Page 1: PROFESSIONAL EXPERIENCE - IPLOCA · PROFESSIONAL EXPERIENCE Mr. Daniel Fernández has an extensive experience in engineering, construction and management fields, with more than 38
Page 2: PROFESSIONAL EXPERIENCE - IPLOCA · PROFESSIONAL EXPERIENCE Mr. Daniel Fernández has an extensive experience in engineering, construction and management fields, with more than 38
Page 3: PROFESSIONAL EXPERIENCE - IPLOCA · PROFESSIONAL EXPERIENCE Mr. Daniel Fernández has an extensive experience in engineering, construction and management fields, with more than 38

PROFESSIONAL EXPERIENCE Mr. Daniel Fernández has an extensive experience in engineering, construction and management fields, with more than 38 years of continuous professional work in the international area. He is a Mechanical Engineer and has a Master in HSE with initial responsibilities within the refining industry and then a successful career in the construction industry, working for a leading international EPC Contractor and well-known Pipeliner such as Techint E&C. CURRENT POSITION Worldwide Machinery and related companies under WW Group, USA

Executive Vice President – Latin America Leading business conduction in Latin America for one of the most important groups in USA, in the business of rental, leasing, purchase and sales of construction equipment, as well as concession and construction services. Owning over 2.500 pieces of equipment, Worldwide Group comprises Companies such as Worldwide Financial, Worldwide Machinery, Worldwide Rental Services, Superior Manufacturing and Worldwide Industrial Parts and Supplies.

PARTICIPATION IN INTERNATIONAL ASSOCIATIONS IPLOCA (International Pipe Line and Offshore Contractors Association) Board Member and Director for Latin America (2011 – 2012)

ACADEMIC ACTIVITIES Project Management Program Activity created jointly by Techint E&C and the Universities “Universidad Católica Argentina”, and “Universidad Austral” aimed at training in Postgraduate Program. • Sponsor and Lecturer Junior Professionals Program Activity created to train Young Professionals for E&C business. • Sponsor and Lecturer

FERNÁNDEZ, Daniel Mechanical Engineer - Universidad Tecnológica Nacional

Master Degree in HSE – Universidad Tecnológica Nacional Argentinian

Born in 1956 Married, three children

Page 4: PROFESSIONAL EXPERIENCE - IPLOCA · PROFESSIONAL EXPERIENCE Mr. Daniel Fernández has an extensive experience in engineering, construction and management fields, with more than 38

COURSES AND SEMINARS • Planning • Construction Equipment • Stress Analysis • Welding

CONFERENCES IN MIDDLE EAST Participating as member of the panel or speaker on subjects such as Construction, Project Execution and Job Opportunities in the area. PROFESSIONAL BACKGROUND SUMMARY 2014 Worldwide Group, USA Executive Vice President 2013 PPS Pipeline Systems GmbH Latin America Director 2006 – 2012 TECHINT E&C

Chief Operating Officer

2003 – 2006 TECHINT E&C Director Engineering & Procurement

Managing Director Saudi Techint Ltd 2002 – 2003 ORGANIZACIÓN TECHINT

E&C Corporate Controller Managing Director Saudi Techint Ltd

1996 – 2002 TECHINT INTERNATIONAL CONSTRUCTION CORP. (TENCO)

MENA (Middle East & North Africa) Director Managing Director Saudi Techint Ltd.

1994 – 1996 TECHINT INTERNATIONAL CONSTRUCTION CORP. (TENCO)

Project Director

1990 – 1994 TECHINT E&C Project Director Engineering Manager Construction Superintendent

1988 – 1990 TECHINT E&C Technical Office Manager

1983 – 1988 SHELL CAPSA Project Leader Project Engineer

Page 5: PROFESSIONAL EXPERIENCE - IPLOCA · PROFESSIONAL EXPERIENCE Mr. Daniel Fernández has an extensive experience in engineering, construction and management fields, with more than 38

1980 – 1983 INDUSTRIAS METALÚRGICAS GALINI

Technical Office Manager

1979 – 1980 TAUCA CONSTRUCCIONES MECÁNICAS Mechanical Designer

1977 – 1979 LD MONTAJES

Mechanical and Piping Draftsman DETAILED RESUMÉ • Worldwide Machinery and related companies under WW Group, USA Vice President – Latin America

Duties: full responsibility of the Profit & Lost in the Area (From Mexico up to Argentina and Brasil).

