PROJECT DESCRIPTION LEGEND · 2019. 1. 22. · d e s ig n \ c a d d s t a n d a r d s \ s a m p l...

11
CLASS ODOT DESCRIPTION N LOCATION MAP 0.42 mm 0.074 mm 0.005 mm 2.0 mm 3" 12" COBBLES GRAVEL COARSE SAND FINE SAND SILT CLAY No. 200 SIEVE No. 40 SIEVE No. 10 SIEVE PARTICLE SIZE DEFINITIONS BOULDERS RECON. - DRILLING - DRAWN - REVIEWED - SS INDICATES A SPLIT-SPOON SAMPLE. LEGEND 8 14 PAVEMENT OR BASE = X = APPROXIMATE THICKNESS SOD AND TOPSOIL = X = APPROXIMATE THICKNESS HORIZONTAL BAR INDICATES A CHANGE IN STRATIGRAPHY. DRIVE SAMPLE AND/OR ROCK CORE BORING PLOTTED TO VERTICAL SCALE ONLY. WC INDICATES WATER CONTENT IN PERCENT. 11 5 3 4 7 3 11 12 50 49 EQUAL TO OR GREATER THAN THE LIQUID LIMIT MINUS 3. INDICATES A PLASTIC MATERIAL WITH A MOISTURE CONTENT NORMALIZED TO 60% DRILL ROD ENERGY RATIO. INDICATES STANDARD PENETRATION RESISTANCE LOCATION FROM STA. TO STA. SHEET SECTION CROSS- INDEX OF SHEETS - SHEET PLAN VIEW SHEET PROFILE MAX. CUT MAX. FILL EMB. 7 7 - 8 8 10 - - - - 5 5 - 6 6 WEST ST. 6+75 10+43.42 RAMP H 50+00 61+30.87 SR 395 0+00 12+50 12+50 25+00 25+00 36+25 8 9 2 2 ST A-1-a A-7-5 A-7-6 CLASS ODOT HISTORIC BORING DESCRIPTIONS A-2-4 1 - 8 - 2 - 2 - VISUAL HISTORIC BORING LOCATION - PLAN VIEW - TER-102-7.86, 1965 CLAY GRAVEL AND/OR STONE FRAGMENTS ELASTIC CLAY UNCONTROLLED FILL GRAVEL AND/OR ST. FRAGS. W/SAND & SILT HORIZONTAL BAR INDICATES A CHANGE IN STRATIGRAPHY. AUGER BORING PLOTTED TO VERTICAL SCALE ONLY. INDICATES FREE WATER ELEVATION. W INDICATES A SHELBY TUBE SAMPLE. GRAVEL AND/OR STONE FRAGMENTS COARSE AND FINE SAND GRAVEL AND/OR ST. FRAGS. WITH SAND AND SILT SANDY SILT SILT AND CLAY SILTY CLAY SHALE GREATER THAN 25% OR GREATER THAN 19% WITH A WET APPEARANCE. INDICATES A NON-PLASTIC MATERIAL WITH A MOISTURE CONTENT 52+00 & 54+00 11 - - 55+00 & 56+00 EXPLORATION LOCATION - PLAN VIEW 13 3 TOTAL - 3 HA NP INDICATES A NON-PLASTIC SAMPLE. INDICATES A HAND AUGER SAMPLE. TR INDICATES THE TOP OF ROCK. CLOSE TO THE BLACK RIVER, UNDERLAIN BY OHIO SHALE OF DEVONIAN AGE. MATERIALS, HOWEVER, SOME ALLUVIAL (WATER-DEPOSITED) SOILS MAY BE ENCOUNTERED PROJECT AREA ARE COMPOSED PRIMARILY OF GLACIALLY DEPOSITED OUTWASH AND TILL PLAIN, BOTH FROM THE LATE WISCONSINIAN GLACIATION. THE SOILS UNDERLYING THE LOAMY TILL PLAIN, ALONG THE WESTERN EDGE OF THE BLACK RIVER INTERLOBATE THE SITE LIES IN THE GLACIATED PORTION OF OHIO, WITHIN THE SOUTHERN OHIO 9 9 FT FT FT FT FT FT FT FT FT FT FT FT 5 5 6 7 16 6 <1 5 12 19 9 11 UNCONTROLLED FILL (UCF) 14 19 A-1-a A-1-b A-3a A-2-4 A-4a A-6a A-6b TOTAL VISUAL VISUAL VISUAL VISUAL SCALE IN MILES 0 1 2 3 4 MECH./VISUAL CLASSIFIED N 60 SUBSURFACE EXPLORATION EXPLORATION FINDINGS PROJECT DESCRIPTION MECH./VISUAL CLASSIFIED GEOLOGY HISTORIC RECORDS RECONNAISSANCE 395 AND OF A PORTION OF WEST STREET (TR 130). ALSO INCLUDED IN THIS PROJECT IS THE REALIGNMENT OF RAMP H FROM US 102 TO SR THIS PROJECT, TER-395-0.00, IS THE WIDENING OF SR 395 FROM US 92 TO CR 10. PROFILE. CONSTRUCTION PLANS, TER-102-7.86, DATED 1965, ARE PRESENTED ON THIS SOIL FOUR HISTORIC HAND AUGER BORINGS ALONG EXISTING RAMP H FROM THE ORIGINAL STA. 0+00 BEGIN PROJECT STA. 36+25 END PROJECT NOTED, TYPICALLY IN GRANULAR SOILS. TRANSIENT GROUNDWATER WAS ENCOUNTERED SPORADICALLY IN THE BORINGS, AS FT FT AVAILABLE INFORMATION SPECIFICATIONS GRAVEL AND/OR STONE FRAGMENTS WITH SAND X:\De s i gn \CADD St a nda r ds \SAMPLE PLANS\2019_e dit s \Soil _Pr of il e \Sh ee t s \99999I C001 . dgn Sh ee t 1 / 18/ 2019 12: 36: 44 PM bl ogs t on 1 11 DESI GN AGENCY PI D NO. 99999 1980 W. BROAD ST. COL UMBUS, OH 43223 OFF I CE OF GE OTE CHNI CAL E NGI NEE RI NG OHI O DE PARTME NT OF TRANSPORTATI ON S O I L P R O FI LE TE R - 395- 0. 00 BROAD STREET. DIRECTOR'S OFFICE OR THE OFFICE OF GEOTECHNICAL ENGINEERING AT 1980 WEST PROJECT. COPIES OF THIS DATA, IF ANY, MAY BE INSPECTED IN THE DISTRICT DEPUTY EXPLORATIONS MAY HAVE BEEN MADE TO STUDY SOME SPECIAL ASPECT OF THE ON THE GEOTECHNICAL EXPLORATION SHEETS HAS BEEN SO REPORTED. ADDITIONAL ALL AVAILABLE SOIL AND BEDROCK INFORMATION THAT CAN BE CONVENIENTLY SHOWN SPECIFICATIONS FOR GEOTECHNICAL EXPLORATIONS, DATED JULY 2014. OF OHIO, DEPARTMENT OF TRANSPORTATION, OFFICE OF GEOTECHNICAL ENGINEERING, THIS GEOTECHNICAL EXPLORATION WAS PERFORMED IN ACCORDANCE WITH THE STATE THE EAST OF THE PROJECT. LANDFILL WERE OBSERVED. THE BLACK RIVER RUNS FROM NORTH TO SOUTH JUST TO THIS PROPERTY. NO EVIDENCE OF SURFACE FEATURES ASSOCIATED WITH ABANDONED LANDFILL. THE REALIGNED RAMP H IS PROPOSED TO CUT ACROSS THE SOUTH EDGE OF RAILROAD AND THE US 92 AND US 102 INTERCHANGE, IS THE SITE OF AN ABANDONED STA. 11+50 TO 12+50. ONE PROPERTY ON THE EAST SIDE OF SR 395, BETWEEN THE GOOD , BUT A BAD PAVEMENT AREA WITH PATCHES WAS OBSERVED ON SR 395 FROM PROJECT IS GENERALLY COMMERCIAL AND RESIDENTIAL. THE PAVEMENT IS GENERALLY STEVE YOUNG VISITED THE SITE ON AUGUST 14, 2014. THE LAND USAGE AROUND THE CORE BARREL, WATER METHOD. THE BORINGS WERE ADVANCED AND THE ROCK WAS SAMPLED USING A TYPE NQ SERIES SAMPLES WERE OBTAINED WITH THE HAND AUGER. WHERE BEDROCK WAS ENCOUNTERED, OR IN THE SUMMARY OF SOIL TEST DATA, IN ACCORDANCE WITH AASHTO T207. AUGER RATIO OF 81.9%. UNDISTURBED SOIL SAMPLES WERE OBTAINED AS SHOWN ON THE LOGS THE BORINGS. HAMMER CALIBRATED ON AUGUST 8, 2013 AND HAS A DRILL ROD ENERGY T206) AT 1.5 TO 5.0 FOOT INTERVALS FOR THE FULL DEPTH OF THE SOIL PORTION OF WERE OBTAINED IN ACCORDANCE WITH THE STANDARD PENETRATION TEST (AASHTO H-014-3-14 TO DELINEATE LIMITS OF UNCONTROLLED FILL. DISTURBED SOIL SAMPLES AUGER (HAND AUGER) WAS USED TO ADVANCE TWO OF THE BORINGS, H-014-2-14 AND THE HOLES THROUGH SOIL. A MECHANICALLY POWERED, CONTINUOUS HELICAL SCREW MOUNTED ROTARY DRILL RIG, USING 3‚-INCH I.D. HOLLOW STEM AUGERS TO ADVANCE BETWEEN SEPTEMBER 15 AND 18, 2014. MOST BORINGS WERE DRILLED WITH A TRUCK (21) TEST BORINGS WERE COMPLETED AS PART OF THIS SUBSURFACE EXPLORATION, SLIGHTLY ORGANIC SOIL (A-6b) WAS ENCOUNTERED IN B-015-14. A-6b WERE LESS PREVALENT, BUT PRESENT THROUGHOUT THE SITE. A LAYER OF A-1-a, A-1-b, AND A-3a. COHESIVE SOILS, CLASSIFIED AS ODOT A-4A, A-6a, AND OUTWASH OR GLACIAL TILL. GRANULAR SOILS ARE PREDOMINANT, CLASSIFIED AS ODOT ALL OF THE BORINGS ENCOUNTERED SOILS OF GLACIAL ORIGIN, EITHER GLACIAL H-014-3-14 DID NOT ENCOUNTER UNCONTROLLED FILL. ENCOUNTERED IN B-014-1-14. THE TWO HAND AUGER BORINGS H-014-2-14 AND UNCONTROLLED FILL, DESCRIBED AS BROWN SILT WITH GARBAGE AND PAPER, WAS LIMITS OF POSSIBLE UNCONTROLLED FILL ASSOCIATED WITH THE LANDFILL. IN THE AREA OF THE ABANDONED LANDFILL, BORINGS WERE DRILLED TO DELINEATE THE DRILLED NEAR THE TOE OF SLOPE, IN THE VICINITY OF THE ABANDONED LANDFILL. BEDDED, CARBANACEOUS AND FRACTURED, WAS ENCOUNTERED IN THE BORING B-015-1-14, GRAY SHALE BEDROCK DESCRIBED AS, SLIGHTLY WEATHERED,MODERATELY STRONG, THIN SPY 08/14/14 BIT 09/15-18/14 INK 12/11-15/14 RED 12/18/14 Ru n Cr eek Rocky Mill er ' s RI VER B u c k B L A C K Cr eek 102 102 92 92 395 T - 4 3 T- 34 WE S T PI KE ST. T- 1 6 C - 21 C- 1 9 C- 30 C - 2 7 C- 16 C- 1 2 T - 24 ST. C- 1 0

