Procuring and Financing Energy Efficiency - Amazon S3 · Procuring and Financing Energy...

41
Procuring and Financing Energy Efficiency Procuring and Financing Energy Efficiency September 20, 2011

Transcript of Procuring and Financing Energy Efficiency - Amazon S3 · Procuring and Financing Energy...

Procuring and Financing Energy EfficiencyProcuring and Financing Energy Efficiency

September 20, 2011

9/22/2011 2Town of Oro Valley

Oro Valley, Arizona Oro Valley, Arizona

Located just a few miles north of Tucson, ArizonaIncorporated in 1974 with 1,500 residentsOver 41,000 residents todayBiotech and retail as dominant industries

Santa Catalina Mountains

9/22/2011 3

Town Operations & Sustainability Town Operations & Sustainability

SustainabilityLand Conservation Fleet EfficienciesBuildings Water ConservationRenewable Energy Waste ReductionStormwaterProcurement

8

9/22/2011 4

Cost Saving OpportunitiesCost Saving Opportunities

$20,000 $477,893 $153,656 $1,300,000

9/22/2011 5

TOV Electricity Power Expenditures FY 07/08TOV Electricity Power Expenditures FY 07/08

$935,611.81

$42,908.32$53,694.25

$196,972.42

Total: $1,229,186.80 Water Utility Pumps & Wells

PoolParks

Buildings

9/22/2011 6

Energy Efficiency Conservation Block GrantEnergy Efficiency Conservation Block Grant

9/22/2011 7

Town’s Energy Efficiency StrategyTown’s Energy Efficiency Strategy

Mission: Mission Impossible:

The project cannot be a drain on the Town’s General Fund

9/22/2011 8

Performance ContractingPerformance Contracting

…a strategic, design-build energy plan that is self-funded by virtue of

its own cost reductions.

9/22/2011 9

Project Financial OverviewProject Financial Overview

$-

$500,000

$1,000,000

$1,500,000

$2,000,000

$2,500,000

Year1

Year2

Year3

Year4

Year5

Year6

Year7

Year8

Year9

Year10

Year11

Year12

Year13

Year14

Year15

Year16

Year17

Year18

Year19

Year20

Current Utility& MaintenanceCost

Post ProjectInvestment

Post ProjectUtility &MaintenanceCost

Pre- Project Energy Costs

Post Project Energy CostsSavings Applied to Finance

9/22/2011 10

Measurement and Verification –and a GuaranteeMeasurement and Verification –and a Guarantee

“If the M&V report reveals a shortfall in annual energy cost savings, the ESCO (Energy Services Contractor) is liable for such shortfall, and shall pay to the Town …the shortfall up to the life of the performance period. ”

9/22/2011 11

Energy AuditEnergy Audit

9/22/2011 12

Evaluation of Energy Conservation MeasuresEvaluation of Energy Conservation Measures

Interior & exterior lighting

Lighting controls

Water conservation

Solar photovoltaic

Solar thermal

Rate analysis

Low E window film

Ceiling fans

Direct Digital Controls (DDC)

Central plant

Cool roof

HVAC zone control

High Efficiency Packaged Units

Variable Frequency Drives (VFDs)

Preventative maintenance

Demand‐controlled ventilation

Pump efficiency measurement

Premium efficiency motors

Data Energy Management

9/22/2011 13

Project ElementsProject Elements

Lighting Measures:Both interior and exterior

Ceiling Fans

WaterConservation

Solar WaterHeating

Solar Panels

Motors andPumpModifications

HVAC System:Zone control andhigh efficiencyunits

Low E Window Film

Energy DataManagement

Controls: directdigital controls (thermostat) anddemand controlledventilation (forair circulation)

Landscaping

Ceiling Fans

9/22/2011 14

Major ImprovementsMajor Improvements

Action Item Units

Lighting Fixtures 1522 HVAC Unit Replacement 10Water Conservation Fixtures 108 Energy Management Controls, Bldg’s 6 Low-E Window Film, Bldg’s 6 Pump/Fan Motors 10 Variable Frequency Drives 4JDK Pool Solar Heating, Panels 46New Pool Cover 1New Ramada 1Street Lighting, Fixtures 253 Solar PV Covered Parking, Panels 1344 Police HQ Solar Water Heating 1

9/22/2011 15

The Project Price TagThe Project Price Tag

Solar Elements $2.4 million

Energy Efficiency $1.8 million

9/22/2011 16

Core PrincipalsCore Principals

The project must be 100% self funded.

“Do no harm” to the General Fund

Low Risk

9/22/2011 17

Pool of Key Funding Sources

Pool of Key Funding Sources

Local Utility

TownFund

Clean Renewable

Energy Bonds

Grant

Energy Savings

9/22/2011 18

Solar FinancingSolar Financing

CREBS: $2.4 M Utility: $83K/year

Energy Savings:$71K/year

Source Payoff Plan

9/22/2011 199/22/2011 19

What are Clean & Renewable Energy Bonds (CREBs)?What are Clean & Renewable Energy Bonds (CREBs)?

