Program & Tenders 2017 Bob Meijer 15 februari 2017

Transcript of Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher...

Page 1: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

Program & Tenders 2017Bob Meijer

15 februari 2017

Page 2: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 2

The TKI R&D program and subsidy tenders

What happened in 2016• Tender results

Program for 2017• Changes in R&D subjects en tenders

• Wind op Zee R&D projects

• Hernieuwbare Energieregeling (Renewable Energy Regulation)

• Systeemintegratie op de Noordzee (System Integration on the North Sea)

• Other R&D subsidy calls (DEI, MIT, TKI Toeslag)

Page 3: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 3

Results 2016

Call Wind op Zee R&D Projects

16 project proposals received

• 9.7 M€ budget requested (4.5 M€ available)

• 4.4 M€ granted (7 projecten)

Call Hernieuwbare Energieregeling (Renewable Energy Regulation) • Available budget 50 M€

• Strict project selection based on feasibility (financial, technical) and 2023 timeline

• 9 Projects filed to date, including 3 DemoWind ; 4 granted

• Call is still open (31-03-2017)

Total project portfolio (2016)TKI projects: 41 with € 34 M subsidy(R&D value >50M€)

Total offshore wind R&D projects± 130 (including NWO en ECN)

Page 4: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 4

Structural Models for large flexible Blades (ECN)

GBS Wind JIP (Marin)

JIP - Simulation of Installation of Monopiles (Deltares)

Blade installation tool (Temporary Works Design B.V.)

Airborne Offshore Wind Farm (Aeolus V.O.F. / Ampyx)

JIP Handbook Scour Protection Methods (Deltares)

Double Slip Joint connection (KCI the engineers BV)

Wind op Zee R&D Project Call

Page 5: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 5

Evaluation tenders 2016Wind op Zee R&D Projects• Improved call model (Pitches, short deadline)

• Ranking based on • Contribution to the Program

• Contribution to the Dutch economy

• Quality of the proposal

• Tender is oversubscribed

Hernieuwbare Energieregeling (Renewable Energy Regulation)• 2023 deadline

• Continued attention to TRL Span

Apply weigths to criteria(Program more important)

Allow more projects (lower max subsidy amount)

Extend deadline?

Page 6: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 6

RD&D Program 2016

Page 7: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 7

Program Lines 2016->2017

TKI Wind op Zee Program Lines

1. Support Structures

2. Optimalisatie van de Windcentrale

3. Inter array network and grid connection

4. Transport, installation and logistics

5. Operations and maintenance

2. Wind turbines and wind farm

Floating Foundations

Next GenWTG

Quality of the Inter-array

network

Inspections and repairs using

robotics and AI

Corrosion (MIC)

End-of-life options

Infrastructure for larger scale and far

offshore

Page 8: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 8

Program Lines 2016->2017

TKI Wind op Zee Program Lines

1. Support Structures

2. Optimalisatie van de Windcentrale

3. Inter array network and grid connection

4. Transport, installation and logistics

5. Operations and maintenance

2. Wind turbines and wind farm

6. Offshore Wind and the environment

Floating Foundations

Next GenWTG

Quality of the Inter-array

network

Inspections and repairs using

robotics and AI

Corrosion (MIC)

End-of-life options

Infrastructure for larger scale and far

offshore

Page 9: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 9

Program Lines 2016->2017

TKI Wind op Zee Program Lines

1. Support Structures

2. Optimalisatie van de Windcentrale

3. Inter array network and grid connection

4. Transport, installation and logistics

5. Operations and maintenance

2. Wind turbines and wind farm

6. Offshore Wind and the environment

Research & Development

Sub

sid

yte

nd

er:

Win

d o

p Z

ee R

&D

Pro

ject

en

Focus on higherTRLs and

demonstration

Sub

sid

yte

nd

er:

Her

nie

uw

bar

e En

ergi

ereg

elin

g

Subsidy Tenders 2016

Page 10: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 10

Program Lines 2016->2017

TKI Wind op Zee Program Lines

1. Support Structures

2. Optimalisatie van de Windcentrale

3. Inter array network and grid connection

4. Transport, installation and logistics

5. Operations and maintenance

2. Wind turbines and wind farm

6. Offshore Wind and the environment

Research & Development

Sub

sid

yte

nd

er:

Win

d o

p Z

ee R

&D

Pro

ject

en

Focus on higherTRLs and

demonstration

Sub

sid

yte

nd

er:

Her

nie

uw

bar

e En

ergi

ereg

elin

g

Focus on cooperation on the North Sea

Sub

sid

yte

nd

er:

Syst

eem

inte

grat

ie o

p d

e

No

ord

zee

Subsidy Tenders 2017

Page 11: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 11

Program Lines 2016->2017

TKI Wind op Zee Program Lines

1. Support Structures

2. Optimalisatie van de Windcentrale

3. Inter array network and grid connection

4. Transport, installation and logistics

5. Operations and maintenance

2. Wind turbines and wind farm

6. Offshore Wind and the environment

Research & Development

Sub

sid

yte

nd

er:

