Progress of Ongoing Progress of Ongoing Management ImprovementManagement Improvement
Presented by :Presented by :Md. Md. WahidurWahidur RahmanRahman
Additional Chief Engineer (Implementation), LGEDAdditional Chief Engineer (Implementation), LGED
HISTORY OF HISTORY OF LGEDLGED
Rural Dev.Model (BARD)
Engg.CellEngg.Cellinin
MLGRD&CMLGRD&CWPWWPW
1960s1960s
19701970ss
LGEBLGEB
LGEDLGED
19821982 19841984
WPWP
19921992
Higher Economic GrowthHigher Economic GrowthIntegrated Rural DevelopmentIntegrated Rural DevelopmentTrade ExpansionTrade ExpansionProvision of Basic ServicesProvision of Basic ServicesIncreased ProductivityIncreased ProductivityDecrease in Production CostDecrease in Production CostPoverty Reduction and Social Poverty Reduction and Social DevelopmentDevelopmentEnhancement of Quality of Life Enhancement of Quality of Life
Issues on Development Strategy / PoliciesIssues on Development Strategy / Policies
TwoTwo--tier Cotier Co--operatives operatives -- KrishakKrishak SamabayaSamabayaSamitySamity (KSS) and (KSS) and ThanaThana ((UpazilaUpazila) Central ) Central CoCo--operatives Association (TCCA)operatives Association (TCCA)
Rural Works Rural Works ProgrammeProgramme (RWP)(RWP)
ThanaThana ((UpazilaUpazila) Irrigation ) Irrigation ProgrammeProgramme (TIP)(TIP)
ThanaThana ((UpazilaUpazila) Training and Development Centre ) Training and Development Centre (TTDC)(TTDC)
Components of Components of ComillaComilla ModelModel
Development of Physical Infrastructure Development of Physical Infrastructure including Roads, Structures and including Roads, Structures and MarketsMarkets
Irrigated Agriculture, Minor Drainage Irrigated Agriculture, Minor Drainage and Flood Control Worksand Flood Control Works
Production and Employment Program Production and Employment Program for the Rural Poorfor the Rural Poor
Rural Development StrategyRural Development Strategy(RD Strategy, 1984)(RD Strategy, 1984)
RD Strategy (1984) Approach Remain ValidRD Strategy (1984) Approach Remain Valid
No Major Changes Are Required, Only Some No Major Changes Are Required, Only Some Adjustments orAdjustments or ““Fine TuningFine Tuning”” May Be JustifiedMay Be Justified
Targets Will Have To Be Reset Due to Increase of Growth Targets Will Have To Be Reset Due to Increase of Growth Centers From 1400 to 2100Centers From 1400 to 2100
Regional Priorities Will Have To Be Defined With View Of Regional Priorities Will Have To Be Defined With View Of The Natural Potential Of The RegionsThe Natural Potential Of The Regions
More Emphasis On User/Community ParticipationMore Emphasis On User/Community Participation
Strengthening Capacity Of ContractorsStrengthening Capacity Of Contractors
Rural Development StrategyRural Development Strategy(Rural Infrastructure Strategy Study 1996)(Rural Infrastructure Strategy Study 1996)
Three Important Elements Of Rural infrastructure are Roads, MarkThree Important Elements Of Rural infrastructure are Roads, Markets ets and Electrificationand Electrification
Emphasis Would Be Given For Developing Growth Emphasis Would Be Given For Developing Growth CentresCentres and and Growth Centre Connecting Roads, Rural Roads & Providing DrainagGrowth Centre Connecting Roads, Rural Roads & Providing Drainage e Structures On Rural Roads Structures On Rural Roads
For Maximizing Direct/Indirect Multipliers Of Income/Employment For Maximizing Direct/Indirect Multipliers Of Income/Employment Generation From Infrastructure Development, Priority Would Be GiGeneration From Infrastructure Development, Priority Would Be Given ven To Create Macro And Micro Level InteractionsTo Create Macro And Micro Level Interactions
For Rural Infrastructure For Rural Infrastructure ProgrammesProgrammes Focus Would Be Given To Focus Would Be Given To Provision Of Basic Economic And Social Services In CollaborationProvision Of Basic Economic And Social Services In CollaborationWith Local Agencies, NGOs And Private SectorWith Local Agencies, NGOs And Private Sector
Relevant Issues as Included in the National Strategy for Relevant Issues as Included in the National Strategy for Accelerated Poverty Reduction (NSAPR), 2005Accelerated Poverty Reduction (NSAPR), 2005
Develop skillDevelop skillof LGEDof LGEDofficialsofficialsthroughthrough
HRDHRDprogramsprograms
Prepare Prepare UpazilaUpazila/Union//Union/
PourashavaPourashavaPlan Books, maps, Plan Books, maps,
design manualsdesign manualstechnical technical
specificationsspecifications
Technical assistanceTechnical assistanceto other Ministry/to other Ministry/
Agencies: Const. of Agencies: Const. of Primary Schools,Primary Schools,Cyclone Shelters, Cyclone Shelters, Community ClinicCommunity Clinic
etc.etc.
