LONG-HOLE
MODULE : SUPPORT, DRILLING, BLASTING
FLOOR
HoursCLEANING DRILLING INSTALLATION DRILLING REDRILLING BLAST
1
2
3Preparation
( 1 hr)
(section 2.0)
Preparation
( 0.3 hr/shift)
(section 4.3)
4
5
6
7
82 blas
drop ra
(section
18.8 meters/ms 76 m/ms 94.6 meters/ms 31.6 t/
MOBILIZATION AND CABLES DROP RAISES
0.13 hr/hole of
5 meters
with 2 men(section 4.4)
3.1 m
advanc
/shift w
2 me
(section
Fixed t( 2.48 hr/
(section
8 m advanced
/hour
with 2 men
(section 4.1)
14.9 m/hour
(section 4.4)
Productivity 9 manshifts/sub 43 meters/manshift
DEMOBILIZATION
3.83 hours/sub-level
with 2 men
(section 3.0)
Fixed time
( 2.17 hr/sub-level)
(section 2.0)
Preparation
( 0.3 hr/shift)
(section 4.3)
Fixed activities per shift
2.13 hours/shift
(section 1.0)
8.9 m/hour
(section 4.3)
File: 159332107.xls.ms_officeSheet: CompilationPage 1 of 16
Experimental MineVal-d'Or
-
7/28/2019 Productivity Long-Hole
2/16
UNIT COST DISTRIBUTION PER ACTIVITY
MODULE: SUPPORT, DRILLING, BLASTING
FLOOR
CLEANING DRILLING INSTALLATION DRILLING REDRILLING
1 - LabourSalary ($/hour) 20.00$ hours hours hours hours hours hoursBonus ($/hour) 8.19$ 237.4 75.9 719.5 612.6 107.1 10.6Fringe benefits 50% $/tonne $/tonne $/tonne $/tonne $/tonne
Total ($/hour) 42.29$ 0.35$ 1.06$ 0.90$ 0.16$ 0.02$
Hours/shift 8
2 - MaterialDrilling (Long-Hole)
including rods, steel bits, hoses, lubricants and grease
Explosives and accessories
Supportmechanical rockboltsrebars and resinSplit-Set
Swellexscreencables, ciment and drillingshotcrete
total support :
Timber
Track
Pipes
Ventilation
Other supplies
3 - Equipment maintenancemechanicalelectricaldiesel and lubricants
Total/tonne 0.35$ 1.06$ 0.90$ 0.16$ 0.02$
4.45$ $/drilled m (cables) 6.29$ $/drilled m (drop ra
Labour only
0.11$
$/tonne
0.11$
DEMOBILIZATION
MOBILIZATION & CABLES DROP RAIS
File: 159332107.xls.ms_officeSheet: CostsPage 2 of 16
Experimental MineVal-d'Or
-
7/28/2019 Productivity Long-Hole
3/16
LONG-HOLE
STOPE PRODUCTIVITY CALCULATION
1.0 - DIRECT FIXED ACTIVITIES PER SHIFT (outside the stope)
Cage (at beginning and end of shift) 2 8 16
Travelling (shaft - refuge station - shaft) 2 5 10 Three-meterOther travelling delays 0 Two workingBack and forth to stope 4 8 32 Ramp accesSupervision 1 15 15 Three sub-leWork planning 1 10 10
Complete daily reports 1 15 15
Lunch 1 30 300
128 minutes
2.13 hours/shift
2.0 - DIRECT FIXED ACTIVITIES PER STEP (inside the stope)
RELATED TO FLOOR
CLEANING RELATED TO BLASTIBring and prepare material 1 30 30 Bring and prepare mate
Store material 1 30 30 Clean the floor followin
0 Store equipment and e
0 Check blasting lineminutes/sub-level 60 Connect the blast
hours/sub-level 1.00 Close access to the stoAccess verification fol lo
RELATED TO ANCHOR CABLE Extra scalingINSTALLATION Repair and install venti
Bring and prepare material 1 60 60
Clean pump and accessories 1 40 40
Store material 1 30 30
0
0
minutes/sub-level 130
hours/sub-level 2.17
Frequency orUnits
Time(min)/Unit
Total Time(min)
Total Time(min)
Time(min)/Unit
Frequency orUnits
Frequency orUnits
