Project Details
Construction of Six Lane Bridge across Ulhas Creek,on Proposed Mankoli – Motagaon Road District Thane.
Information in From-APart- II
Filled up byThe Project Authority
The Executive Engineer,Engineering Division,
Mumbai Metropolitan RegionDevelopment Authority,Bandra – Kurla Complex,
Bandra (E), Mumbai.
APPENDIX(Sec Rule 6)
FORM – ‘A’
Form for seeking prior approval under section 2 of the proposals by the State Governmentsand other Authorities.
PART – 1(to the filled up by user agency)
1. Project Details1.0 Short narrative of the proposal
and project /scheme for whichforest land is acquired.
Proposal:Construction of six lame bridge across Ulhas creekhaving length 980 meter on proposed Mankoli Motagaonroad connecting kdmc municipal limit at Dombivali (w)to Surai village This missing link will connect KDMCmunicipal limit to Thane & Bhivandi municipal limit withshortest distance. constructing this bridge on Ulhas creekriver(east west) at motagaon (Dombivali) and mankoli(Bhivandi Taluka) will form connectivity to population ofthree municipal limits benefiting to about 60 lacs. People.Maharashtra Coastal Zone Management Authority(MCZMA) in 84th meeting of the Coastal ZoneManagement Authority held on 30th & 31stAugust2013.The Authority has recommended the proposal fromCRZ point of view to MOEF subjected to conditions of10 times replantation of mangroves falling in survey no 62in surai village which is shown as tickle land in 7/12extract.As Mangroves are seen on Govt. Land necessarypermission from forest deptt is being taken. Hence toidentify the exact number of mangroves affecting &transfer the above land through the forest departmentadmeasuring about Total Area: 0.58 Ha Of Tal.Bhivandi, Village- Surai: S.No. 62 Pt. 0.58 Ha.(less than 1Ha) is submitted .MMRDA has also applied for permission to carry outconstruction activity in Mangroves or its buffer Zone areaif any.
1.1 Map showing the requiredforest area, boundary ofadjoining forest area & itemwise breakup of forest arearequired for different purposes.
1) Index Map in 1:5000 scale is enclosed on Page No.2) Mangroves in alignment & bridge structure shown inVillage Map surai on mankoli side (Taluka Bhivandi) in1:5000 scale is enclosed on Page No.3) Geo-Digital Map in 1:5000 scale is enclosed on PageNo.4) Topo Sheet in 1:5000 scale is enclosed on Page No.5) KMZ File is enclosed
1.2 Cost of the project Total Cost of the bridge Project Rs. 190.00 Crores1.3 Justification for locating the
project in forest area.1. Approved D.P. Road in MMRDA area2. This is shortest link connecting Thane & Bhivandi
Municipal Limit to Thane by constructing bridge980m. length on Ulhas Creek connecting Surai &Motagaon Village & very few or smallest patchMangroves land on Surai side at present mankolivillage on thane & Bhivandi Bypass in 22 KMfrom Dombivali – Thane 18KM form Dombivali-Kalyan, Kalyan Bhivandi NH3 Mankoli Village.
1.4 Cost-benefit analysis (to beenclosed)
Not Applicable
1.5 Employment likely to begenerated
About 200 Man Per days for two years.
2.0 Purpose-wise break-up of thetotal land required
Total forest (Khanjan) land required = 0.58 Ha
Break up of forest land required1. Along existing road
Bhivandi : 0.58 HaTotal : 0.58 Ha
2. Refer Annex 3 for details on Page no.3.0 Details of displacement of
people due to the projectNil
3.1 Total Number of Families Nil3.2 Number of Scheduled Tribe
familiesNot Applicable
3.3 Rehabilitation Plan Not Applicable4.0 Whether clearance under
Environment (Protection) Act,1986 required.
Not Applicable
5.0 Undertaking to bear the cost ofraising and maintenance ofcompensatory Afforestation
Replantation Mangroves affected to project underguidance forest deptt. Will be done by MMRDACertificated.