Technical Technical support tosupport toUnion & Union & UpazilaUpazila
ParishadsParishads
Technical Technical support tosupport to
ZillaZillaParishadsParishads
Technical Technical support tosupport to
PourashavasPourashavas& City& City
CorporationsCorporations
Functions Functions of LGEDof LGED
Planning,Planning,ImplementationImplementationand monitoringand monitoring
ofofrural /urban/waterrural /urban/water
sectorsectorInfrastructure Infrastructure Dev. ProjectDev. Project
Planning,Planning,Implementation Implementation and monitoringand monitoringof maintenanceof maintenance
of rural /urban/waterof rural /urban/watersectorsector
infrastructureinfrastructure
Chief EngineerAsst.. Chief Engineer
Addl.. Chief Engineer Addl.. Chief Engineer
Superintending Engineer
Superintending Engineer
Superintending Engineer
Superintending Engineer
Superintending Engineer
Superintending Engineer
12 XENs5 XEN Mechanical (1 ) / Training (
4 )1 Architecture1 Urban Planner1 Transport Economist1 System Analyst1 Computer Programmer15 Assistant Engineers
4 Upper Division Assistant11 Stenographer15 Steno Typist7 Accountant Assistant (1) LDA-cum-Typist17 Moazzen (1) / Drivers1 Duplicating Machine Operator1 Ammonia Machine Operator25 MLSS
1 Senior Assistant Engineer1 Assistant Engineer1 Assistant Engineer (Mechanical) (in 22 Greater
District)1 District Sociologist1 Sub-Assistant Engineer 1 Laboratory Technician 1 Upper Division Assistant (UDA)
1 Accountant1 Steno Typist 1 Jeep Driver 1 Truck Driver1 Road Roller Driver1 MLSS
1 Assistant Upazila Engineer1 SAE (Construction)1 SAE (Maintenance)1 Draftsman (SAE)1 Community Organizer1 Accountant1 Surveyor
4 Work Assistant1 Electrician1 Accounts Assistant1 Office Assistant 1 LDA-cum Typist2 Chowkidars2 MLSS
Executive Engineer x 64 (District)
Upazila Engineer x 481
Total Manpower = 854 (8.28%)
TOTAL MANPOWER = 10,287TOTAL MANPOWER = 10,287
2 A E Mechanical / Electrical2 Agronomist / Aquaculturalist2 Statistician / Accounts Officer2 Estimators (SAE)2 Draftsman (SAE)1 Mechanical Foreman1 Imam2 Head Assistant / Accountant
Total Manpower = 9059
TOTAL MANPOWER = 146 (1.41%)
MANPOWER : 87.8%
1* XEN (Training) 1* Assistant Engineer 1* Computer Operator cum Office Assistant
Superintending Engineer * x 10 (Region)
Total (10 x 7) = 70 (24+46)
(0.68%)
1* Driver*1 M.L.S.S.
