Program & Tenders 2017Bob Meijer
15 februari 2017
15 februari 2017 Match Making Day 2017 2
The TKI R&D program and subsidy tenders
What happened in 2016• Tender results
Program for 2017• Changes in R&D subjects en tenders
• Wind op Zee R&D projects
• Hernieuwbare Energieregeling (Renewable Energy Regulation)
• Systeemintegratie op de Noordzee (System Integration on the North Sea)
• Other R&D subsidy calls (DEI, MIT, TKI Toeslag)
15 februari 2017 Match Making Day 2017 3
Results 2016
Call Wind op Zee R&D Projects
16 project proposals received
• 9.7 M€ budget requested (4.5 M€ available)
• 4.4 M€ granted (7 projecten)
Call Hernieuwbare Energieregeling (Renewable Energy Regulation) • Available budget 50 M€
• Strict project selection based on feasibility (financial, technical) and 2023 timeline
• 9 Projects filed to date, including 3 DemoWind ; 4 granted
• Call is still open (31-03-2017)
Total project portfolio (2016)TKI projects: 41 with € 34 M subsidy(R&D value >50M€)
Total offshore wind R&D projects± 130 (including NWO en ECN)
15 februari 2017 Match Making Day 2017 4
Structural Models for large flexible Blades (ECN)
GBS Wind JIP (Marin)
JIP - Simulation of Installation of Monopiles (Deltares)
Blade installation tool (Temporary Works Design B.V.)
Airborne Offshore Wind Farm (Aeolus V.O.F. / Ampyx)
JIP Handbook Scour Protection Methods (Deltares)
Double Slip Joint connection (KCI the engineers BV)
Wind op Zee R&D Project Call
15 februari 2017 Match Making Day 2017 5
Evaluation tenders 2016Wind op Zee R&D Projects• Improved call model (Pitches, short deadline)
• Ranking based on • Contribution to the Program
• Contribution to the Dutch economy
• Quality of the proposal
• Tender is oversubscribed
Hernieuwbare Energieregeling (Renewable Energy Regulation)• 2023 deadline
• Continued attention to TRL Span
Apply weigths to criteria(Program more important)
Allow more projects (lower max subsidy amount)
Extend deadline?
15 februari 2017 Match Making Day 2017 6
RD&D Program 2016
15 februari 2017 Match Making Day 2017 7
Program Lines 2016->2017
TKI Wind op Zee Program Lines
1. Support Structures
2. Optimalisatie van de Windcentrale
3. Inter array network and grid connection
4. Transport, installation and logistics
5. Operations and maintenance
2. Wind turbines and wind farm
Floating Foundations
Next GenWTG
Quality of the Inter-array
network
Inspections and repairs using
robotics and AI
Corrosion (MIC)
End-of-life options
Infrastructure for larger scale and far
offshore
15 februari 2017 Match Making Day 2017 8
Program Lines 2016->2017
TKI Wind op Zee Program Lines
1. Support Structures
2. Optimalisatie van de Windcentrale
3. Inter array network and grid connection
4. Transport, installation and logistics
5. Operations and maintenance
2. Wind turbines and wind farm
6. Offshore Wind and the environment
Floating Foundations
Next GenWTG
Quality of the Inter-array
network
Inspections and repairs using
robotics and AI
Corrosion (MIC)
End-of-life options
Infrastructure for larger scale and far
offshore
15 februari 2017 Match Making Day 2017 9
Program Lines 2016->2017
TKI Wind op Zee Program Lines
1. Support Structures
2. Optimalisatie van de Windcentrale
3. Inter array network and grid connection
4. Transport, installation and logistics
5. Operations and maintenance
2. Wind turbines and wind farm
6. Offshore Wind and the environment
Research & Development
Sub
sid
yte
nd
er:
Win
d o
p Z
ee R
&D
Pro
ject
en
Focus on higherTRLs and
demonstration
Sub
sid
yte
nd
er:
Her
nie
uw
bar
e En
ergi
ereg
elin
g
Subsidy Tenders 2016
15 februari 2017 Match Making Day 2017 10
Program Lines 2016->2017
TKI Wind op Zee Program Lines
1. Support Structures
2. Optimalisatie van de Windcentrale
3. Inter array network and grid connection
4. Transport, installation and logistics
5. Operations and maintenance
2. Wind turbines and wind farm
6. Offshore Wind and the environment
Research & Development
Sub
sid
yte
nd
er:
Win
d o
p Z
ee R
&D
Pro
ject
en
Focus on higherTRLs and
demonstration
Sub
sid
yte
nd
er:
Her
nie
uw
bar
e En
ergi
ereg
elin
g
Focus on cooperation on the North Sea
Sub
sid
yte
nd
er:
Syst
eem
inte
grat
ie o
p d
e
No
ord
zee
Subsidy Tenders 2017
15 februari 2017 Match Making Day 2017 11
Program Lines 2016->2017
TKI Wind op Zee Program Lines
1. Support Structures
2. Optimalisatie van de Windcentrale
3. Inter array network and grid connection
4. Transport, installation and logistics
5. Operations and maintenance
2. Wind turbines and wind farm
6. Offshore Wind and the environment
Research & Development
Sub
sid
yte
nd
er:
Win
d o
p Z
ee R
&D
Pro
ject
en