Transcript of PROJECT DESCRIPTION LEGEND · 2019. 1. 22. · d e s ig n \ c a d d s t a n d a r d s \ s a m p l...

Page 1: PROJECT DESCRIPTION LEGEND · 2019. 1. 22. · d e s ig n \ c a d d s t a n d a r d s \ s a m p l e-p l a n s \ 2 0 1 9 _ e d it s \ s o il _ p r o f il e \ s h e e t s \ 9 9 9 9

CLASS

ODOT

DESCRIPTION

N

LOCATION MAP

0.42 mm 0.074 mm 0.005 mm2.0 mm3"12"

COBBLES GRAVEL COARSE SAND FINE SAND SILT CLAY

No. 200 SIEVENo. 40 SIEVENo. 10 SIEVE

PARTICLE SIZE DEFINITIONS

BOULDERS

RECON. -

DRILLING -

DRAWN -

REVIEWED -

SS INDICATES A SPLIT-SPOON SAMPLE.

LEGEND

8 14

PAVEMENT OR BASE = X = APPROXIMATE THICKNESS

SOD AND TOPSOIL = X = APPROXIMATE THICKNESS

HORIZONTAL BAR INDICATES A CHANGE IN STRATIGRAPHY.

DRIVE SAMPLE AND/OR ROCK CORE BORING PLOTTED TO VERTICAL SCALE ONLY.

WC INDICATES WATER CONTENT IN PERCENT.

11 5

3 4

7 3

11 12

50 49

EQUAL TO OR GREATER THAN THE LIQUID LIMIT MINUS 3.

INDICATES A PLASTIC MATERIAL WITH A MOISTURE CONTENT

NORMALIZED TO 60% DRILL ROD ENERGY RATIO.

INDICATES STANDARD PENETRATION RESISTANCE

LOCATION

FROM STA. TO STA.SHEET

SECTION

CROSS-

INDEX OF SHEETS

-

SHEET

PLAN VIEW

SHEET

PROFILE

MAX.

CUT

MAX.

FILL EMB.

7 7

-

8 8

10 - -

-

-

5 5

-

6 6

WEST ST.

6+75 10+43.42

RAMP H

50+00 61+30.87

SR 395

0+00 12+50

12+50 25+00

25+00 36+25

8 9

2 2

ST

A-1-a

A-7-5

A-7-6

CLASS

ODOT

HISTORIC BORING DESCRIPTIONS

A-2-4 1 -

8 -

2 -

2 -

VISUAL

HISTORIC BORING LOCATION - PLAN VIEW - TER-102-7.86, 1965

CLAY

GRAVEL AND/OR STONE FRAGMENTS

ELASTIC CLAY

UNCONTROLLED FILL

GRAVEL AND/OR ST. FRAGS. W/SAND & SILT

HORIZONTAL BAR INDICATES A CHANGE IN STRATIGRAPHY.

AUGER BORING PLOTTED TO VERTICAL SCALE ONLY.

INDICATES FREE WATER ELEVATION.W

INDICATES A SHELBY TUBE SAMPLE.

GRAVEL AND/OR STONE FRAGMENTS

COARSE AND FINE SAND

GRAVEL AND/OR ST. FRAGS. WITH SAND AND SILT

SANDY SILT

SILT AND CLAY

SILTY CLAY

SHALE

GREATER THAN 25% OR GREATER THAN 19% WITH A WET APPEARANCE.

INDICATES A NON-PLASTIC MATERIAL WITH A MOISTURE CONTENT

52+00 & 54+00

11 - - 55+00 & 56+00

EXPLORATION LOCATION - PLAN VIEW

13 3 TOTAL

- 3

HA

NP INDICATES A NON-PLASTIC SAMPLE.

INDICATES A HAND AUGER SAMPLE.

TR INDICATES THE TOP OF ROCK.

CLOSE TO THE BLACK RIVER, UNDERLAIN BY OHIO SHALE OF DEVONIAN AGE.

MATERIALS, HOWEVER, SOME ALLUVIAL (WATER-DEPOSITED) SOILS MAY BE ENCOUNTERED

PROJECT AREA ARE COMPOSED PRIMARILY OF GLACIALLY DEPOSITED OUTWASH AND TILL

PLAIN, BOTH FROM THE LATE WISCONSINIAN GLACIATION. THE SOILS UNDERLYING THE

LOAMY TILL PLAIN, ALONG THE WESTERN EDGE OF THE BLACK RIVER INTERLOBATE

THE SITE LIES IN THE GLACIATED PORTION OF OHIO, WITHIN THE SOUTHERN OHIO

9 9

FT

FT

FT

FT

FT

FT FT

FT

FT

FT

FT

FT

5

5

6

7

16

6

<1

5

12

19

9

11

UNCONTROLLED FILL (UCF)

14

19

A-1-a

A-1-b

A-3a

A-2-4

A-4a

A-6a

A-6b

TOTAL

VISUAL

VISUAL

VISUAL

VISUAL

SCALE IN MILES

0 1 2 3 4

MECH./VISUAL

CLASSIFIED

N60

SUBSURFACE EXPLORATION

EXPLORATION FINDINGS

PROJECT DESCRIPTION

MECH./VISUAL

CLASSIFIED

GEOLOGY

HISTORIC RECORDS

RECONNAISSANCE

395 AND OF A PORTION OF WEST STREET (TR 130).

ALSO INCLUDED IN THIS PROJECT IS THE REALIGNMENT OF RAMP H FROM US 102 TO SR

THIS PROJECT, TER-395-0.00, IS THE WIDENING OF SR 395 FROM US 92 TO CR 10.

PROFILE.

