7/21/2019 Project Estimate
4/4
"ll all leng'ts 218 rea 418.91(7
132
3(
71
457
in/o all lengt's 70 rea 240
107
17(
127
480
toilet all lengt' 200 rea 183.3333
Total eilingea (5141 rea 452.3(81
cabinetr! all lengt 17(
107
29
312