Focus on higherTRLs and
demonstration
Sub
sid
yte
nd
er:
Her
nie
uw
bar
e En
ergi
ereg
elin
g
Focus on cooperation on the North Sea
Sub
sid
yte
nd
er:
Syst
eem
inte
grat
ie o
p d
e
No
ord
zee
Subsidy Tenders 2017
15 februari 2017 Match Making Day 2017 12
Program Lines 2016->2017
TKI Wind op Zee Program Lines
1. Support Structures
2. Optimalisatie van de Windcentrale
3. Inter array network and grid connection
4. Transport, installation and logistics
5. Operations and maintenance
2. Wind turbines and wind farm
6. Offshore Wind and the environment
Research & Development
Sub
sid
yte
nd
er:
Win
d o
p Z
ee R
&D
Pro
ject
en
Focus on higherTRLs and
demonstration
Sub
sid
yte
nd
er:
Her
nie
uw
bar
e En
ergi
ereg
elin
g
Focus on cooperation on the North Sea
Sub
sid
yte
nd
er:
Syst
eem
inte
grat
ie o
p d
e
No
ord
zee
Subsidy Tenders 2017
15 februari 2017 Match Making Day 2017 13
• Costs of offshore wind are largely defined by the environment (water depth, soil conditions, metoceanclimate, sailing distances) and other users of the North Sea
• Location selection and available area are restricted by environmental factors
• New Program Line to target RD&D on • Understand the interaction between technology and the environment
• Develop products or systems to the growing role of offshore wind in the energy transition at low cost
• No overlap with other programs:
Offshore Wind & The Environment
Prog Line 6Offshore Wind and the
EnvironmentWOZEP MER studies MVI Programma
15 februari 2017 Match Making Day 2017 14
(Systeemintegratie op de Noordzee)
Joint tender TKI Wind op Zee and TKI Gas
Objectives:• Create added value through cooperation
between Offshore Wind and Oil & Gas activiteson the North Sea
• Cost reduction of Offshore Wind and integration in the Energy System
• Expedite the energy transition to reduce CO2 emission
• Increase the potential of Offshore Wind Energy in the North Sea
System Integration North Sea
15 februari 2017 Match Making Day 2017 15
Instruments subsidy tenders 2017
15 februari 2017 Match Making Day 2017 16
Product development & Research
Support the development of new products
Pre-competitive collaborative research
Wind op Zee R&D Projecten
TRL 1 TRL 2 TRL 3 TRL 4 TRL 5 TRL 6 TRL 7 TRL 8 TRL 9
Research
(early) Product Development Demonstration
Hernieuwbare Energieregeling
Only the officially published regulations are leading.
15 februari 2017 Match Making Day 2017 17
Higher score (max 5 points) for • Higher contribution to the program objectives• Higher contribution to the Dutch economy• Higher quality of the proposal (feasibility, participants, efficiency)
Minimum of 3 points per item
Increased weight for “contribution to the program” (factor 2)
No more than 3 projects in Program Lines 3 and 6
Rejection when:• < 9 points• Project is similar to earlier projects• Too low ranked (overall maximum subsidy of 4.7 M€)• Maximum € 500,000 per project
Wind op Zee R&D projects - Ranking criteria
Only the officially published regulations are leading.
15 februari 2017 Match Making Day 2017 18
Wind op Zee R&D projects – evaluation process
Screening project ideas (not obligatory)
Initial evaluation by Advisory Committee
Presentation by Project initiator(s) and possible clarification
Final evaluation by Advisory Committee and discussion with RVO
Subsidy Grant
• Project idea / summary
• CommentsAbstract
• Full proposal
• Cannot bechanged
Proposal
• Followingevaluation
• Presentation andclarification
Presen-tation
Finalevaluationand grant
Evalua-tion
Only the officially published regulations are leading.
15 februari 2017 Match Making Day 2017 19
Joint Program with other TKIs in the Topsector Energy
Higher TRLs leading to Demonstration
Contribution to Cost Reduction, CO2 targets and Economy
Corroborate the actual potential cost reduction on SDE+ spent
Quality and feasibility of the project and efficiency
Knowledge dissemination
Balanced cooperation
TRL 6 t/m 8. Lower TRLS are not strictly excluded, but large TRL spans are considered less feasible. Project ends in a form of demonstration (TRL 7-8).
Maximum € 6,000,000 per project – budget is € 50 M
Renewable Energy Regulation
Only the officially published regulations are leading.
15 februari 2017 Match Making Day 2017 20
Renewable Energy Regulation (HER)
2017 2023 Operational2019 tender FID
Development and delivery of new technology for construction
Development and delivery of new technology for operations and maintenance
Development and delivery of new technology for post 2023 period
2030 Operational
Cost reduction is the key deliverable
Only the officially published regulations are leading.
