Product Life Cycle Board-level Products - DFI...

38
Product Life Cycle Board-level Products April, 2016

Transcript of Product Life Cycle Board-level Products - DFI...

Product Life Cycle

Board-level Products

April, 2016

01 | Industrial Motherboards

02 | Computer-On-Modules

03 | Embedded SBCs

04 | EOL Models

Content Overview

Industrial Motherboards

Mini-ITX, microATX, ATX, EATX

2020 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4

Q67

H61

HD100-H81

SB100-NRM 2011, Q1

SB102-D

before

HD101-H81

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

H81

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

HD171-H81

HD173-H81

Mini-ITX microATX ATX & EATX

Intel Desktop Chipset Q170

H110

SD100-Q170

2022, Q3

2021, Q4

SD101/SD103-Q170

SD100-H110

SD101/SD103-H110

HU171/HU173

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

Mini-ITX microATX ATX & EATX

2014 2015 2016 2017 2018 2019 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4

QM87

HM86

HM100-QM87

HM100-HM86

before

HM101-QM87

HM101-HM86

HM103-HM86

HM103-QM87

ULT

HU101/HU103

2020 2 3 4 Q1

2022 Q1 2 3

2021 Q1 2 3 4 4

SU171/SU173

Intel Mobile Chipset

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

Mini-ITX microATX ATX & EATX

2012 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before

QM57 CP100-NRM

2010, Q1

QM67 HR100-CRM

2011, Q2

HM76 CR101-D

QM77 CR100-CRM

Intel Mobile Chipset

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

Mini-ITX microATX ATX & EATX

Intel Atom Processor

2014 2015 2016 2017 2018 2019 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before

BT160

BT161

Atom E3800 Series/ Celeron

BT101/BT103

BT100

2020 Q1 3 4 2

2022 Q1 2 3

2021 Q1 2 3 4 4

Pentium N3700/ Celeron N3050

BW171/BW173

2023 Q1 3 2 4

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

Mini-ITX microATX ATX & EATX

2012 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before

Atom D525/D425/N455

LR102-B18D/S/M 2011, Q3

LR100-N18D/S/M 2011, Q3

Atom D510/D410/N450

LR100-N16D/S/M 2010, Q1

CD101-N2550

Atom D2550/N2800/N2600

CD101-N2800

CD101-N2600

CD102-25N

CD102-26N

CD102-28N

Intel Atom Processor

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

Mini-ITX microATX ATX & EATX

AMD Chipset

2013 2014 2015 2022 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4

2023 before

G-Series SoC

KB160

KB161

R-Series A77E BE170

BE171

BE173

Q1 4 3 2

2016 2017 Q1 2 3 4 Q1 2 3 4

2018 2 3 Q1 4

..............

