Production Balancing Nift

download Production Balancing Nift

of 58

Transcript of Production Balancing Nift

  • 7/30/2019 Production Balancing Nift

    1/58

    Production Balancing

    The phrase that spreads fear into

    managers and supervisors& students?

  • 7/30/2019 Production Balancing Nift

    2/58

  • 7/30/2019 Production Balancing Nift

    3/58

    Production Balancing

    The views of someone whohas:

    -been there

    -done that

    -got the T-shirt

    -been driven crazy by it all

  • 7/30/2019 Production Balancing Nift

    4/58

    Factory watch

    Production targets not being met

    Production targets being met exactly

    Operators sitting idle Operators complaining about being

    constantly moved between jobs

    Large build up of work in progress No work in progress

  • 7/30/2019 Production Balancing Nift

    5/58

    YES

    You have a production

    balancing and productionmanagement problem!

  • 7/30/2019 Production Balancing Nift

    6/58

    Production Balancing -A Definition

    Ensuring that input = output on all

    operations and work sections. X

    Ensuring that input= output on alloperations and work sections and that all

    operations and operators have the

    opportunity to work to their maximum

    potential.

  • 7/30/2019 Production Balancing Nift

    7/58

    Water tanks

    a Each tank has its own

    inlet & outlet valves

    Valves are difficult to

    open to exactlycorrect settings

    Each tank contains an

    amount of water

    OP 1

    OP 2

    OP 3

    OP 1

  • 7/30/2019 Production Balancing Nift

    8/58

    Water tanks - operations

    Each operation has a different labour

    content. S.A.M. S.M.V.

    Every operator works at a different pace.

    Many operators work inconsistently.

    Machines break quality problems -

    absence

  • 7/30/2019 Production Balancing Nift

    9/58

    Production Balancing

    Initial Balance - planning

    skills matrix

    operation list

    SMVs Running the section

    initial balance

    skills matrixW.I.P. levels

    Live output data

  • 7/30/2019 Production Balancing Nift

    10/58

    Operator information

    What tasks can

    they do?

    How well can they

    do them?

    Factual-numerical

    Based on ability-not previous output

    Hold on a skills

    matrix

    Recent not old

    history

    Potential output

    Performance/

    garments per hour

  • 7/30/2019 Production Balancing Nift

    11/58

    Operator performance

    Do not rely only on historical information.

    Circumstances may have affected

    performance e.g. lack of work

    Find out potential performance from

    cycle timing and come to decision about

    performance level to be used.

  • 7/30/2019 Production Balancing Nift

    12/58

    Potential performance

    Find cycle time

    Compare with basic time.

    Example SMV = 0.60

    Allowances = 20%

    Bundle handling allowance = 0.02 Average cycle time = 0.70

  • 7/30/2019 Production Balancing Nift

    13/58

    Potential performance

    Basic time = (smv bundling) -allowances = (0.60-0.02) 20% = 0.464

    Basic time = 0.464

    Cycle time = 0.70

    Potential Performance = basic timex 100

    cycle time

    = 0.464 = 66%

    0.70

  • 7/30/2019 Production Balancing Nift

    14/58

    Potential performance

    SMV = 0.60

    Potential performance = 66%

    @ 100% output per hour = 60/0.60 = 100 Potential performance = 66% therefore

    potential output per hour = 100 x 66%

    = 66 pieces per hour

  • 7/30/2019 Production Balancing Nift

    15/58

    Potential performance

    Using cycle time and potential

    performance is absolutely essential in

    effective balancing/setting up of modular

    manufacturing teams.

  • 7/30/2019 Production Balancing Nift

    16/58

    Potential performance and output

    SMV = 0.36

    Bundling 0.015

    Allowances 18%

    Average cycle time =

    0.25

    Potential

    performance? Potential hourly

    output?

    SMV = 0.45

    Bundling 0.02

    Allowances 15%

    Average cycle time =

    0.40

    Potential

    performance? Potential hourly

    output?

