product well intervention - Destini...

13
Well Intervention | Destini Oil Services 1 Well Intervention

Transcript of product well intervention - Destini...

Page 1: product well intervention - Destini Oildestinioil.com/.../2013/04/Product-Catalogue-Well-Intervention.pdf · 2 Destini Oil Serices Well Intervention To be a fully integrated, globally

Well Intervention | Destini Oil Services 1

Well Intervention

Page 2: product well intervention - Destini Oildestinioil.com/.../2013/04/Product-Catalogue-Well-Intervention.pdf · 2 Destini Oil Serices Well Intervention To be a fully integrated, globally

Destini Oil Services | Well Intervention2

To be a fully integrated, globally competitive oil and gas company.

To provide outstanding products and services that enhances and optimizes our clients’ performance through operational efficiency, quality service and business transparency

VISION

MISSION

Page 3: product well intervention - Destini Oildestinioil.com/.../2013/04/Product-Catalogue-Well-Intervention.pdf · 2 Destini Oil Serices Well Intervention To be a fully integrated, globally

Well Intervention | Destini Oil Services 3

AboutDestini Oil Services

Destini Oil has over 20 years of extensive experience in offshore hammer services, casing and tubing handling equipment and running services, torque monitoring system services, onshore bucking services and provides pressure testing facilities.

The company also offers an extensive range of well intervention services which is able to extend the life of producing wells. On contrary, Destini Oil is also able to carry on well abandonment and field decommissioning services on dried oilfields.

With an ever-expanding portfolio of services, Destini Oil offer solutions to enhance, optimise and improve every clients’ specialised needs, operational requirements and unique challenges.

Headquartered in Kuala Lumpur, Destini Oil is competitively expanding its market segments to be a global leader by subscribing to its values of transparency, quality and efficiency.

Destini Oil, formerly known as Samudra Oil Services Sdn Bhd, is a wholly-owned subsidiary of integrated engineering solutions provider Destini Berhad, a Malaysian company that specialises in maintenance, repair and overhaul (MRO) services for safety and survival related equipment’s in the aerospace and maritime industry.

Destini Oil Services Sdn. Bhd. (“Destini Oil”) is a leading regional oilfield service company in Southeast Asia with active presence in Malaysia, Myanmar, Indonesia and Vietnam.

The company has an unparalleled operational track record in the provision of upstream onshore and offshore exploration, development, production services and workover programmes for the oil and gas sector.

20 YEARS OF EXPERIENCE

Page 4: product well intervention - Destini Oildestinioil.com/.../2013/04/Product-Catalogue-Well-Intervention.pdf · 2 Destini Oil Serices Well Intervention To be a fully integrated, globally

Destini Oil Services | Well Intervention4

Destini Oil offers an extensive range of products and services within its three core business segments which are Tubular Running Services, Well Intervention as well as Well Abandonment and Decommissioning. While meeting global HSSE standards set out by oil majors, the company’s products and services are operated by the industry’s qualified and experienced engineers

Destini Oil offers an extensive range of well intervention services which is able to extend the life of producing wells and provide value throughout the well’s lifecycle. This can be done by improving performance or providing access to stranded hydrocarbon reserves.

The company’s well intervention services are able to ensure maximum productivity and operational efficiency in any onshore or offshore drilling campaigns.

ProductsAnd Services

WellIntervention

Page 5: product well intervention - Destini Oildestinioil.com/.../2013/04/Product-Catalogue-Well-Intervention.pdf · 2 Destini Oil Serices Well Intervention To be a fully integrated, globally

Well Intervention | Destini Oil Services 5

Features

• Multi duro packing system • Cage slip design located below packing

system • Dual bore design • Large ID/OD ratio• Once packer is released, it locks into

release position. * Short overall length

Benefits

• Superior sealing • Aids in retrievability • Allows for large thru bore of sealing

accessories • Large finish bore • Prevents slips from re-engaging allowing

packer to be worked up and down aiding

• The Retrievable Thru - Tubing Packer System (RTTP) is a retrievable dual bore packer specifically designed for thru tubing use