R-Series A70M

CM100-C

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

Mini-ITX microATX ATX & EATX

C226 Xeon E3-1200 v3

DL310-C226

2020 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before

Intel Server/Workstation Chipset

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

Mini-ITX microATX ATX & EATX

2020 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4

Q87

H81

Q77

HD330-H81

HD310-Q87

MB330-CRM

before

HD330-Q87

MB331-CRM 2012, Q3

HD332-H81

Intel Desktop Chipset

SD331-Q170

2022, Q4

2022, Q1 Q170

SD330-Q170

SD330-H110

H110

SB300-C 2011, Q4

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

Mini-ITX microATX ATX & EATX

2012 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4

B65

H61

PT332-DRM 2010, Q4

PT330-DRM 2010, Q1

Q57

SB331-D 2011, Q4

SB332-C

before

SB336-Ni

Intel Desktop Chipset

SB331-IPM 2011, Q3

SB330-CRM 2011, Q2

Q67

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

Mini-ITX microATX ATX & EATX

2012 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4

CP330-NRM 2010, Q3

CP337-NRM 2010, Q4

QM57

before

Intel Mobile Chipset

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

Intel Server/Workstation Chipset Mini-ITX microATX

C226 Xeon E3-1200 v3

C216 Xeon E3-1200 v2

C602 Xeon E5-2600 v2 RL830-C602/C604

EATX

DL631-C226 ATX

CL630-CRM ATX

Q2, 2012

2020 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before

ATX & EATX

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

Mini-ITX microATX ATX & EATX

Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before

Q87

H81

HD631-Q87 2014, Q1

HD630-H81 2014, Q1

HD632-H81 2014, Q2

HD620-H81 2014, Q3

SD630-H110

H110

Q1 2 3 Q1 2 3 4 4

Intel Desktop Chipset

2020 2015 2016 2017 2018 2019 2022 2021

HD636-H81CS

SD631-Q170

Q170

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

Intel Desktop Chipset

Mini-ITX microATX ATX & EATX

2012 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4

PT630-NRM 2010, Q2

SB600-C 2011, Q4

SB601-C 2011, Q4

B65

Q57

before

PT631-IPM 2010, Q2

Q77

MB630-CRM

SB630-CRM 2011, Q4

Q67

Computer-On-Module

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

ULT

HU968 Compact

Computer-On-Module

SU968 Compact

2020 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before

2022 Q1 2 3

2021 Q1 2 3 4 4

2014 Q1 3 2 4

Intel Mobile Chipset

QM170

HM170

SH960-QM170 Basic

SH960-HM170 Basic

Intel Mobile Chipset

2012 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before

QM77

CR902-B Basic

CR901-B Basic

CR900-B Basic

CR908-B Compact

CR960-QM77 Basic

ATX & EATX Computer-On-Module

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

QM87

HM960-QM87 Basic

HM961-QM87 Basic

HM920-QM87 Basic

2020, Q2

HM86

HM960-HM86 Basic

HM961-HM86 Basic

HM920-HM86 Basic

Intel Mobile Chipset

2012 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before

HM55 CP908-B Compact

2010, Q4

CP900-B Basic

2010, Q3

ATX & EATX Computer-On-Module

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

HM76

CR902-BL Basic

HR908-B Compact

HR900-B Basic

2011, Q3

QM67

CR960-HM76 Basic

Intel Atom Processor

2014 2015 2016 2017 2018 2019 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before

BT700 Qseven

Atom E3800 Series/ Celeron

BT968 Compact

BT9A3 Mini

2020 Q1 4 2 3

ATX & EATX

Pentium N3700/ Celeron N3050

BW968

2022 Q1 2 3

2021 Q1 2 3 4 4

Computer-On-Module

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

2023,Q1

Intel Atom Processor

2012 2013 2014 2015 2016 2017 2018 2019 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before

Atom D525/D425/N455

LR905-B18D/S/M Compact

2011, Q3

Atom D2550/N2800/N2600

CD905-B2550 Compact

CD905-B2800 Compact

CD905-B2600 Compact

CD9A3-25B20 Mini

CD9A3-26B20 Mini

CD9A3-28B20 Mini

Computer-On-Module

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

AMD Chipset

2013 2014 2015 2022

Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 before

G-Series SoC

KB968 Compact

2016 2021

Q1 2 3 4 Q1 2 3 4 ..............

R-Series A70M CM901-B

Basic

OT905-B Compact

2012, Q2

G-Series A55E

2020, Q2

2017 Q1 2 3 4

Computer-On-Module

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

R-Series A77E

BE960 Basic

2023, Q2

2018 Q1 2 3 4

R-Series SoC

ARM

2012 2013 2014 2015 2016 2017 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 4 before

Freescale i.MX6 FS700

Qseven

2027 Q1 2 3

..............

