Project Cost Forecasting in SAP Solution Overview

57
SAP Project management solu2ons in detail: Cost Planning & Forecas2ng Varia2on Management

description

Project Cost forecasting

Transcript of Project Cost Forecasting in SAP Solution Overview

Page 1: Project Cost Forecasting in SAP Solution Overview

SAP  Project  management  solu2ons  in  detail:  

  Cost  Planning  &  Forecas2ng  

  Varia2on  Management    

Page 2: Project Cost Forecasting in SAP Solution Overview

This  presenta2on…  

•  This  presenta,on  presents  end-­‐to-­‐end  solu,ons  to  manage  project  cost  planning,  execu,on,  monitoring,  forecas,ng  and  varia,ons  in  SAP  

•  The  project  data  is  managed  in  the  integrated  SAP  ECC  system  enhanced  by  Noveco’s  extended  Project  Management  (ePM)  add-­‐on  

Page 3: Project Cost Forecasting in SAP Solution Overview

Cost  Planning  and  Forecas2ng  solu2ons    

Page 4: Project Cost Forecasting in SAP Solution Overview

Process  overview  

Step-­‐by-­‐step  walkthrough  

Page 5: Project Cost Forecasting in SAP Solution Overview

Project  Management  Business  Process  Map  

PR PO GR

PR PO SES

Invoice

●  Rough cut Cost Estimation ●  Budget Preparation ●  Profitability Plan

●  Labour Internal External ●  Materials & Services ●  Overheads

●  Network scheduling ●  Cost Plan Distribution

●  Capacity planning ●  Manpower planning ●  Personnel Management

●  Project KPIs monitoring ●  Exception reporting ●  Detailed Reporting

●  Progress Assessment ●  Cost & Work to Complete ●  Estimated Costs at Completion

SAP

Stan

dard

N

ovec

o eP

M

●  Project Variation register ●  Cost Estimation ●  Cost integration with EAC/CTC

●  Quotation from project Cost Estimation ●  Pricing and Conditions ●  Link to Project

●  Billing: Lump-Sum, Cost Plus, Schedule of rate

●  Revenue Plan & Actual Integration

Page 6: Project Cost Forecasting in SAP Solution Overview

Project  Lifecycle:  Es2ma2ng  and  Planning  

.  .   .  .  

Effective Project

Management

Execution

Monitoring Forecasting

  Reporting   Analysis   Settlement

  Estimating   Planning   Budgeting

Create Project Cost Plan

Option1: create directly in PS Option2: crate automatically from external estimate

Page 7: Project Cost Forecasting in SAP Solution Overview

Project  Cost  Planning  in  SAP  

Type   Resource   Cost  Element   Quan2ty   UOM   Price   Value  

Material   Cable   400000   100   m2   $50   $5,000  

Variable   Sub-­‐Contract   417000   1   AU   $7,500   $7,500  

Labour   Welder   603000   200   H   $40   $8,000  

Labour   Proj.Manager   701000   50   H   $80   $4,000  

$24,500  

Type   Resource   Cost  Element   Quan2ty   UOM   Price   Value  

Labour   Design   400000   100   H   $80   $8,000  

Variable   Engineering   415000   200   H   $90   $18,000  

$26,000  

Page 8: Project Cost Forecasting in SAP Solution Overview

Project  Easy  Cost  Planning  

●  Plan  costs  on  Network  Ac,vity  and/or  WBS  on  the  same  screen  ●  Plan  mul,ple  costs  type  and  resources  on  the  same  project  element  (example  above)  

●  Instant  review  of  your  total  planned  costs  ●  Integra,on  with  procurement  

●  Integra,on  with  resource  planning  (with  Noveco  ePM  enhancements)  ●  Integra,on  with  Cost  Forecas,ng  (with  Noveco  ePM  enhancements)  

Easy  Cost  Planning  highlights  

Cost  Es2ma2on  can  be  created  using  cos2ng  

template  

Page 9: Project Cost Forecasting in SAP Solution Overview

Project  Lifecycle:  Es2ma2ng  and  Planning  

.  .   .  .  