6.0 Details of Certificates /documents enclosed asrequired under the instructions.
Required certificates and documents are providedseparately in respective section.Encolsed in proposal as per Index.
Date :- / /2014Place :-
(J.S. Chivhane)Executive Engineer
M.M.R.D.A.
State Serial No. of proposal ______________(To be filled up by the Nodal Officer with date of receipt)
PART-II
(To be filled by the concerned Deputy Conservator of Forests)State serial No. of proposal________________
Location of the project/Scheme:
i State/Union Territory MAHARASHTRA STATE
ii Forest Division Thane Forest Division, Thane
iii District Thane
iv Area of forest land proposed fordiversion (in ha.)
0.58 Ha of forest area at Surai Village, Bhivandi
v Legal status of forest The legal status of the land on which mangroveson said area and very fev Mangaon are disturbedis tickle land as per 7/12 extract having surveyno 62. As Mangroves are seen on Govt. Landnecessary permission from forest deptt is beingtaken.
vi Density of Vegetation Sparingly are seen.
vii Species-wise (scientific names) anddiameter class-wise enumeration oftrees (to be enclosed. In case ofirrigation / hydel projectsenumeration at FRL, FRL-2 meter &FRL-4 meter also to be enclosed.)
1. Mangroves along creek shore.10 time mangroves to be planted as perMaharashtra Coastal Zone ManagementAuthority (MCZMA) .
viii Brief note on vulnerability of theforest area to erosion
vulnerability of the forest area to erosion notseen
ix Approx. distance of proposed site fordiversion from boundary of forest
No Forest boundary is adjacent to the ProposedBridge site
X Whether forms part of National Park,wildlife sanctuary, biosphere reserve,tiger reserve, elephant corridor, etc.(If so, the details of the area andcomments of the Chief WildlifeWarden to be annexed).
No
xi Whether any rare/endangered/ uniquespecies of flora and fauna found inthe area if so detail thereof.
No
xii Whether any protected No necessary Certificate Attached by project
archaeological/heritage site/ defenseestablishment or any other importantmonument is located in the area. Ifso, the details thereof with NOC fromcompetent authority, if required
authority.
8 Whether the requirement of forestland as proposed by the user agencyin col. 2 of Part-I is unavoidable andbarest minimum for the project. If no,recommended area item-wise withdetails of alternatives examined
The legal status of the land on which mangroveson said area and very fev Mangaon are disturbedis tickle land as per 7/12 extract having surveyno 62. As Mangroves are seen on Govt. Landnecessary permission from forest deptt is beingtaken. The required area demanded for thepurpose of the project is the barest minimumrequirement & unavoidable.
9 Whether any work in violation of theAct has been carried out (Yes/No). Ifyes, details of the same includingperiod of work done, action taken onerring officials. Whether work inviolation is still in progress.
No
10 Details of compensatory afforestationscheme
A compensatory afforestation scheme isenclosed on Page No.
i Details of non forest area/degradedforest area identified forcompensatory afforestation, itsdistance from adjoining forest,number of patches, size of each patch
--
ii Map showing non-forest/degradedforest area identified forcompensatory afforestation andadjoining forest boundaries
Enclosed at page No.----
iii Details Compensatory afforestationscheme including species to beplanted, implementing agency, timeschedule, cost structure,etc.
Enclosed at page No.----
iv Total financial outlay for comp-ensatory afforestation scheme
Enclosed at page No.----
v Certificates from competent authorityregarding suitability of areaidentified for compensatoryafforestation and from managementpoint of view. (To be signed by theconcerned Deputy Conservator ofForests).
Not Applicable.
11 Site inspection report of the DCF (tobe enclosed) especially highlightingfacts asked in col. 7 (xi, xii), 8 and 9above.
Site Inspection format attached on pageNo. site inspection is to be done
12 Division/District profile: District – ThaneDivision – Thane Forest Division
i Geographical area of the district
ii Forest area of the district.
iii Total forest area diverted since 1980with number of cases in the Division
-
iv Total compensatory afforestationstipulated in the district/divisionsince 1980 on
a) forest land including penalcompensatory afforestation,
b) non-forest land
Refer Annex III for details on Page no.
v Progress of compensatoryafforestation as on 31/03/2013(a) forest land
(b) non-forest land.
