WIP 2017PROJECT NAME
PROJECT LOCATION:
TEAM:
OFFICE:
ID#:
CHALLENGE:
We were presented with the challenge of creating a multi modal station that could house 5 public and private transportation means. Regional buses, city buses, trolley buses, subway and taxis on a site that already has all access and egress points saturated and constrained. Because of this commuters must circumvent vehicles both private and public, on every inter-modal connection.
On top of the mobility component the station had to include a shopping center, hotel, offices and an entertainment area.
Each one of these components must function independently while being connected between each other. From the mixed used standpoint, the challenge was to create a public space that feels integrated to the local community while giving a sense of order to the intermodal exchange experience.
STRATEGY:
The first approximation we had, to the issue of integrating all uses, came by arranging users in a layered manner so that vehicles and pedestrians could move freely and independently. After this it became apparent that a main public circulation was needed. So, we began to zone everything around a main pedestrian street on an upper level and an internal street on a lower level. By doing so we ended up having a street that was both porous and permeable while retaining controlled access points for each use.
Zoning then came naturally from locating the uses where they were closer to their respective users. And in turn phasing became just a matter of sectioning the complex on the constituent parts that made more sense for the client investment portfolio as the business, community and market evolves in time.
RESULTS/IMPACT:
We firmly believe that the final complex would work as kind of a template for densification on a city that demands efficiency on every major infrastructure.
Every use became an independent constituent part of the hole; functioning independently on one layer of the complex and dependently to the rest on another.
Since the main building blokc of a CETRAM is the mobility hub, it was conceived as the beating heart of the complex and as a first phase to which the remaining blocks had to be joint to.
227
Mexico City
Juan Jose ZarateLiliana BernardisPenfei ZhengEmmanuel Bancesco
Mexico city
Cetram Tasqueña
EGGRESS
ACCESS
AV. TASQUENA
ACCESOSSALIDAS
UNDERPASS FORAVENIDA DE LAS TORRES
PRIVATE ACCESS AND EGRESS FOR TERMINAL REGIONAL BUSES
LOCAL BUS
LIGHT RAIL
TROLLEY BUS
SUBWAY
TAXI PRIVATE CAR
REGIONAL BUS
L1
GF
B1
SCHEME 2 (UNDERGROUND BUS TERMINAL)
LEVEL 1
BASEMENT 1
GROUND FLOOR
AV. TASQUENA
LOCAL BUS
LIGHT RAIL
TROLLEY BUS
SUBWAY
TAXI PRIVATE CAR
REGIONAL BUS
L1
GF
B1
SCHEME 2 (UNDERGROUND BUS TERMINAL)
CONFLICT ZONE
TRAFFIC STRATEGY
Located at the south of Mexico City’s urbanized areas. CETRAM Tasqueña is a mixed use multi modal station that aims to connect 5 public and private transportation means. Regional buses, city buses, trolley buses, subway and taxis on a site that already has all access and egress points saturated and constrained. Because of this, commuters must circumvent vehicles both private and public, on every intermodal connection.
CETRAM Tasqueña is the third largest inter modal station in the city, connecting the city to neighbouring cities such as Cuernavaca, Veracruz, Oaxaca, Acapulco, etc. As well as becoming an entry point for most of the workforce that each day travells from the Estado de Mexico to Mexico City.
On top of the mobility component the station had to include a shopping center, hotel, offices and an entertainment area. Each one of these components must function independently while being connected between each other. From the mixed used standpoint, the challenge was to create a public space that feels integrated to the local community while giving a sense of order to the intermodal exchange experience.
For this reason the optimal and most obvious solution we found was to take the public transportation to a lower lever in which they can go in and out of the complex without disturbing local transit.