Effective Project

Management

Execution

Monitoring Forecasting

  Reporting   Analysis   Settlement

  Estimating   Planning   Budgeting

Create Project Cost Plan

Option1: create directly in PS Option2: crate automatically from external estimate

Page 10: Project Cost Forecasting in SAP Solution Overview

●  Create  Cost  Quan,ty  Structure  in  an  Es,ma,ng  system  

●  Assign  SAP  Cost  Elements    ●  Map  es,mate  to  project  WBS  or  NWA  

●  Generate  Cost  Es,mates  in  Easy  Cost  Planning  on  assigned  project  planning  elements  automa,cally  

BAPI  

Project  Cost  Es2ma2on  generated  automa2cally  

Es2ma2ng  soUware  

Excel

Page 11: Project Cost Forecasting in SAP Solution Overview

Project  Lifecycle:  Es2ma2ng  and  Planning  

.  .   .  .  

Effective Project

Management

Execution

Monitoring Forecasting

  Reporting   Analysis   Settlement

  Estimating   Planning   Budgeting

Project Plan

Project Schedule Plan Cost distribution

Page 12: Project Cost Forecasting in SAP Solution Overview

Project  Scheduling  

●  Create  Network  Ac,vity  Rela,onships  ●  Schedule  Network  ●  System  determines  start  and  finish  dates  (earliest  and  latest)    for  each  network  

ac,vity  and  project  

Page 13: Project Cost Forecasting in SAP Solution Overview

Project  Lifecycle:  Es2ma2ng  and  Planning  

.  .   .  .  

Effective Project

Management

Execution

Monitoring Forecasting

  Reporting   Analysis   Settlement

  Estimating   Planning   Budgeting

Project Plan

Project Schedule Plan Cost distribution

Page 14: Project Cost Forecasting in SAP Solution Overview

Distribu2on  of  Es2mated  Costs  

Noveco’s  ePM:    ●  Cost  Es,mate  Distributed  along  the  WBS  and  NWA  

start  –  finish  dates    

●  converts  Cost  Es,ma,on  to  Project  Cost  Forecasts    ●  Forecast  Costs  are  distributed  along  project  ,me  line  ●  Generates  Resource  plan  from  Easy  Cost  Plan  

Cost Estimate

Costs Estimate

t

t

$

$

Feb-10 Mar-10 Apr-10 May-10

Feb-10 Mar-10 Apr-10 May-10

Costs to Complete

t

$

Feb-10 Mar-10 Apr-10 May-10

Page 15: Project Cost Forecasting in SAP Solution Overview

Project  Es2mated  Cost  are  distributed  as  Cost  Forecasts    

●  Cost  Forecasts  are    distributed  along  the  project  ,me  frame.  

●  Users  can  manually  adjust  distribu,on  pacern  (Noveco  ePM  Workbench)  

Page 16: Project Cost Forecasting in SAP Solution Overview

Project  Cos2ng:  cos2ng  layers  

Project Costing layers C

ost E

stim

ate

Cos

t To

Com

plet

e

Act

ual C

osts

Com

mitm

ents

Varia

tions

Con

tinge

ncy

Cos

t Est

imat

e

Cos

t To

Com

plet

e

Project planning phase finished:

  Project structure created   Cost Estimate saved on project   Project start & finish date created   Initial Cost Forecast generated from Cost

Estimate   Plan costs are distributed

Page 17: Project Cost Forecasting in SAP Solution Overview

.  .  

Project  Management:  Execu2on  

.  .  

