Process Site Evaluation and Constraints

17
Calming the Storm Calming the Storm Calming the Storm Calming the Storm Strategies and Tools for Easing the Design and Permitting Process Site Evaluation and Constraints Presented By: Richard C. Tso, P.E., QSD/P David M. Ramsey, PE., QSD/P Civil Engineering | Structural Design | Development Planning June 2015

Transcript of Process Site Evaluation and Constraints

Page 1: Process Site Evaluation and Constraints

Calming the StormCalming the StormCalming the StormCalming the Storm

Strategies and Tools for Easing the Design and Permitting

Process

Site Evaluation and Constraints

Presented By:

Richard C. Tso, P.E., QSD/PDavid M. Ramsey, PE., QSD/P

Civil Engineering | Structural Design | Development Planning

June 2015

Page 2: Process Site Evaluation and Constraints

Challenges to LID Implementation

What are some of the things that tend to make LID implementation difficult?

• Not engaging the Civil Engineer early in the planning phase

• Lack of public infrastructure nearby

• Hillside conditions

• Poorly draining soils

• High water table

• Retrofitting developed sites

• Perception that LID is guaranteed to reduce project costs

2

Page 3: Process Site Evaluation and Constraints

Challenges to LID Implementation

Not Engaging the Civil Engineer Early in Planning

• Structures located at the low point of the site

• Insufficient open space provided

• Open space limited to areas immediately adjacent to buildings where storage/infiltration is not advised

• Site layout which precludes any ability to alter site grades for LID

• So what should you do?

3

Page 4: Process Site Evaluation and Constraints

Pre-Project Planning

• Consult with the Civil Engineer prior to the start of any project regarding

storm water requirements.

• After the initial site planning and/or programming by the architect or

planner, consult with a civil engineer regarding storm water treatment

and storage designs.

• Keep in mind that some sites will require accurate and final design

analysis by the civil engineer even in the planning stage due to tight site

constraints and limited real-estate!

• It is important to meet with the city or county staff regarding storm

water design concepts at the early stages of the planning process to

ensure a project is heading on the right track.

4

Page 5: Process Site Evaluation and Constraints

Challenges to LID Implementation

Lack of Nearby Infrastructure for Connection

• Most favored LID facilities require depth, up to 4 feet (bioswales, raingardens)

• Once water goes in, how to get it back out?

• Draining through curb faces is not always possible

• Especially true with tight, in-fill developments where raising the site may not be feasible

• Filling sites isn’t environmentally sensitive and can be expensive, jeopardizing project budgets and desired economic development

• Raising a site can block runoff coming to the site from adjacent properties

• Accounting for off-site run-on can increase project costs (bypass system or larger LID facilities)

• Could be mitigated by use of pumps…as long as local agencies allow them

5

Page 6: Process Site Evaluation and Constraints

6

Page 7: Process Site Evaluation and Constraints

7

Page 8: Process Site Evaluation and Constraints

Challenges to LID Implementation

Hillside Conditions

• Bioswales don’t work when slope is excessive

• Raingardens should be level to maximize their efficiency

• It can be expensive to create flat areas where the natural terrain does not provide them

• Does it make sense to construct a retaining wall and then intentionally put water behind it?

8

Page 9: Process Site Evaluation and Constraints

9

Page 10: Process Site Evaluation and Constraints

Challenges to LID Implementation

Poorly Draining Soils

• How to infiltrate when permeability is near zero (clay or bedrock)?

• Soil strata may require drilling though clay layers to get to more suitable materials

• EPA permit for injection well?

• May require additional detention and treatment area and volumes.

• Design system for multiple storm discharge rates.

10

Page 11: Process Site Evaluation and Constraints

11

Page 12: Process Site Evaluation and Constraints

Challenges to LID Implementation

High Water Table

• Ground water cannot be at or above the bottom of an LID facility

• Requires raising the site, or….

• Shallow LID facilities = Larger Footprints

• Larger SF can increase project costs

• Take away usable building or open space

• Create more earthwork & environmental impacts

12

Page 13: Process Site Evaluation and Constraints

Challenges to LID Implementation

Retrofits of Developed Sites

• Parking lot repaving…subject to stormwater regulations or not?

• Most contractors (and owners) likely aren’t even aware there could be a trigger for stormwater compliance if existing pavement is being removed and replaced

• Creating space for LID facilities on existing sites is challenging and can be expensive

• Sometimes requires losing parking spaces which is not always an option.

13

Page 14: Process Site Evaluation and Constraints

14

Page 15: Process Site Evaluation and Constraints

Challenges to LID Implementation

Perception that LID Reduces Project Costs

• Digging pits and filling with rock can be expensive• If deep enough, they can require expensive shoring to support pit walls

where sloping excavation isn’t feasible

• Facilities at times require deep concrete side walls to separate “wet” storage areas from adjacent materials that require protection

• Deepening and waterproofing building foundations

• Sleeving utilities penetrating LID facilities

• Up front design costs are higher due to complexity of design

• Plan reviews and approvals can take longer

• Multiple disparate facilities with overflow piping can lead to MORE piping/trenching

15

Page 16: Process Site Evaluation and Constraints

16

Page 17: Process Site Evaluation and Constraints

CONTACT:

The earlier our involvement, the greater chance for

project success!

5300 Soquel Avenue, Suite 101

Santa Cruz, CA 95062

Ph. (831) 426-5313

www.iflandengineers.com

Stormwater Specialists: