    Project Monthly Report (March 1 ~ March 31, 2013)

    New Era University

    1

    PHILIPPINE ARENA

    PROJECT NAME Philippine Arena

    Location Aerial View

    Description Site Scenery

    Date March 13

    Photo File Name Photo 001. jpeg

    Activity Code GENERAL OVERVIEW

    Monthly Progress Photograph

  • 7/27/2019 Progress Photo (March 2013).pdf

    2/11

    Project Monthly Report (March 1 ~ March 31, 2013)

    New Era University

    2

    PHILIPPINE ARENA

    PROJECTNAME

    PhilippineArena

    Location Site / ChillerPlant

    Description Installation of r

    ebars at ground floor prior toschedule of pouring

    Date Mar.13

    Photo FileName

    Photo 002.jpeg

    ActivityCode

    RMC

  • 7/27/2019 Progress Photo (March 2013).pdf

    3/11

    Project Monthly Report (March 1 ~ March 31, 2013)

    New Era University

    3

    PHILIPPINE ARENA

    PROJECTNAME

    PhilippineArena

    Location Site/ chillerplant

    Description Status of

    chiller plantbuilding

    Date Mar.13

    Photo FileName

    Photo 003.Jpeg

    ActivityCode

    RMC

  • 7/27/2019 Progress Photo (March 2013).pdf

    4/11

    Project Monthly Report (March 1 ~ March 31, 2013)

    New Era University

    4

    PHILIPPINE ARENA

    PROJECTNAME

    PhilippineArena

    Location Site

    Description Installation ofSpace frame &

    tension truss

    Date Mar.13

    Photo FileName

    Photo 004.jpeg

    ActivityCode

    Steel structure

  • 7/27/2019 Progress Photo (March 2013).pdf

    5/11

    Project Monthly Report (March 1 ~ March 31, 2013)

    New Era University

    5

    PHILIPPINE ARENA

    PROJECTNAME

    PhilippineArena

    Location Site

    Description Installation ofring truss at

    Zone H

    Date Mar.13

    Photo FileName

    Photo 005.jpeg

    ActivityCode

    Steel structure

  • 7/27/2019 Progress Photo (March 2013).pdf

    6/11

    Project Monthly Report (March 1 ~ March 31, 2013)

    New Era University

    6

    PHILIPPINE ARENA

    PROJECTNAME

    PhilippineArena

    Location Site/Level 2

    Description CHB Laying at2nd Floor toilet

    walls

    Date Mar.13

    Photo FileName

    Photo 006.Jpeg

    ActivityCode

    ArchitecturalWorks

  • 7/27/2019 Progress Photo (March 2013).pdf

    7/11Project Monthly Report (March 1 ~ March 31, 2013)

    New Era University

    7

    PHILIPPINE ARENA

    PROJECTNAME

    PhilippineArena

    Location Site/Level 2

    Description Skimcoat finishing of beams

    and slab soffitat level 2

    Date Mar.13

    Photo FileName

    Photo 007.Jpeg

    ActivityCode

    Finishing Works

  • 7/27/2019 Progress Photo (March 2013).pdf

    8/11Project Monthly Report (March 1 ~ March 31, 2013)

    New Era University

    8

    PHILIPPINE ARENA

    PROJECTNAME

    PhilippineArena

    Location Site

    Description Installed sak bioduct at roof

    Grid Line 16-20

    Date Mar.13

    Photo FileName

    Photo 008.jpeg

    ActivityCode

    Mechanical

  • 7/27/2019 Progress Photo (March 2013).pdf

    9/11Project Monthly Report (March 1 ~ March 31, 2013)

    New Era University

    9

    PHILIPPINE ARENA

    PROJECTNAME

    PhilippineArena

    Location Site / ChillerPlant

    Description Deliveredpumps on site

    Date Mar.13

    Photo FileName

    Photo 009.jpeg

    Activity

    Code

    Mechanical

    works

  • 7/27/2019 Progress Photo (March 2013).pdf

    10/11Project Monthly Report (March 1 ~ March 31, 2013)

    New Era University

    10

    PHILIPPINE ARENA

    PROJECTNAME

    PhilippineArena

    Location Site /Level 2

    Description Installed Drainand Soil Pipe a

    t Grid Line 1 ~9

    Date Mar.13

    Photo FileName

    Photo 010.jpeg

    Activity

    Code

    Mechanical

    works

  • 7/27/2019 Progress Photo (March 2013).pdf

    11/11Project Monthly Report (March 1 ~ March 31, 2013)

    New Era University

    11

    PHILIPPINE ARENA

    PROJECTNAME

    PhilippineArena

    Location Site

    Description Assembly of520 tons

    crawler crane

    Date Mar.13

    Photo FileName

    Photo 011.jpeg

    ActivityCode

    Steel Structure