  • 7/30/2019 Production Balancing Nift

    17/58

    Potential performance and output

    0.36 0.015 = 0.345

    0.345 18%

    = 0.283 basic time

    Cycle = 0.25

    P.perf. = basic =0.283

    cycle 0.25

    = 113%

    0.45-0.02 = 0.43

    0.43 15%

    = 0.366 basic time

    Cycle = 0.40

    = basic = 0.366

    cycle 0.40

    = 91%

  • 7/30/2019 Production Balancing Nift

    18/58

    Skills Matrix

    Operator/job title Elasticate Backs yokes lace t/s front sh & slvs bind neck slvs in hem t/s hem

    Doreen 75 75

    Duresha 100 90 90 90

    Geetha 120 100 120 120

    Indrani 100 75 100

    Iromi 100 75

    Jeevani 100 100 100 100

    Mangalika 75 75 65

    Neetha 120 120 120 120

    Nirosha 75 100

    Pushpa 100 50 100

    Thushanti

    Shirani

    50

    25

    50

    75

    50

    75

    75

    50

    75

    50

    50

    75

    75

    50

    50

    75

    50

    25

    75

    50

  • 7/30/2019 Production Balancing Nift

    19/58

    Skills Matrix

    Supervisors will tell you a skills matrix isnot necessary they know what peoplecan do!

    Problem. What is in their head is notavailable to others!

    What if an operator changes section or the

    supervisor changes section or leaves. People forget things! Do not depend upon

    the operator to tell you what the can do.

  • 7/30/2019 Production Balancing Nift

    20/58

    Skills matrix

    A skills matrix gives you a picture and picturesare easy to understand.

    At a glance you can see cover, number of

    operators that can do an operation You can see how multi-skilled each operator is.

    Helps with multi-skilling plans

    It is of limited value if held in the computer in

    Industrial engineering. Keep it up to date- people leave or learn new

    operations, performances change.

  • 7/30/2019 Production Balancing Nift

    21/58

    Initial balance

    What is Shirani &Thushantis role in the section?

    NEVER, NEVER, EVER include the floater in theinitial balance

    When they are included in the initial balancethey are not available to perform floating jobsand cease to be a floater

    BEWARE: Supervisors will use floaters as

    repair hands, helper, trainer, sample hand orleave them where they are useful and doing agood job.

  • 7/30/2019 Production Balancing Nift

    22/58

    Floater calculation

    Theory:

    Number of operators in section = 30

    Average absence = 8%

    Floaters cover absence therefore 30 x 8%= 2.4 people missing at any time.

    Floaters are not specialists and will usually

    work at a lesser rate than regular operator,say 66% therefore 2.4/0.66 = 3.6 = 4needed

  • 7/30/2019 Production Balancing Nift

    23/58

    Floater calculation

    Practice

    Sufficient floaters are never allocated and

    the supervisor has to work with what she

    has got.

    Usually an inadequate floater supply

    mixed with a few operators that are partly

    multi-skilled.

  • 7/30/2019 Production Balancing Nift

    24/58

    Operation list

    1. Elasticate attach lace elasticator 0.70

    & elastic to sleeves

    2. Join two back seams 2 needle o/lock 1.00

    3. Attach front & back yokes 2 needle o/lock /frill 1.20

    4. Attach lace to front yoke L/S Diff feed 1.005. L/s yokes and topstitch 2 needle L/S 1.00

    sides to hold

    6. Join shoulder& sleeve seams 2 needle o/lock 1.10

    7. Attach binding, tab & lace to neck L/S Diff feed 0.708. Attach sleeves 2 needle o/lock diff 1.40

    9. Whip hem Cover stitch 0.90

    10. Top sew neck and two sleeves Lockstitch 1.00

  • 7/30/2019 Production Balancing Nift

    25/58

    Initial balance

    We now know operations and sequence

    Machines & SMVs

    From skills matrix, what operations eachoperator can do and at what performance

    level

    We can know allocate people to tasks

    complete the initial balance

  • 7/30/2019 Production Balancing Nift

    26/58

    Initial Balance

    Op. Number S.M.V. standard operator machine exp. Perf expected spare time garments