Computer-On-Module

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

Embedded SBCs

Intel Desktop Chipset

2012 2013 2014 2015 2016 2017 2018 2019

Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 before

PIC-H61 PICMG 1.3

H61

Embedded SBCs

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

Intel Atom Processor

before 2014 2015 2016 2017 2018 2019

Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 2020

Q1 4 2 3

Atom E3800 Series/ Celeron

BT253 4”

BT551/BT553 3.5”

BW551 3.5”

2022 Q1 2 3

2021 Q1 2 3 4 4

Pentium/Celeron N3000 Series

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

Embedded SBCs

BW051 2.5” Pico-ITX

Intel Atom Processor

before

Atom D2550/ N2800/ N2600

CD952-2xDE21 3.5”

2013, Q3

CD951-C2550 3.5”

2012, Q4

CD951-C2800 3.5”

2012, Q4

CD951-C2600 3.5”

2012, Q4

CD952-2xDE20 3.5”

2013, Q3

2014 2015 2016 2017 2018 2019 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4

2020 Q1 4 2 3

2022 Q1 2 3

2021 Q1 2 3 4 4

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

Embedded SBCs

Intel ULT Processor

before

ULT

HU551 3.5”

HU553 3.5”

2014 2015 2016 2017 2018 2019 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4

2020 Q1 4 2 3

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

Embedded SBCs

SU551 3.5”

2022 Q1 2 3

2021 Q1 2 3 4 4

SU251/253 4”

2012 2013 2014 2015 2016 2017 2018 Q1 2 3 4 Q1 2 3 4 Q1 3 2 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 Q1 2 3 4 after before

G-Series A50M

OT951-D 3.5”

2021, Q1

2020, Q2

AMD Chipset

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

7-year life cycle includes an End of Life (EOL) period which is typically 18 months.

● New Product Sample Availability | ⇨ Released Product | ■ Last Order Date (will vary according to the CPU/Chipset vendor’s EOL notice)

Embedded SBCs

EOL Products

Milestone Model

End of Sale Date1 Last Shipment Date2 End of RMA Service Date3

G4S601-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G4V600-S Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G5G101-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G5G100-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G5G100-L10C Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G5M101-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G5M900-B10 Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G5M900-B06C Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G5M350-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G5M300-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

GIC68-B/-N Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G4V100-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G7V600-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G7V300-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G5G330-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G4S600-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G4S300-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G4V620-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

Milestone Model

End of Sale Date1 Last Shipment Date2 End of RMA Service Date3

G4V300-D Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

GCB60-BX Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G4V621-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G7S620-N Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G7V330-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G4E620-B Oct. 31, 2010 Jun. 30, 2011 Jun. 30, 2013

G7V100-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G7V100-N Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G7S600-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G7S300-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G5M151-B Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G5M151-B10C Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G5M151-B06C Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G5M151-B06 Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G5M150-N10C Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G5M150-N10 Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G5M150-N06C Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G5M150-N Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

EOL Models | Boards

Milestone Model

End of Sale Date1 Last Shipment Date2 End of RMA Service Date3

G5M100-N Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

GIC68-D Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G4V509-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G4V506-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G4S306-C Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G4M300-M12 Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G4M100-MS12 Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G4H875-N Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G4H875-C Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G4G100-N Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G4E606-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G4E620-N Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