Time(min)/Unit
Total Time(min)
File: 159332107.xls.ms_office
Sheet: Long-HolePage 3 of 16
Experimental MineVal-d'Or
-
7/28/2019 Productivity Long-Hole
4/16
LONG-HOLE
STOPE PRODUCTIVITY CALCULATION
3.0 - DIRECT FIXED ACTIVITIES PER STOPE
RELATED TO MOBILIZATION OTHER ACTIVITIES
AND DEMOBILIZATION PER STOPEPrepare the slide and working areas 3 80 240
Bring and lower drill in the sub-level 3 60 180Assemble the drill 3 20 60
Install electric services 3 60 180
Dismantle and bring out drill from sub-level 3 60 180Remove electric services 3 180 540
0
0
01380 minutes
Required number of men 2 23.00 hours
4.0 - DIRECT VARIABLE ACTIVITIES PER STEP (inside the stope)
4.1 - Floor cleaning
Cleaning time
Sub-levels (hours) 8
1 11.632 11.633 11.634 11.63
5 11.636 11.63
69.75 hours
Surveyors
Geologists
Productivity (linear meters/hour)
Frequency orUnits
Time(min)/Unit
Total Time(min)
Repairs in main access
Mechanics and electricians
3rd drilling level or UPPER LEVEL
2nd drilling sub-level
1st drilling sub-level
Drop raises
Typical Long-Hole Stope
LOWER LEVEL
File: 159332107.xls.ms_office
Sheet: Long-HolePage 4 of 16
Experimental MineVal-d'Or
-
7/28/2019 Productivity Long-Hole
5/16
LONG-HOLE
STOPE PRODUCTIVITY CALCULATION
4.2 - Stope parameters
4.2.1 - Drop raise parameters
Production Reaming
Drilling sub-levels Actual length Width Height # of drop raises 54 102
1 6 2.4 3.0 1 16
2 6 2.4 3.0 1 163 6 2.4 3.0 1 16
4 6 2.4 3.0 1 16
5 6 2.4 3.0 1 16
6 6 2.4 3.0 1 16
6
4.2.2 - Drilling and blasting parameters of production rows
Length of Spacing between Number Average area Number of tonnes Number of drille
Drilling sub-levels sub-levels rows of rows /row (m ) /row meters/row
1 93 1.2 76 18 62 1
2 93 1.2 76 18 62 1
3 93 1.2 76 18 62 1
4 93 1.2 76 18 62 15 93 1.2 76 18 62 1
6 93 1.2 76 18 62 1369
Total tonnage from production ro
Average tonnage per drilled mete
4.3 - Drilling
Sub-levels Drop raises Long-Hole % Hours %
1 10.79 98.42 10% 1.1 1%
2 10.79 98.42 10% 1.1 1%
3 10.79 98.42 10% 1.1 1%4 10.79 98.42 10% 1.1 1%
5 10.79 98.42 10% 1.1 1%
6 10.79 98.42 10% 1.1 1%64.72 590.50 10% 6.47 1%
# shifts (incl maintenance) 12 106 # shifts (incl maintenance) 1
drilling hours (incl maintenance) 68.32 622.30 drilling hours (incl maintenance) 6.77
NOTE: The average productivity includes: drilling, daily maintenan
Drop raises -> 43.0 67.3
-
7/28/2019 Productivity Long-Hole
6/16
LONG-HOLE
STOPE PRODUCTIVITY CALCULATION
4.4 - Support by anchor cables
Drilling sub-levels Length of Spacing between Number of Number of Number of cables Number of drilledLong-Hole sub-levels rows rows holes/row /hole meters/row
1 93 2.4 38 6 1 3
2 93 2.4 38 6 1 33 93 2.4 38 6 1 3
4 93 2.4 38 6 1 3
5 93 2.4 38 6 1 3
6 93 2.4 38 6 1 3Anchor cables per drift outside the mineralized zone
0
0
00
Total tonnage from drilling rows (Long-Hole) 28071 tonnes
Meter of cable/Long-Hole tonne 0.244 meter of cable/tonne
14.9 meters/hour1
76.0 meters/shift* The average productivity includes: drilling, daily maintenance, fixed time per shift and contingencies.