CONSTRUCTION PLANS, TER-102-7.86, DATED 1965, ARE PRESENTED ON THIS SOIL

FOUR HISTORIC HAND AUGER BORINGS ALONG EXISTING RAMP H FROM THE ORIGINAL

STA. 0+00

BEGIN PROJECT

STA. 36+25

END PROJECT

NOTED, TYPICALLY IN GRANULAR SOILS.

TRANSIENT GROUNDWATER WAS ENCOUNTERED SPORADICALLY IN THE BORINGS, AS

FT FT

AVAILABLE INFORMATION

SPECIFICATIONS

GRAVEL AND/OR STONE FRAGMENTS WITH SAND

X:\

Desig

n\

CA

DD

Standards\

SA

MP

LE

PL

AN

S\

2019_edits\

Soil_

Profile\

Sheets\

99999IC

001.d

gn

Sheet 1/18/2019 12:3

6:4

4

PM blo

gston

1 11

DESIG

N

AG

EN

CY

PID

NO.

9

99

99

1980

W. B

RO

AD S

T. C

OL

UM

BU

S,

OH 43223

OFFIC

E

OF

GE

OT

EC

HNIC

AL E

NGIN

EE

RIN

G

OHIO

DEP

AR

TM

EN

T

OF T

RA

NSP

OR

TA

TIO

N

SOIL

PR

OFIL

ET

ER-3

95-0.0

0

BROAD STREET.

DIRECTOR'S OFFICE OR THE OFFICE OF GEOTECHNICAL ENGINEERING AT 1980 WEST

PROJECT. COPIES OF THIS DATA, IF ANY, MAY BE INSPECTED IN THE DISTRICT DEPUTY

EXPLORATIONS MAY HAVE BEEN MADE TO STUDY SOME SPECIAL ASPECT OF THE

ON THE GEOTECHNICAL EXPLORATION SHEETS HAS BEEN SO REPORTED. ADDITIONAL

ALL AVAILABLE SOIL AND BEDROCK INFORMATION THAT CAN BE CONVENIENTLY SHOWN

SPECIFICATIONS FOR GEOTECHNICAL EXPLORATIONS, DATED JULY 2014.

OF OHIO, DEPARTMENT OF TRANSPORTATION, OFFICE OF GEOTECHNICAL ENGINEERING,

THIS GEOTECHNICAL EXPLORATION WAS PERFORMED IN ACCORDANCE WITH THE STATE

THE EAST OF THE PROJECT.

LANDFILL WERE OBSERVED. THE BLACK RIVER RUNS FROM NORTH TO SOUTH JUST TO

THIS PROPERTY. NO EVIDENCE OF SURFACE FEATURES ASSOCIATED WITH ABANDONED

LANDFILL. THE REALIGNED RAMP H IS PROPOSED TO CUT ACROSS THE SOUTH EDGE OF

RAILROAD AND THE US 92 AND US 102 INTERCHANGE, IS THE SITE OF AN ABANDONED

STA. 11+50 TO 12+50. ONE PROPERTY ON THE EAST SIDE OF SR 395, BETWEEN THE

GOOD , BUT A BAD PAVEMENT AREA WITH PATCHES WAS OBSERVED ON SR 395 FROM

PROJECT IS GENERALLY COMMERCIAL AND RESIDENTIAL. THE PAVEMENT IS GENERALLY

STEVE YOUNG VISITED THE SITE ON AUGUST 14, 2014. THE LAND USAGE AROUND THE

CORE BARREL, WATER METHOD.

THE BORINGS WERE ADVANCED AND THE ROCK WAS SAMPLED USING A TYPE NQ SERIES

SAMPLES WERE OBTAINED WITH THE HAND AUGER. WHERE BEDROCK WAS ENCOUNTERED,

OR IN THE SUMMARY OF SOIL TEST DATA, IN ACCORDANCE WITH AASHTO T207. AUGER

RATIO OF 81.9%. UNDISTURBED SOIL SAMPLES WERE OBTAINED AS SHOWN ON THE LOGS

THE BORINGS. HAMMER CALIBRATED ON AUGUST 8, 2013 AND HAS A DRILL ROD ENERGY

T206) AT 1.5 TO 5.0 FOOT INTERVALS FOR THE FULL DEPTH OF THE SOIL PORTION OF

WERE OBTAINED IN ACCORDANCE WITH THE STANDARD PENETRATION TEST (AASHTO

H-014-3-14 TO DELINEATE LIMITS OF UNCONTROLLED FILL. DISTURBED SOIL SAMPLES

AUGER (HAND AUGER) WAS USED TO ADVANCE TWO OF THE BORINGS, H-014-2-14 AND

THE HOLES THROUGH SOIL. A MECHANICALLY POWERED, CONTINUOUS HELICAL SCREW

MOUNTED ROTARY DRILL RIG, USING 3‚-INCH I.D. HOLLOW STEM AUGERS TO ADVANCE

BETWEEN SEPTEMBER 15 AND 18, 2014. MOST BORINGS WERE DRILLED WITH A TRUCK

(21) TEST BORINGS WERE COMPLETED AS PART OF THIS SUBSURFACE EXPLORATION,

SLIGHTLY ORGANIC SOIL (A-6b) WAS ENCOUNTERED IN B-015-14.

A-6b WERE LESS PREVALENT, BUT PRESENT THROUGHOUT THE SITE. A LAYER OF

A-1-a, A-1-b, AND A-3a. COHESIVE SOILS, CLASSIFIED AS ODOT A-4A, A-6a, AND

OUTWASH OR GLACIAL TILL. GRANULAR SOILS ARE PREDOMINANT, CLASSIFIED AS ODOT

ALL OF THE BORINGS ENCOUNTERED SOILS OF GLACIAL ORIGIN, EITHER GLACIAL

H-014-3-14 DID NOT ENCOUNTER UNCONTROLLED FILL.

ENCOUNTERED IN B-014-1-14. THE TWO HAND AUGER BORINGS H-014-2-14 AND

UNCONTROLLED FILL, DESCRIBED AS BROWN SILT WITH GARBAGE AND PAPER, WAS

LIMITS OF POSSIBLE UNCONTROLLED FILL ASSOCIATED WITH THE LANDFILL.

IN THE AREA OF THE ABANDONED LANDFILL, BORINGS WERE DRILLED TO DELINEATE THE

DRILLED NEAR THE TOE OF SLOPE, IN THE VICINITY OF THE ABANDONED LANDFILL.

BEDDED, CARBANACEOUS AND FRACTURED, WAS ENCOUNTERED IN THE BORING B-015-1-14,

GRAY SHALE BEDROCK DESCRIBED AS, SLIGHTLY WEATHERED,MODERATELY STRONG, THIN

SPY 08/14/14

BIT 09/15-18/14

INK 12/11-15/14

RED 12/18/14

Run

Creek

Rocky

Miller's

RIV

ER

Buck

BLACK

Creek

102

102

92

92

395

T-43

T-34

WEST

PIK

E ST.

T-16

C-21

C-19

C-30

C-27

C-16

C-12

T-24

ST.

C-10

Page 2: PROJECT DESCRIPTION LEGEND · 2019. 1. 22. · d e s ig n \ c a d d s t a n d a r d s \ s a m p l e-p l a n s \ 2 0 1 9 _ e d it s \ s o il _ p r o f il e \ s h e e t s \ 9 9 9 9

ST

ATIO

N

&

OFFS

ET

FR

OM T

OC

SFS

SIL

TC

LA

YL

LPI

WC

PL

%

RE

C

%%

%%

%%

01.

00-02.50

89

44

22

1512

7N

PN

PN

P9

A-1-

b

ST

A. 0

+00, |

02.50-04.00

94

42

23

1811

6N

PN

PN

P6

A-1-

b

04.00-05.50

89

6A-1-

b

05.50-07.00

83

5A-1-

b

01.

00-02.50

78

32

1919

1713

1712

512

A-2-4

02.50-04.00

89

31

1616

22

1520

119

9A-4a

04.00-05.50

94

1811

1631

24

29

1415

10A-6a

05.50-07.00

83

14A-6a

01.

00-02.50

100

46

1618

137

NP

NP

NP

4A-1-

b

02.50-04.00

94

9A-1-

b

04.00-05.50

89

1411

23

24

28

30

1416

14A-6b

05.50-07.00

94

21

A-6b

01.

00-02.50

94

20

1216

29

23

31

1912

17A-6a

ST

A. 12

+00, |

02.50-04.00

94

1010

21

34

25

26

1610

14A-4a

04.00-05.50

78

15A-4a

05.50-07.00

83

35

A-4a

01.

00-02.50

94

55

1514

106

NP

NP

NP

13A-1-

b

ST

A. 16

+00, |

02.50-04.00

94

22

1119

28

20

25

169

13A-4a

04.00-05.50

89

17A-4a

05.50-07.00

94

15A-4a

08.50

10.00

83

39

26

1910

6N

PN

PN

P12

A-1-

b

01.