Refer Annex III for details on Page no.
13 Specific recommendations of theDeputy Conservator of Forest foracceptance or otherwise of theproposal with reasons
Attached separately
Place :ThaneDate: / /2014
Deputy Conservator of Forest,Thane
PART – III
(To be filled up by the concerned Chief Conservator of Forests)
1. Whether site, where the forestlandinvolved is located has beeninspected by concerned ChiefConservator of Forests (Yes / No).If yes, the date of inspection andobservations made in form ofinspection note to be enclosed.
2. Whether the Chief Conservator ofForests agree with the informationgiven in Part-II and therecommendations of the DeputyConservator of Forests.
3. Specific recommendations of theconcerned Chief Conservator ofForests for acceptance orotherwise of the proposal withdetailed reasons.
Date :Place :
Chief Conservator of ForestsThane,
MAHARASHTRA
PART – IV
(To be filled up by the Nodal Officer or Principal Chief Conservator of Forests
or Head of Forest Departments)
Detailed opinion and specific recommendations
of the State Forest Department for acceptance or
otherwise of the proposal with detailed reasons.
( While giving opinion, the adverse comments made by concerned
Conservator of Forests or Deputy Conservator of Forests should be
categorically reviewed and critically commented upon)
Date :
Place :
Nmae & Designation
(Official Seal)
PART – V
(To be filled in by the Secretary in charge of the Forest Department or any
other authorized officer of the State Government not below the rank of Under
Secretary)
Recommendations of the State Government.
( Adverse comments made by any officer or authority in part-B or Part – C or
Part –D) above should be specifically communicated upon)
Date :Place :
Name & Designation
(Official Seal)
Project Note
1.0 GENERAL
1.1 With the growth of urban centre and the economic activities around
the focal points, the demand for inter-urban transportation has been
increasing steadily in India. To cope with this ever increasing demand
Mumbai Metropolitan Region have undertaken 6 lanning bridge
project in various phases for safe, economic and fast travel. Proposed
6 lanning Bridge is part of stages as explained above .
1.2 Six lane bridge across Ulhas creek having length 980 meter on
proposed Mankoli – Motagaon Road which forms existing Kalyan
Dombivali city.In short this will form acceses to south west side of
thane district Kalyan city.
The bridge proposal is cleared in the 134th Authority meeting of
MMRDA held on 27th June 2014 headed by Hon’ble Chief Minister
Maharashtra.
Maharashtra Coastal Zone Management Authority (MCZMA) in 84th
meeting of the Coastal Zone Management Authority held on 30th &
31stAugust 2013.The Authority has recommended the proposal from
CRZ point of view to MOEF subjected to conditions of 10 times
replantation of mangroves falling in survey no 62 in surai village
which is shown as tickle land in 7/12 extract. The legal status of the
land on which mangroves on said area and very few Mangroves are
disturbed is tickle land as per 7/12 extract having survey no 62. As
Mangroves are seen on Govt. Land necessary permission from forest
deptt is being taken.
2.0 DESIGN STANDARDS
2.1 The IRC standards for major design elements of the proposed road,
generally are being adopted as recommended by Consultants and
were accepted by the Mumbai Metropolitan Region Development
Authority
Bridge Alignment
The bridge alignment having length 980 meter is on approved DP is under
consideration under this proposal.
2.3 ROW/Land width
The proposed ROW/land width required is of 45 mtr.width and bridge
width is 28 mtr.
2.5 4 Lane Configuration
Based on the traffic survey, analysis consultant has recommened 6 lane
bridge.