• PPS Pipeline Systems GmbH a Habau Company

Latin America Director. Duties: Leading a well known international Pipeline Contractor with worldwide experience in projects performed in Europe , Asia and South America.

• TECHINT E&C Position: Managing Director, Andean Area Duties: full responsibility of the Profit & Lost in the Area (Panamá; Colombia; Ecuador; Perú; Chile).

• TECHINT INTERNATIONAL CONSTRUCTION CORP.(Since 2006) Position: President Duties: Leading a well known international Pipeline Contractor with worldwide experience in projects performed in Middle East, Africa, Australia, Europe, Canada and Latin America.

• TECHINT E&C – CHIEF OPERATING OFFICE (Since 2006 - 2012) Position: Chief Operating Officer Main duties: responsible for the execution of all Projects in the Americas, among others within Oil & Gas, Infrastructure, Mining and Power sectors. Also in charge of Techint’s Branches in Canada, Mexico, Central America and South America (except Brazil).

• TECHINT E&C - ENGINEERING (2003 – 2006) Position: Director of Engineering Division / Managing Director Saudi Techint Ltd Main duties: Management of a multitask group of Process, Mechanical equipment, Piping, Electrical, Instrumentation, Civil, Architectural and Control Systems Engineers who performs Basic, Conceptual and Detail Engineering.

• TECHINT Organization – Share Holders Board (2002 – 2003) Position: E&C Corporate Controller Main duties: Worked for the President of Techint Group as part of the Holding Staff Office. The activities were concentrated in informing the Shareholders directly about the performance of the main E&C projects, analyzing all the aspects of the business such as management decisions, viability of the budget and construction programme, early warnings of deviations, technical consistency of the executions, etc.

• TECHINT INTERNATIONAL CONSTRUCTIONS CORP (TENCO) – SAUDI TECHINT LTD. (1996 – 2002) Position: MENA (Middle East & North Africa) Director / Managing Director Saudi Techint Ltd.

Page 6: PROFESSIONAL EXPERIENCE - IPLOCA · PROFESSIONAL EXPERIENCE Mr. Daniel Fernández has an extensive experience in engineering, construction and management fields, with more than 38

Main Projects: - SHAYBAH TO ABQAIQ PIPELINE 640 KM 46” Crude oil pipeline across the Rub AL Khali desert in the empty quarter of Saudi Arabia. Client: Saudi Aramco - HAWIYAH INLETS & AUXILIARY FACILITIES (KSA) New Aramco Gas Plant at Eastern Province (KSA) The inlet facilities package includes six slug catchers (three phase separators) and five air coolers followed by fired three phase separators. It also includes three hydrocarbon stabilizer modules; two sour water stripper modules, auxiliaries and the main electrical power supply substations. Slug catcher is sized for 540MMSCFD with design pressure 693psi and temperature of 248°F. Client: Saudi Aramco - HAWIYAH GAS DEVELOPMENT PIPELINES (KSA) 600 KM new Pipelines in different diameters (56”, 48”, 36” & 24”); 150 KM diameter 48” conversion from Oil to Gas Line, upgrading of Pump Stations, Interface Installations Client: Saudi Aramco - MUGLAD BASIN OIL DEVELOPMENT PIPELINES (SUDAN) 6 Pump Stations for 1500 KM of Pipeline Onshore & Offshore Marine Terminal SCADA & Communication System 1500 KM of Fibre Optic Cable Client: Greater Nile Petroleum Operating Company - SHAYBAH TO ABQAIQ OIL PIPELINE 635 KM of 46” diameter from Shaybah fields to Abqaiq Processing Plant across Rub Al Khali Desert. Client: Saudi Aramco