00-02.50

94

39

1918

1410

28

1810

13A-2-4

ST

A. 20

+00, |

02.50-04.00

83

21

1318

26

22

31

1714

23

A-6a

04.00-05.50

94

A-6a

05.50-07.00

100

20

A-6a

01.

00-02.50

83

40

20

1716

7N

PN

PN

P5

A-1-

b

ST

A. 24+00, |

02.50-04.00

94

16A-1-

b

04.00-05.50

100

55

1814

85

NP

NP

NP

6A-1-

a

05.50-07.00

100

6A-1-

a

01.

00-02.50

78

44

23

1413

6N

PN

PN

P5

A-1-

b

02.50-04.00

94

41

1215

21

1120

155

12A-2-4

04.00-05.50

94

187

1627

32

35

1718

24

A-6b

05.50-07.00

89

17A-6b

01.

00-02.50

94

47

1715

147

NP

NP

NP

6A-1-

b

02.50-04.00

89

18

04.00-05.50

100

124

1837

29

28

1612

20

A-6a

05.50-07.00

100

22

A-6a

01.

00-02.50

83

35

24

1816

7N

PN

PN

P6

A-1-

b

02.50-04.00

78

109

21

27

33

30

1614

21

04.00-05.50

78

16

05.50-07.00

100

24

(0)

(0)

(0)

(0)

(6)

(0)

(6)

(4)

(5)

(0)

(3)

(0)

(0)

(4)

(0)

(0)

(0)

(0)

(8)

(0)

(7)

(0)

(7)

(VIS

UA

L)

(VIS

UA

L)

(VIS

UA

L)

(VIS

UA

L)

(VIS

UA

L)

(VIS

UA

L)

(VIS

UA

L)

(VIS

UA

L)

(VIS

UA

L)

(VIS

UA

L)

(VIS

UA

L)

ST

ATIO

N

&

OFFS

ET

FR

OM T

OC

SFS

SIL

TC

LA

YL

LPI

WC

PL

%

RE

C

%%

%%

%%

EX

PL

OR

ATIO

N

NO.,

01.

00-02.50

100

1213

20

29

26

23

1310

9A-4a

02.50-04.00

89

20

1217

27

24

26

1412

14A-6a

04.00-05.50

94

05.50-07.00

100

19A-6a

01.

00-02.50

83

1210

56

193

NP

NP

NP

12A-3a

ST

A. 9+50, |

02.50-04.00

78

7A-3a

05.00-06.50

100

02

72

22

4N

PN

PN

P

11A-3a

07.50-09.00

83

19A-3a

10.00-11.50

100

5A-3a

12.50-14.00

94

1341

36

55

NP

NP

NP

6A-1-

b

15.00-16.50

94

5A-1-

b

01.

00-02.50

89

32

1921

1612

NP

NP

NP

7A-2-4

02.50-04.00

89

13A-2-4

04.00-05.50

89

1213

21

32

22

23

149

10A-4a

05.50-07.00

100

9A-4a

01.

00-02.50

100

42

1513

1812

20

137

9A-2-4

02.50-04.00

78

1312

20

31

24

22

139

9A-4a

04.00-05.50

94

14A-4a

05.50-07.00

78

14A-4a

02.00-03.50

100

UC

F

04.00-06.00

94

31

1615

22

1632

22

1021

A-4a

07.50-09.00

83

56

UC

F

10.00-11.50

89

43

813

20

1633

22

1121

A-6a

12.50-14.00

89

54

23

136

4N

PN

PN

P12

A-1-

a

15.00-16.50

83

14A-1-

a

(4)

(4)

(0)

(0)

(0)

(4)

(0)

(4)

(1)

(0)

(0)

(VIS

UA

L)

(VIS

UA

L)

(VIS

UA

L)

(VIS

UA

L)

(VIS

UA

L)

(VIS

UA

L)

(VIS

UA

L)

(VIS

UA

L)

ST

ATIO

N

&

OFFS

ET

FR

OM T

OC

SFS

SIL

TC

LA

YL

LPI

WC

PL

%

RE

C

%%

%%

%%

EX

PL

OR

ATIO

N

NO.,

20

16A-6a

-

WES

T S

T.

RA

MP

H

SR 395

SS-1

SS-2

SS-3

SS-4

SS-1

SA

ME

AS SS-2

SA

ME

AS SS-2

(VIS

UA

L)

(VIS

UA

L)

SA

ME

AS SS-4

SA

ME

AS SS-1

SA

ME

AS SS-3

SA

ME

AS SS-2

SA

ME

AS SS-2

(VIS

UA

L)

SA

ME

AS SS-2

SA

ME

AS SS-2

(VIS

UA

L)

SA

ME

AS SS-2

SA

ME

AS SS-2

SA

ME

AS SS-2

SA

ME

AS SS-3

SA

ME

AS SS-3

(VIS

UA

L)

SA

ME

AS SS-2

SA

ME

AS SS-2

SA

ME

AS SS-2

(VIS

UA

L)

(VIS

UA

L)

SA

ME

AS SS-2

SA

ME

AS SS-2

SA

ME

AS SS-2

SA

ME

AS SS-2

SA

ME

AS SS-2

(VIS

UA

L)

(VIS

UA

L)

SA

ME

AS SS-6

SA

ME

AS SS-1

SA

ME

AS SS-3

(VIS

UA

L)

SA

ME

AS SS-2

SA

ME

AS SS-2

SA

ME

AS SS-5

SA

ME

AS SS-1

BR

OW

N SIL

T,

WIT

H

GA

RB

AG

E

AN

D P

AP

ER

00.00

05.00

-27

1518

24

1627

189

18

05.00-07.90

-

07.90-12.00

-18

A-1-

a61

1212

78

NP

NP

NP

(1)

(0)

A-4a

00.00

05.00

-18

A-1-

a

05.00-10.00

-66

176

54

NP

NP

NP

15A-1-

a

10.00-16.00

-16

A-1-

a

(0)

SA

ME

AS

HA-2

SA

ME

AS

HA-1

16A-4a

(VIS

UA

L)

SA

ME

AS

HA-2

(VIS

UA

L)

(VIS

UA

L)

--

(0)

A-6a

(VIS

UA

L)

SA

ME

AS SS-2

A-6a

A-6a

A-6a

(VIS

UA

L)

- - - - - -

EX

PL

OR

ATIO

N

NO.,

33

15 12 23

23

46

25

45

68

63 7 14 19 5 5 11 11 10 7 4 11 5 8 10 15 41

11 11 31

86

27 11 25

30 8 12 26

60

10 16 11 18 50

31

20

15 40

29

31

44

55

46

45

42

31

29

31

14 14 31

31

N60

pp

m

SO

4

SO

4N

60

pp

m

SO

4N

60

pp

m

ST

A 4+00, 7'

RT.

ST

A. 8+00, 3'

LT.

ST

A. 28+00, 1' L

T.

ST

A. 32+00, 1' L

T.

ST

A. 36+00, 4'

LT.

ST

A. 7+00, 2'

RT.

ST

A. 52+00, 16'

RT.

ST

A. 54+00, 10'

RT.

ST

A. 54+00, 75'

LT.

ST

A. 55+00, 60'

LT.

ST

A. 55+00, 12

0'

LT.