2.6 Financial Details
The capital cost of the project 190.00Crores
Construction period 24 Months
Date :
Place :
(J.S. Chivhane)Executive Engineer
M.M.R.D.A.-
AREA STATEMENT
(J.S. Chivhane)Executive Engineer
M.M.R.D.A.Address (of user agency:)
Mumbai Metropolitan Region Development AuthorityBandra – Kurla Complex, Bandra (E), Mumbai
Construction of Six lane bridge across ulhas creek having length 980 meter on proposed Mankoli Motagaon road .Survey Number wise Four side Boundary Area Statement
Thane Forest Division
Sr.No.
Nmae ofVillage
Nameof
Division
Lagel Status Boundaries of Four StateSurvey/ GatNo.
Area inHa.
East West South North Remark
1 2 3 4 5 6 7 8 9 10
1.Surai Thane
62 Pt. 0.58Remaining Part ofSurvey No. 62 Pt.
Remaining Part ofSurvey No. 62 Pt.
Survey No. 59 Pt. Survey No. 56 Pt.
Total Forest Area (in Ha.) 0.58
Item-wise Breakup of the Land 1/2THANE FOREST DIVISION
(Under Forest Conservation Act, 1980)
Abstract of Item-wise Breakup of the LandAnnexure – III
( Details of area statement of Forest Land & Non-Forest Land Required)
Item of the workpurpose
Nameof
Village
Forest Land to be AcquiredLegal Statue
of Land
Details of Non Forest LandTotal Area
Ha.
Survey /Gat
ConpttNo.
Av Length xwidth
Area Survey /Gat
Length x widthArea inSq.Mtr.Sq.Mtr. Ha.
Construction ofSix lane bridgeacross ulhascreek havinglength 980 meteron proposedMankoliMotagaon road .
Surai 62 Pt. 129.45 x 45 5835.43 0.58 TickleLand 40 Pt. As shape of area
affected surveynos is norrectangle Exactarea of affectedsurvey nos inforest & nonforest land areworked fromvillage map byauto cad fromauto caddrawing.
2219.80 4.40
Total 0.58 38 Pt. 195.3344 Pt. 1263.7245 Pt. 5107.0046 Pt. 2352.7351 Pt. 1364.4052 Pt. 2232.8753 Pt. 1118.1154 Pt. 2010.1255 Pt. 227.2756 Pt. 2506.9258 Pt. 1880.3659 Pt. 635.00Creek 15150.00
Total 38263.63
As shape of area affected survey nos is nor rectangle Exact area of affected survey nos in forest & non forest land are worked from village map byauto cad from auto cad drawing.
(J.S. Chivhane)Executive Engineer
M.M.R.D.A.
Construction of Six lane bridge across ulhas creek having length 980 meter on proposed MankoliMotagaon road
Village wise Area
Thane Forest Division, Thane
Sr.No.
Name ofvillage
Taluka
FOREST AREA UNDER HA.TotalForestAreaHA.
NonForestAreaHA.
TotalAreaHA.
R.F.I.F.
Under Section 35(3)
RestoredUnder
Required
Areafinally
acquired1. Surai Bhivandi 0.58 0.58 3.82 4.40
(J.S. Chivhane)Deputy Conservator of Forest Executive Engineer
Thane Forest Division M.M.R.D.A.Thane
Necessary
documents
as per the Index
SiteInspection
Report
SITE INSPECTION REPORT
THANE FOREST DIVISION
(Under Forest Conservation Act,1980)
1. Name of the Proposal : Construction of Six lane bridge
across ulhas creek having length
980 meter on proposed Mankoli
Motagaon road.
2. Forest Area involved : 0.58 Ha.
3. Location
a. Division : Thane
b. Range : As Per List
c. Round : As Per List
d. Survey No./ Compt No. : As Per List
4. Date of Site Inspection : ……………………
5. Details of forest type and area
of existing crop with
botanical Name of specie
: ……………………
6. Details of fauna including
their population and
distribution in Game
sanctuary, National Park or
Reserve Forest.