Win

d o

p Z

ee R

&D

Pro

ject

en

Focus on higherTRLs and

demonstration

Sub

sid

yte

nd

er:

Her

nie

uw

bar

e En

ergi

ereg

elin

g

Focus on cooperation on the North Sea

Sub

sid

yte

nd

er:

Syst

eem

inte

grat

ie o

p d

e

No

ord

zee

Subsidy Tenders 2017

Page 12: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 12

Program Lines 2016->2017

TKI Wind op Zee Program Lines

1. Support Structures

2. Optimalisatie van de Windcentrale

3. Inter array network and grid connection

4. Transport, installation and logistics

5. Operations and maintenance

2. Wind turbines and wind farm

6. Offshore Wind and the environment

Research & Development

Sub

sid

yte

nd

er:

Win

d o

p Z

ee R

&D

Pro

ject

en

Focus on higherTRLs and

demonstration

Sub

sid

yte

nd

er:

Her

nie

uw

bar

e En

ergi

ereg

elin

g

Focus on cooperation on the North Sea

Sub

sid

yte

nd

er:

Syst

eem

inte

grat

ie o

p d

e

No

ord

zee

Subsidy Tenders 2017

Page 13: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 13

• Costs of offshore wind are largely defined by the environment (water depth, soil conditions, metoceanclimate, sailing distances) and other users of the North Sea

• Location selection and available area are restricted by environmental factors

• New Program Line to target RD&D on • Understand the interaction between technology and the environment

• Develop products or systems to the growing role of offshore wind in the energy transition at low cost

• No overlap with other programs:

Offshore Wind & The Environment

Prog Line 6Offshore Wind and the

EnvironmentWOZEP MER studies MVI Programma

Page 14: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 14

(Systeemintegratie op de Noordzee)

Joint tender TKI Wind op Zee and TKI Gas

Objectives:• Create added value through cooperation

between Offshore Wind and Oil & Gas activiteson the North Sea

• Cost reduction of Offshore Wind and integration in the Energy System

• Expedite the energy transition to reduce CO2 emission

• Increase the potential of Offshore Wind Energy in the North Sea

System Integration North Sea

Page 15: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 15

Instruments subsidy tenders 2017

Page 16: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 16

Product development & Research

Support the development of new products

Pre-competitive collaborative research

Wind op Zee R&D Projecten

TRL 1 TRL 2 TRL 3 TRL 4 TRL 5 TRL 6 TRL 7 TRL 8 TRL 9

Research

(early) Product Development Demonstration

Hernieuwbare Energieregeling

Only the officially published regulations are leading.

Page 17: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 17

Higher score (max 5 points) for • Higher contribution to the program objectives• Higher contribution to the Dutch economy• Higher quality of the proposal (feasibility, participants, efficiency)

Minimum of 3 points per item

Increased weight for “contribution to the program” (factor 2)

No more than 3 projects in Program Lines 3 and 6

Rejection when:• < 9 points• Project is similar to earlier projects• Too low ranked (overall maximum subsidy of 4.7 M€)• Maximum € 500,000 per project

Wind op Zee R&D projects - Ranking criteria

Only the officially published regulations are leading.

Page 18: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 18

Wind op Zee R&D projects – evaluation process

Screening project ideas (not obligatory)

Initial evaluation by Advisory Committee

Presentation by Project initiator(s) and possible clarification

Final evaluation by Advisory Committee and discussion with RVO

Subsidy Grant

• Project idea / summary

• CommentsAbstract

• Full proposal

• Cannot bechanged

Proposal

• Followingevaluation

• Presentation andclarification

Presen-tation

Finalevaluationand grant

Evalua-tion

Only the officially published regulations are leading.

Page 19: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 19

Joint Program with other TKIs in the Topsector Energy

Higher TRLs leading to Demonstration

Contribution to Cost Reduction, CO2 targets and Economy

Corroborate the actual potential cost reduction on SDE+ spent

Quality and feasibility of the project and efficiency

Knowledge dissemination

Balanced cooperation

TRL 6 t/m 8. Lower TRLS are not strictly excluded, but large TRL spans are considered less feasible. Project ends in a form of demonstration (TRL 7-8).

Maximum € 6,000,000 per project – budget is € 50 M

Renewable Energy Regulation

Only the officially published regulations are leading.

Page 20: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 20

Renewable Energy Regulation (HER)

2017 2023 Operational2019 tender FID

Development and delivery of new technology for construction

Development and delivery of new technology for operations and maintenance

Development and delivery of new technology for post 2023 period

2030 Operational

Cost reduction is the key deliverable

Only the officially published regulations are leading.