GR

GR

GR

LA

TIT

UD

E = 39.925486

LO

NGIT

UD

E = -83.285745

LA

TIT

UD

E = 39.926592

LO

NGIT

UD

E = -83.857471

LA

TIT

UD

E = 39.927689

LO

NGIT

UD

E = -83.857510

LA

TIT

UD

E = 39.928767

LO

NGIT

UD

E = -83.857770

LA

TIT

UD

E = 39.929854

LO

NGIT

UD

E = -83.857886

LA

TIT

UD

E = 39.930904

LO

NGIT

UD

E = -83.857483

LA

TIT

UD

E = 39.9319

36

LO

NGIT

UD

E = -83.856996

LA

TIT

UD

E = 39.933020

LO

NGIT

UD

E = -83.856891

LA

TIT

UD

E = 39.934096

LO

NGIT

UD

E = -83.85717

2

LA

TIT

UD

E = 39.93517

3

LO

NGIT

UD

E = -83.857458

LA

TIT

UD

E = 39.926629

LO

NGIT

UD

E = -83.858576

LA

TIT

UD

E = 39.926937

LO

NGIT

UD

E = -83.857794

LA

TIT

UD

E = 39.927220

LO

NGIT

UD

E = -83.856060

LA

TIT

UD

E = 39.927429

LO

NGIT

UD

E = -83.85619

4

LA

TIT

UD

E = 39.927520

LO

NGIT

UD

E = -83.855910

LA

TIT

UD

E = 39.927058

LO

NGIT

UD

E = -83.856751

LA

TIT

UD

E = 39.927648

LO

NGIT

UD

E = -83.856044

- - - - -

4.50

4.00

4.50

- -

1.00

2.00

2.50

1.50

1.50

2.00

-

1.50

1.00

1.00

- -

1.50

1.50

2.00

- - - - - -

2.00

3.00

-

1.00

1.50

2.50

-

1.50

2.00

1.50

B-001-

0-14

B-002-0-14

B-003-0-14

B-004-0-14

B-005-0-14

B-006-0-14

B-007-0-14

B-008-0-14

B-009-0-14

B-010-0-14

B-011-0-14

B-012-0-14

B-013-0-14

B-014-0-14

B-014-1-

14

210

388

3200

630

141

223

165

194

115

H-014-2-14

H-014-3-14

HP

HP

2.50

4.50

4.00

3.00

- - - - - - - HP - -

4.00

4.00

-

2.00

2.00

3.50

- -

2.00

4.00

- -

tsf

tsf

tsf

SU

MM

AR

Y

OF S

OIL T

ES

T

DA

TA

1140

345

212

ID

SA

MP

LE

ID

SA

MP

LE

ID

SA

MP

LE

X:\

Desig

n\

CA

DD

Standards\

SA

MP

LE

PL

AN

S\

2019_edits\

Soil_

Profile\

Sheets\

99999ID

001.d

gn

Sheet 1/18/2019 12:3

6:4

4

PM blo

gston

2 11

CH

EC

KE

D

RE

D

IN

K

DR

AW

N

SU

MM

AR

Y

OF

SOIL

TE

ST

DA

TA

TE

R-3

95-0.0

0S

OIL

PR

OFIL

E

8 - 16 33

33

SU

MM

AR

Y

OF S

OIL T

ES

T

DA

TA

SU

MM

AR

Y

OF S

OIL T

ES

T

DA

TA

SS-1

SS-2

SS-3

SS-4

SS-1

SS-2

SS-3

SS-4

SS-1

SS-2

SS-3

SS-4

SS-1

SS-2

SS-3

SS-4

SS-1

SS-2

SS-3

SS-4

SS-1

SS-2

SS-3

SS-4

SS-1

SS-2

SS-3

SS-4

SS-1

SS-2

SS-3

SS-4

SS-1

SS-2

SS-3

SS-4

SS-5

SS-1

SS-2

SS-3

SS-4

SS-1

SS-2

SS-3

SS-4

SS-1

SS-2

SS-3

SS-4

SS-1

SS-2

SS-3

SS-4

SS-5

SS-6

SS-7

ST-2

SS-3

SS-4

SS-5

SS-6

HA-1

HA-2

HA-3

HA-1

HA-2

HA-3

OD

OT

CL

ASS (GI)

CL

ASS (GI)

OD

OT

OD

OT

CL

ASS (GI)

Page 3: PROJECT DESCRIPTION LEGEND · 2019. 1. 22. · d e s ig n \ c a d d s t a n d a r d s \ s a m p l e-p l a n s \ 2 0 1 9 _ e d it s \ s o il _ p r o f il e \ s h e e t s \ 9 9 9 9

-4

20

35

24

NP

NP

- -10.00

1111

89

--

10.00-15.00

(VIS

UA

L)

ST

ATIO

N

&

OFFS

ET

FR

OM T

OC

SFS

SIL

TC

LA

YL

LPI

WC

CL

ASS

%%

%%

%%

EX

PL

OR

ATIO

N

NO.,

H-001-

65

15.00-20.00

20.00-24.00

BR

OW

N, S

AN

DY SIL

T

WIT

H S

TO

NE F

RA

GM

EN

TS

AN

D B

RIC

KB

AT

S

(16

23)

(61

91)

(VIS

UA

L)

DA

RK-

BR

OW

N SIL

T

WIT

H P

AP

ER

AN

D

GA

RB

AG

E

112

242

43

41

1438

A-7-6

SH

TL.

70

55

1137

10A-2-4

56

24

78

5N

PN

P14

A-1-

a

60

23

8N

PN

P15

A-1-

a

-4

20

8-

-(VIS

UA

L)

H-002-65

(86

77)

- -14.00

14.00-19.00

6.00

0.80

6.00

2.50

0.00

2.50

6.00

6.00

9.00

9.00

93

439

45

43

1825

A-7-6

72

106

75

NP

NP

25

A-1-

a

78

134

NP

NP

10A-1-

a- 5 -

- 9 -

- - -15.00

0.00

3.00

3.00

02

20

46

32

79

36

66

A-7-5

81

84

34

NP

NP

10A-1-

a

69

165

NP

NP

13A-1-

a

H-003-65

9.00

9.00

64

- - -15.00

0.00

4.00

4.00

010

1736

37

95

44

90

A-7-5

80

104

24

NP

NP

13A-1-

a

80

94

NP

NP

13A-1-

a

H-004-65

34

10.00

10.00

RA

MP

H

HIS

TO

RIC B

ORIN

GS

BR

OW

N SIL

T

WIT

H

GR

AV

EL,

GA

RB

AG

E

AN

D P

AP

ER

01.

00

02.50

89

15A-1-

a

ST

A. 56+00, 10

0'

LT.

02.50-04.00

78

15A-1-

a

05.00-06.50

83

60

22

115

2N

PN

PN

P

15A-1-

a

07.50-09.00

83

24

A-1-

a

10.00-11.50

83

12

12.50-14.00

89

15

15.00-16.50

83

22

17.50-19.00

94

14

01.

00

02.50

94

32

1416

20

1827

1413

13A-6a

02.50-04.00

94

31

1915

22

1320

146

10A-2-4

04.00-05.50

83

13A-2-4

05.50-07.00

100

17A-2-4

01.

00

02.50

83

54

1513

135

NP

NP

NP

5A-1-

b

ST

A. 60

+00, \

02.50-04.00

83

27

1516

28

1422

166

12A-4a

04.00-05.50

89

10A-4a

05.50-07.00

89

43

1813

1610

1914

58

A-2-4

(VIS

UA

L)

(0)

(1)

(0)

(VIS

UA

L)

(VIS

UA

L)

(0)

(1)

(VIS

UA

L)

(0)

20.00-20.30

1610

0S

HA

LE,

GR

AY,

WE

AT

HE

RE

D,

WE

AK, F

RA

CT

UR

ED

VIS

UA

L

SA

ME

AS SS-2

SA

ME

AS SS-2

SA

ME

AS SS-2

SA

ME

AS SS-4

SA

ME

AS SS-4

SA

ME

AS SS-4

SA

ME

AS SS-4

SA

ME

AS SS-4

A-1-

a(VIS

UA

L)

A-1-

a(VIS

UA

L)

A-1-

a(VIS

UA

L)

A-1-

a(VIS

UA

L)

SA

ME

AS SS-4

SA

ME

AS SS-4

(VIS

UA

L)

(VIS

UA

L)

- - -

01.

00

02.50

83

78

124

51

NP

NP

NP

3A-1-

a

02.50-04.00

89

80

123

41

NP

NP

NP

5A-1-

a

04.00-05.50

94

5A-1-

a

05.50-07.00

78

1729

23

20

11N

PN

PN

P8

A-3a

07.50-09.00

83

8A-3a

10.00-12.00

89

12.50-14.00

83

A-4a

15.00-16.50

78

13A-4a

17.50-19.00

100

23

1321

26

1720

146

10A-4a

20.00-21.

50

89

10A-4a

22.50-24.00

83

70

99

93

NP

NP

NP

4A-1-

a

25.00-26.50

83

2A-1-

a

28.50-30.00

89

4A-1-

a

(0)

(0)

(0)

(VIS

UA

L)

(VIS

UA

L)

(2)

(VIS

UA

L)

(0)

(VIS

UA

L)

SA

ME

AS SS-12

SA

ME

AS SS-12

SA

ME

AS SS-2

SA

ME

AS SS-4

(VIS

UA

L)

SA

ME

AS SS-9

SA

ME

AS SS-9

SA

ME

AS SS-9

(VIS

UA

L)

-

(VIS

UA

L)

(6)

52

29

44

20

22

148

18A-4a

18

20

14 18 26

20

27

26

34

33

53

60

38

41

37

30

38

31

46

53

38

50/4"

15 27

19 22

31

12 20

40

ST

ATIO

N

&

OFFS

ET

FR

OM T

OC

SFS

SIL

TC

LA

YL

LPI

WC

PL

%

RE

C

%%

%%

%%

EX

PL

OR

ATIO

N

NO.,

N60

pp

m

SO

4

ST

A. 56+00, 30'

LT.

ST

A. 58+00, 4'

LT.

(\ E

X. R

AM

P

H, S

TA. 1+

50, 35'

LT.)