UP
UP
UP
UP
UP
UP
UP
UP
UP
1595 m²ENGLISH COURTYARD
38785 m²PARKING
2016 m²BOH/MEP
3153 m²TERMINAL
436 m²BOH/MEP
160 m²BUS WASHING
14000
14000
2000
1400
020
00
R20000
R20000
1360
014
000
1000
014
000
1400
014
000
1000
014
000
1850
013
800
LEGEND
CIRCULATION
MEP/BOH
PARKING
TERMINAL PROGRAM
TERRACE
5000
7000
5000
2500
17000
6000
9400
6000
909 m²CIRCULATION
909 m²CIRCULATION
SC. 01
SC. 03
SC. 02SC. 04
QUEUEING/WASHING
ACCE
SSEG
RESSS
DN
DN
DN
DN
DN
UP
UP
DN
DN
DN
DN
UP
UP
1352 m²HOTEL LOBBY
LEGEND
CIRCULATION
F&B
MEP/BOH
RETAIL
HOTEL
TICKETING
MARKET
828 m²MARKET
961 m²BOH316 m²
HOTEL
210 m²RETAIL
210 m²RETAIL
210 m²RETAIL
210 m²RETAIL228 m²
RETAIL
7509 m²CIRCULATION
116 m²RETAIL
176 m²RETAIL
176 m²RETAIL
116 m²RETAIL
176 m²RETAIL
176 m²RETAIL
116 m²RETAIL
188 m²TICKETING
188 m²TICKETING
188 m²TICKETING
188 m²TICKETING
176 m²TICKETING
176 m²TICKETING
179 m²TICKETING
525 m²F&B
637 m²F&B
130 m²BOH
176 m²RETAIL
176 m²RETAIL
60 m²SECURITY
60 m²SECURITY
60 m²SECURITY
210 m²RETAIL126 m²
BOH
7500
72002800
30006000
31007000
800 6000800
107004800
7000
3100
6000
6000
10500800 6000
80010700
4800
7500
700
8000
9000
1100
090
0080
00
6000
3800 13600 14000 13600 10700
R 12000
R 19000
2500 6000 2200
6000
8000
1100
0
9000
1500
0
9000
1100
0
1400
0
1100
0
7000
7300
14000
SC. 01
SC. 03
SC. 02SC. 04
ACCE
SS
ACCESS
ACC
ESS
ACCESSACCESS
EGRES
EGRESSEGRESS
ACCESS
ACC
ESS
EGRES
S
ACC
ESS
ACCESS
EGRESS
EGRE
SS
DN
DN
DNUP
UP
267 m²RETAIL
334 m²RETAIL
9122 m²CIRCULATION
286 m²RETAIL
511 m²F&B
508 m²F&B
796 m²F&B
330 m²MEP/BOH
503 m²F&B
200 m²RETAIL
200 m²RETAIL
182 m²RETAIL
195 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
290 m²RETAIL
200 m²RETAIL
375 m²MARKET
375 m²MARKET
195 m²RETAIL
375 m²MARKET
345 m²TICKETING
345 m²TICKETING
377 m²MISC
413 m²F&B
1030 m²TERRACE
209 m²RETAIL
341 m²RETAIL
200 m²RETAIL
171 m²RETAIL
200 m²RETAIL 200 m²
RETAIL
200 m²RETAIL
195 m²RETAIL
195 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
220 m²RETAIL
152 m²RETAIL
160 m²RETAIL
160 m²RETAIL
155 m²RETAIL
160 m²F&B
160 m²F&B
160 m²F&B
270 m²TERRACE
302 m²F&B
417 m²F&B
304 m²RETAIL
212 m²RETAIL
466 m²RETAIL
463 m²RETAIL
240 m²RETAIL
286 m²RETAIL
332 m²RETAIL
377 m²RETAIL
395 m²RETAIL
389 m²RETAIL
236 m²RETAIL216 m²
RETAIL186 m²RETAIL
205 m²RETAIL
144 m²F&B
50 m²F&B
50 m²F&B
50 m²F&B
50 m²RETAIL
50 m²RETAIL
50 m²RETAIL
144 m²RETAIL
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
278 m²RAMP
220 m²RETAIL
220 m²RETAIL
220 m²RETAIL
220 m²RETAIL
220 m²RETAIL220 m²
RETAIL220 m²RETAIL
197 m²BOH/MEP
220 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
199 m²RETAIL
149 m²RETAIL
190 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
230 m²RETAIL
150 m²RETAIL
246 m²RETAIL
209 m²RETAIL
153 m²RETAIL
148 m²RETAIL
154 m²RETAIL
138 m²RETAIL
148 m²RETAIL 384 m²
F&B
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
154 m²RETAIL
63 m²F&B
63 m²F&B
63 m²F&B
63 m²F&B
63 m²F&B
147 m²F&B
6575 m²CIRCULATION
11635 m²CIRCULATION
63 m²F&B
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
497 m²RETAIL
525 m²BOH/MEP
220 m²RETAIL215 m²
RETAIL
325 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
1787 m²CIRCULATION
529 m²OFFICE LOBBY
526 m²OFFICE LOBBY
2000 6000
7200
12100
7000
3500
6000
LEGEND
CIRCULATION
F&B
MEP/BOH
RETAIL
OFFICE
TICKETING
MISC
TERRACE
MARKET
7000
6000
SC. 01