G4E600-D Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

ST2K-E Dec. 31, 2009 Mar. 31, 2010 Mar. 31, 2013

GIE65-D Sep. 30, 2008 Dec. 31, 2008 Dec. 31, 2011

G370IM-24 Sep. 30, 2008 Dec. 31, 2008 Dec. 31, 2011

G4C600-D Sep. 30, 2008 Dec. 31, 2008 Dec. 31, 2011

G4C600-DG Sep. 30, 2008 Dec. 31, 2008 Dec. 31, 2011

Milestone Model

End of Sale Date1 Last Shipment Date2 End of RMA Service Date3

CT930-B Feb. 01, 2011 Aug. 01, 2011 Aug. 31, 2013

CT950-B10 Feb. 01, 2011 Aug. 01, 2011 Aug. 31, 2013

BP900 Feb. 01, 2011 Aug. 01, 2011 Aug. 31, 2013

GIC68-P Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

PT331-DRM Sep. 15, 2011 Mar. 15, 2012 Mar. 15, 2014

LR101-B16D Aug. 10, 2012 Feb. 10, 2013 Feb. 10, 2015

LR101-B16M Aug. 10, 2012 Feb. 10, 2013 Feb. 10, 2015

LR101-B16S Aug. 10, 2012 Feb. 10, 2013 Feb. 10, 2015

G7B630-N Sep. 02, 2012 Mar. 02, 2013 Mar. 02, 2015

G7B630-NR Sep. 02, 2012 Mar. 02, 2013 Mar. 02, 2015

G7L330-B Jan. 02, 2013 Jan. 02, 2013 Jan. 02, 2015

G7L331-B Jan. 02, 2013 Jan. 02, 2013 Jan. 02, 2015

G7L331-L Jan. 02, 2013 Jan. 02, 2013 Jan. 02, 2015

G7L332-L Jan. 02, 2013 Jan. 02, 2013 Jan. 02, 2015

G7L830-B Jan. 02, 2013 Jan. 02, 2013 Jan. 02, 2015

CT132-BR Jan. 03, 2013 Apr. 03, 2013 Apr. 03, 2015

AR100-DR Jan. 03, 2013 Apr. 03, 2013 Apr. 03, 2015

G7B336-P Jan. 03, 2013 Apr. 03, 2013 Apr. 03, 2015

EOL Models | Boards

Milestone Model

End of Sale Date1 Last Shipment Date2

End of RMA Service Date3

EL331-RM Jan. 03, 2013 Apr. 03, 2013 Apr. 03, 2015

CA230-BF Jan. 03, 2013 Apr. 03, 2013 Apr. 03, 2015

G7L630-B Jan. 11, 2013 Jan. 11, 2014 Jan. 11, 2016

ADD7009 Sep. 12, 2013 Dec. 12.2013 Dec. 12.2015

SR960-N Sep. 21, 2013 Dec. 21.2013 Dec. 21.2015

G7B330-B Dec. 21, 2013 Mar. 21, 2014 Mar. 21, 2016

G7B330-BR Dec. 21, 2013 Mar. 21, 2014 Mar. 21, 2016

ML936-B11C/B16C Jan. 16, 2014 Apr. 16, 2014 Apr. 16, 2016

ML936-B11T/B13T Jan. 16, 2014 Apr. 16, 2014 Apr. 16, 2016

CA100-D Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

CA101-D Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

CA331-NR Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

CA331-N Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

CA331-P Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

CA900-B Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

NP100-N16C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

NP101-D16C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

G5C100-N Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

G5C100-NR Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

Milestone Model

End of Sale Date1 Last Shipment Date2

End of RMA Service Date3

G5C100-B Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

G5C100-N10C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

G5C630-DR Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

G5C900-B Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

LT330-B Apr. 28, 2014 Apr. 27, 2015 Apr. 27, 2017

LT600-DR Apr. 28, 2014 Apr. 27, 2015 Apr. 27, 2017

LT600-D Apr. 28, 2014 Apr. 27, 2015 Apr. 27, 2017

LT600-T Apr. 28, 2014 Apr. 27, 2015 Apr. 27, 2017

NP1208-C84 Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

NP102-N16C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

NP900-B16C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

NP905-B16C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

NP951-B16C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

EL332-IP Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

G5G330-P Apr. 28, 2014 Apr. 27, 2015 Apr. 27, 2017

PD-7010 Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

BL100-N Aug. 7 2014 Feb. 9 2016 Feb. 9 2018

BL100-NE Aug. 7 2014 Feb. 9 2016 Feb. 9 2018

BL100-P Aug. 7 2014 Feb. 9 2016 Feb. 9 2018

EOL Models | Boards

1. End of Sale Date: The last Date to order the product and that the product is no longer for sale after this Date. 2. Last Shipment Date: The last-possible ship Date that can be requested from DFI and/or its branch offices. Actual ship Date is dependent on the lead time. 3. End of RMA Service Date: DFI continues updates to the products until this Date. The RMA service will still be available depending on the DFI’s RMA policy. 4. The EOL list is updated every 25th of the month.

