PROGRESS AND PROSPECT OF YANCHANGINTEGRATED CCS DEMONSTRATION PROJECT

Cover image: Yanchang Petroleum-Yulin CO2 Capture facilities located at Yulin

City, Shaanxi Province, China. Image provided by Baidu.com.

Dr. Xiangshan Ma

27 June, Tokyo

Page 2: PROGRESS AND PROSPECT OF YANCHANG …jp.globalccsinstitute.com/sites/jp.globalccsinstitute.com/files/... · PROGRESS AND PROSPECT OF YANCHANG INTEGRATED CCS DEMONSTRATION PROJECT

Reserves to production ratio:

~75 years

1. Project Overview

Page 3: PROGRESS AND PROSPECT OF YANCHANG …jp.globalccsinstitute.com/sites/jp.globalccsinstitute.com/files/... · PROGRESS AND PROSPECT OF YANCHANG INTEGRATED CCS DEMONSTRATION PROJECT

General Information

Capture

source:

50,000 t/a of CO2 from gasification facilities of the Yulin Coal

Chemical Co., Yulin City, since 2012

360,000 t/a CO2 from gasification facilities of the Yulin Energy

Chemical Co., 100 KM southwest of Yulin City (planning)

Type: Pre-combustion (gasification)

Method: Absorption physical solvent-based process - Recti sol

Transportation

Tanker trucks + Pipeline(Planning)

Yulin City to Jingbian injection site: 140KM

Jingbian Industrial Park to Jingbian Injection site: 42KM

Storage

Site:

Primary injection site is the Jingbian oilfield of the Yanchang oil

field

Additional test volumes have been injected into the Wuqi oilfield

Xingzichuan oilfield (planning, 105KM)

Purpose: EOR

Formation and Depth: Yanchang Formation in Triassic for Jingbian

CO2 injection site ; 1,500 to 2,200 below the surface

Page 4: PROGRESS AND PROSPECT OF YANCHANG …jp.globalccsinstitute.com/sites/jp.globalccsinstitute.com/files/... · PROGRESS AND PROSPECT OF YANCHANG INTEGRATED CCS DEMONSTRATION PROJECT

General Information

CO2 Source-18 Coal Chemical

plants

- 25 Coal-fired

power plants

Yanchang

Oilfield Shaanxi Province

Page 5: PROGRESS AND PROSPECT OF YANCHANG …jp.globalccsinstitute.com/sites/jp.globalccsinstitute.com/files/... · PROGRESS AND PROSPECT OF YANCHANG INTEGRATED CCS DEMONSTRATION PROJECT

INTERNATIONAL RECOGNITION

This project was noted as a

cooperation project in the US-China

Joint Presidential Statement on

Climate Change in September

2015. -------The two countries have

identified the project site in Yan’An-

Yulin, Shan’xi Province, China,

operated by Shan’xi Yanchang

Petroleum.

Page 6: PROGRESS AND PROSPECT OF YANCHANG …jp.globalccsinstitute.com/sites/jp.globalccsinstitute.com/files/... · PROGRESS AND PROSPECT OF YANCHANG INTEGRATED CCS DEMONSTRATION PROJECT

INTERNATIONAL RECOGNITION

Page 7: PROGRESS AND PROSPECT OF YANCHANG …jp.globalccsinstitute.com/sites/jp.globalccsinstitute.com/files/... · PROGRESS AND PROSPECT OF YANCHANG INTEGRATED CCS DEMONSTRATION PROJECT

Reserves to production ratio:

~75 years

2. Project Progress

Page 8: PROGRESS AND PROSPECT OF YANCHANG …jp.globalccsinstitute.com/sites/jp.globalccsinstitute.com/files/... · PROGRESS AND PROSPECT OF YANCHANG INTEGRATED CCS DEMONSTRATION PROJECT

HISTORICAL REVIEW

2009• Chuankou oilfield No.104 well group CO2-EOR pilot test

2012

• 50,000 t/a of CO2 from gasification facilities of the Yulin Coal Chemical Co.,

• Jingbian Qiao-Jia-Wa oilfield CO2-EOR pilot test

2013• Sino-Australian International Cooperation Demonstration Project

2014• Wuqi oilfield CO2-EOR pilot test

2016

• CCS demonstration and new generation technology research and development

• 2nd phase of Sino US International Cooperation Demonstration Project

Page 9: PROGRESS AND PROSPECT OF YANCHANG …jp.globalccsinstitute.com/sites/jp.globalccsinstitute.com/files/... · PROGRESS AND PROSPECT OF YANCHANG INTEGRATED CCS DEMONSTRATION PROJECT

1. Low cost CO2 capture technology in coal chemical

industry• 2012, the 50000 tons p.a. CO2 capture - Yulin Coal-chemical Company by

rectisol technology

• High concentration CO2 Capture cost: 25USD/ton

• Low concentration CO2 Capture: developed the industrialization process

package and built the pilot plant.

