Procuring and Financing Energy EfficiencyProcuring and Financing Energy Efficiency
September 20, 2011
9/22/2011 2Town of Oro Valley
Oro Valley, Arizona Oro Valley, Arizona
Located just a few miles north of Tucson, ArizonaIncorporated in 1974 with 1,500 residentsOver 41,000 residents todayBiotech and retail as dominant industries
Santa Catalina Mountains
9/22/2011 3
Town Operations & Sustainability Town Operations & Sustainability
SustainabilityLand Conservation Fleet EfficienciesBuildings Water ConservationRenewable Energy Waste ReductionStormwaterProcurement
8
9/22/2011 5
TOV Electricity Power Expenditures FY 07/08TOV Electricity Power Expenditures FY 07/08
$935,611.81
$42,908.32$53,694.25
$196,972.42
Total: $1,229,186.80 Water Utility Pumps & Wells
PoolParks
Buildings
9/22/2011 7
Town’s Energy Efficiency StrategyTown’s Energy Efficiency Strategy
Mission: Mission Impossible:
The project cannot be a drain on the Town’s General Fund
9/22/2011 8
Performance ContractingPerformance Contracting
…a strategic, design-build energy plan that is self-funded by virtue of
its own cost reductions.
9/22/2011 9
Project Financial OverviewProject Financial Overview
$-
$500,000
$1,000,000
$1,500,000
$2,000,000
$2,500,000
Year1
Year2
Year3
Year4
Year5
Year6
Year7
Year8
Year9
Year10
Year11
Year12
Year13
Year14
Year15
Year16
Year17
Year18
Year19
Year20
Current Utility& MaintenanceCost
Post ProjectInvestment
Post ProjectUtility &MaintenanceCost
Pre- Project Energy Costs
Post Project Energy CostsSavings Applied to Finance
9/22/2011 10
Measurement and Verification –and a GuaranteeMeasurement and Verification –and a Guarantee
“If the M&V report reveals a shortfall in annual energy cost savings, the ESCO (Energy Services Contractor) is liable for such shortfall, and shall pay to the Town …the shortfall up to the life of the performance period. ”
9/22/2011 12
Evaluation of Energy Conservation MeasuresEvaluation of Energy Conservation Measures
Interior & exterior lighting
Lighting controls
Water conservation
Solar photovoltaic
Solar thermal
Rate analysis
Low E window film
Ceiling fans
Direct Digital Controls (DDC)
Central plant
Cool roof
HVAC zone control
High Efficiency Packaged Units
Variable Frequency Drives (VFDs)
Preventative maintenance
Demand‐controlled ventilation
Pump efficiency measurement
Premium efficiency motors
Data Energy Management
9/22/2011 13
Project ElementsProject Elements
Lighting Measures:Both interior and exterior
Ceiling Fans
WaterConservation
Solar WaterHeating
Solar Panels
Motors andPumpModifications
HVAC System:Zone control andhigh efficiencyunits
Low E Window Film
Energy DataManagement
Controls: directdigital controls (thermostat) anddemand controlledventilation (forair circulation)
Landscaping
Ceiling Fans
9/22/2011 14
Major ImprovementsMajor Improvements
Action Item Units
Lighting Fixtures 1522 HVAC Unit Replacement 10Water Conservation Fixtures 108 Energy Management Controls, Bldg’s 6 Low-E Window Film, Bldg’s 6 Pump/Fan Motors 10 Variable Frequency Drives 4JDK Pool Solar Heating, Panels 46New Pool Cover 1New Ramada 1Street Lighting, Fixtures 253 Solar PV Covered Parking, Panels 1344 Police HQ Solar Water Heating 1
9/22/2011 15
The Project Price TagThe Project Price Tag
Solar Elements $2.4 million
Energy Efficiency $1.8 million
9/22/2011 16
Core PrincipalsCore Principals
The project must be 100% self funded.
“Do no harm” to the General Fund
Low Risk
9/22/2011 17
Pool of Key Funding Sources
Pool of Key Funding Sources
Local Utility
TownFund
Clean Renewable
Energy Bonds
Grant
Energy Savings
9/22/2011 18
Solar FinancingSolar Financing
CREBS: $2.4 M Utility: $83K/year
Energy Savings:$71K/year
Source Payoff Plan
9/22/2011 199/22/2011 19
What are Clean & Renewable Energy Bonds (CREBs)?What are Clean & Renewable Energy Bonds (CREBs)?