• It can be deployed on either coil tubing, jointed pipe, electric line or slick wire line• It can also be retrieved via coil tubing, jointed pipe or slick wireline with straight pull• The packer is rated for 5,000psi differential from above and below• The RTTP System can be configured for use as a retrievable Bridge Plug and can be

trimmed for HT, HP and corrosive environment use• Currently the RTTP system is available for tubing sizes 2-3/8” to 5-1/2”

RETRIEVABLE THRU- TUBING SYSTEM

Page 6: product well intervention - Destini Oildestinioil.com/.../2013/04/Product-Catalogue-Well-Intervention.pdf · 2 Destini Oil Serices Well Intervention To be a fully integrated, globally

Destini Oil Services | Well Intervention6

SIZE 2-3/8” 2-7/8” 2-7/8” 2-7/8” 2.225” /3.50” 3-1/2” 3-1/2” 3.50” /

4.50”3.50” / 4.50”

WEIGHT4.00#

to 4.60#

6.40#7.80#

to 8.60#

2.225” 6.4# to

7.8#

9.20# to

10.2#

9.20# to

10.20#12.70#

10.50# to

13.50#15.1#

FISH NECK TTS TTS TTS TTS TTS TTS TTS TTS TTS

A 1.800” 2.225” 2.110” 2.110” 2.225” 2.700” 2.225” 2.700” 2.700”

B 1.380” 1.750” 1.630” 1.630” 1.750” 2.188” 1.750” 2.188” 2.188”

C 1.000” 1.380” 1.250” 1.250” 1.380” 1.625” 1.380” 1.627” 1.627”

D 1.810” 2.285” 2.156” 2.218” 2.725” 2.725” 2.531” 3.750” 3.650”

E 1.810” 2.290” 2.156” 2.225” 2.725” 2.725” 2.531” 3.760” 3.660”

F 2.00’ 1.96’ 2.26’ 2.26’ 2.12’ 2.23’ 2.00’ 2.05’ 2.05’

G .35’ .37’ .37’ .37’ .45’ .45’ .37’ .53’ .53’

H .33’ .34’ .36’ .36’ .40’ .41’ .36’ .46’ .46’

J .25’ .27’ .27’ .27’ .32’ .29’ .27’ .38’ .38’

K .31’ .38’ .38’ .38’ .40’ .41’ .38’ .50’ .50’

L 3.24’ 3.32’ 3.64’ 3.64’ 3.68’ 3.80’ 3.38’ 3.91’ 3.91’

MAX REC. SET

I.D.2.020” 2.450” 2.317” 2.441” 2.994” 2.994” 2.758” 4.064” 3.826”

SLIP RANGE 2.020” 2.480” 2.347” 2.480” 3.024” 3.024” 2.790” 4.094” 3.856”

HANG OFF LBS.

80%19K 30K 25K 25K 25K 47K 30K 30K 30K

SIZE 4.00” 4-1/2” 4-1/2” 4-1/2” 5-1/2”

WEIGHT 10.9#10.50#

to13.50#

15.10# 17.0#17.00#

to 23.00#

FISH NECK TTS TTS TTS TTS TTS

A 2.700” 3.650” 3.650” 3.590” 4.470”

B 2.188” 2.750” 2.750” 2.750” 3.490”

C 1.627” 2.000” 2.000” 2.000” 2.812”

D 3.110” 3.750” 3.650” 3.590” 4.531”

E 3.110” 3.760” 3.660” 3.590” 4.531”

F 2.41’ 2.77’ 2.77’ 2.78’ 3.65’

G .49’ .52’ .52’ .53’ 7.68”

H .51’ .30’ .30’ .34’ 4.80”

I .25’ .35’ .35’ .26’ 4.00”

J .49’ .49’ .49’ .54’ 6.86”