Effective Project

Management

Execution

Monitoring Forecasting

  Reporting   Analysis   Settlement

  Estimating   Planning   Budgeting

Project Execution

•  Time sheets (internal labour/external labour) •  Service, Materials and Equipment Procurement •  Invoices & Payments

Page 18: Project Cost Forecasting in SAP Solution Overview

Project  Actual  Costs  Collec2on    

Time sheets

Expenses    &  

other  costs  

Material  Consump2on  from  stock  

Sub-Contracted Services

Equipment & Materials Direct

Page 19: Project Cost Forecasting in SAP Solution Overview

Service  and  Material  Procurement  

materials

Services

  Procurement  of  Materials  or  sub-­‐contacted  services  directly  to  project  

  Automa,c  adjustments  of  Cost  to  Complete  from  raising  commitments  or  actual  costs  (ePM  workbench)  

Purchase Requisition

Purchase Order

Invoice

Good receipt or

Service Entry

EAC Actual Cost Commitments Cost To Complete

$1,000.0 $0.0 $0.0 $1000.0

EAC Actual Cost Commitments Cost To Complete

$1,000.0 $0.0 $800.0 $200.0

EAC Actual Cost Commitments Cost To Complete

$1,000.0 $500.0 $300.0 $200.0

Page 20: Project Cost Forecasting in SAP Solution Overview

Project  Cos2ng:  cos2ng  layers  

Project Costing layers C

ost E

stim

ate

Cos

t To

Com

plet

e

Act

ual C

osts

Com

mitm

ents

Varia

tions

Con

tinge

ncy

Cos

t Est

imat

e

Cos

t To

Com

plet

e A

ctua

l Cos

ts &

Com

mitm

ents

Project Execution phase:

  Time confirmations posted   Purchase Orders created   Good receipts posted   Service Entry sheets accepted   Invoices & payments   Cost Forecasts automatically recalculated

Page 21: Project Cost Forecasting in SAP Solution Overview

.  .   .  .  

Project  Management:  Cost  Forecas2ng  

Effective Project

Management

Execution

Monitoring Forecasting

  Reporting   Analysis   Settlement

  Estimating   Planning   Budgeting

Monitoring & Forecasting

•  Auto reduction of Cost To Complete •  Compare Cost Estimate with Estimate At Completion •  Manually change remaining Cost and Work

Page 22: Project Cost Forecasting in SAP Solution Overview

Project  Management  Business  Process  Map  

PR PO GR

PR PO SES

Invoice

●  Rough cut Cost Estimation ●  Budget Preparation ●  Profitability Plan

●  Labour Internal External ●  Materials & Services ●  Overheads

●  Network scheduling ●  Cost Plan Distribution

●  Capacity planning ●  Manpower planning ●  Personnel Management

●  Project KPIs monitoring ●  Exception reporting ●  Detailed Reporting

●  Progress Assessment ●  Cost & Work to Complete ●  Estimated Costs at Completion

SAP

Stan

dard

N

ovec

o eP

M

●  Project Variation register ●  Cost Estimation ●  Cost integration with EAC/CTC

●  Quotation from project Cost Estimation ●  Pricing and Conditions ●  Link to Project

●  Billing: Lump-Sum, Cost Plus, Schedule of rate

●  Revenue Plan & Actual Integration

Page 23: Project Cost Forecasting in SAP Solution Overview

ePM:  Project  Manager  Workbench  

Project Manager Workbench  Automatically reduces Cost To Complete

from posted actual costs and commitments  Recalculates project Estimated Cost at

Completion (EAC)

 Compares Project Plan vs EAC and presents exceptions in form of traffic lights

 Manual change of project work or cost to complete

 Drill down reports

  Forecast history   Period specific CTC/EAC  Etc.

Page 24: Project Cost Forecasting in SAP Solution Overview

Process  overview  

Step-­‐by-­‐step  walkthrough  

•  Cost  Element  based  cost  forecast  •  Opera,on  based  cost  forecast    

Page 25: Project Cost Forecasting in SAP Solution Overview

Forecas2ng:    Cost  To  Complete  calcula2on  Methods  

Cost Element based CTC calculation

Cost  Element   EAC   Actual  Cost   Actual  Qty  

Commitments   Qty  To  Complete    

UOM   Cost  To  Complete  

603000  -­‐  Concrete  work   $3900.0   $3000.0   100.0   $0.0   30.0   m3   $900.0  

610000  -­‐  Electrical  labour   $4000.0   $1000.0   20.0   $1500.0   50.0   Hr   $1500.0  

415000    -­‐Equipment  installa,on   $5500.0   $4500.0   90.0   $500.0   0.0   Hr   $500.0  

