Date Comment 26/10/ 12 Firstly, I started the 1 I feel that I progressed through these without difficulty and I feel that I gained enough knowledge of buttons and flash for the future tasks. I started on task 2 by creating a project schedule; I had a little bit of difficulty with this being the first project schedule I have created. This task took a while to create. I then started on my product log which I updated throughout the Assignment. I Then started my mood board, I found this as an easy task to do and felt it went quite well, the mood board contained images of 2D & 3D characters to give me ideas for my character. I feel that that the task was completed on time. 31/26/ 12 I Created my task by compiling my 10 favourite 2D Characters into a document each with a small paragraph explaining who they are & What they do as well as why they are my in my top 10 favourite. This task was Simple and was created very quickly and easily. This task was not completed on time as it was set for non-school periods and I created it in class time. After this was completed I started to generate ideas for my character by using my mood board and task 3 for reference. 2/11/1 2 I Continued generating ideas for my Character. 5/11/1 2 I started Task 4 with creating a storyboard with my planned Idea and produced it on the template which I was given. I found this task very simple and quick to complete. I completed this task within my allocated time. 7/11/1 2 I Produced my Product Charter I found this slightly difficult with wording but after a short amount of thought I produced it fairly quickly. I then Updated my Schedule with my completed work. 14/11/ 2012 I started on Task 5 where I created a presentation/Profile of my character including Biography, Personality, Powers and Backround. I then started starting to create my character in illustrator for task 6. I found a reference image which I then vector drew around an image with the pen tool.

Transcript of Production log

Page 1: Production log

Date Comment26/10/12 Firstly, I started the 1 I feel that I progressed through these without difficulty and I feel

that I gained enough knowledge of buttons and flash for the future tasks.I started on task 2 by creating a project schedule; I had a little bit of difficulty with this being the first project schedule I have created. This task took a while to create. I then started on my product log which I updated throughout the Assignment.

I Then started my mood board, I found this as an easy task to do and felt it went quite well, the mood board contained images of 2D & 3D characters to give me ideas for my character. I feel that that the task was completed on time.

31/26/12 I Created my task by compiling my 10 favourite 2D Characters into a document each with a small paragraph explaining who they are & What they do as well as why they are my in my top 10 favourite. This task was Simple and was created very quickly and easily. This task was not completed on time as it was set for non-school periods and I created it in class time.After this was completed I started to generate ideas for my character by using my mood board and task 3 for reference.

2/11/12 I Continued generating ideas for my Character.5/11/12 I started Task 4 with creating a storyboard with my planned Idea and produced it on the

template which I was given. I found this task very simple and quick to complete. I completed this task within my allocated time.

7/11/12 I Produced my Product Charter I found this slightly difficult with wording but after a short amount of thought I produced it fairly quickly.I then Updated my Schedule with my completed work.

14/11/2012

I started on Task 5 where I created a presentation/Profile of my character including Biography, Personality, Powers and Backround.I then started starting to create my character in illustrator for task 6. I found a reference image which I then vector drew around an image with the pen tool.

Page 2: Production log

16/11/12 I Created a Presentation of my character including name, backstory, physical description and the game genre with the template given, I felt that I did very well with the this taskI was then Recorded given my presentation to the class, I felt that the Presentation Went well, I spoke Confidently and too the class. I also feel that I stuttered my words a few times.I also updated my Project schedule accordingly.

21/11/12 I continued on with task 5, creating the character, I added colour via the eye-dropper tool using the reference image.I Updated the Project Schedule.I started to create the backround for my Character using a reference image taken from the internet and then I Vector drew around it with the pen tool.

Page 3: Production log

23/11/12 I Finished the backround and My character, I now started on Task 6, I started with the Animation Plan. I felt that I didn’t need the animation plan, but I created one anyway.I completed the Plan quickly and started on the animation work.

Page 4: Production log

23/11/12 I Continued on with the animations, I now started putting the artwork onto the scenes and creating a logo for the Title Scene. I created the logo from a reference Image.When adding the Artwork to flash I realised that it would not animate as a group so I had to take it back into illustrator and break it up for me to animate it in flash.

Page 5: Production log

28/11/12 I added the broken up parts of the vector images into flash scenes appropriately. I then animated it. I Found creating and setting up the scenes easy.

Page 6: Production log

30/11/12 I updated my project Schedule accordingly.I took my Character back into illustrator and tweaked it’s colours design because I felt it needed a more realistic feel to it.

5/12/12 I tweeked my animation because some of the scenes were out of place.7/12/12 I updated my project schedule accordiangly.

I tweeked my flash project more because I felt it was needed.13/12/12 I went over all the tasks and tweeked & Fixed anything that was needed. No tasks

needed anymore tweeking so I got everything ready to upload them on the deadline.14/12/12 The Deadline is today, I uploaded my Tasks to slideshare and then embedded them to

slideshare.