4.5 - Blasting
4.5.1 - Loading parameters
Length notSub-levels Drop raises Long-Hole Drop raises loaded/row Long-Hole Drop raises
1 32 228 96 3 1140 2222 32 228 96 3 1140 222
3 32 228 96 3 1140 2224 32 228 96 3 1140 222
5 32 228 96 3 1140 2226 32 228 96 3 1140 222
192 1368 576 6840 1332
Number of holes to be loaded
Number of men (drilling)
Average productivity (meters/shift) *
Productivity (meters/hour)
Number of meters to be loaded
Kg of
Long-Hole rows
See worksheet:
Cable_Drilling: productivity calculation of ancho
File: 159332107.xls.ms_office
Sheet: Long-Hole
Page 6 of 16
Experimental Min
Val-d'Or
-
7/28/2019 Productivity Long-Hole
7/16
LONG-HOLE
STOPE PRODUCTIVITY CALCULATION
4.5.2 - Loading time
Sub-levels Fixed Variable TOTAL Fixed Variable TOTAL
1 3.39 1.60 5.00 19.00 16.41 35.41
2 3.39 1.60 5.00 19.00 16.41 35.41
3 3.39 1.60 5.00 19.00 16.41 35.41
4 3.39 1.60 5.00 19.00 16.41 35.41
5 3.39 1.60 5.00 19.00 16.41 35.416 3.39 1.60 5.00 19.00 16.41 35.41
20.36 29.98 212.45
NOTE: - fixed time: includes a,b,c,d,e
- varable time: includes transportation and loading of explosives Loa
LONG-HOLE NUMBER OF ROWS/SHIFT 4.7 rows/shiftTONNES/SHIFT 289 tonnes/shift
DROP RAISES NUMBER OF BLASTS/SHIFT 1.03 blasts/shiftMETERS ADVANCED/SHIFT 3.1 meters/shift
Long-Hole (hours)Drop raises (hours)
T
File: 159332107.xls.ms_officeSheet: Long-Hole
Page 7 of 16
Experimental Mine
Val-d'Or
-
7/28/2019 Productivity Long-Hole
8/16
LONG-HOLE
STOPE PRODUCTIVITY CALCULATION
5.0 - STOPE COMPILATION
5.1 - TABLE OF REQUIRED HOURS PER ACTIVITY
FLOOR
CLEANING DRILLING REDRILLING
ref. section 2.0
1.006
6.00
FLOOR
CLEANING DRILLING REDRILLINGref. section 4.1 ref. section 4.3 ref. section 4.3
69.75 68.32 6.77
REFERENCE NUMBER OF MEN 2 One man by default
PLANNED NUMBER OF MEN 2
ONLY DIRECT VARIABLE ACTIVITIES ARE INFLUENCED BY THE NUMBER OF MEN.THEREFORE, ACCORDING TO THE NUMBER OF MEN ENTERED, WE OBTAIN:
69.75 68.32 6.77
* The planned number of men can be different from the one entered in each section. If the number is different,
the time required for variable activities will be corrected in proportion to the number of men.
(inside the stope)
Number of times
23.00
DIRECT VARIABLE (hours) *
2
1
DEMOBILIZATION
23.00
ref. section 3.0
MOBILIZATION AND
One man per drill
DROP RAISES
DIRECT FIXED (hours)
(inside the stope)
2
MOBILIZATION AND DROP RAISES5.1.2 - DIRECT VARIABLE ACTIVITIES
1
DEMOBILIZATIONref. section 3.0
5.1.1 - DIRECT FIXED ACTIVITIES
DIRECT VARIABLE (hours)
One man per drill
File: 159332107.xls.ms_office
Sheet: Long-HolePage 8 of 16
Experimental MineVal-d'Or
-
7/28/2019 Productivity Long-Hole
9/16
LONG-HOLE
STOPE PRODUCTIVITY CALCULATION
5.2 - STOPE PRODUCTIVITY CALCULATION
FLOOR
CLEANING DRILLING REDRILLING
Hours of fixed activities 6.00 29.
