Menino Poti Ana Maria Machado e Claudius Lá na mata, vive o menino Poti.
Project # 1 Rikoti-Zestaponi Highway May, 2011. Rikoti-Zestaponi Highway 11/29/2015Ministry of...
-
Upload
norah-palmer -
Category
Documents
-
view
214 -
download
0
Transcript of Project # 1 Rikoti-Zestaponi Highway May, 2011. Rikoti-Zestaponi Highway 11/29/2015Ministry of...
![Page 1: Project # 1 Rikoti-Zestaponi Highway May, 2011. Rikoti-Zestaponi Highway 11/29/2015Ministry of Regional Development & Infrastructure of Georgia 2 Poti.](https://reader030.fdocuments.net/reader030/viewer/2022032722/56649f455503460f94c665ed/html5/thumbnails/1.jpg)
Project # 1Project # 1
Rikoti-Zestaponi HighwayRikoti-Zestaponi Highway
May, 2011May, 2011
![Page 2: Project # 1 Rikoti-Zestaponi Highway May, 2011. Rikoti-Zestaponi Highway 11/29/2015Ministry of Regional Development & Infrastructure of Georgia 2 Poti.](https://reader030.fdocuments.net/reader030/viewer/2022032722/56649f455503460f94c665ed/html5/thumbnails/2.jpg)
Rikoti-Zestaponi HighwayRikoti-Zestaponi Highway
04/18/23Ministry of Regional Development &
Infrastructure of Georgia 2
Poti
Sarpi
Vale
Sadakhlo
Red bridge
LagodekhiBatu
mi
Zestaponi
Black Sea
TurkeyArmenia
Azerbaijan
Russia
Guguti
Tbilisi
Rikoti
Kutaisi
![Page 3: Project # 1 Rikoti-Zestaponi Highway May, 2011. Rikoti-Zestaponi Highway 11/29/2015Ministry of Regional Development & Infrastructure of Georgia 2 Poti.](https://reader030.fdocuments.net/reader030/viewer/2022032722/56649f455503460f94c665ed/html5/thumbnails/3.jpg)
Rikoti-Zestaponi HighwayRikoti-Zestaponi Highway
04/18/23Ministry of Regional Development &
Infrastructure of Georgia 3
Project DescriptionProject Description(Regional Criteria)(Regional Criteria)
• TRACECA route TRACECA route - Tbilisi-Senaki-Leselidze international road
• Directly Interconnects – 4 Directly Interconnects – 4 countries (Georgia, Turkey, countries (Georgia, Turkey, Armenia, Azerbaijan)Armenia, Azerbaijan)
• Suggested project Suggested project is the to upgrade existing road from 2 lines to 4 lines and construction new road on some sections.• Road section located on Poti-Tbilisi-Red Bridge road (part of TRACECA) in the Imereti region, connecting western and connecting western and eastern regionseastern regions, ensuring transit traffic via Georgia to/from Turkey, Azerbaijan and Armenia. This road section sill ensure ensure connectivity with the Black Sea Ports connectivity with the Black Sea Ports (Poti Sea Port, Batumi Sea Port) and notable impacts on Inter-modality notable impacts on Inter-modality of the region.
![Page 4: Project # 1 Rikoti-Zestaponi Highway May, 2011. Rikoti-Zestaponi Highway 11/29/2015Ministry of Regional Development & Infrastructure of Georgia 2 Poti.](https://reader030.fdocuments.net/reader030/viewer/2022032722/56649f455503460f94c665ed/html5/thumbnails/4.jpg)
Project’s Technical Project’s Technical CharacteristicsCharacteristics
04/18/23Ministry of Regional Development &
Infrastructure of Georgia 4
Widening (upgrading) Highway from 2 lane to 4 Widening (upgrading) Highway from 2 lane to 4 lanelane
• Total Length – 49 km• Existing Capacity – 7 000 vehicles per day• Artificial Constructions (in accordance with the Feasibility
Study)
– Bridges – 5695 m– Tunnel – 5115 m– Transport Nodes – 11 unit
• Existing Lanes – 2• Lanes After Construction – 4
![Page 5: Project # 1 Rikoti-Zestaponi Highway May, 2011. Rikoti-Zestaponi Highway 11/29/2015Ministry of Regional Development & Infrastructure of Georgia 2 Poti.](https://reader030.fdocuments.net/reader030/viewer/2022032722/56649f455503460f94c665ed/html5/thumbnails/5.jpg)
Technical CharacteristicsTechnical Characteristics
04/18/23Ministry of Regional Development &
Infrastructure of Georgia 5
Section
Existing Road Proposed Road
LanesLengt
h (km)