Main Tasks

Page 10: PROGRESS AND PROSPECT OF YANCHANG …jp.globalccsinstitute.com/sites/jp.globalccsinstitute.com/files/... · PROGRESS AND PROSPECT OF YANCHANG INTEGRATED CCS DEMONSTRATION PROJECT

2. CO2-EOR experiment evaluation system• Miscibility pressure between CO2 - crude oil

• Phase change of CO2- crude oil

• The influence of CO2 on reservoir

• Efficiency influencing factors of CO2-EOR

• CO2 Sealing system

Main Tasks

Page 11: PROGRESS AND PROSPECT OF YANCHANG …jp.globalccsinstitute.com/sites/jp.globalccsinstitute.com/files/... · PROGRESS AND PROSPECT OF YANCHANG INTEGRATED CCS DEMONSTRATION PROJECT

3. CO2 fracturing technology • Ultra-low density proppant without thickening and dry carbon dioxide

fracturing has been successfully implemented in Yanchang 4 shale

gas exploration area of continental shale gas field

Main Tasks

Page 12: PROGRESS AND PROSPECT OF YANCHANG …jp.globalccsinstitute.com/sites/jp.globalccsinstitute.com/files/... · PROGRESS AND PROSPECT OF YANCHANG INTEGRATED CCS DEMONSTRATION PROJECT

4. Injection-production string design and anticorrosion

technology• Optimize the ordinary carbon steel and corrosion inhibit or matching

technology and its application effect is well

Main Tasks

Injection systemProduction system

Page 13: PROGRESS AND PROSPECT OF YANCHANG …jp.globalccsinstitute.com/sites/jp.globalccsinstitute.com/files/... · PROGRESS AND PROSPECT OF YANCHANG INTEGRATED CCS DEMONSTRATION PROJECT

5. CO2 geologic sequestration capacity evaluation

system• To evaluate the CO2 sequestration potential of the extended ultra-low

permeability reservoir, the effective sealing capacity of CO2 in the

Yanchang oilfield is calculated to be about 400M tones

Main Tasks

Page 14: PROGRESS AND PROSPECT OF YANCHANG …jp.globalccsinstitute.com/sites/jp.globalccsinstitute.com/files/... · PROGRESS AND PROSPECT OF YANCHANG INTEGRATED CCS DEMONSTRATION PROJECT

6. CO2 –EOR safety monitoring system• subsurface -surface-aboveground

• CO2 geologic sequestration safety warning system

Main Tasks

Page 15: PROGRESS AND PROSPECT OF YANCHANG …jp.globalccsinstitute.com/sites/jp.globalccsinstitute.com/files/... · PROGRESS AND PROSPECT OF YANCHANG INTEGRATED CCS DEMONSTRATION PROJECT

ACHIEVEMENTS

1. Qiao-Jia-Wa Pilot

Two pilot test area with 10 injection gas wells had been built, cumulative

injection of 66200t , and show a good oil displacement effect, the dynamic

storage reach to 66200 tons.

Page 16: PROGRESS AND PROSPECT OF YANCHANG …jp.globalccsinstitute.com/sites/jp.globalccsinstitute.com/files/... · PROGRESS AND PROSPECT OF YANCHANG INTEGRATED CCS DEMONSTRATION PROJECT

ACHIEVEMENTS

2. Wuqi Pilot: 5 injection wells ,14 production wells, cumulative injection

8800t CO2, daily oil production improved from 2.22 t to 2.53 t, increased oil

production 900t.

Page 17: PROGRESS AND PROSPECT OF YANCHANG …jp.globalccsinstitute.com/sites/jp.globalccsinstitute.com/files/... · PROGRESS AND PROSPECT OF YANCHANG INTEGRATED CCS DEMONSTRATION PROJECT

ACHIEVEMENTS

3. New Build (for the 0.36 Mtpa facility of Yulin Energy Chemical Co., ): The

feasibility study report has been completed and planned to be completed

and put into operation in 2018.

Page 18: PROGRESS AND PROSPECT OF YANCHANG …jp.globalccsinstitute.com/sites/jp.globalccsinstitute.com/files/... · PROGRESS AND PROSPECT OF YANCHANG INTEGRATED CCS DEMONSTRATION PROJECT

Reserves to production ratio:

~75 years

3. Project prospect

Page 19: PROGRESS AND PROSPECT OF YANCHANG …jp.globalccsinstitute.com/sites/jp.globalccsinstitute.com/files/... · PROGRESS AND PROSPECT OF YANCHANG INTEGRATED CCS DEMONSTRATION PROJECT

General Objective

- Strive to build China's first megaton CCS flagship

project

- Form a comprehensive technology and standards

of coal chemical industry CO2 capture/EOR and

storage

- Create a professional team of carbon capture,

transportation, storage and monitoring

- Drive oil exploration technology and CCS business

model to provide the experience for low carbon

development in other areas of China .

Page 20: PROGRESS AND PROSPECT OF YANCHANG …jp.globalccsinstitute.com/sites/jp.globalccsinstitute.com/files/... · PROGRESS AND PROSPECT OF YANCHANG INTEGRATED CCS DEMONSTRATION PROJECT

General Objective

- Strive to build China's first megaton CCUS flagship

project

Short-term goal

Middle-term goal

Long-term goal

• To built 0.36 MPA integrated CCS demonstration areabefore 2018

• To built 1MPAintegrated CCS demonstration project before 2020

• To built 4 MPA integrated CCS demonstration base before 2030