+ + +
Hours of variable activities 69.75 68.32 6.7727
Tr= = = 2.9
TOTAL 75.75 68.32 6.77* * *
PLANNED NUMBER OF MEN 2 1 1= = =
TOTAL MANHOURS REQUIRED 151.5 68.3 6.8
Number of hours per shift (schedule) 8 hours
with a co
OUTSIDE STOPE
PRODUCTIVE CONTINGENCY FIXED
2863.3 429.5 1194.8 4487.6
64% 10% 27% 100%
*23.00
2=
DEMOBILIZATION
INSIDE THE STOPE
TOTAL (STOPE)TOTAL
73%
DROP RAISES
=
+
46.0
23.00
MOBILIZATION AND
MANHOURS
3292.8
File: 159332107.xls.ms_officeSheet: Long-HolePage 9 of 16
Experimental MineVal-d'Or
-
7/28/2019 Productivity Long-Hole
10/16
LONG-HOLE
STOPE PRODUCTIVITY CALCULATION
6.0 - STOPE STATISTICS
Pow
54 mm 102 mm Tonnes T/drilled m Explosives (kg) (k
DROP RAISES 576 144 739 1.026 1,332
LONG-HOLE 8208 28,071 3.42 15,822
CABLES 6840
TOTAL 15624 144 28,810 1.83 17,154
6.1 - STOPE PLANNING FACTORS
Required number of shifts (including contingencies and fixed time per shift)
Mobilization and
Floor cleaning Demobilization DRILLING REDRILLING BLASTING DRILLING REDRILLING BL
14.8 4.5 13.4 1.3 11.7 121.9 1.2
with 2 men with 2 men with 1 man with 1 man with 2 men with 1 man with 1 man wit
Productivity
Floor Mobilization & Inscleaning Demobilization of
18.8 meters/ms 9 manshifts/sub 94.6
Drilling
(m/shift)
43.0 63.1 tonnes/shift
LONG-HOLE 67.3 289.4 tonnes/shift
CABLES 76.0
per drill
DROP RAISES
DROP RAISES
LONG-HOLE
Drilled meters
Loading
File: 159332107.xls.ms_officeSheet: Long-HolePage 10 of 16
Experimental MineVal-d'Or
-
7/28/2019 Productivity Long-Hole
11/16
LONG-HOLEPRODUCTIVITY CALCULATION OF PRODUCTION DRILLING
1.0 - Calculation of the average drilling time per rod 3.0 - Hole b
minutes0.41.50.40.5
1.4
0.7
4.0 - Pivotinaverage drilling time per rod 4.9 min/rod
length of the rod (m) 1.2average time per drilled meter 4.1 min/drilled m
5.0 - Movingchang
2.0 - Casingmin
0.4 average time t1.52.0
0.8 6.0 - Movingor on t
minutes/casing 4.7
Insert the rodDrilling time/rod
Change of rodHole cleaning/rod
Loosen the rod
Store the rod
Mo
Insert the rod with steel bit for casing
DrillingInsert casing
Remove the rod with steel bit for casing
A
Adjust the time in relation to the
penetration rate and the length
of the rod
File: 159332107.xls.ms_officeSheet: Prod_DrillingPage 11 of 16
Experimental MineVal-d'Or
-
7/28/2019 Productivity Long-Hole
12/16
LONG-HOLEPRODUCTIVITY CALCULATION OF PRODUCTION DRILLING
7.0 - Typical row 1.254 mm
Breakthrough Number Hole # Length yes=1, no=0 Setup Casing of rods Drilling Breakthrough Casing Positioning
15 1 1 12.7 62.1 0.9 0.0 1.1 15 1 1 12.7 62.1 0.9 0.0 1.2 15 1 1 12.7 62.1 0.9 0.0 1.3 0.0 0.0 0.0 0.04 0.0 0.0 0.0 0.05 0.0 0.0 0.0 0.06 0.0 0.0 0.0 0.07 0.0 0.0 0.0 0.08 0.0 0.0 0.0 0.09 0.0 0.0 0.0 0.0
10 0.0 0.0 0.0 0.011 0.0 0.0 0.0 0.012 0.0 0.0 0.0 0.013 0.0 0.0 0.0 0.014 0.0 0.0 0.0 0.015 0.0 0.0 0.0 0.016 0.0 0.0 0.0 0.017 0.0 0.0 0.0 0.018 0.0 0.0 0.0 0.019 0.0 0.0 0.0 0.020 0.0 0.0 0.0 0.021 0.0 0.0 0.0 0.022 0.0 0.0 0.0 0.023 0.0 0.0 0.0 0.024 0.0 0.0 0.0 0.0
25 0.0 0.0 0.0 0.0
45 3 1 186.2 2.7 0.0 4.
Hole diameter (mm)Length of rods (m)
0
Average product
Number of drill rig displacements on the same row
Drilling time (min) Disp
Enter the required number of displacements of the drill rig
on the same row.
The displacement time between rows is already included
in the calculations.