Milestone Model

End of Sale Date1 Last Shipment Date2

End of RMA Service Date3

BL100-PE Aug. 7 2014 Feb. 9 2016 Feb. 9 2018

BL330-B Aug. 7 2014 Feb. 9 2016 Feb. 9 2018

BL330-BR Aug. 7 2014 Feb. 9 2016 Feb. 9 2018

BL600-DR Aug. 7 2014 Feb. 9 2016 Feb. 9 2018

BL600-D Aug. 7 2014 Feb. 9 2016 Feb. 9 2018

BL630-DR Aug. 7 2014 Feb. 9 2016 Feb. 9 2018

BL630-D Aug. 7 2014 Feb. 9 2016 Feb. 9 2018

EL109-N Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

EL339-B Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

EL620-C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

ML905-B11C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

ML905-B16C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

BL631-D Aug. 7 2014 Feb. 9 2016 Feb. 9 2018

NP101-B16C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

G7B630-B Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

SR100-N Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

SR100-L20C Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

Milestone Model

End of Sale Date1 Last Shipment Date2

End of RMA Service Date3

CT132-B Jan. 3, 2013 Apr. 3, 2013 Apr. 3, 2015

EL330-DR Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

EL630-NR Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

SR330-L Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

SR330-N Jul. 20, 2014 Jan. 20, 2016 Jan. 20, 2018

PT631-IPM Jul. 20, 2015 Dec. 20, 2016 Dec. 20, 2017

LR100 Series Dec. 31, 2015 Jun. 1, 2017 Jun. 1, 2019

LR102 Series Dec. 31, 2015 Jun. 1, 2017 Jun. 1, 2019

LR905 Series Dec. 31, 2015 Jun. 1, 2017 Jun. 1, 2019

LR200-D Dec. 31, 2015 Jun. 1, 2017 Jun. 1, 2019

CM960-B Jan 8, 2016 Mar 30, 2016 Jun 30, 2016

HR902-B/BL Jan 8, 2016 Mar 30, 2016 Jun 30, 2016

ML905 Jan 8, 2016 Mar 30, 2016 Jun 30, 2016

QB700 Jan 8, 2016 Mar 30, 2016 Jun 30, 2016

QB701 Jan 8, 2016 Mar 30, 2016 Jun 30, 2016

QB702 Jan 8, 2016 Mar 30, 2016 Jun 30, 2016

EOL Models | Boards

Milestone Model

End of Sale Date1 Last Shipment Date2 End of RMA Service Date3

LAT720-D Aug. 06, 2013 Oct. 06, 2013 Oct. 06, 2015

LS3440 Aug. 10, 2012 Feb. 10, 2013 Feb. 10, 2015

LCG300 Oct. 01, 2010 Apr. 01, 2011 Apr. 30, 2013

LAT700 Jan. 30, 2008 Sep. 30, 2008 Dec. 31, 2011

ADD7017 May. 31, 2008 Aug. 31, 2008 Aug. 31, 2011

ADD7307 Jan. 03, 2013 Apr. 03, 2013 Apr. 03, 2015

EXT-ECX2 Jan. 16, 2014 Apr. 16, 2014 Apr. 16, 2016

LAN81C May 14, 2012 Nov. 14, 2013 Nov. 14, 2014

LEA6x6 Series Sep. 25, 2015 Sep. 25, 2016 Sep. 25, 2018

1. End of Sale Date: The last Date to order the product and that the product is no longer for sale after this Date. 2. Last Shipment Date: The last-possible ship Date that can be requested from DFI and/or its branch offices. Actual ship Date is dependent on the lead time. 3. End of RMA Service Date: DFI continues updates to the products until this Date. The RMA service will still be available depending on the DFI’s RMA policy. 4. The EOL list is updated every 25th of the month.

EOL Models | Graphic Cards/ Peripherals

DFI’s Long Product Life Support

DFI is dedicated to providing long life manufacturing support for the embedded market.

DFI’s product availability commitment for all embedded products is 7 years as defined by:

7-year life cycle spans from DFI product launch to last shipments

7-year life cycle includes an End of Life (EOL) period which is typically 18 months

- Product EOL notifications typically issued between 66-72 months of

production followed by

• 6 month last time order period followed by

• 6 month last time ship period

The life cycle stage of each product will vary in length depending on the actual EOL notice from Intel and AMD. Once DFI receives the EOL notice of a certain processor or chipset, we will issue an EOL notice of all related products 6-12 months prior to its actual EOL.

Thank you for your attention.