ProE-tutorial4
-
Upload
mithun-ravichandran -
Category
Documents
-
view
8 -
download
0
description
Transcript of ProE-tutorial4
Pro / ENGINEER Tutorial
Part 2
Kathryn J. De LaurentisMircea Badescu, Ph.D.
MB, Hinge Assembly Tutorial, ProE_2001
Tutorial Part 1• Draw Hinge Part 1• Make .jpeg and .stl Files• Make Engineering Drawing
Tutorial Part 2• Draw Hinge Parts 2 & 3• Assemble Hinge• Animate Assembly
MB, Hinge Assembly Tutorial, ProE_2001
Part files and tutorials for this class:http://robots.rutgers.edu/dms/Mircea/Create a dms folderDownload part files (part01, 02 and 03) in that folderOpen proe20 and set the working directory to that folderUtilities/Environment Ring Message OFF
Additional PTC tutorials:http://ptc-mss.com/Tutorial/proe_tutorial.htm
MB, Hinge Assembly Tutorial, ProE_2001
Review – The parts
Part_01
MB, Hinge Assembly Tutorial, ProE_2001
MB, Hinge Assembly Tutorial, ProE_2001
MB, Hinge Assembly Tutorial, ProE_2001
Part_02
MB, Hinge Assembly Tutorial, ProE_2001
MB, Hinge Assembly Tutorial, ProE_2001
MB, Hinge Assembly Tutorial, ProE_2001
Part_03
MB, Hinge Assembly Tutorial, ProE_2001
MB, Hinge Assembly Tutorial, ProE_2001
Assembly
File/New/Select assembly type; Name
Have the datum planes/axes view ON
MB, Hinge Assembly Tutorial, ProE_2001
Add Part01:
Menu Manager/Assembly/Component/Assemble/Select part (Part01)/Open
Component Placement MenuSelections: icon top-left:
show component in a separate window ---ONshow component in the assembly window --- OFF
Constraints: Click on “Automatic”, open drop-down menu, select “Align”
Select “Front” Datum plane on the component window“Asm_Front” datum plane on the assembly window
Select “+” to add a new constraint/ “Align”“Top” component“Asm_Top” assembly
Select “+” “Align”“Right”“Asm_Right”
Placement Status “Fully Constrained”Click on OK
MB, Hinge Assembly Tutorial, ProE_2001
Add Part02
Constraints“Align” A_1 component/part02
A_1 assembly/part01“Align” “Front” component
“Asm_Front”“Align” “Top”
“Asm_Top”
“Fully constrained”
MB, Hinge Assembly Tutorial, ProE_2001
Add Part03Constraints“Align” A_1 component/part03
A_1 assembly/part01“Mate/Align” two planar surfaces
MB, Hinge AnimationTutorial, ProE_2001
Animation
File/New/Select assembly type; Name
Have the datum planes/axes view ON
MB, Hinge AnimationTutorial, ProE_2001
Add Part01:
Menu Manager/Assembly/Component/Assemble/Select part (Part01)/Open
Component Placement MenuSelections: icon top-left:
show component in a separate window ---ONshow component in the assembly window --- OFF
Connections: Click on “Automatic”, open drop-down menu, select “Align”
Select “Front” Datum plane on the component window“Asm_Front” datum plane on the assembly window
Select “+” to add a new constraint“Top” component“Asm_Top” assembly
Select “+”“Right”“Asm_Right”
Placement Status “Fully Constrained”Click on OK
MB, Hinge AnimationTutorial, ProE_2001
Add Part02
Component/Assemble/Select Part02/Open
ConnectionsConnection_1: Pin
Axis Alignment:Component Reference: Part02 A_1Assembly reference: Part01 A_1
Translation:Component Reference: Part02 TopAssembly reference: Part01 Top/or Asm_Top
OK
MB, Hinge AnimationTutorial, ProE_2001
Add Part03
Component/Assemble/Select Part03/Open
ConnectionsConnection_1: Pin
Axis Alignment:Component Reference: Part03 A_1Assembly reference: Part01 A_1
Translation:Component Reference: Part03 RightAssembly reference: Part01 Top/or Asm_Top
Preview: (Axis Alignment: Flip) if necessary
OK
Save file!!!!
MB, Hinge AnimationTutorial, ProE_2001
AnimationMain menusApplications/AnimationNew screen with animation icons on the right.
Body definition in animation…(3nd icon)Ground (Part01)body1 (Part02)body2 (Part03) Click on them to see if the parts are highlightedClose
Drag model and create snapshots…(4th icon)- drag the part02 and move it 90 degrees (click w left mouse button, double-click to release at the desired position)- take a snapshot “Snapshot1”appears in the “Drag” GUI- drag part02 in the initial position, take “Snapshot2”- drag part02 another 90 degrees (opposite snapshot1); take “Snapshot3”Close
MB, Hinge AnimationTutorial, ProE_2001
AnimationCreate new keyframe sequence… (5th icon)
Name it “Rotation”In the snapshot window, drop-down menu to select “Snapshot1…2…”
Snapshot 1, Time 0.00, “+”Snapshot 2, Time 2.00, “+”Snapshot 3, Time 4.00, “+”OK
Start the animation…(3rd to last icon)STOP it at the end of 4 seconds time interval
Playback (2nd to last icon)Animate GUI. See if the total no of frames is 40. If no repeat the previous step.Capture/ Name of file, Type(.mpeg, .jpeg)
Works better with a white background (View/Display Settings/System Colors/ (background-white)
P R A C T I C E ! ! !Do not forget the ProeE requirements for project reports given in
Part 1 of the tutorial