    output type % per hour

    1.elasticate 0.70 86

    2.back seam 1.00 60

    3.yokes 1.20 50

    4.lace 1.00 60

    5.t/s front 1.00 60

    6. sh & slvs 1.10 55

    7. bind neck 0.70 86

    8.slvs in 1.40 43

    9. hem 0.90 67

    10.t/s neck 1.00 60

  • 7/30/2019 Production Balancing Nift

    27/58

    Initial Balance- 60 hour

    Op. Number S.M.V. standard operator machine exp. Perf expected spare time garments

    output type % per hour

    1.elasticate 0.70 86 Doreen 75 64 +4

    2.back seam 1.00 60

    3.yokes 1.20 50

    4.lace 1.00 60

    5.t/s front 1.00 60

    6. sh & slvs 1.10 55

    7. bind neck 0.70 86

    8.slvs in 1.40 43

    9. hem 0.90 67

    10.t/s neck 1.00 60

  • 7/30/2019 Production Balancing Nift

    28/58

    Initial Balance

    Op. Number S.M.V. standard operator machine exp. Perf expected spare time garments

    output type % per hour

    1.elasticate 0.70 86 Doreen elasticator 75 64 0.07 4

    2.back seam 1.00 60 Duresha 2n o/l 100 60 0.00 0

    3.yokes 1.20 50 neetha o/l frill 120 60 0.00 0

    4.lace 1.00 60 Indrani l/s diff 100 60 0.00 0

    5.t/s front 1.00 60 Iromi 2n o/l 100 60 0.00 0

    6. sh & slvs 1.10 55 Jeevani 2n o/l 100 55 -0.10 -5

    7. bind neck 0.70 86 Mangalika l/s diff 75 64 0.07 4

    8.slvs in 1.40 43 geetha 2n o/l diff 120 51 -0.17 -9

    9. hem 0.90 67 Nirosha hemmer 100 67 0.10 7

    10.t/s neck 1.00 60 Pushpa l/s 100 60 0.00 0

  • 7/30/2019 Production Balancing Nift

    29/58

    Initial Balance

    A perfect balance is not possible unlessevery operation has the same workcontent (SMV) and every operator works

    at the same performance. (this can onlybe achieved by restricting work supply tothe lowest operation output). Whatefficiency?

    Be aware of potential imbalances

    One of the reasons people like modular

  • 7/30/2019 Production Balancing Nift

    30/58

    Section summary

    High performing operators-average 99%

    Op. 8. sleeve attach is bottle-neck with 51 perhour only despite high performing operator.

    If traditional approach is taken and section isbalanced to lowest operation then section underideal circumstances will never achieve higherthan 83% efficiency

    Not perfect but no balance will beit ismanageable if we know about it and monitor thesection

  • 7/30/2019 Production Balancing Nift

    31/58

    Hourly target why 60 ?

    SMV = 10 per garment

    10 operators

    Average efficiency of section is 100% No need to factor in absence as sufficient

    floater cover.

    8% absence average = 0.8 (1) personabsent at ay time. floaters work at lesser

    rate and 2 available.

  • 7/30/2019 Production Balancing Nift

    32/58

    Hourly target why 60 ?

    10 operators = 600 attended minutes

    available in one hour.

    600/smv of 10 = 60 per hour.

    IF floater cover we not available we would

    have needed to reduce target by 8% for

    absence. 60 8% = 55 per hour.

  • 7/30/2019 Production Balancing Nift

    33/58

    Running the line

    2 things can be guaranteed about a plan

    (initial balance)

    It will immediately go out of date

    It will immediately go wrong.

    IT is a starting point

    You need to manage people and WIP(Work-in-progress) to make the line work

  • 7/30/2019 Production Balancing Nift

    34/58

    Running the line. Regular checks

    Input to every operation

    Output from every operation

    Work-inprogress levels

    1 2 3

  • 7/30/2019 Production Balancing Nift

    35/58

    Running the line

    Section: 1. Supervisor: Raveen

    Operation Manning 8.00 TO 10.00 10.00 TO 12.00

    W.I.P. INPUT OUTPUT W.I.P INPUT OUTPUT W.I.P

    1. elasticate Doreen 48 128 128 48 128 128 48

    2. Back seams Duresha 48 128 120 56 128 120 64

    3. front yoke Geetha 48 120 120 48 120 120 484.Lace to yoke Indrani 48 120 120 48 120 135 33