Page 21: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 21

Higher score (max 5 points) for• Higher contribution to the program objectives• Higher contribution to the Dutch economy• Higher quality of the proposal (feasibility, participants, efficiency)

Minimum of 3 points per item

Rejection when:• < 9 points• Project is similar to earlier projects• Too low ranked (overall maximum subsidy of 1 M€)• Maximum € 350,000 per project

System Integration on the North Sea – Ranking

Only the officially published regulations are leading.

Page 22: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 22

Subsidy instruments 2017Hernieuwbare

energieWind op Zee R&D

ProjectenSystem Integration

North SeaCooperation required (min 1 company) ☺ ☺ ☺

Fundamental Research X X XIndustrial Research ☺ ☺ ☺

Experimentak development ☺ ☺ ☺

Demonstration ☺ X ☺

80% subsidy for Research Institutes ☺ ☺ ☺

Supplement for SME: Medium (10%) ☺ ☺ ☺

Supplement for SME: Small (20%) ☺ ☺ ☺

Supplement for cooperation Research Institute (10%)

☺ ☺ ☺

Tender budget € 50 M € 4.7 M € 1 MMax. subsidie/project € 6,000,000 € 500,000 €350,000Evaluation: first come, first serve ☺

Evalution: tender with ranking ☺ ☺

Max project duration (years) 4 4 4

Only the officially published regulations are leading.

Page 23: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 23

Demonstration of Energy Innovations

Contributes to “green growth”

Can be single company project

Maximum € 6M subsidy per project

No Industrial Research

Tender based on• contribution to the Dutch economy

• Contribution to the energy transition

• Innovative character

• Quality of the project

Demonstration Energy Innovation (DEI)

Only the officially published regulations are leading.

Page 24: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 24

• Innovatiemakelaars / Innovation Brokers• TKI Wind op Zee supports SME companies with advisory services from experts in

• Kennisvoucher / Knowledge Coupon• SME company support for support from Knowledge Institutes (€ 3750)

• Haalbaarheidsstudies / Feasibility studies• Feasibility studies (>60%) possibly complemented with industrial research or

experimental development. • Can include literature study, patent investigation, technology scans, market studies,

competitive analysis etc. • Subsidy 40% of the eligible cost (maximum € 50.000)

• Collaborative R&D• Industrial Research and/or Experimental Development• Project includes at least 2 SME companies• Regional tender system (refer to RVO website)

MIT (SME Innovation Topsector)

Only the officially published regulations are leading.

Page 25: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 25

• Projects not eligible for Topsector Energy subsidies

• Are in line with the TKI Wind op Zee Program

• Cooperation between at least one business and one Knowledge Institute

• Possibility of 25% (gross) contribution on the (largely) cash spent on work done by Knowledge Institutes

• For further questions and request for PPS Toeslag: TKI Wind op Zee

PPS Toeslag / PPP Contribution

Only the officially published regulations are leading.

Page 26: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 26

Wind op Zee R&D Projecten• Pre-competitive R&D and product development• No Demonstration• Budget € 4.7 M, maximum € 0.5 M per project• Tender with selection on quality of the proposal

Hernieuwbare Energieregeling• Cost Reduction of SDE+ spent before 2023• Higher TRL Levels – limited TRL span (feasibility)• Budget: € 50M, maximum per project € 6M€• first-come-first-serve (entry criteria apply)

System integration on the North Sea• Collaborative R&D for cost reduction and added

value in offshore wind and oil&gas projects• Budget € 1 M, maximum € 0.35 M per project• Tender with selection on quality of the proposal

Summary instruments 2017Tender Budget Max

subsidyper project

Tenderperiod

Selection

Wind op Zee R&DProjecten

€ 4.7 M € 0.5M 1/4/2017 –2/5/2017

Ranking

HernieuwbareEnergie Regeling

€ 50 M € 6M 1/4/2017 –31/3/2018

First come first serve

Systeemintegratie op de Noordzee

€ 1 M € 0.35M 1/4/2017 –23/5/2017

Ranking

Only the officially published regulations are leading.

Other Subsidy instruments: • PPS toeslag / PPP Supplement• MIT – SME Instrument for Innovation• DEI – Demonstration of Energy Innovations

More information on all instruments: http://www.rvo.nl/subsidies-regelingen/subsidies-energie-innovatie

Page 27: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

15 februari 2017 Match Making Day 2017 27

• Revision KIA in 2017 for 2018-2021

• Knowledge and Innovation Agenda and Knowledge and Innovation Contracts up for renewal

• Review of TKI Wind op Zee objectives and program

• Market consultation in 2017

Knowledge and Innovation Agenda

Page 28: Program & Tenders 2017 - Topsector Energie...•Higher contribution to the Dutch economy •Higher quality of the proposal (feasibility, participants, efficiency) Minimum of 3 points

www.tki-windopzee.nl