* borne by under development budget
Addl.. Chief Engineer
Addl.. Chief Engineer
Superintending Engineer
Chief Engineer (1)
* Superintending Engineer(7+10)
* Executive Engineer (87)
Upazila Engineer (481) Sr. Assistant Engineer (64)
Additional Chief Engineer (4)
Upazila Assistant Engineer (476) * Assistant Engineer (152)
Organizational Hierarchy (Engineering)Organizational Hierarchy (Engineering)
Overview of ISAP
In 2003, the GOB has identified substantial Institutional Strengthening (IS) actions of LGED with a view to enhance its capacities for managing rural infrastructure and enhancing its role in assisting LGI's in managing rural infrastructure.
The ISAP was implemented by the LGED with the support of Technical Assistance (TA) Consultancy Services from December 2004 to June 2007.
Objectives of ISAP
• Modernizing policies, functions and processes; and
• Improving organizational structures, skills, systems and technological enhancements.
Specific areas of focus under the ISAP
I. Strategic FrameworkII. Organizational DevelopmentIII. Financial Management and AuditIV. Quality Assurance and Technical
AuditingV. Maintenance and Asset
ManagementVI. Transport SafetyVII. Environnemental & Social
Mitigation / Management
I. Strategic FrameworkTargets:
Confirmation of evolving LGED role, core functions and resources for strategic planning.
2. Effective road network ownership and management
3. Sustainable LGED role in support to LGIs
4. Strategic improvements in LGED capabilities and effectiveness
I. Strategic FrameworkOutcomes:• GoB Rules of Business issued confirming
LGED responsibilities – May 2003 and May 2005.
• Draft LGED Mission, Vision and Strategic Plan prepared and cleared in 2004.
• LGED prepared Rural Road Master Plan and Road Network reclassified and Notified.
• LGED started building capacities of LGIs
I. Strategic Framework:Actions required:• Carry out actions as set out in the
"Mission, Vision and Strategic Plan of LGED" document after GoB's clearance.
• Continue consolidation of LGED management of all roads.
• Consider scaling up of LGIP in future as a sector-wide model in LGED.
• Implement ISAP recommendation for Strengthening of LGED
II.Organizational Development
Targets:1. Effective LGED organizational
structure, staffing profile and skills mix
2. Strengthened governance, performance accountability
3. Effective comprehensive ICT, GIS and MIS
4. Enhanced in-house HRD.
II.Organizational Development
Outcomes:• GoB approved LGED's revise organogram
including skill mix staffing.• LGED strictly follows PPR and publishes Annual
Report. It has prepared and adopted SEME guidelines.
• LGED prepared ICT Strategy and assessed ICT needs. The implementation of strategy is underway.
• LGED completed TNA. GOB contribution to local Training outlays is increasing progressively.
II.Organizational DevelopmentActions Required:• Arrange recruitment to the posts through GoB
Procedures and impart orientation and training to newly recruited / promoted Staff
• Further review of adequacy & effectiveness of LGED staffing in relation to functional priorities & needs.
• PPR will continue to be followed by LGED and training in PPR will continue to be imparted to LGED officials.
• Carryout SEME on a sample basis.• Further Review of LGED Annual Report Format &
Process.• Continue to implement ICT strategy.• Continuously monitor the effectiveness of training
III. Financial Management and Audit
Targets:• Improve financial resource management and
planning • Improve LGED internal Audit capability.Outcomes:• Partial implementation of UFMS in HQ has been
made (30 projects)• LGED established Audit Cell.• Report on Review of Financial Management in
LGED has been prepared.• LGED framework for implementation of GoB
audit process has also been updated.
III. Financial Management and Audit:
Action required:1. Implement UMFS in HQ and in district offices 2. Prepare proposal for further improvement of
finance/accounts in LGED and strengthening of finance/ accounts Unit
3. Review UFMS effectiveness and integrate in LGED-wide operation.
4. Preparation of proposal for further strengthening of LGED Audit Cell.
IV. Quality Assurance and Technical Auditing
Targets :• Improved LGED project development, works
quality and asset management.