    5. L/s yoke Iromi 48 120 120 48 135 120 63

    6. Shoulder &

    slv smsJeevani 48 120 132 17 120 110 27

    7 lace to neck Mangalika 48 132 128 71 110 128 53

    8 Attach sleeves Neetha 48 128 140 42 128 134 36

    9. Hem Nirosha 48 140 134 48 134 134 48

    10. Top sew Pushpa 48 134 120 62 134 150 46

  • 7/30/2019 Production Balancing Nift

    36/58

    Running the line

    Section: 1. Supervisor: Raveen

    Operation Manning 1.00 TO 3.00 3.00 TO 5.00

    W.I.P. INPUT OUTPUT W.I.P INPUT OUTPUT W.I.P

    1. elasticate Doreen 48

    2. Back seams Duresha

    3. front yoke Geetha

    4.Lace to yoke Indrani

    5. L/s yoke Iromi

    6. Shoulder &

    slv smsJeevani

    7 lace to neckMangalika

    8 Attach sleeves Neetha

    9. Hem Nirosha

    10. Top sew Pushpa

  • 7/30/2019 Production Balancing Nift

    37/58

    Running the line

    Every operator works to their potential as

    shown on the skills matrix.

    Iromi is absent.

    Factory rules state that no operator

    (including floaters) can be moved for less

    than one hour and can only be moved in

    whole hours.

  • 7/30/2019 Production Balancing Nift

    38/58

    Exercise summary

    There were multi-skilled operators

    available.

    The section was reasonably well

    balanced.

    Floater cover was available.

    WIP was available.

  • 7/30/2019 Production Balancing Nift

    39/58

    Line Balancing

    Welcome to the real

    world.

    An actual example

    from a real factory.

  • 7/30/2019 Production Balancing Nift

    40/58

    Operation list standard 5 pocket

    jean Fronts sectionOperation M/C S.M.V. @100%Serge front 3 thread o/lock 0.130 450

    Attach zipper S/NL/S 0.400 150

    Run stitch pockets S/N L/S 0.370 161

    (bags to fronts)

    Topsew front pkts D/N L/S 0.410 147Secure pkts at sides& waist S/N L/S 0.458 131

    J stitch fly D/N L/S ubt 0.340 176

    Run stitch front to Secure S/N L/S ubt 0.260 232

    Topsew front seam D/N L/S ubt 0.250 240

    Join crotch D/N L/S ubt 0.290 205Bartack pkts Bartack 0.170 360

    Front sub total.. 3.278

    Skill i t F t ti

  • 7/30/2019 Production Balancing Nift

    41/58

    Skills inventory. Fronts section

    Operator/job title Sergefront

    Attach

    Flly &zipper Run pkt Topsew Secure J Runstitch topsew crotch bartack

    Huda 100

    Sabreen 120

    Shadia 112

    Aydaa 100

    Saffa 94

    Kareem 94

    Ahlam 83

    Nora 83

    Aisha 72

    Hamida 94

    Hwidaa 86

  • 7/30/2019 Production Balancing Nift

    42/58

    Skills inventory. Fronts section

    Operator/job titleSergefront

    Attach

    Flly &zipper Run pkt Topsew Secure J Runstitch topsew crotch bartack

    Asmaa 101

    Nadra 117

    Mahmoud 75

    Eman 76

    Rasha 78

    Karema 100

    Alham(2) 85

    Afaf 120

    Hamida(2)

    78

    Amina 100

    Fatma 48

  • 7/30/2019 Production Balancing Nift

    43/58

    Skills inventory. Fronts section

    Operator/job title

    Serge

    front

    Attach

    Flly &

    zipper Run pkt Topsew Secure J Runstitch topsew crotch bartack

    Samah 120

    Ahmad 100

    Hamdia 102

    Bossi 80

    Abbier

    90

  • 7/30/2019 Production Balancing Nift

    44/58

    Initial balance

    No skills matrix was available. Compiled

    by engineers doing cycle timing.

    No means available of measuring

    efficiency.

    Floaters included in section.

    No section absence information available.