K 4.2’ 4.43’ 4.43’ 4.44’ 5.6’

MAX REC. SET I.D. 3.476” 4.064” 3.826” 3.754” 4.896”

SLIP RANGE 3.520” 4.094” 3.856” 3.785” 4.927”

HANG OFF LBS. 80% 49K 74K 74K 74K 89K

RETRIEVABLE THRU- TUBING SYSTEM Specification Details

Page 7: product well intervention - Destini Oildestinioil.com/.../2013/04/Product-Catalogue-Well-Intervention.pdf · 2 Destini Oil Serices Well Intervention To be a fully integrated, globally

Well Intervention | Destini Oil Services 7

PIPE SIZE WEIGHT (ppf)

SETTING RANGE (in) WILL PASS MIN.ID (in)

MAX. EQ.OD (in)

MIN. EQ. BORE ID

(in)

FLOW THROUGH AREA (in2)MIN MAX

2-3/8” 4.0-4.7 1.995 2.020 1.875 1.810 1.000 0.785

2-7/8” 6.4-6.5 2.441 2.450 2.313 2.290 1.375 1.500

7.8-8.6 2.259 2.326 2.188 2.156 1.250 1.227

3-1/2” 9.3-10.2 2.922 2.994 2.750 2.725 1.625 2.070

12.7-12.95 2.750 2.758 2.563 2.531 1.380 1.500

4-1/2” 10.5-13.5 3.826 4.054 3.812 3.760 2.000 3.140

4-1/2” 15.1 3.826 4.064 3.688 3.660 2.000 3.140

5-1/2” 17.0-23.0 4.670 4.896 4.562 4.531 2.812 6.210

PIPE SIZE AP RATING (psi)

MIN. TENSILE

STRENGTH (lb)

MAX TEMP. RATING

(°F)

HYD. / WL SET

SETTING TOOL

DRILLABLE / MILLABLE

OUTER/ INNER FISH NECK TYPE

2-3/8” 5K 19000 350 Both1-11/16” Long

StrokeYes

Inner / TTS Buttress

2-7/8” 5K 30000 350 Both1-11/16” LS or 2-1/9”

MSSTYes

Inner / TTS Buttress

5K 25000 350 Both1-11/16” Long

StrokeYes

Inner / TTS Buttress

3-1/2” 5K 47000 350 Both1-11/16” LS or 2-1/8”

MSSTYes

Inner / TTS Buttress

5K 30000 350 Both1-11/16” LS or 2-1/8”

MSSTYes

Inner / TTS Buttress

4-1/2” 5K 74000 350 Both

Baker #10, 2-11/16” MSST or

3-1/4” MSST or 3-5/8”

Owen Compact

YesInner / TTS

Buttress

4-1/2” 5K 74000 350 Both

Baker #10, 2-11/16” MSST or

3-1/4” MSST or 3-5/8”

Owen Compact

YesInner / TTS

Buttress

5-1/2” 5K 89000 350 Both

Baker #20, or 3-5/8”

Owen Compact

YesInner / TTS

Buttress

Page 8: product well intervention - Destini Oildestinioil.com/.../2013/04/Product-Catalogue-Well-Intervention.pdf · 2 Destini Oil Serices Well Intervention To be a fully integrated, globally

Destini Oil Services | Well Intervention8

RETRIEVABLE THRU-TUBING SYSTEMSTRADDLE PACK-OFF

RTTP Tubing Patch Straddle Pack Installation

Set Lower Packer

Locate Seals

Upper Packer Set Final Assy

• Can be installed via coil tubing, electric line, slickline or a combination, of both - this allows operator flexibility and associated cost savings.

• Requires only two trips to set or retrieve this slickline or wireline and up to one or two trips on coil tubing. Saves time and risk compared to conventional tubing stop and pack-off alternatives.