: ……………………
7. Other aspects of importance
a. Historical/ Archaeological : ……………………
b. Geographical : ……………………
c. Religious : ……………………
d. Geological : ……………………
8. Remarks regarding sensitivity : ……………………
of the Area is affected due to
the project
9. Number of Photographs if
enclosed
:……………………
10. Whether any work in
violation of the Act has been
carried out
a. On non – forest land : ……………………
b. On forest land ……………………
((J.S. Chivhane)Executive Engineer Deputy Conservator of Forest
M.M.R.D.A. Thane Forest DivisionThane
NecessaryCertificates.Asperthe guideline issued bytlieChief Conservator
of Forests :Noda[Officer,:M.S.,:Nagpur's fetter:No.Desk..;17/:NC/CRJ/571,dated2ndJuly,2005
Required Certificates for the proposal, as per theguidelineissuedbytheChiefConservatorofForests&NodalOffic
er,M.S.,Nagpur'sletterNo.Desk-17/NC/RS/571,dated 2nd July, 2005.
REQUIRED CERTIFICATE FOR THE PROPOSAL
Documents verification certificate
Certified that all the documents enclosed here with the proposal have
been scrutinized as per the revised check list and found to be correct.
Deputy Conservator of ForestThane Forest Division
Thane
Chronology of Events.
Date From To No. & date.
Deputy Conservator of ForestThane Forest Division
Thane
Minimum Demand of Forest Area- Certificate ofProject Authority.
This is to certify that no suitable alternative Non-Forest Land is
available for the purpose for use of Forest Land to non-forest purpose i.e. for
construction of Roads required forest land is lowest minimum & unavoidable.
(J.S. Chivhane)Executive Engineer
M.M.R.D.A.
Certificate of about absences of alternative about the project.
This is to certify that no suitable alternative non-forest land is
available other than forest Gut No. Village- Surai : 62 Pt Tal. Bhivandi, Dist.
Thane and demand for the forest land is minimum & unavoidable.
Deputy Conservator of ForestThane Forest Division
Thane
Compensatory Afforestation Cost- Certificate of Project Authority.
This is to certify that the Project Authority is agreed to defray the cost
of compensatory afforestation as determined by the Forest Department.
(J.S. Chivhane)Executive Engineer
M.M.R.D.A.
No violation of forest (Conservation) Act, 1980 / Guide lines under it - Certificateof Project Authority.
It is state that the proposed work is not started yet. It will be started
only after the Government of India gives permission. However, no violation is
done of the Forest (Conservation) Act, 1980 or its guidelines.
(J.S. Chivhane)Executive Engineer
M.M.R.D.A.
Certificate of Forest Department violation / No violation of Forest (Conservation)
Act, 1980 - Certificate of Deputy Conservator of Forest Officer, Thane
It is state that the proposed work is not started yet. It will be started
only after the Government of India gives permission. However, no violation is
done of the Forest (Conservation) Act, 1980 or its guidelines
Deputy Conservator of ForestThane Forest Division
Thane
Compensatory Afforestation area suitability Certificate – By Deputy Conservatorof Forest Officer, Thane
proposed area is 0.58 ha.
AND
Certificate of identified Forest and Acquired Forest for compensatory afforestationarea - Deputy Conservator of Forest Officer, Thane certificate.
proposed area is 0.58 ha.
Deputy Conservator of ForestThane Forest Division
Thane
Identified Forest and Acquired forest certificate for Non-Forest area under theproject - Deputy Conservator of Forest Officer, Thane
Not applicable as the project includes only the reserved forest area of
forest Village- Surai : 62 Pt Tal. Bhivandi, dist. Thane not any privet land.
Deputy Conservator of ForestThane Forest Division
Thane
Archeological importance - Certificate by the Deputy Conservator of ForestOfficer, Thane
This is to certify that, Construction of Six lane bridge across ulhas
creek having length 980 meter on proposed Mankoli Motagaon road is not likely to
affect any monument site of cultural, historical, religious, archeological or
recreational importance.