    Target of 400 hour imposed by

    management.

  • 7/30/2019 Production Balancing Nift

    45/58

    Initial calculation 400 hour

    SMV = 3.278 per front

    27 operators available

    400 per hour needed.

    400 x 3.278 = 21.86 std hours needed.60

    21.86 = 81% efficiency needed (absence)

    27

    With many high performing operators targetdoes not look unreasonable

  • 7/30/2019 Production Balancing Nift

    46/58

    Initial Balance

    Prepare initial balance from the

    information given

    find existing position using all operators

  • 7/30/2019 Production Balancing Nift

    47/58

    Initial Balance(1) 400 hour

    Op. Number S.M.V. standard operator machine exp. Perf expected spare time garments

    output type % per hour

    Serge front 0.13 450

    Sabreen

    Huda 3 thr o/l

    120

    100

    540

    450

    8.00

    0.11

    +590

    Attach zipper 0.40 150

    Shadia

    AydaaSaffa s/n l/s

    112

    10094

    168

    150141

    0

    00.42 +59

    Run pocket

    0.370 161

    Kareem

    Ahlam

    Nora d/n l/s

    94

    83

    83

    151

    134

    134

    0

    0

    0.15 + 19

    Topsew 0.41 147

    Hamida

    Hwidaa

    Asmaa

    Aisha s/n l/s

    94

    86

    101

    72

    138

    126

    148

    106 8.00 +112

    Secure pkts 0.458 131

    Nadra

    Eman

    Rasha

    Mahmoud

    117

    76

    78

    75

    153

    100

    102

    98

    0

    0

    0

    0.65 +53

  • 7/30/2019 Production Balancing Nift

    48/58

    Initial Balance(1) 400 hour

    Op. Number S.M.V. standard operator machine exp. Perf expected spare time garments

    output type % per hour

    J stitch front 0.34 176

    Karema

    Alham(2) d/n l/s ubt100

    85

    176

    150

    0

    0 -74

    Run stitch

    pockets 0.26 232

    AfafHamida s/n l/s ubt

    120

    78

    278

    181

    0

    0.33 +59

    Top sew 0.25 240

    Amina

    Fatma

    Samah d/n l/s ubt

    100

    48

    120

    240

    115

    288

    0

    0

    0.84 +243

    Join crotch 0.29 205

    Ahmad

    Hamda d/n l/s ubt

    100

    102

    205

    209

    0

    0 +14

    Bartack

    pockets 0.17 360

    Bossi

    Abbier bartack

    80

    90

    288

    324 0.65 +212

    Running the line

  • 7/30/2019 Production Balancing Nift

    49/58

    Running the line

    Section: 1. Supervisor:

    Operation Manning 8 TO 10 10 TO 12 12.30

    W.I.P. INPUT OUTPUT W.I.P INPUT OUTPUT W.I.P

    serge Huda 50 900 900 50

    zipper Shadia

    Aydaa

    Saffa

    100 900 336

    300

    282

    918

    92

    Run pocket Kareem

    AhlamNora

    0 918 302

    268268

    838

    80

    topsew Aisha

    Hamida

    Hwidaa

    Asmaa

    50 838 64

    276

    252

    296

    (1.54 wait)

    0

    Secure Nadra

    Mahmoud

    Eman

    Rasha

    60 888 306

    196

    200

    204

    42

  • 7/30/2019 Production Balancing Nift

    50/58

    Running line

    Conclusions

    Too out of balance to avoid waiting time.

    WIP levels inadequate to cope

    Need to do something about initial balance

    for supervisor to be able to improve

    section performance.