15 februari 2017 Match Making Day 2017 21
Higher score (max 5 points) for• Higher contribution to the program objectives• Higher contribution to the Dutch economy• Higher quality of the proposal (feasibility, participants, efficiency)
Minimum of 3 points per item
Rejection when:• < 9 points• Project is similar to earlier projects• Too low ranked (overall maximum subsidy of 1 M€)• Maximum € 350,000 per project
System Integration on the North Sea – Ranking
Only the officially published regulations are leading.
15 februari 2017 Match Making Day 2017 22
Subsidy instruments 2017Hernieuwbare
energieWind op Zee R&D
ProjectenSystem Integration
North SeaCooperation required (min 1 company) ☺ ☺ ☺
Fundamental Research X X XIndustrial Research ☺ ☺ ☺
Experimentak development ☺ ☺ ☺
Demonstration ☺ X ☺
80% subsidy for Research Institutes ☺ ☺ ☺
Supplement for SME: Medium (10%) ☺ ☺ ☺
Supplement for SME: Small (20%) ☺ ☺ ☺
Supplement for cooperation Research Institute (10%)
☺ ☺ ☺
Tender budget € 50 M € 4.7 M € 1 MMax. subsidie/project € 6,000,000 € 500,000 €350,000Evaluation: first come, first serve ☺
Evalution: tender with ranking ☺ ☺
Max project duration (years) 4 4 4
Only the officially published regulations are leading.
15 februari 2017 Match Making Day 2017 23
Demonstration of Energy Innovations
Contributes to “green growth”
Can be single company project
Maximum € 6M subsidy per project
No Industrial Research
Tender based on• contribution to the Dutch economy
• Contribution to the energy transition
• Innovative character
• Quality of the project
Demonstration Energy Innovation (DEI)
Only the officially published regulations are leading.
15 februari 2017 Match Making Day 2017 24
• Innovatiemakelaars / Innovation Brokers• TKI Wind op Zee supports SME companies with advisory services from experts in
• Kennisvoucher / Knowledge Coupon• SME company support for support from Knowledge Institutes (€ 3750)
• Haalbaarheidsstudies / Feasibility studies• Feasibility studies (>60%) possibly complemented with industrial research or
experimental development. • Can include literature study, patent investigation, technology scans, market studies,
competitive analysis etc. • Subsidy 40% of the eligible cost (maximum € 50.000)
• Collaborative R&D• Industrial Research and/or Experimental Development• Project includes at least 2 SME companies• Regional tender system (refer to RVO website)
MIT (SME Innovation Topsector)
Only the officially published regulations are leading.
15 februari 2017 Match Making Day 2017 25
• Projects not eligible for Topsector Energy subsidies
• Are in line with the TKI Wind op Zee Program
• Cooperation between at least one business and one Knowledge Institute
• Possibility of 25% (gross) contribution on the (largely) cash spent on work done by Knowledge Institutes
• For further questions and request for PPS Toeslag: TKI Wind op Zee
PPS Toeslag / PPP Contribution
Only the officially published regulations are leading.
15 februari 2017 Match Making Day 2017 26
Wind op Zee R&D Projecten• Pre-competitive R&D and product development• No Demonstration• Budget € 4.7 M, maximum € 0.5 M per project• Tender with selection on quality of the proposal
Hernieuwbare Energieregeling• Cost Reduction of SDE+ spent before 2023• Higher TRL Levels – limited TRL span (feasibility)• Budget: € 50M, maximum per project € 6M€• first-come-first-serve (entry criteria apply)
System integration on the North Sea• Collaborative R&D for cost reduction and added
value in offshore wind and oil&gas projects• Budget € 1 M, maximum € 0.35 M per project• Tender with selection on quality of the proposal
Summary instruments 2017Tender Budget Max
subsidyper project
Tenderperiod
Selection
Wind op Zee R&DProjecten
€ 4.7 M € 0.5M 1/4/2017 –2/5/2017
Ranking
HernieuwbareEnergie Regeling
€ 50 M € 6M 1/4/2017 –31/3/2018
First come first serve
Systeemintegratie op de Noordzee
€ 1 M € 0.35M 1/4/2017 –23/5/2017
Ranking
Only the officially published regulations are leading.
Other Subsidy instruments: • PPS toeslag / PPP Supplement• MIT – SME Instrument for Innovation• DEI – Demonstration of Energy Innovations
More information on all instruments: http://www.rvo.nl/subsidies-regelingen/subsidies-energie-innovatie
15 februari 2017 Match Making Day 2017 27
• Revision KIA in 2017 for 2018-2021
• Knowledge and Innovation Agenda and Knowledge and Innovation Contracts up for renewal
• Review of TKI Wind op Zee objectives and program
• Market consultation in 2017
Knowledge and Innovation Agenda
www.tki-windopzee.nl