(\ E

X. R

AM

P

H, S

TA. 3+50, 30'

LT.)

(\ E

X. R

AM

P

H, S

TA. 5+40, 6'

RT.)

(\ E

X. R

AM

P

H, S

TA. 6+70, 26'

LT.)

GR

LA

TIT

UD

E = 39.927758

LO

NGIT

UD

E = -83.855803

LA

TIT

UD

E = 39.928074

LO

NGIT

UD

E = -83.855208

LA

TIT

UD

E = 39.928590

LO

NGIT

UD

E = -83.854967

- -

2.00

1.50

2.50

- - - - - - - - - - - -

178

426

B-015-1-

14

B-016-0-14

B-017-0-14

X:\

Desig

n\

CA

DD

Standards\

SA

MP

LE

PL

AN

S\

2019_edits\

Soil_

Profile\

Sheets\

99999ID

002.d

gn

Sheet 1/18/2019 12:3

6:4

5

PM blo

gston

3 11

CH

EC

KE

D

RE

D

IN

K

DR

AW

N

SOIL

PR

OFIL

E

SU

MM

AR

Y

OF

SOIL

TE

ST

DA

TA

TE

R-3

95-0.0

0

LA

TIT

UD

E = 39.927638

LO

NGIT

UD

E = -83.855608

B-015-0-14

- - - - -

1.50

3.00

3.50

4.00

4.00

- - -

-

GR

HP

tsf

SU

MM

AR

Y

OF S

OIL T

ES

T

DA

TA

ID

SA

MP

LE

RA

MP

H (C

ON

T.)

SU

MM

AR

Y

OF S

OIL T

ES

T

DA

TA

923

SS-1

SS-2

SS-3

SS-4

SS-5

SS-6

SS-7

SS-8

SS-1

SS-2

SS-3

SS-4

SS-1

SS-2

SS-3

SS-4

SS-9

SS-1

SS-2

SS-3

SS-4

SS-5

ST-6

SS-7

SS-8

SS-9

SS-10

SS-11

SS-12

SS-13

OD

OT

CL

ASS (GI)

\ C

ON

ST. R

AM

P

H, S

TA. 51+

40, 27'

LT.

\ C

ON

ST. R

AM

P

H, S

TA. 53+45, 24'

LT.

\ C

ON

ST. R

AM

P

H, S

TA. 55+17, 48'

RT.

\ C

ON

ST. R

AM

P

H, S

TA. 56+31, 6'

RT.

Page 4: PROJECT DESCRIPTION LEGEND · 2019. 1. 22. · d e s ig n \ c a d d s t a n d a r d s \ s a m p l e-p l a n s \ 2 0 1 9 _ e d it s \ s o il _ p r o f il e \ s h e e t s \ 9 9 9 9

X:\

Desig

n\

CA

DD

Standards\

SA

MP

LE

PL

AN

S\

2019_edits\

Soil_

Profile\

Sheets\

99999ID

003.d

gn

Sheet 1/18/2019 12:3

6:4

6

PM blo

gston

4 11

CH

EC

KE

D

RE

D

IN

K

DR

AW

N

SOIL

PR

OFIL

E

LA

BO

RA

TO

RY

TE

ST

DA

TA

TE

R-3

95-0.0

0

Page 5: PROJECT DESCRIPTION LEGEND · 2019. 1. 22. · d e s ig n \ c a d d s t a n d a r d s \ s a m p l e-p l a n s \ 2 0 1 9 _ e d it s \ s o il _ p r o f il e \ s h e e t s \ 9 9 9 9

2+00 3+00 4+00 5+00 6+00 7+00

890

900

910

920

930

940

950

890

900

910

920

930

940

950

N

1+000+00 8+00 9+00 10+00 11+00 12+00

MA

TC

H LIN

E S

TA. 12

+50

939.50

939.58

939.66

939.71

939.66

939.61

939.52

939.33

939.06

938.69

938.24

937.70

937.07

936.35

935.59

934.78

933.88

932.89

931.

82

930.66

929.41

928.07

926.65

925.17

923.68

922.19

920.70

919.21

917.72

916.24

914.84

913.52

912.27

911.11

910.02

909.01

908.08

907.23

906.46

905.76

905.15

904.61

904.15

903.77

903.47

903.25

903.10

903.03

903.04

903.13

78

910

8

50

0

5 10

610

10

5

0

89

11

12

7

9

10

4

321

67

939.32

939.97

939.75

939.30

937.98

936.14

933.90

931.

59

929.25

926.83

924.51

922.20

919.94

917.67

915.35

913.14

911.03

909.13

907.65

906.27

905.10

904.10

903.50

903.04

903.14

903.39

W

895

900

900

900

900

905

905

905

905

905

905

905

905

910

910

910

910

910

910

910

910

910

910915

915

915

915

915

915

915

920

920

920

920

920

920

920

920

920

920

920

920

925

925

925

925

925

925

925

925

925

930

930

930

930

930

930

930

930

930

930

930

935

935

935

935

935

935

935

935

935

935

935

940

940

940

940

940

940

940

945

945

945

945

945

950

950

950

H-001-65

WC

WC

WC

WC

566933

151223

N60

1410912

45254623

N60

211494

147

6368

N60

35151417

1155

19

N60

CONCRETE = 0.8'

|

B-001-0-14

ASPHALT = 0.7'

|

B-004-0-14

BASE = 0.5'

ASPHALT = 0.5'

7' RT.

B-002-0-14

ASPHALT = 0.7'

3' LT.

B-003-0-14

B-001-0-14

B-002-0-14

B-013-0-14

B-012-0-14

B-011-0-14

B-003-0-14

B-004-0-14

\ EX. RAMP G \ CONST. RAMP H

SR 395

| CONST.

(TR 130)

WEST ST.

| CONST.

(TR 130)

WEST ST.

| EX.

US 92

| EX.

\ EX. RAMP H

STA. 0+00 | CONST. SR 395

STA. 611+02.67 | EX. US 92 =

STA. 10+07.65 | EX. WEST ST.

STA. 4+44.53 | CONST. SR 395 =

STA. 50+00.00 \ CONST. RAMP H

STA. 5+53.00 | CONST. SR 395 =STA. 10+43.42 | CONST. WEST ST. (TR 130)

STA. 5+40.78 | CONST. SR 395 =

STA. 0+07.30 \ EX. RAMP H

STA. 5+42.91 | CONST. SR 395 =

FOR SOIL PROFILE CROSS SECTIONS FOR RAMP H SEE SHEET NOS. 10 & 11.

FOR SOIL PROFILE FOR RAMP H SEE SHEET NO. 9.

FOR SOIL PROFILE FOR WEST ST. (TR 130) SEE SHEET NO. 8.

STA. 0+00

BEGIN PROJECT

ST

A. 6+75

BE

GIN

WO

RK

COMMERCIAL

PAVEMENT

DETERIORATED

COMMERCIAL

APPROXIMATE LIMITS

ABANDONED LANDFILL

X:\

Desig

n\

CA

DD

Standards\

SA

MP

LE

PL

AN

S\

2019_edits\

Soil_

Profile\

Sheets\

99999IP

001.d

gn

Sheet 1/18/2019 12:3

7:0

5

PM blo

gston

HO

RIZ

ON

TA

L

SC

AL

E IN F

EE

T

100

25

050

5 11

CH

EC

KE

D

RE

D

IN

K

DR

AW

N

SOIL

PR

OFIL

E

ST

A.

0+0

0

TO

ST

A.

12

+5

0

SR

39

5T

ER-3

95-0.0

0

Page 6: PROJECT DESCRIPTION LEGEND · 2019. 1. 22. · d e s ig n \ c a d d s t a n d a r d s \ s a m p l e-p l a n s \ 2 0 1 9 _ e d it s \ s o il _ p r o f il e \ s h e e t s \ 9 9 9 9

13+00 14+00 15+00 16+00 17+00 18+00 19+00 20+00 21+00 22+00 23+00 24+00 25+00

870

880

890

900

910

920

930

870

880

890

900

910

920

930

Align: CLPC327

Angle: 77.2072

Sheet: 2

N

12+00

MA

TC

H LIN

E ST

A. 12

+50

MA

TC

H LIN

E S

TA. 25+00

903.29

903.53

903.79

904.05

904.32

904.65

905.04

905.48

905.99

906.55

907.17

907.79

908.40

909.02

909.64

910.26

910.82

911.29

911.67

911.96

912.16

912.28

912.31

912.25

912.10

911.86

911.54

911.13

910.64

910.17

909.77

909.41

909.11

908.87

908.68

908.54

908.46

908.43

908.45

908.53

908.66

908.85

909.09

909.39

909.74

910.13

910.53

910.93

911.32

911.70

903.39

903.63

904.06

904.90

905.86

906.74

907.72

908.84

910.13

911.27

911.67

911.50

910.85

910.00

909.22

908.76

908.43

908.11

907.86

907.89

908.20

908.38

908.79

909.37

910.16

BRUSH & SCATTERED TREES

BRUSH & SCATTERED TREES

COMMERCIAL (VACANT)

COMMERCIAL

15

20

13

14

16 1718

19

21

22

23

24

W

895

895

895

895

895

895

895

895

895

895

895

900

900

900

900900

900

905

905

905 905905

905

905

905

905

905

905

910

910

910

910

910

910

910 910

910

9109

10

910

910

910910

910

910

910

910

915

915915

915

915

920

920

920

920

925

925

930

WC

WC WC

B-005-0-14

B-006-0-14

B-007-0-14

| CONST. SR 395

X:\

Desig

n\

CA

DD

Standards\

SA

MP

LE

PL

AN

S\

2019_edits\

Soil_

Profile\

Sheets\

99999IP

002.d

gn

Sheet 1/18/2019 12:3

7:0

6

PM blo

gston

HO

RIZ

ON

TA

L

SC

AL

E IN F

EE

T

100

25

050

6 11

CH

EC

KE

D

RE

D

IN

K

DR

AW

N

SOIL

PR

OFIL

E

ST

A.

