Getting Organised
Planning
Keeping Track
Use the headings on the left hand side of the DIDA2009 website as your MAIN TASKS in your project plan
![Page 2: Proj Plan](https://reader031.fdocuments.net/reader031/viewer/2022012922/55879c29d8b42a0a758b4625/html5/thumbnails/2.jpg)
Tinyurl.com/DIDA2009
Getting Organised
Planning
Keeping Track
Use the blue arrows on each page of the DIDA2009 website as your SUB TASKS in your project plan
![Page 3: Proj Plan](https://reader031.fdocuments.net/reader031/viewer/2022012922/55879c29d8b42a0a758b4625/html5/thumbnails/3.jpg)
Time allowed
• Can be classified into 1 of 6 categories:
Task type
Time allowed (approx)
Small 5 minsMedium 15 minsLong 30 minsXL 1 lessonXXL 2 lessonsXXXL 4 lessons
![Page 4: Proj Plan](https://reader031.fdocuments.net/reader031/viewer/2022012922/55879c29d8b42a0a758b4625/html5/thumbnails/4.jpg)
Quick Quiz
What would the following tasks be classified as:
1.Design and build a database2.Save a picture (as a JPEG)3.Perform 4 searches (queries) in a database4.Add 5 new records to a database5.Make a presentation (4 slides)
Small Medium Long XL XXL XXXL5 mins 15 mins 30 mins 1 lesson 2 lessons 4 lessons
![Page 5: Proj Plan](https://reader031.fdocuments.net/reader031/viewer/2022012922/55879c29d8b42a0a758b4625/html5/thumbnails/5.jpg)
IdeaFor time allowed, you can either write in the
time in minutes/lessons.
Or simply write:–S, M, L, XL, XXL, XXL
Then use V LOOKUP to automatically insert the times later.
![Page 6: Proj Plan](https://reader031.fdocuments.net/reader031/viewer/2022012922/55879c29d8b42a0a758b4625/html5/thumbnails/6.jpg)
Further Notes
• Remember some of the work, you will have to assign for homework. E.g. updating your project plan and project diary
• Rough Guideline: The finish date should lie between July 2009 and March 2010.
• There is no “correct” answer for the plan, just be sensible with your estimates- you will all work at different rates.