Total   $13,400.0   $8,500.0   $2,000.0   $2,900.0  

You  can  change  work  and/or  cost  to  complete  per  cost  element  assigned  to  network  ac,vity  or  WBS  element  

Page 26: Project Cost Forecasting in SAP Solution Overview

ePM  Workbench:  Automa2c  Forecas2ng    Ini2al  

planning   Time  sheets  PO  

Commitment  

Easy

Cos

t Pla

n C

ost F

orec

asts

Copy Cost Plan to Cost Forecast

Cost  Forecas2ng  

Current Budget is Cost Plan Initial CTC generated

from cost plan

Page 27: Project Cost Forecasting in SAP Solution Overview

Project  Actual  Costs  Ini2al  

planning   Time  sheets  PO  

Commitment  Cost  

Forecas2ng  

Time sheets Person  No.   Ac2vity  Type   Actual  Work   Price/H   Actual  Costs  

101234   7000   40  H   $100   $4000.0  

109243   7008   20  H   $100   $2000.0  

Page 28: Project Cost Forecasting in SAP Solution Overview

Project  Monitoring  &  Forecas2ng  Before time confirmation

After time confirmation

CTC automatically reduced

Before time confirmation

Page 29: Project Cost Forecasting in SAP Solution Overview

Project  Actual  Costs  Ini2al  

planning   Time  sheets  PO  

Commitment  Cost  

Forecas2ng  

Purchase Order

40 H x $150.0 = $6000.0

Sub-Contracted Services

Page 30: Project Cost Forecasting in SAP Solution Overview

Project  Monitoring  &  Forecas2ng  Before Purchase Order

After Purchase Order

Before PO created

After PO created - CTC automatically

reduced

Page 31: Project Cost Forecasting in SAP Solution Overview

ePM  Workbench:  Manual  Forecas2ng    Ini2al  

planning   Time  sheets  PO  

Commitment  Cost  

Forecas2ng  

Change Work and Cost To Complete manually

Page 32: Project Cost Forecasting in SAP Solution Overview

Project  manger  workbench:  Excep2ons  

Changed Cost Forecast produces exceptions: Budget Deficit = Budget – EAC = - $9000.0

Page 33: Project Cost Forecasting in SAP Solution Overview

Process  overview  

Step-­‐by-­‐step  walkthrough  

•  Cost  Element  based  cost  forecast  •  Opera2on  based  cost  forecast    

Page 34: Project Cost Forecasting in SAP Solution Overview

Forecas2ng:  Network  Opera2on  based  

Operation based Cost Forecasting

Cost  Element   EAC   Actual  Cost  

Actual  Qty  

Commitments   Qty  To  Complete    

UOM   Cost  To  Complete  

610000  -­‐  Electrical  labour   $4500.0   $1500.0   30.0   $0.0   60.0   m3   $3000.0  