• The use of both RTTP Retrievable Seal Bore Packers and a Floating Seal Assembly can easily accommodate production-tubing movements caused by downhole temperature changes due to well killing, stimulation, and producing operations. Utilizing mechanical compression or tension set packers, wireline pack-offs, as well as inflatables, has little tolerance to production tubing movement. Also large I.D. /O.D. ratio packer creates larger finished bores than competitive systems.

• Each packer can be tested along with all connections of coil tubing as they are run into the well. Allows for removal and replacement of any failed components prior to attempting to flow the well.

• Superior sealing and anchoring system. Multi-durometer packing systems hold pressure from above or below. Bi-directional caged slip design anchors packer in both directions and can handle much higher tail pipe loads.

Page 9: product well intervention - Destini Oildestinioil.com/.../2013/04/Product-Catalogue-Well-Intervention.pdf · 2 Destini Oil Serices Well Intervention To be a fully integrated, globally

Well Intervention | Destini Oil Services 9

THRU TUBING GAS LIFT / VELOCITY STRING

BRIDGE PLUG SYSTEM

• Designed for applications when desirable to deepen the Gas Lift injection point without pulling the production tubing, this allows for Gas Lift repair or installation using coil tubing and/or wireline without the expense of a rig.

• Live well operations can easily be tolerated, eliminating the need and expense of well killing programs.

• Each packer can be tested along with all connections of coil tubing as it runs, allowing for removal and replacement prior to attempting to flow the well.

• The Tubing Bridge Plug is designed with a few defining features that differentiate it from conventional cast iron plugs.

• It utilises a specially designed Ecner Array elastomer system to provide structural integrity within the sealing element to withstand the differential pressure

• This eliminates the fragile slotted metal backups normally employed to support the sealing element in the annular area between the plug and the pipe wall, making for a more robust plug design

• The running diameter is smaller than most conventional plugs

• Compact and dependable, the Tubing Bridge Plug is easily set via wireline or pipe. Setting force is maintained by a ratcheting lock ring on top of the Bridge Plug.

Final AssyGas LiftSet StraddlePunch Hole in Tubing

Page 10: product well intervention - Destini Oildestinioil.com/.../2013/04/Product-Catalogue-Well-Intervention.pdf · 2 Destini Oil Serices Well Intervention To be a fully integrated, globally

Destini Oil Services | Well Intervention10

RETRIEVABLE BRIDGE PLUG SYSTEM

The Retrievable Bridge Plug (RBG) System can be deployed via coiled tubing, pipe or wireline. Retrieval is accomplished by a straight pull to equalize and again to release. It is utilized using a proven multi-durometer packing system located above bi-directional caged slips. It is available for tubing sizes of 2 3/8” to 4 ½”.

Applications

• One-trip installation. One- trip retrieve Bridge Plug• Straight pull to equalize and release, no downward manipulation

required• Pressure Equalizing Valve opens before release occurs• Bi-Directional caged slip design located below the packing

system provides increased retrievability• Multi durometer packing system increases sealing ability• Standard external fishing neck for reliable latching• Releasing mechanism is not affected by differential pressures;

this allows a reduction of the required release forces to aid the retrieval of wireline

• Once RBP is released, the tool is locked in the release position which allows the ability to work up this will, not re-engage slips

• Temporary abandonment• Zonal isolation• Wellhead change out• Storm Choke• Deployment Plug• Depth Locator for subsequent operations• Selective testing/ Production

RETRIEVABLE BRIDGE PLUG SYSTEM

Tubing Size (in)

Tubing (wt)

Packer OD (in)

Gage Ring* (in)

IDBore (in)

Max Slip Range

2-3/8 4.70 1.800 1.810 1.000 2.02

2-7/8 7.80-8.60 2.110 2.166 1.250 2.31

2-7/8 6.50 2.225 2.290 1.380 2.45

3-1/2 9.30-10.20 2.700 2.725 1.625 3.00

3-1/2 12.70-12.95 2.500 2.531 1.380 2.76

4-1/2 10.50-13.50

3.650 3.750 2.000 4.10

4-1/2 15.10 3.650 3.650 2.000 4.10

5-1/2 17.0-23.0 4.470 4.531 2.812 4.90

Page 11: product well intervention - Destini Oildestinioil.com/.../2013/04/Product-Catalogue-Well-Intervention.pdf · 2 Destini Oil Serices Well Intervention To be a fully integrated, globally