SC. 03
SC. 02SC. 04
ACC
ESS
EGRESS
BASEMENT 1
ARCHITECTURE VEHICLES PEDESTRIANS
GROUND LEVEL
LEVEL 1
TAXIREGIONAL BUS LOCAL BUS CURRENT LEVEL UPPER LEVEL LOWER LEVELPRIVATE CAR
LOBBY
ACCESS
ACCESS
±0.00
-4.00
-8.00
-4.00
-8.00
+8.00
+14.00
+20.00
+26.00
+8.00
+14.00
+20.00
+26.00
±0.00
+32.00 +32.00
+36.00
+44.00
+48.00
+56.00
+60.00
+68.00
+72.00
+64.00
+52.00
+40.00
DN
DN
DN
DN
DN
UP
UP
DN
DN
DN
DN
UP
UP
1352 m²HOTEL LOBBY
LEGEND
CIRCULATION
F&B
MEP/BOH
RETAIL
HOTEL
TICKETING
MARKET
828 m²MARKET
961 m²BOH316 m²
HOTEL
210 m²RETAIL
210 m²RETAIL
210 m²RETAIL
210 m²RETAIL228 m²
RETAIL
7509 m²CIRCULATION
116 m²RETAIL
176 m²RETAIL
176 m²RETAIL
116 m²RETAIL
176 m²RETAIL
176 m²RETAIL
116 m²RETAIL
188 m²TICKETING
188 m²TICKETING
188 m²TICKETING
188 m²TICKETING
176 m²TICKETING
176 m²TICKETING
179 m²TICKETING
525 m²F&B
637 m²F&B
130 m²BOH
176 m²RETAIL
176 m²RETAIL
60 m²SECURITY
60 m²SECURITY
60 m²SECURITY
210 m²RETAIL126 m²
BOH
7500
72002800
30006000
31007000
8006000
80010700
4800
7000
3100
6000
6000
10500800
6000800
10700
4800
7500
700
8000
9000
1100
090
0080
00
6000
3800 13600 14000 13600 10700
R 12000
R 19000
2500 6000 2200
6000
8000
1100
0
9000
1500
0
9000
1100
0
1400
0
1100
0
7000
7300
14000
DN
DN
DNUP
UP
267 m²RETAIL
334 m²RETAIL
9122 m²CIRCULATION
286 m²RETAIL
511 m²F&B
508 m²F&B
796 m²F&B
330 m²MEP/BOH
503 m²F&B
200 m²RETAIL
200 m²RETAIL
182 m²RETAIL
195 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
290 m²RETAIL
200 m²RETAIL
375 m²MARKET
375 m²MARKET
195 m²RETAIL
375 m²MARKET
345 m²TICKETING
345 m²TICKETING
377 m²MISC
413 m²F&B
1030 m²TERRACE
209 m²RETAIL
341 m²RETAIL
200 m²RETAIL
171 m²RETAIL
200 m²RETAIL 200 m²
RETAIL
200 m²RETAIL
195 m²RETAIL
195 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
220 m²RETAIL
152 m²RETAIL
160 m²RETAIL
160 m²RETAIL
155 m²RETAIL
160 m²F&B
160 m²F&B
160 m²F&B
270 m²TERRACE
302 m²F&B
417 m²F&B
304 m²RETAIL
212 m²RETAIL
466 m²RETAIL
463 m²RETAIL
240 m²RETAIL
286 m²RETAIL
332 m²RETAIL
377 m²RETAIL
395 m²RETAIL
389 m²RETAIL
236 m²RETAIL216 m²
RETAIL186 m²RETAIL
205 m²RETAIL
144 m²F&B
50 m²F&B
50 m²F&B
50 m²F&B
50 m²RETAIL
50 m²RETAIL
50 m²RETAIL
144 m²RETAIL
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
278 m²RAMP
220 m²RETAIL
220 m²RETAIL
220 m²RETAIL
220 m²RETAIL
220 m²RETAIL220 m²
RETAIL220 m²RETAIL
197 m²BOH/MEP
220 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
199 m²RETAIL
149 m²RETAIL
190 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
230 m²RETAIL
150 m²RETAIL
246 m²RETAIL
209 m²RETAIL
153 m²RETAIL
148 m²RETAIL
154 m²RETAIL
138 m²RETAIL
148 m²RETAIL 384 m²
F&B
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
154 m²RETAIL
63 m²F&B
63 m²F&B
63 m²F&B
63 m²F&B
63 m²F&B
147 m²F&B
6575 m²CIRCULATION
11635 m²CIRCULATION
63 m²F&B
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
497 m²RETAIL
525 m²BOH/MEP
220 m²RETAIL215 m²
RETAIL
325 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
1787 m²CIRCULATION
529 m²OFFICE LOBBY
526 m²OFFICE LOBBY
2000 6000
7200
12100
7000
3500
6000
LEGEND
CIRCULATION
F&B
MEP/BOH
RETAIL
OFFICE
TICKETING
MISC
TERRACE
MARKET
7000
6000
GROUND LEVEL
LEVEL 1
LOBBY
ACCESS
-4.00
-8.00
+8.00
+14.00
+20.00
+17.00
+26.00
+23.00
±0.00
+32.00+29.00
+36.00
+44.00
+48.00
+56.00
+60.00
+68.00
+72.00
+76.00
+80.00
+84.00
+88.00
+102.00
+64.00
+52.00