Deputy Conservator of ForestThane Forest Division
Thane
WILD LIFE CERTIFICATE
(Certificate of Deputy Conservator of Forest)
This is certify that area Construction of Major Bridge on D.P Road (at
present missing link) Mankoli to motgaon road lies on Ulhas Creek river Village-
Surai Tal. Bhivandi, District Thane does not included in the area of any National
Park / Wild life Sanctuary or Nature Reserve.
Deputy Conservator of ForestThane Forest Division
Thane
Wildlife certificate if proposed area is within 10 km from National Park /Sanctuary – By the Deputy Conservator of Forests Wildlife
Not applicable as the required & proposed forest area is not within 10
km from National Park / Sanctuary.
Deputy Conservator of ForestThane Forest Division
Thane
Net Present Value – Project Authority.
Under taking
Project Authority hereby gives an undertaking to defray the Net
Present Value of area 0.58 ha. proposed for Non-Forest use for the project of Road
Construction in forest Village- Surai : 62 Pt Tal. Bhivandi, District Thane as fixed
by the Forest Department.
(J.S. Chivhane)Executive Engineer
M.M.R.D.A.
Net Present Value – Deputy Conservator of Forest Officer,Thane
Certify that 0.58 ha. of forest land to be used in this proposed project,
construction of Roads on the forest Gut No. Village- Surai : 62 Pt Tal. Bhivandi
Dist- Thane of Thane Range falls in Soil and Moisture Conservation cum
afforestion working Circle and has the density of 0.01.
It is also certify that the amount of Net Present Value of forest
land calculated and to be collected for Rs. ( /-) One lakh sixty
one thousand six hundred seventy seven only for value Class IV of open forest is
exactly as per the rates and calculation provided in the letter No. 1-19/ CEC/ SCI
2006-Pt., dated 5th June, 2008 of Central Empowered Committee.
Deputy Conservator of ForestThane Forest Division
Thane
Certificate for area under enquiry under Private Forest(Acquisition) Act, 1975 – By Villagers
Not applicable
Deputy Conservator of ForestThane Forest Division
Thane
Certificate of the project authority to take up attachmentarea treatment plan as per the guidelines of
Government of India.
Not applicable
Deputy Conservator of ForestThane Forest Division
Thane
Certificate of the Deputy Conservator of Forests
regarding alternative examined
Certified that following alternatives:
I have been examined the alignment connecting KDMC and Bhivandi talukaaffecting mangroves very less though it crosses creek and land in vicinity ofmarshi and creek portion in between Mumbra and Dombivali .
Deputy Conservator of ForestThane Forest Division
Thane
Alignment GutNo./Comptt.No.
Length &Width in
Sq.m.
Areain ha
Reason for site selection orrejection.
AlignmentNo. 1D.P. RoadConstructionof MajorBridge on D.PRoad(atpresentmissing link)Mankoli tomotgaon roadlies on UlhasCreek river
Village-Surai : 62 Pt
129 x 45 0.58 This alignment is recoomendedbecause1. alignment is on approvedD.P.Road in MMR area .2. This is shortest route
connecting KDMC area atDombivali and NH-3 (Mankoli)crossing Ulhas Creek river bybridge and very megremangroves come acrossalignment
No objection certificate of Gram Sabha about theproject- English copy.
Copy of the no-objection certificate from the Grampanchayat of Surai,
Tal. Bhivandi is attached here with.
Deputy Conservator of ForestThane Forest Division
Thane
Certificate of Zudpi Jungle compensatory afforestationland- Deputy Conservator of Forests.
Not applicable
Deputy Conservator of ForestThane Forest Division
Thane
Non availability of non-forest area for compensatoryafforestation- Collector / commissioner.
Not applicable
Deputy Conservator of ForestThane Forest Division
Thane
When any protected / archeological / heritage site andother important monument is located in the area-
Certificate by Archeological Department
Not applicable
Deputy Conservator of ForestThane Forest Division
Thane
Complete list of Identified Forest of the District Thane.
Complete list of Identified Forest of Thane District is attached here
with.
Deputy Conservator of ForestThane Forest Division
Thane
No objection Certificate of M. D., F.D.C.M. forInvolvement of their area.
