Project Development – High Priority Segments
1/24/2011
Rumble StripE
Lane Width?
Rumble Strip
2 ft. shoulder paving* (up to 6 miles/year**)+ rumble stripE+ safety edge
Noise Sensitive Receiver
Paved Shoulder? PROJECT:
6” Wet Reflective in longitudinal groove
Note: All projects also include Chevrons and Paving 2’ inside shoulder in Critical Radius curves, except Gravel Roads
* Where regrading not required** After 6 miles/year of paving, wet
reflective longitudinal groove provided
NO YES
YES NO
>=12 feet <12 feet
PROJECT:
PROJECT:
PROJECT:
PROJECT:
6” Latex Edgeline
YES NO
ADT >200?
Road Surface?
Paved Gravel
Segment received Stars forSVROR Crash Density &
Critical Radius Curve Density
PROJECT:
Chevrons in Critical Radius Curves
YESNO
NO PROJECT
1
Directional Median+ Street Lights+ Upgraded Signs &
Markings
(Major ADT> 4,000 andMinor ADT> 500)
ANDRight Angle Crash?
Divided Roadway?
Roundabout
Upgraded Signs & Markings
Dynamic Mainline Warning+ Street Lights+ Upgraded Signs &
Markings
Street Lights Not InstalledAND
Minor ADT >200?
Street Lights+ Upgraded
Signs & Markings
CSAH ADT > TH ADTOR
Major ADT ≈ Minor ADT?
Street Lights+ All-Way Stop+ Upgraded Signs
& Markings
Multiple Severe Right AngleAND
Major>10,000 & Minor>4,000?
NO
YES
PROJECT:
YES NO
PROJECT: PROJECT:PROJECT:
PROJECT: PROJECT:
YESNO
YES NO
YESNO
2
Project Development – High Priority Rural Intersections
Road Surface?
All Legs Paved
Minor Legs Gravel
Note: On gravel approaches, install stop bar on paved apron
All Legs Gravel
Review for Sign Upgrade or Removal of Signs+Clear Sight Triangles
PROJECT:
1/24/2011
Project Development – High Priority Curves
Three ways for a Curve to receive a project
1/24/2011 3
High Priority Curvesand those in close proximity
Curves w/ Existing Chevrons
All Curves on Roadways*
High Priority Segments & Critical Curve Radius
PROJECT:Install/upgrade Chevrons+2’ Shoulder Paving+Rumble Strip
Note: Gravel roads were considered if the segment experienced a high frequency of severe curve-related crashes.