• TECHINT INTERNATIONAL CONSTRUCTIONS CORP (TENCO) - YANBU-MADINAH WATER TRANSMISSION SYSTEM (PHASE II) LOT 3C 3D - SALINE WATER CONVERSION CORPORATION (SWCC) Position: Project Director and Managing Director / Saudi Techint Ltd. Project Description: 180 km pipeline diam. 60’’ and 52’’ (high pressure), 190 Km pipeline diam. 32’’, 26’’, 24’’, 4 API Tanks 850,000 Bb each (140,000 c.m.) reservoirs, 12 Concrete reservoirs 50,000 c.m. each, 2 Pumps Stations 54,000 KW each (40,000 Hp each) Surge vessel plants, telecontrol � SCADA System, 370 Km Optical Fiber Cable. Client: SALINE WATER CONVERTION CORPORATION - SWCC Saudi Arabia

• TECHINT E&C - MULTI-PRODUCTS PIPELINE ESMERALDAS STO. DOMINGO

Position: Project Manager Project Description: 164 Km diam. 16’’ multi-products (Gasoline- Diesel) pipeline across the Andes Mountains Client: PETROECUADOR (Nacional Oil Company of Ecuador)

• TECHINT E&C - CENTRAL PRODUCTION FACILITY (CPF) - OCCIDENTAL EXPLORATION AND PRODUCTION COMPANY (1992 – 1994) Position: Project Manager Project Description: 14 API Oil storage tanks, Desalination units, flow lines, all related facilities for oil treatment. Client: OCCIDENTAL COMPANY “OXY” (Ecuadorian Branch)

• TECHINT E&C - WATER SUPPLY SYSTEM GUAYAQUIL CITY - EMPRESA PROVINCIAL DE AGUA POTABLE DEL GUAYAS EPAP-G (1992 – 1994) Position: Project Engineer Project Description: 20 Km diam. 2000 mm pipeline, Pumps Station, Treatment Plant (10 cm/s.) Client: EMAP Guayaquil

Page 7: PROFESSIONAL EXPERIENCE - IPLOCA · PROFESSIONAL EXPERIENCE Mr. Daniel Fernández has an extensive experience in engineering, construction and management fields, with more than 38

• TECHINT E&C - COASTAL MULTI-PRODUCTS PIPELINE PETROECUADOR

(COMPAÑÍA DE PETRÓLEO ECUATORIANA) (1990 – 1992) Position: Engineering Manager - Construction Manager Project Description: 128 Km diam. 10’’ pipeline Libertad-Pascuales 275 Km diam. 10’’ pipeline Pascuales-Sto Domingo 178 Km diam. 6’’ pipeline Libertad-Manta 10 API Steel Storage Tanks 2 Pumps Station, Communication System, Control System, All the related activities for a LSTK contract. Client: PETROECUADOR (Ecuadorian Oil Company)

• TECHINT E&C – Quito Water System PAPALLACTA - EMPRESA MUNICIPAL DE

ALCANTARILLADO Y AGUA POTABLE DE QUITO (EMAAP-Q) (1988 – 1990) Position: Technical Office Manager Project Description: 48 Km diam. 48’’ pipeline with 1500 meters differences level, 2 Booster Pump Stations 15,000 KW each 1 Intake Station Surge tanks, One way surge tank, 3 rivers intake dams, Treatment Plant 3 cm/s Recovery Station with 14 MW Pelton Turbine. in charge of Mechanical Design for Pipeline, Pipeline Special Crossing, Pumping Stations, Hydraulic Studies, Transient Devices and special work Client: EMPRESA MUNICIPAL DE AGUA POTABLE EMAP-Q ECUADOR.

• SHELL CAPSA - BUENOS AIRES Refinery (1983 – 1988)

Position: Project Leader - Project Engineer Main Duties: Cat Cracker Unit upgrading, Lub Oil Unit Revamp Cooling Water System Lines Power Plant Revamp VisBreaking Unit Relief System

• INDUSTRIAS METALÚRGICAS GALINI (1980 – 1983)

Position: Engineering Manager Main Duties: Design and Construction of Dry Chemical Fire Extinguisher Manufacturing Plant. Automatic Welding Devices, Dry Chemical Powder Plant, Stamp Devices, External Coating Line, Final Assembly Line.

• TAUCA – CONSTRUCCIONES MECÁNICAS (1979 – 1980) Position: Mechanical Designer

• LD MONTAJES (1977 – 1979)

Position: Mechanical & Piping Draftman