A unique funding opportunity to encourage development of renewable energy– Wind, biomass, geothermal, solar, landfill gas,

hydropower and marine and hydrokinetic

Tax credit bonds authorized under ARRA in 2009 and U.S. Treasury allocated $2.2 billion to 805 issuers

9/22/2011 209/22/2011 20

Applying for Clean & Renewable Energy Bonds (CREBs) Applying for Clean & Renewable Energy Bonds (CREBs)

Deadlines periodically throughout the year

Applications submitted to the IRSKey elements of application:

– Renewable energy project description

– Engineer must certify viability of project

– Project budget

9/22/2011 219/22/2011 21

Key Provisions of CREBsKey Provisions of CREBs

Hiring Incentives to Restore Employment Actapproved in 2009 provides a DIRECT PAY subsidy– Initially structured as tax credits – Bonds issued on a taxable basis with estimated 70% federal

subsidy. Subsidy received on each bond payment date

100% of bond proceeds spent within three years or funds will be re-allocated– September 2012 – keep an eye out!

Amortization period limited to 14-16 yearsDavis-Bacon wage requirements

9/22/2011 22

The Electric Utility and Performance Based IncentivesThe Electric Utility and Performance Based Incentives

What is the bid process?

Why is it so important?• Biggest funding source• Locks in rate for energy

production, per Kw

= must be producing, maximize Kwthrough tracking & maintenance

9/22/2011 23

Energy Efficiency FinancingEnergy Efficiency Financing

Grant: $164,200Town Funds: $1.6M

Utility Rebate: $57KEnergy Savings: $160K/year

Source Payoff Plan

9/22/2011 249/22/2011 24

Issuance of Municipal Bonds vs.Use of Contingency ReservesIssuance of Municipal Bonds vs.Use of Contingency Reserves

Total requested: $1,627,683Avoids interest expense of over $600,000Significantly improves payback period

$423,197

$895,226

$309,260

General Fund

Highway Fund

Water UtilityFund

9/22/2011 25

Solar and Energy EfficiencyProjects Working in TandemSolar and Energy EfficiencyProjects Working in Tandem

9/22/2011 26

Entering into a Performance ContractEntering into a Performance Contract

9/22/2011 27

Entering into a Performance Contract…Entering into a Performance Contract…

$212,504 Total Project Cost

$986 Insurance (Actual Cost)

$4,534 Bonds (Actual Cost)

<--- Enter %5%$9,856 Contingency

$197,128 Project Cost Subtotal

<--- Enter %9%$14,308 Profit

<--- Enter %15%$23,846 Overhead

$158,974 Cost Subtotal

9/22/2011 28

Pre-Construction PlanningPre-Construction Planning

Staff Teams including all DepartmentsInternal Planning & Progress ReportsGetting the word out to the Public

9/22/2011 29

The Construction ExperienceThe Construction Experience

9/22/2011 30

The Construction Experience:Employee Shuttle & Alternate ModesThe Construction Experience:Employee Shuttle & Alternate Modes

9/22/2011 31

The Construction ExperienceThe Construction Experience

9/22/2011 32

Getting the Right Message Out to Staff and PublicGetting the Right Message Out to Staff and Public

Elected OfficialsMediaTown StaffResidents

9/22/2011 33

Project Results: Energy SavingsProject Results: Energy Savings

Town Hall CampusEnergy Consumption Comparison

$12,000

$13,000

$14,000

$15,000

$16,000

$17,000

Oct Nov Dec Jan Feb Mar

Month

Mon

thly

Ele

ctric

Bill

s

FY 08/09 FY 10/11

9/22/2011 34

Project Results: Energy SavingsProject Results: Energy Savings

Actual Savings

Weather Adjusted Savings

Town Hall CampusEnergy Consumption Comparison

$12,000

$13,000

$14,000

$15,000

$16,000

Dec Jan Feb Mar

Month

Mon

thly

Ele

ctric

Bill

s

FY 08/09 FY 10/11

Town Hall CampusEnergy Consumption Comparison

$12,000

$13,000

$14,000

$15,000

Dec Jan Feb Mar

MonthM

onth

ly E

lect

ric B

ills

FY 08/09 FY 10/11

9/22/2011 35

Project Results: Cost AvoidanceProject Results: Cost Avoidance

Putting “Found” Money to Work– Replace aging equipment

• Air Conditioning Units• Street Lights• Water Well Pump Motors• Pool Covers

– Purchase of New Facilities• Pool Ramada• Town Hall Ramada• Covered Parking

9/22/2011 36

Project Results: EnvironmentalProject Results: Environmental

Annual greenhouse gas emissions from 258passenger cars, orCO2 emissions from the electricity use of 184homes for one year, or

Planting and growing for 10 years 36,895trees/year, orGreenhouse gas emissions avoided by recycling 461 tons of waste instead of sending it to the landfill

9/22/2011 37

Project Results: LeadershipProject Results: Leadership

9/22/2011 38

Project Results: Leadership and EducationProject Results: Leadership and Education

VideoScreen

9/22/2011 39

If I Knew What I Know NowIf I Knew What I Know Now

Contract must do’sManage expectationsThe ESCO and utility as partnersContingency reserveTrack your own resultsInternal and public outreach

9/22/2011 40

Key Points to Take HomeKey Points to Take Home

Project is 100% self-fundedEnergy cost savings are guaranteed by performance contractor for a priceInvest in Town infrastructure instead of maintaining current utility expensesKnow the pro’s and con’s of performance contractingOutreach. Outreach. Outreach.

Questions?

Thank you,

Brian P. Garrity, C.P.M., CPPB