File: 159332107.xls.ms_officeSheet: Prod_DrillingPage 12 of 16
Experimental MineVal-d'Or
-
7/28/2019 Productivity Long-Hole
13/16
LONG-HOLEPRODUCTIVITY CALCULATION OF DROP RAISE DRILLING
1.0 - Calculation of the average drilling time per rodProduction Reaming
54 102
0.4 0.41.5 2.4
0.4 0.8
0.5 0.5
1.4 2.0
0.7 0.8
average drilling time per rod 4.9 6.9 min/rod
1.2
average time per drilled meter 54 mm 4.1 minutes/drilled meter102 mm 5.8 minutes/drilled meter
2.0 - Casingmin
0.4
1.5
2.0
0.8
minutes/casing 4.7
7.0 - Typical drop raise drilling
1.26
Breakthrough # setups Number Casing Number
# holes Diam (mm) yes=1, no=0 Length /row of rows yes=1, no=0 of rods Drilling Bre
16 54 1 96 3 5 0 82.7 405.1
4 102 1 24 2 2 0 20.7 142.6
120 5 7 547.7
Insert the rod with steel bit for casing
length of the rod (m)
Drilling
Insert casing
Remove the rod with steel bit for casing
Loosen the rod
DIAMETER (mm)
Store the rod
Insert the rod
Change of rod
Hole cleaning/rod
Drilling time/rod
Length of rods (m)Length of holes (m)
Drillin
Average prod
Total number of additional displacements of the dr
3
Only big diameter hole drilling.
If pilot holes are required before drilling the big diameter,
these will have to be added to the first line.
Enter the total number of additional displacements of the drill rig on all the
rows.
The displacement time between rows is already included in the
calculations.
Adjust the
penetratio
of the rod
-
7/28/2019 Productivity Long-Hole
14/16
LONG-HOLEPRODUCTIVITY CALCULATION OF ANCHOR CABLE DRILLING
1.0 - Calculation of the average drilling time per rod 3.0 - Hole bmin
0.41.50.40.5
1.4
0.7
4.0 - Pivoti
average drilling time per rod 4.9 min/rod
length of the rod (m) 1.2average time per drilled meter 4.1 min/drilled m
5.0 - Movinchang
2.0 - Casingmin
0.4 average time1.52.0
0.8 6.0 - Movinor on
minutes/casing 4.7
DrillingInsert casing
Remove the rod with steel bit for casing
M
Store the rod
Loosen the rod
Insert the rod with steel bit for casing
Drilling time/rodInsert the rod
Change of rodHole cleaning/rod
Adjust the time in relation to the
penetration rate and the length
of the rod
File: 159332107.xls.ms_officeSheet: Cable_DrillingPage 14 of 16
Experimental MineVal-d'Or
-
7/28/2019 Productivity Long-Hole
15/16
LONG-HOLEPRODUCTIVITY CALCULATION OF ANCHOR CABLE DRILLING
7.0 - Typical row1.2
54 mm
Breakthrough Number Hole # Length yes=1, no=0 Setup Casing of rods Drilling Breakthrough Casing Positionin
1 5 0 1 4.3 21.2 0.0 0.0 12 5 0 1 4.3 21.2 0.0 0.0 13 5 0 1 4.3 21.2 0.0 0.0 14 5 0 2 4.3 21.2 0.0 0.0 15 5 0 2 4.3 21.2 0.0 0.0 16 5 0 2 4.3 21.2 0.0 0.0 17 0.0 0.0 0.0 0.08 0.0 0.0 0.0 0.09 0.0 0.0 0.0 0.0
10 0.0 0.0 0.0 0.0
11 0.0 0.0 0.0 0.012 0.0 0.0 0.0 0.013 0.0 0.0 0.0 0.014 0.0 0.0 0.0 0.015 0.0 0.0 0.0 0.016 0.0 0.0 0.0 0.017 0.0 0.0 0.0 0.018 0.0 0.0 0.0 0.019 0.0 0.0 0.0 0.020 0.0 0.0 0.0 0.021 0.0 0.0 0.0 0.022 0.0 0.0 0.0 0.023 0.0 0.0 0.0 0.024 0.0 0.0 0.0 0.0
25 0.0 0.0 0.0 0.0
26 0.0 0.0 0.0 0.0
30 0 2 127.4 0.0 0.0 7
Dis
Number of drill rig displacements on the same row
0
Average produc
Length of rods (m)
Drilling time (min)
Hole diameter (mm)
Enter the required number of displacements of the drill rig
on the same row.
The displacement time between rows is already included in
the calculations.
File: 159332107.xls.ms_officeSheet: Cable_DrillingPage 15 of 16
Experimental MineVal-d'Or
-
7/28/2019 Productivity Long-Hole
16/16
3rd drillin level or UPPER LEVEL
2nd drilling sub-level
1st drilling sub-level
Drop raises
Typical Long-Hole Stope
LOWER LEVEL
File: 159332107.xls.ms_officeSheet: DrawingPage 16 of 16
Experimental MineVal-d'Or
7/22/201312:19 AM