Outcomes:• Dedicated Quality Assurance Unit and
resources at LGED HQ has been established.• All quality-related processes in LGED have been
reviewed and viable Action Plan has been developed.
• Initiated a working group to determine QA enhancement actions in LGED
IV. Quality Assurance and Technical Auditing:
Action Required :
1. Activities of dedicated QA units at LGED HQ and districts offices will continue.
2. Determine short-to-medium action plan for strengthening LGED’s framework and capacities for effective QA in all its operations including Technical Audit.
3. Implement the Action Plan as proposed by the QA enhancement WG.
V. Maintenance and Asset Management
Targets :• Improvement in LGED road network maintenance
and management performance.
Outcomes:1. LGED reviewed existing road maintenance (RM)
planning, procedures and resources.2. Formats for road database and survey as part of
HDM-4 has been prepared.3. Training module / materials has been prepared
and training imparted to LGED officials on upgraded formats and survey system.
V. Maintenance and Asset Management:
Outcomes (Continued)
4. LGED prepared Action Plan on comprehensive framework of policy, processes, and resources for system based road maintenance planning and management.
Actions Required : 1. Implement Action Plan on comprehensive
framework of policy, processes, and resources for system based road maintenance planning and management in LGED
2. Assist in further development of RIMMU Capacity.
VI. Transport Safety Targets :• Sustainable LGED and LGI measures for improved road
safety Outcomes:1. LGED prepared report on Rural Safety Assessment of
pilot Roads.2. Established "Road Safety Unit" at the HQ level and
"Regional Road Safety Unit (RRSU) at the 10 regions.3. One Assistant Engineer at the district level has been
given responsibility of the Road Safety.4. Inrodueced basic road safety issues in the training
manual prepared for UP representatives.5. Circulated guidelines for road safety activities to be
carried out by LGED field officials.
VI. Transport Safety:Actions required:• Scale-up the result of pilot exercises.• Develop simple procedure for Road Safety Audit
in the perspective of rural roads.• Activate the Central as well as Regional Road
Safety Unit of LGED through motivation and training.
• Prepare design manual for road safety and include standard clauses of road safety into the Specifications.
• Incorporate road safety issues in Estimates and BoQs.
• Carry out Awareness, Advocacy and Educational Campaign involving Up representatives.
VII. Environnemental & Social Mitigation / Management
Targets :Comprehensive E&SM capabilities to support LGED project planning, preparation, execution, monitoring and evaluation functions. Effective community participation in all phases of LGED works.
Outcomes:1. LGED updated its Environmental Guidelines and
established dedicated "Environmental Cell".2. LGED has got the position of District Sociologist in each
district and one Sr. Sociologist at the HQ level.3. Establishment of E&SM Cells is underway.4. LGED is adopting participatory issues in the planning
and implementation of infrastructure.
VII. Environnemental & Social Mitigation / Management:
Outcomes (Continued)5. LGED prepared Environmental Codes of Pratice(ECP)
and Environmental Supervision Manual (ESM).
6. Preparation of Environmental Management Information System (EMIS) is underway.
Actions required :• Prepared Environmental Guidelines/Manuals/Codes to be
followed.• Prepared Guidelines/Manuals/Codes to be reviewed
periodically.• Guidelines for Social Impact Assessment needs to be
prepared.
VII. Environnemental & Social Mitigation / Management:
Actions required (Continued)
• E&S Cell yet to be established and functionalized, although an active Environmental Cell is in place and operating.
• For all LGED projects necessary provision for environmental items in the contract document yet to be incorporated.
• Training program needs to be continued for both LGED staff and contractors.
Conclusion
The institutional development of LGED is a continuous process and need to be followed up/pursued. LGED will play proactive roll to accommodate the new priorities.