+40.00
DN
DN
DNUP
UP
267 m²RETAIL
334 m²RETAIL
9122 m²CIRCULATION
286 m²RETAIL
511 m²F&B
508 m²F&B
796 m²F&B
330 m²MEP/BOH
503 m²F&B
200 m²RETAIL
200 m²RETAIL
182 m²RETAIL
195 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
290 m²RETAIL
200 m²RETAIL
375 m²MARKET
375 m²MARKET
195 m²RETAIL
375 m²MARKET
345 m²TICKETING
345 m²TICKETING
377 m²MISC
413 m²F&B
1030 m²TERRACE
209 m²RETAIL
341 m²RETAIL
200 m²RETAIL
171 m²RETAIL
200 m²RETAIL 200 m²
RETAIL
200 m²RETAIL
195 m²RETAIL
195 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
220 m²RETAIL
152 m²RETAIL
160 m²RETAIL
160 m²RETAIL
155 m²RETAIL
160 m²F&B
160 m²F&B
160 m²F&B
270 m²TERRACE
302 m²F&B
417 m²F&B
304 m²RETAIL
212 m²RETAIL
466 m²RETAIL
463 m²RETAIL
240 m²RETAIL
286 m²RETAIL
332 m²RETAIL
377 m²RETAIL
395 m²RETAIL
389 m²RETAIL
236 m²RETAIL216 m²
RETAIL186 m²RETAIL
205 m²RETAIL
144 m²F&B
50 m²F&B
50 m²F&B
50 m²F&B
50 m²RETAIL
50 m²RETAIL
50 m²RETAIL
144 m²RETAIL
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
192 m²TICKETING
278 m²RAMP
220 m²RETAIL
220 m²RETAIL
220 m²RETAIL
220 m²RETAIL
220 m²RETAIL220 m²
RETAIL220 m²RETAIL
197 m²BOH/MEP
220 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
199 m²RETAIL
149 m²RETAIL
190 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
230 m²RETAIL
150 m²RETAIL
246 m²RETAIL
209 m²RETAIL
153 m²RETAIL
148 m²RETAIL
154 m²RETAIL
138 m²RETAIL
148 m²RETAIL 384 m²
F&B
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
154 m²RETAIL
63 m²F&B
63 m²F&B
63 m²F&B
63 m²F&B
63 m²F&B
147 m²F&B
6575 m²CIRCULATION
11635 m²CIRCULATION
63 m²F&B
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
497 m²RETAIL
525 m²BOH/MEP
220 m²RETAIL215 m²
RETAIL
325 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
200 m²RETAIL
1787 m²CIRCULATION
529 m²OFFICE LOBBY
526 m²OFFICE LOBBY
2000 6000
7200
12100
7000
3500
6000
LEGEND
CIRCULATION
F&B
MEP/BOH
RETAIL
OFFICE
TICKETING
MISC
TERRACE
MARKET
7000
6000
LEVEL 1
RETAIL
REGIONAL BUS TERMINAL
ENTRETAINMENT
OFFICES
HOTEL
The first approximation we had, to the issue of integrating all uses, came by arranging users in a layered manner so that vehicles and pedestrians could move freely and in-dependently. After this it became apparent that a main public circulation was needed. So, we began to zone everything around a main pedestrian street on an upper level and an internal street on a lower level. By doing so we ended up having a street that was both porous and permeable while retaining controlled access points for each use.
Zoning then came naturally from locating the uses where they were closer to their respective users. And in turn phasing became just a matter of sectioning the complex on the constituent parts that made more sense for the client investment portfolio as the business, community and market evolves in time.
We firmly believe that the final complex would work as kind of a template for densification on a city that demands efficiency on every major infrastructure. Every use became an independent constituent part of the hole; functioning independently on one layer of the complex and dependently to the rest on another. Since the main building blokc of a CETRAM is the mobility hub, it was conceived as the beating heart of the complex and as a first phase to which the remaining blocks had to be joint to.