Not applicable
Deputy Conservator of ForestThane Forest Division
Thane
COST BENEFIT ANALYSISTHANE FOREST DIVISION
(Under Forest Conservation Act, 1980)
COST BENEFIT ANALYSIS
Not applicable, due to the proposed &
required area is less than 1.00 ha.
Deputy Conservator of ForestThane Forest Division
Thane
(J.S. Chivhane)Executive Engineer
M.M.R.D.A.
Construction of six lame bridge across Ulhas creek having length 980 meter on proposed Mankoli Motagaon roadTHANE FOREST DIVISION = GIRTH WISE TREE TO BE FEILED ALONG THE EXISTING ROAD
LocalName
Scientific Name < =30
> 30 to<
=45
> 45 to<=60
> 60to<=75
> 75 to<=90
> 90 to<=105
> 105to<
=120
> 120to< =135
>135 to<=135
> 180 TOTAL
1 2 3 4 5 6 7 8 9 10 11 12 13Sag Techona grandisAir TerminaliyaKhair Acasia catechuSaver Bombax malaborikPalas Butea prondisaShemal Odina wadirAssana Bridelia retuseVehal Texminalia betoriaDhawala Anogeissus latifoliaAthroon Flacurtin ramontochiBhisala Plerocarpas marsupiumKuda Holarrena antiolysentericaMoha Sam madhuka parrifolaUmbar Ficus glornerataDhaman Grewia filaHedu Adina cordidiaBonda Lagerstroemia parvifolaHakad Garuga pinnataGhol Perena orintailsPelar Prewia nudifloraDhandosi Dalberia inceclariaKharsing Stereospermumxy locarpumAiv Phyilanyus emblicaChera Erimacarpus nimmoamesMot Bassia latidiaArshi Morinda tintoriaBholi Semecarpus anacardimuSambhai Albizia procersBehada Terminillia belericaHumb Saccopetalum tomentosum
(J.S. Chivhane)Deputy Conservator of Forest Executive Engineer
Thane Forest Division M.M.R.D.A.Thane
Gram Panchayat’sN.O.C.
And7/12 Extract
To
EXECUTIVE ENGINEEREngineering Division,Mumbai Metropolitan Region Development Authority,Bandra – Kurla Complex, Bandra (E), Mumbai.
Sub: NOC for Acquisition of Land to Forest Department
Construction of six lame bridge across Ulhas creek on proposed Mankoli
Motagaon road .
Ref: Engineering Division MMRDA Letter No. 284/2014 Dated 17/10/2014.
With reference to above subject, we hereby inform you that Surai – Sarang Grampanchayat
has no objection For Acquisition of land throughforest department for Construction of six lane
bridge across Ulhas Creeck.
Sd/-Sarpunch
Group Grampanchyet Surai Sarang,Taluka Bhivandi, Dist Thane.
Village Extract Number 7, 7-A & 12.Village:Surai Taluka:Bhiwandi District: Thane
Survey No./GutNo.
Hissa No. Holding No. Village form No. 7 Khate No.
62Cultivable Area Hactor R.
Tickle LandNon Irrigated -- --IrrigatedPady land
Total 14 51 Name ofTenantsOther rights
Fall OutClass (a)Class (b)
Total 14 51Aneswari Rs.
Coss orSpecial CossAbout water
Total -- --
Village Extract No. 7-4 Village Extract No. 12Year Na
meofCultivator
Type
season
Area under Mixcrop
Name of cropunder mixcrop
Area n underNon- Mix crop
Particular of &Nonunableland
Irrigationsystem
Remarks
Num
eric
alM
ix c
rop
Iriga
ted
Non
-irr
igat
edC
rop
Nam
eIrr
igat
ed
Non
Irrig
ayte
d
Cro
pN
ame
Irrig
ated
non
Irrig
ated
Type
Area
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 172011-2012
Grazing waste
True Extract Given Date:- 30/03/2012 Sd/-TalathiSurai
TalukaBhiwandi, District Thane.