12

+5

0

TO

ST

A.

25

+0

0

SR

39

5T

ER-3

95-0.0

0

ASPHALT = 0.8'

|

B-005-0-14

ASPHALT = 0.6'

|

B-006-0-14

ASPHALT = 0.8'

|

B-007-0-14

12

15171313

11

47

1011

N60

20202313

151085

N60

66165

31111141

N60

Page 7: PROJECT DESCRIPTION LEGEND · 2019. 1. 22. · d e s ig n \ c a d d s t a n d a r d s \ s a m p l e-p l a n s \ 2 0 1 9 _ e d it s \ s o il _ p r o f il e \ s h e e t s \ 9 9 9 9

25+00 26+00 27+00 28+00 29+00 30+00 31+00 32+00 33+00 34+00 35+00 36+00 37+00

880

890

900

910

920

930

940

880

890

900

910

920

930

940

N

MA

TC

H LIN

E S

TA. 25+00

CR 10

PIK

E S

T.

912.03

912.33

912.59

912.81

913.00

913.14

913.25

913.32

913.35

913.34

913.29

913.21

913.11

913.02

912.93

912.83

912.74

912.65

912.56

912.46

912.37

912.28

912.19

912.11

912.06

912.04

912.05

912.06

91 2.08

91 2.10

912.1 1

912.13

912.15

912.16

912.18

912.20

912.21

912.23

912.25

912.26

912.28

912.30

912.31

912.33

912.35

912.36

911.15

911.90

912.11

912.23

912.14

912.23

912.23

911.96

911.59

91 1.24

911.42

911.75

911.99

912.01

911.92

911.92

912.03

912.17

912.38

912.58

912.58

912.39

912.45

912.74

912.62

912.26

WEEDS

CO

MM

ER

CIA

L

COMMERCIAL

BRUSH & SCATTERED TREES

30

35

26

27 2829

3132

3334

3637

38

895

900

900

900

900

905

905

905

910 910910

910

910

910

915915 915

915

915

915

920

920

920

920920

925

925

925

925

925

925

925

925

925

930

930

930

930 9

30

935

WC WC WC

B-008-0-14

B-009-0-14

B-010-0-14

ASPHALT = 0.7'

1' LT.

B-008-0-14

ASPHALT = 0.7'

1' LT.

B-009-0-14

ASPHALT = 0.8'

4' LT.

B-010-0-14

25

N60

2220186

26128

30

N60

2416216

11161060

N60

1724125

112786

X:\

Desig

n\

CA

DD

Standards\

SA

MP

LE

PL

AN

S\

2019_edits\

Soil_

Profile\

Sheets\

99999IP

003.d

gn

Sheet 1/18/2019 12:3

7:0

7

PM blo

gston

HO

RIZ

ON

TA

L

SC

AL

E IN F

EE

T

100

25

050

7 11

CH

EC

KE

D

RE

D

IN

K

DR

AW

N

SOIL

PR

OFIL

E

ST

A.

25

+0

0

TO

ST

A.

36

+2

5

SR

39

5T

ER-3

95-0.0

0

| CONST. SR 395

STA. 36+25

END PROJECT

Page 8: PROJECT DESCRIPTION LEGEND · 2019. 1. 22. · d e s ig n \ c a d d s t a n d a r d s \ s a m p l e-p l a n s \ 2 0 1 9 _ e d it s \ s o il _ p r o f il e \ s h e e t s \ 9 9 9 9

5+00 6+00 7+00 8+00 9+00 10+00

900

910

920

930

940

950

960

900

910

920

930

940

950

960

Align: CLPCOLU

Angle: 10.9874

Sheet: 1

N

890 890

952.89

948.43

943.77

939.17

935.22

932.35

930.39

927.23

919.28

915.78

914.14

922.09

932.39

931.

27

930.28

929.41

928.67

928.06

927.57

927.21

926.98

926.87

926.89

926.97

927.05

927.13

933.64

927.19

COMMERCIAL

WEEDS

3

4

5

6

7

8

9

10

8

50

55

5

5

10

0 5

415

8

5

6

7

910

4

3

6

7

W

900

9059

05

905

905 905

905

910

910 910

910

910

915

915

915

915915

915

915

915

920

920

920

920

920

920

920920

920

920920

920

920

925

925

925

925

925

925

925

925

925

925

925

925

930

930

930

930

930

930

930

930

930

930

930

930

930

930

935

935

935

935

935

935

935

935

935

935

935

935

935

935

935

940

940

940

940

940

940

940

940

940

940

940

940940

945

945

945

945

945

945

945

945

945945945

945

945

945

945

950

950

950

955

WC

WC

H-001-65H-002-65

H-003-65

H-004-65

B-011-0-14

B-012-0-14

B-002-0-14

B-003-0-14

B-013-0-14 B-014-0-14

B-014-1-14

H-014-2-14

H-014-3-14

B-015-1-14

B-015-0-14

B-016-0-14

ASPHALT = 0.6'

2' RT.

B-011-0-14

\ CONST. RAMP H

\ EX. RAMP G

| CONST. SR 395

| EX. WEST ST.

| CONST. WEST ST.

| EX. US 102

APPROXIMATE LIMITS

ABANDONED LANDFILL

\ EX. RAMP H

STA. 0+07.30 \ EX. RAMP H

STA. 5+42.91 | CONST. SR 395 =

STA. 50+00.00 \ CONST. RAMP H

STA. 5+53.00 | CONST. SR 395 =

STA. 10+43.42 | CONST. WEST ST. (TR 130)

STA. 5+40.78 | CONST. SR 395 =

STA. 10+07.65 | EX. WEST ST.

STA. 4+44.53 | CONST. SR 395 =

FOR SOIL PROFILE CROSS SECTIONS FOR RAMP H SEE SHEET NOS. 10 & 11.

FOR SOIL PROFILE FOR RAMP H SEE SHEET NO. 9.

FOR SOIL PROFILE FOR SR 395 SEE SHEET NOS. 5-7. APPROXIMATE LIMITS

ABANDONED LANDFILL

X:\

Desig

n\

CA

DD

Standards\

SA

MP

LE

PL

AN

S\

2019_edits\

Soil_

Profile\

Sheets\

99999IP

004.d

gn

Sheet 1/18/2019 12:3

7:0

8

PM blo

gston

HO

RIZ

ON

TA

L

SC

AL

E IN F

EE

T

100

25

050

8 11

CH

EC

KE

D

RE

D

IN

K

DR

AW

N

SOIL

PR

OFIL

E

WE

ST

ST. (T

R

13

0)

TE

R-3

95-0.0

0

TOPSOIL = 0.4'

|

B-012-0-14

1918149

20315018

N60

5

6

5

19

11

712

46

55

44

31

29

4015

N60

BEGIN WORK

STA. 6+75

Page 9: PROJECT DESCRIPTION LEGEND · 2019. 1. 22. · d e s ig n \ c a d d s t a n d a r d s \ s a m p l e-p l a n s \ 2 0 1 9 _ e d it s \ s o il _ p r o f il e \ s h e e t s \ 9 9 9 9

50+00 51+00 52+00 53+00 54+00 55+00 56+00 57+00 58+00 59+00 60+00 61+00

890

900

910

920

930

940

950

890

900

910

920

930

940

950

Align: BLPR068H

Angle: 43.9560

Sheet: 2

N

949.04

880 880

926.48

926.40

926.33

926.40

926.63

927.03

927.60

928.33

929.24

930.31

931.

51

932.72

933.93

935.14

936.35

937.56

938.77

939.96

941.