Max Speed (km/h
)
Min Speed (km/h
)
Design Capaci
ty (Vehic
le/ day)
Max Capaci
ty (Vehic
le/ day)
LanesLengt
h (km)
Max Speed (km/h
)
Min Speed (km/h
)
Design Capaci
ty (Vehicle/day)
Max Capaci
ty (Vehicle/day)
Rikoti-Rikoti-ZestaponiZestaponi 2 49 80 50
7 000
7 000
4 43 110 8040000
40000
Note: Topography on the whole section is – terrain Note: Topography on the whole section is – terrain
PROJECTS AADT (2010 year)
Private Car
Mini Buses<15,
Pickups
Buses & Trucks
Trailers & > 3 axels
Sum
Vehicle per day 5,106 1,0673 543 778 7,494
Daily TrafficDaily Traffic
![Page 6: Project # 1 Rikoti-Zestaponi Highway May, 2011. Rikoti-Zestaponi Highway 11/29/2015Ministry of Regional Development & Infrastructure of Georgia 2 Poti.](https://reader030.fdocuments.net/reader030/viewer/2022032722/56649f455503460f94c665ed/html5/thumbnails/6.jpg)
Road SafetyRoad Safety
04/18/23Ministry of Regional Development &
Infrastructure of Georgia 6
• Project implementation is part
of Georgian National Traffic Georgian National Traffic
Safety StrategySafety Strategy
• Can ensure high road capacityhigh road capacity
• No traffic jamsNo traffic jams
• Marking and Signaling Marking and Signaling in accordance with international standards
![Page 7: Project # 1 Rikoti-Zestaponi Highway May, 2011. Rikoti-Zestaponi Highway 11/29/2015Ministry of Regional Development & Infrastructure of Georgia 2 Poti.](https://reader030.fdocuments.net/reader030/viewer/2022032722/56649f455503460f94c665ed/html5/thumbnails/7.jpg)
Economic CriteriaEconomic Criteria
04/18/23Ministry of Regional Development &
Infrastructure of Georgia 7
• Feasibility Study – has been done
• Investment Volume – 340 million USD
Rikoti-Zestaponi LengthTotal Construction
Cost USD thousand
Cost per km USD
thousandIRR
Upgrade/Construct new sections
43.4 333 166 769 10.0
![Page 8: Project # 1 Rikoti-Zestaponi Highway May, 2011. Rikoti-Zestaponi Highway 11/29/2015Ministry of Regional Development & Infrastructure of Georgia 2 Poti.](https://reader030.fdocuments.net/reader030/viewer/2022032722/56649f455503460f94c665ed/html5/thumbnails/8.jpg)
Preliminary Environmental Preliminary Environmental AssessmentAssessment
04/18/23Ministry of Regional Development &
Infrastructure of Georgia 8
• Infrastructure Environmental Effect Infrastructure Environmental Effect is – minimalis – minimal
• Impact on Pollution is – minimalImpact on Pollution is – minimal
• Impact on Noise is – lowImpact on Noise is – low
• Emission due to traffic will be Emission due to traffic will be sensible reducedsensible reduced
![Page 9: Project # 1 Rikoti-Zestaponi Highway May, 2011. Rikoti-Zestaponi Highway 11/29/2015Ministry of Regional Development & Infrastructure of Georgia 2 Poti.](https://reader030.fdocuments.net/reader030/viewer/2022032722/56649f455503460f94c665ed/html5/thumbnails/9.jpg)
Rikoti-Zestaponi HighwayRikoti-Zestaponi Highway
04/18/23Ministry of Regional Development &
Infrastructure of Georgia 9
Political AdvantagesPolitical Advantages• Open policy for international road transportation
• Road Improvement is defined as State Priority in
the main state policy documents – Basic Data & Basic Data &
Direction (BDD) & Georgia Without PovertyDirection (BDD) & Georgia Without Poverty
• More than 90% of East-West Highway in GOOD
conditions
• The Shortest link between Black & Caspian Seas
• Simplified border crossing procedures
![Page 10: Project # 1 Rikoti-Zestaponi Highway May, 2011. Rikoti-Zestaponi Highway 11/29/2015Ministry of Regional Development & Infrastructure of Georgia 2 Poti.](https://reader030.fdocuments.net/reader030/viewer/2022032722/56649f455503460f94c665ed/html5/thumbnails/10.jpg)
04/18/23Ministry of Regional Development &
Infrastructure of Georgia 10
Thank you for your Thank you for your attention!attention!