    Running the line

  • 7/30/2019 Production Balancing Nift

    51/58

    Running the line

    Section: 1. Supervisor:

    Operation Manning 8 TO 10 10 TO 12 12.30

    W.I.P. INPUT OUTPUT W.I.P INPUT OUTPUT W.I.P

    serge Huda 400 900 900

    zipper Shadia

    Aydaa

    Saffa

    400 900 336

    300

    282

    918

    Run pocket Kareem

    AhlamNora

    400 918 302

    268268

    838

    topsew Aisha

    Hamida

    Hwidaa

    Asmaa

    400 838 64

    276

    252

    296

    Secure Nadra

    Mahmoud

    Eman

    Rasha

    400 888 306

    196

    200

    204

    R i th li

  • 7/30/2019 Production Balancing Nift

    52/58

    Running the line

    Section: 1. Supervisor:

    Operation Manning 8 TO 10 10 TO 12 12.30

    W.I.P. INPUT OUTPUT W.I.P INPUT OUTPUT W.I.P

    J stitch KaremaAlham

    400 906 352

    300

    652

    Run stitch Afaf

    Hamida

    400 652 556

    196

    Top sew AminaFatma

    Samah

    400 752 480

    0

    322

    CrotchseamAhmadHamdia 400 802 410418

    bartack BossiAbbier

    400 828 576

    252

  • 7/30/2019 Production Balancing Nift

    53/58

    Actions

    Serge remove Sabreen Huda has 1hour spare per day . Bartack?

    Attach zipper

    Saffa to J- stitch (0.42)

    Run stitch pocket - not priority

    Top sew front - remove Aisha

    A i (2)

  • 7/30/2019 Production Balancing Nift

    54/58

    Actions (2)

    Secure pockets- remove Mahmoud

    train Eman & Rasha (94%)

    J stitch- use Saffa (0.42)

    Run stitch- remove Samah, use Amina Topsew- remove Fatma, remove Amina

    0.50 hours to run stitch pockets

    Crotch seam

    no action Bartack remove Bossi train Huda

  • 7/30/2019 Production Balancing Nift

    55/58

    Initial Balance(2) 400 hour

    Op. Number S.M.V. standard operator machine exp. Perf expected spare time garments

    output type % per hour

    Serge 0.13 450 Huda 3 thr o/l 100 450 0.11 +50

    Attach zipper 0.40 150

    Shadia

    Aydaa

    Saffa s/n l/s

    112

    100

    94

    168

    150

    82 (141)

    0

    0

    0.42 (J) +59

    Run pocket

    0.370 161

    Kareem

    Ahlam

    Nora d/n l/s

    94

    83

    83

    151

    134

    134

    0

    0

    0.15 + 19

    Topsew 0.41 147

    Hamida

    Hwidaa

    Asmaa s/n l/s

    94

    86

    101

    138

    126

    148 +22

    Secure pkts 0.458 131

    Nadra

    EmanRasha

    117

    7678

    153

    100102

    0

    00 -45

  • 7/30/2019 Production Balancing Nift

    56/58

    Initial Balance(2) 400 hour

    Op. Number S.M.V. standard operator machine exp. Perf expected spare time garments

    output type % per hour

    J stitch front 0.34 176

    Karema

    Alham(2)

    Saffa d/n l/s ubt

    100

    85

    85

    176

    150

    150(63)

    0

    0 -11

    Run stitch

    pockets 0.26 232

    Afaf

    Amina s/n l/s ubt

    120

    100

    278

    (116)

    0

    0 -6

    Top sew 0.25 240

    Amina

    Samah d/n l/s ubt

    100

    120

    240 (120)

    288

    0.50

    0.84 +8

    Join crotch 0.29 205

    Ahmad

    Hamda d/n l/s ubt

    100

    102

    205

    209

    0

    0 +14

    Bartack

    pockets 0.17 360

    Abbier

    Huda bartack

    90

    75

    324

    30 0 - 46

    Running the line

  • 7/30/2019 Production Balancing Nift

    57/58

    Running the line

    Section: 1. Supervisor:

    Operation Manning 8 TO 10 10 TO 12 12.30

    W.I.P. INPUT OUTPUT W.I.P INPUT OUTPUT W.I.P

    serge 400

    zipper 400

    Run pocket 400

    topsew 400

    Secure 400

    R i th li

  • 7/30/2019 Production Balancing Nift

    58/58

    Running the line

    Section: 1. Supervisor:

    Operation Manning 8 TO 10 10 TO 12 12.30

    W.I.P. INPUT OUTPUT W.I.P INPUT OUTPUT W.I.P

    J stitch 400

    Run stitch 400

    Top sew 400

    Crotchseam

    400

    bartack 400