62000  Plumbinglabour   $300.0   $300.0   10.0   0.0   $0.0   Hr   $0.0  

65000  Project  Manager   $500.0   $500.0   10.0   0   $0.0   Hr   $0.0  

Total   $5300.0   $2300.0   $0.0   $3000.0  

Ac2vity  Descrip2on   Plan  Qty  

Actual  Qty  

EAC  Qty  

UOM   Ac2vity  Type   Rate   Cost  Element  

Qty  To  Complete  

Cable  Laying   100.0   50.0   110.0   Hr   EL01   $50.0   610000   60.0  

Page 35: Project Cost Forecasting in SAP Solution Overview

ePM  Workbench:  Automa2c  Forecas2ng    Ini2al  

planning   Time  sheets  PO  

Commitment  

Easy

Cos

t Pla

n C

ost F

orec

asts

Copy Cost Plan to Cost Forecast

Cost  Forecas2ng  

Initial CTC generated from cost plan

Page 36: Project Cost Forecasting in SAP Solution Overview

Project  Actual  Costs  Ini2al  

planning   Time  sheets  PO  

Commitment  Cost  

Forecas2ng  

Time sheets Person  No.   Ac2vity  Type   Actual  Work   Price/H   Actual  Costs  

101456   7010   20  H   $120   $2400.0  

109657   6110   20  H   $123   $2460.0  

Page 37: Project Cost Forecasting in SAP Solution Overview

Project  Monitoring  &  Forecas2ng  Before time confirmation

After time confirmation

Before time confirmation

Work and Cost To Complete

automatically reduced

Page 38: Project Cost Forecasting in SAP Solution Overview

Project  Actual  Costs  Ini2al  

planning   Time  sheets  PO  

Commitment  Cost  

Forecas2ng  

Purchase Order

30 H x $150.0 = $4500.0

Sub-Contracted Services

Page 39: Project Cost Forecasting in SAP Solution Overview

Project  Monitoring  &  Forecas2ng  Before Purchase Order

After Purchase Order

After PO created - CTC automatically

reduced

Before PO created

Page 40: Project Cost Forecasting in SAP Solution Overview

ePM  Workbench:  Manual  Forecas2ng    Ini2al  

planning   Time  sheets  PO  

Commitment  Cost  

Forecas2ng  

Change Work and Cost To Complete manually

Page 41: Project Cost Forecasting in SAP Solution Overview

Project  manger  workbench:  Excep2ons  

Changed Cost Forecast produces exceptions: Budget Deficit = Budget – EAC = - $14,540.0

Page 42: Project Cost Forecasting in SAP Solution Overview

.  .  

Project  Management:  Execu2on  

.  .  

Effective Project

Management

Execution

Monitoring Forecasting

  Reporting   Analysis   Settlement

  Estimating   Planning   Budgeting

Page 43: Project Cost Forecasting in SAP Solution Overview

ePM  Cost  Forecast  Report  (integra2on  with  PS  Info  system)  

Page 44: Project Cost Forecasting in SAP Solution Overview

NovecoePM  Project  Cost  Forecas2ng  

•  Project  Costs  Forecasts  integrated  with  ECC  in  real  ,me  

•  Automa,c  reduc,on  of  Cost  to  Complete  •  Automa,c  recalcula,on  of  project  Es,mated  Cost  at  Comple,on  

•  Manual  adjustment  of  Cost  or  Work  To  Complete  on  Network  Ac,vity  and  WBS  elements  

•  Cost  Forecast  distribu,on  •  Workbench  provides  one  central  place  for  Project  Manager  to  

review  KPIs,  perform  forecasts,  execute  analy,cal  and  drill  down  reports  

•  No  modifica,ons  to  SAP  standard  applica,ons    

•  No  interfaces  •  No  “z-­‐tables”  to  keep  forecasts  costs:  all  data  read/wricen  

from/to  SAP  ECC.  

Page 45: Project Cost Forecasting in SAP Solution Overview

Project  Varia2on  Management  solu2ons  

Page 46: Project Cost Forecasting in SAP Solution Overview

Varia2on  Management  process  

Varia2on   301006  

Project   CS-­‐00123  

Total   $5,000.0  

Accepted   $0.0  

Status   PENDING  

Cost  Element   Descrip2on   Value  

630000   Labour   $1,000.0  

415000   Plant  hire   $1,500.0  

550000   Equipment   $2,500.0  

EAC

AC

CTC

BU

DG

ET

VAR

PEND

Variation

APPR EA

C

AC

CTC

BU

DG

ET

VAR

Variation

Automa,cally  update  project  forecasts  and  

budget  

Create  varia,on  

Es,mate  varia,on  costs  

Assign  to  project  elements  (WBS,  NWA)  