A unique funding opportunity to encourage development of renewable energy– Wind, biomass, geothermal, solar, landfill gas,
hydropower and marine and hydrokinetic
Tax credit bonds authorized under ARRA in 2009 and U.S. Treasury allocated $2.2 billion to 805 issuers
9/22/2011 209/22/2011 20
Applying for Clean & Renewable Energy Bonds (CREBs) Applying for Clean & Renewable Energy Bonds (CREBs)
Deadlines periodically throughout the year
Applications submitted to the IRSKey elements of application:
– Renewable energy project description
– Engineer must certify viability of project
– Project budget
9/22/2011 219/22/2011 21
Key Provisions of CREBsKey Provisions of CREBs
Hiring Incentives to Restore Employment Actapproved in 2009 provides a DIRECT PAY subsidy– Initially structured as tax credits – Bonds issued on a taxable basis with estimated 70% federal
subsidy. Subsidy received on each bond payment date
100% of bond proceeds spent within three years or funds will be re-allocated– September 2012 – keep an eye out!
Amortization period limited to 14-16 yearsDavis-Bacon wage requirements
9/22/2011 22
The Electric Utility and Performance Based IncentivesThe Electric Utility and Performance Based Incentives
What is the bid process?
Why is it so important?• Biggest funding source• Locks in rate for energy
production, per Kw
= must be producing, maximize Kwthrough tracking & maintenance
9/22/2011 23
Energy Efficiency FinancingEnergy Efficiency Financing
Grant: $164,200Town Funds: $1.6M
Utility Rebate: $57KEnergy Savings: $160K/year
Source Payoff Plan
9/22/2011 249/22/2011 24
Issuance of Municipal Bonds vs.Use of Contingency ReservesIssuance of Municipal Bonds vs.Use of Contingency Reserves
Total requested: $1,627,683Avoids interest expense of over $600,000Significantly improves payback period
$423,197
$895,226
$309,260
General Fund
Highway Fund
Water UtilityFund
9/22/2011 25
Solar and Energy EfficiencyProjects Working in TandemSolar and Energy EfficiencyProjects Working in Tandem
9/22/2011 27
Entering into a Performance Contract…Entering into a Performance Contract…
$212,504 Total Project Cost
$986 Insurance (Actual Cost)
$4,534 Bonds (Actual Cost)
<--- Enter %5%$9,856 Contingency
$197,128 Project Cost Subtotal
<--- Enter %9%$14,308 Profit
<--- Enter %15%$23,846 Overhead
$158,974 Cost Subtotal
9/22/2011 28
Pre-Construction PlanningPre-Construction Planning
Staff Teams including all DepartmentsInternal Planning & Progress ReportsGetting the word out to the Public
9/22/2011 30
The Construction Experience:Employee Shuttle & Alternate ModesThe Construction Experience:Employee Shuttle & Alternate Modes
9/22/2011 32
Getting the Right Message Out to Staff and PublicGetting the Right Message Out to Staff and Public
Elected OfficialsMediaTown StaffResidents
9/22/2011 33
Project Results: Energy SavingsProject Results: Energy Savings
Town Hall CampusEnergy Consumption Comparison
$12,000
$13,000
$14,000
$15,000
$16,000
$17,000
Oct Nov Dec Jan Feb Mar
Month
Mon
thly
Ele
ctric
Bill
s
FY 08/09 FY 10/11
9/22/2011 34
Project Results: Energy SavingsProject Results: Energy Savings
Actual Savings
Weather Adjusted Savings
Town Hall CampusEnergy Consumption Comparison
$12,000
$13,000
$14,000
$15,000
$16,000
Dec Jan Feb Mar
Month
Mon
thly
Ele
ctric
Bill
s
FY 08/09 FY 10/11
Town Hall CampusEnergy Consumption Comparison
$12,000
$13,000
$14,000
$15,000
Dec Jan Feb Mar
MonthM
onth
ly E
lect
ric B
ills
FY 08/09 FY 10/11
9/22/2011 35
Project Results: Cost AvoidanceProject Results: Cost Avoidance
Putting “Found” Money to Work– Replace aging equipment
• Air Conditioning Units• Street Lights• Water Well Pump Motors• Pool Covers
– Purchase of New Facilities• Pool Ramada• Town Hall Ramada• Covered Parking
9/22/2011 36
Project Results: EnvironmentalProject Results: Environmental
Annual greenhouse gas emissions from 258passenger cars, orCO2 emissions from the electricity use of 184homes for one year, or
Planting and growing for 10 years 36,895trees/year, orGreenhouse gas emissions avoided by recycling 461 tons of waste instead of sending it to the landfill
9/22/2011 38
Project Results: Leadership and EducationProject Results: Leadership and Education
VideoScreen
9/22/2011 39
If I Knew What I Know NowIf I Knew What I Know Now
Contract must do’sManage expectationsThe ESCO and utility as partnersContingency reserveTrack your own resultsInternal and public outreach
9/22/2011 40
Key Points to Take HomeKey Points to Take Home