07

942.11

943.07

943.96

944.78

945.52

946.18

946.78

947.30

947.74

948.11

948.42

948.71

949.07

949.20

949.36

949.50

949.64

949.77

949.84

949.96

950.06

950.01

949.99

949.80

949.53

949.19

922.14

922.89

924.10

926.15

928.59

930.92

933.21

935.31

933.51

931.

36

929.66

931.

04

934.91

942.67

947.09

948.42

949.05

949.34

949.58

949.81

949.81

949.51

948.52

WEEDS

9

10

50

55

60

5

5

0

5

10

420

9

10

4

6

7

870 870

W

W

W W

900

900

900

900

905

905

905

905

905

905

905

905

905

905

905

905

910

910

910

910

910

910

915

915

915

915

915

915

915

915

920

920

920

920

920

920

920

920

920

925

925

925

925

925

925

925

925

925

930

930

930

930

930

930

930935

935

93593

5

935

935

935

935

935

940

940

940

940

940

940

940

940

945

945

945 945

945

945

950

950

950

H-001-65

H-002-65

H-003-65

H-004-65

ON BOULDER

AUGER REFUSAL

WC

WC

WC

WCWC

B-012-0-14

B-002-0-14

B-013-0-14

B-014-1-14

H-014-3-14

H-014-2-14

B-015-1-14

B-015-0-14

B-016-0-14

B-017-0-14

B-014-0-14

ASPHALT = 0.8'

16' RT.

B-013-0-14

ASPHALT = 0.8'

10' RT.

B-014-0-14

ASPHALT = 0.7'

4' LT.

B-016-0-14

FOR SOIL PROFILE CROSS SECTIONS FOR RAMP H SEE SHEET NOS. 10 & 11.

FOR SOIL PROFILE FOR WEST ST. (TR 130) SEE SHEET 87.

FOR SOIL PROFILE FOR SR 395 SEE SHEET NOS. 5-7.

\ CONST. RAMP H

\ EX. RAMP G

| EX. US 102

| CONST. SR 395

(TR 130)

WEST ST.

| CONST.

(TR 130)

WEST ST.

| EX.

\ EX. RAMP H

STA. 50+00.00 \ CONST. RAMP H

STA. 5+53.00 | CONST. SR 395 =

STA. 0+07.30 \ EX. RAMP H

STA. 5+42.91 | CONST. SR 395 =

STA. 10+43.42 | CONST. WEST ST. (TR 130)

STA. 5+40.78 | CONST. SR 395 =

STA. 10+07.65 | EX. WEST ST.

STA. 4+44.53 | CONST. SR 395 =

APPROXIMATE LIMITS

ABANDONED LANDFILL

HO

RIZ

ON

TA

L

SC

AL

E IN F

EE

T

100

25

050

9 11

CH

EC

KE

D

IN

K

DR

AW

N

RE

D

SOIL

PR

OFIL

E

RA

MP

HT

ER-3

95-0.0

0

X:\

Desig

n\

CA

DD

Standards\

SA

MP

LE

PL

AN

S\

2019_edits\

Soil_

Profile\

Sheets\

99999IP

005.d

gn

Sheet 1/18/2019 12:3

7:0

8

PM blo

gston

38

23

14

15

25

25

10

66

10

1313

13

90

910137

29314245

N60

141499

31141431

N60

3558

8

18

13

10

10

4

2

4

20141826

20

ST

27

26

34

33

53

60

38

N60

17131013

22192715

N60

810125

40201231

N60

18 SLIGHTLY ORGANIC

ASPHALT = 0.7'

\

B-017-0-14

BRICKBATS

WITH ST. FRAGS. AND

BROWN SANDY SILT

GARBAGE

WITH PAPER AND

DARK-BROWN SILT

(BOULDERS)

REFUSAL

AND PAPER

GRAVEL, GARBAGE

BROWN SILT WITH

(HOLE CAVED IN)REFUSAL

REFUSAL

STA. 61+30.87

END WORK

CROSS SECTION INDEX

STATION SHEET

52+00 & 54+00

55+00 & 56+00

10

11

27' LT.

H-001-65

24' LT.

H-002-65

48' RT.

H-003-65

TOPSOIL = 0.8'

30' LT.

B-015-0-14

6' RT.

STA. 56+31

H-004-65

Page 10: PROJECT DESCRIPTION LEGEND · 2019. 1. 22. · d e s ig n \ c a d d s t a n d a r d s \ s a m p l e-p l a n s \ 2 0 1 9 _ e d it s \ s o il _ p r o f il e \ s h e e t s \ 9 9 9 9

54+00.00

938.77

933.51

2:1

6:1

52+00.00

929.24

928.59

2:1 7:1

WC

WC

WC

W

W

900.4

3:13:1

GARBAGE AND PAPER

BROWN SILT, WITH

141499

31141431

N60

14

12

21

56

21

-

33

33

31

8

16

ST

N60

910137

29314245

N60

38

23

14

15

25

25

10

ASPHALT = 0.8'

B-014-0-14

TOPSOIL = 0.4'

B-014-1-14

ASPHALT = 0.8'

B-013-0-14

X:\

Desig

n\

CA

DD

Standards\

SA

MP

LE

PL

AN

S\

2019_edits\

Soil_

Profile\

Sheets\

99999IX

001.d

gn

Sheet 1/18/2019 12:3

7:0

9

PM blo

gston

10 11

CH

EC

KE

D

IN

K

DR

AW

N0

20

10

5

HO

RIZ

ON

TA

L

SC

AL

E IN F

EE

T

SOIL

PR

OFIL

E

RE

D

TE

R-3

95-0.0

0R

AM

P

H

CR

OS

S

SE

CTIO

NS

ST

A.

52

+0

0

&

ST

A.

54

+0

0

\ Existing Ramp H

\ Ramp G

\ Existing Ramp H

940

930

920

910

900

890

880

870

860

940

930

920

910

900

890

880

870

940

930

920

910

900

890

880

870

860

940

930

920

910

900

890

880

870

140 130 120 110 100 90 80 70 60 50 40 30 20 10 10 20 30 40 50 60 70 80 90 100 110 120 130 140 0

(BOULDERS)

REFUSAL

(HOLE CAVED IN)

GARBAGE

WITH PAPER AND

DARK-BROWN SILT BRICKBATS

WITH ST. FRAGS. AND

BROWN SANDY SILT

AND PAPER

GRAVEL, GARBAGE

BROWN SILT WITH

STA. 53+45

H-002-65

STA. 51+40

H-001-65

Page 11: PROJECT DESCRIPTION LEGEND · 2019. 1. 22. · d e s ig n \ c a d d s t a n d a r d s \ s a m p l e-p l a n s \ 2 0 1 9 _ e d it s \ s o il _ p r o f il e \ s h e e t s \ 9 9 9 9

56+00.00

946.18

934.91

2:1

8:1 8:1

W

ON BOULDER

AUGER REFUSAL

RQD 66%, LOSS 0%. NO WATER RETURN.

STRONG, THIN BEDDED, CARBONACEOUS, FRACTURED.

SHALE, GRAY, SLIGHTLY WEATHERED, MODERATELY

WC

WC

55+00.00

943.07

929.66

2:1

10:1

10:1

WC WCW

899.4

3:13:1

13

13

90

REFUSAL

3558

8

18

13

10

10

4

2

4

20141826

20

ST

27

26

34

33

53

60

38

N60

18 SLIGHTLY ORGANIC

14

22

15

12

24

15

15

15

38

53

46

31

38

30

41

N60

16

TR

37

899.9

2:1

3:1

18

16

18

18

15

1666

10

13

REFUSAL

H-014-3-14

H-014-2-14

B-015-1-15

TOPSOIL = 0.8'

B-015-0-14

50/4"

| US 102

\ Existing Ramp H

\ Existing Ramp H

950

940

930

920

910

900

890

880

870

950

940

930

920

910

900

890

880

950

940

930

920

910

900

890

880

870

950

940

930

920

910

900

890

880

140 130 120 110 100 90 80 70 60 50 40 30 20 10 10 20 30 40 50 60 70 80 90 100 110 120 130 140 0

11 11

CH

EC

KE

D

IN

K

DR

AW

N0

20

10

5

HO

RIZ

ON

TA

L

SC

AL

E IN F

EE

TR

ED

SOIL

PR

OFIL

E

RA

MP

H

CR

OS

S

SE

CTIO

NS

ST

A.

55

+0

0

&

ST

A.

56

+0

0T

ER-3

95-0.0

0

X:\

Desig

n\

CA

DD

Standards\

SA

MP

LE

PL

AN

S\

2019_edits\

Soil_

Profile\

Sheets\

99999IX

002.d

gn

Sheet 1/18/2019 12:3

7:1

0

PM blo

gston

STA. 55+17

H-003-65

STA. 56+31

H-004-65