Approve  

Page 47: Project Cost Forecasting in SAP Solution Overview

Budget  Varia2ons:  Affect  Budget  and  Forecas2ng  

Status:  CREATED  

Bud

get

EAC CTC

Varia2on  documents  

Con

tinge

ncy

Varia

tion

EAC CTC

Bud

get

Status:  APPROVED  

Con

tinge

ncy

Varia

tion

Page 48: Project Cost Forecasting in SAP Solution Overview

Con2ngency  Varia2ons:  Affect  Budget  and  Forecas2ng  

Bud

get

EAC CTC

Varia2on  documents  

Con

tinge

ncy

Varia

tion

Status:  CREATED  

EAC CTC

Bud

get

Con

tinge

ncy

Varia

tion

Status:  APPROVED  

Page 49: Project Cost Forecasting in SAP Solution Overview

Varia2on    

• Plan  varia,on  costs  using  Easy  Cost  Planning  format  

• Enter  Revenue  Varia,on  • Assign  varia,on  cost  line  items  to  WBS  or  NWA  (one  varia,on  can  be  assigned  to  many  WBS  or  NWA  within  same  project)  

• Change  status  to  “Pending”  or  “Approved”  

Costs  

Page 50: Project Cost Forecasting in SAP Solution Overview

Varia2ons  integrated  in  Project  Manager  Workbench  

Page 51: Project Cost Forecasting in SAP Solution Overview

Varia2on  Drill  down  reports  

Page 52: Project Cost Forecasting in SAP Solution Overview

ePM  Cost  Forecast  Report  (integra2on  with  PS  Info  system)  

Page 53: Project Cost Forecasting in SAP Solution Overview

Project  Cos2ng:  cos2ng  layers  

Project Costing layers C

ost E

stim

ate

Cos

t To

Com

plet

e

Act

ual C

osts

Com

mitm

ents

Varia

tions

Con

tinge

ncy

Cos

t Est

imat

e

Cos

t To

Com

plet

e A

ctua

l Cos

ts &

Com

mitm

ents

Project Variations:

  Variation created and approved   Project Budgets updated automatically   Projects Cost forecasts updated

automatically   Original Cost Plan not changed

Varia

tions

& C

ontin

genc

y

Page 54: Project Cost Forecasting in SAP Solution Overview

ePM  Varia2on  Management  Advantages  

•  Varia,on  Costs  and  Revenues  are  integrated  with  project  planning,  budge,ng  and  forecas,ng  

•  Automa,c  integra,on  of  varia,ons  based  on  status  change  control  

•  Enable  repor,ng  of:  Original  Cost  Plan,  Current  Budget,  Varia,ons  and  Con,ngency  etc.  

•  Varia,ons  are  Integrated  with  project  manager  workbench  for  easy  tracking  and  repor,ng  

•  Varia,on  and  Con,ngency  values  are  reported  in  SAP  standard  PS  info  system  

•  No  modifica,ons  to  SAP  standard  core  applica,ons    

•  No  “z-­‐tables”  to  keep  varia,on  costs,  all  data  read/wricen  from/to  SAP  standard  database.  

Page 55: Project Cost Forecasting in SAP Solution Overview

Integrated  Project  Management  

Costs    &  

Resource  Forecas2ng  

Project  Manager  

Workbench  

Integrated  Project  Management  in  SAP  

PS FI

HR

CO SD

PM

MM Varia2on  Management  

Page 56: Project Cost Forecasting in SAP Solution Overview

ePM  Project  Manager  Workbench  

ePM  highlights:  ●  ePM    applica,on  is  fully  integrated  with  

standard  SAP  ECC  

●  ePM  enhances  SAP  standard  func,onality  by  providing  comprehensive  solu,ons  for  cost  forecas,ng  and  project  varia,on  management  

●  Cost  Forecas,ng  for  Service  and  Maintenance  Project  are  integrated  with  PM/CS  order  cos,ng  

●  Enables  Management  of    Project  Es,mates,  Budgets,  Cost  To  Complete,  Es,mated  At  Comple,on,  Varia,ons  of  Costs  and  Revenue  

●  Present  informa,on  in  one  easy  to  read  screen  for  project  managers  to  review  their  project  KPIs,  perform  forecas,ng,  execute  drill  down  reports  etc.    

●  Provides  data  layout    for  project  repor,ng  and  analysis  

●  e-­‐PM  is  an  add-­‐on  that  does  not  modify  SAP  standard  core  components  and  is  fully  integrated  with  BW,  RPM  for  strategic  planning  and  repor,ng.  

Page 57: Project Cost Forecasting in SAP Solution Overview