Well Intervention | Destini Oil Services 11

RETRIEVABLE CEMENT RETAINER

Tubing Size (in)

Tubing (wt)

Packer OD (in)

Gage Ring* (in)

IDBore (in)

Max Slip Range

2-3/8 4.70 1.800 1.810 1.000 2.02

2-7/8 7.80-8.60 2.110 2.166 1.250 2.31

2-7/8 6.50 2.225 2.290 1.380 2.45

3-1/2 9.30-10.20 2.700 2.725 1.625 3.00

3-1/2 12.70-12.95 2.500 2.531 1.380 2.76

4-1/2 10.50-13.50

3.650 3.750 2.000 4.10

4-1/2 15.10 3.650 3.650 2.000 4.10

5-1/2 17.0-23.0 4.470 4.531 2.812 4.90

RETRIEVABLE CEMENT RETAINER

The Retrievable Cement Retainer (Sliding Sleeve) is a dual seal bore packer with a positive closing sliding sleeve valve deployable via coiled tubing, jointed pipe, or wireline. Retrieval is accomplished by straight pull to release. It utilizes a proven multi-durometer packing system located above bi-directional cage slips. The standard differential pressure rating is 5000 psi at 300 Degree Fahrenheit. Customizations are available for special sizes, corrosive environments, higher temperature or pressure requirements. Available for tubing sizes 2 3/8” to 5 ½”.

NOTE: Other sizes available upon request.

Applications

• One-trip installation. Separate trips using wireline• One-trip retrieve. Straight pull to release, no downward

manipulation required• Modular Gage Rings allow for optimizing seal gap• Bi-Directional caged slips located below the packing system

provide increased retrievability• Multi durometer packing system increases sealing ability• Sliding Sleeve Valve System is positively closed by running toll

removal to prevent cement flow back from below and hold excess hydrostatic head from above

• Release mechanism is not affected by hanging weigh or differential pressures allowing reduction of the required release forces to aid wireline retrieving

• Once Retainer is released, the tool is locked in the released position allowing the ability to work up and down once released and not re-engaged slips

• Cement Retainer• Treatment Isolation

Page 12: product well intervention - Destini Oildestinioil.com/.../2013/04/Product-Catalogue-Well-Intervention.pdf · 2 Destini Oil Serices Well Intervention To be a fully integrated, globally

Destini Oil Services | Well Intervention12

Destini Oil has several supply basses in Malaysia. On the West coast, Destini Oil is located in the Kemaman Supply Base in Terengganu while in the East the company can be located in the Asian Supply Base in the Federal Territory of Labuan.

Kuala Lumpur

Suite A-21-13A, Level 21,Menara UOA Bangsar No 5,Jalan Bangsar Utama 159000 Kuala LumpurTel: +603 2288 8333Fax: +603 2288 1833

Kemaman, Terengganu

Phase II Kemaman Supply Base24007 Kemaman, TerengganuTel: +609 863 1737Fax: +609 863 1699/ +609 863 1252

Labuan, Wilayah Persekutuan

Lorong SK46, Jalan Rancha-RanchaRancha-Rancha Industrial Estate87000 Labuan Tel: +6(087) 583 282 Fax: +6(087) 424 282

For more information, please drop your enquiries at [email protected]

Facilities

1

1

2

2

3

3

Page 13: product well intervention - Destini Oildestinioil.com/.../2013/04/Product-Catalogue-Well-Intervention.pdf · 2 Destini Oil Serices Well Intervention To be a fully integrated, globally

Well Intervention | Destini Oil Services 13