PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity...

58
.. 3 BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED PROCEEDINGS OF 68th MEETING OF BOARD OF DIRECTORS OF BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED HELD ON WEDNESDAY THE 16th OF MAY 2015 AT 11.00 A.M. AT CORPORATE OFFICE, BESCOM, K.R.CIRCLE, BENGALURU. MEMBERS PRESENT: Sriyuths: 1. P.Ravi Kumar 2. Pankaj Kumar Pandey 3. Arvind Shrivastava Chairman Managing Director Director 4. H.Nagesh 5. B.L.Guruprasad 6. T.H.lVI.Kumar 7. K.T.Mahanthappa 8. M.Nagaraj 9. A.N.Jayaraj Director (Technical) Director (Finance) Director Director Director Director Invitee: T.H.Shakeel Ahmed· CGM(F&C),BESCOM In Attendance K.T.Hiriyanna Company Secretary, BESCOM and Convener. At the outset, MD welcomed the Chairman, Directors, newly appointed Director Sri.A.N.Jayaraj and other officers to t¥e I eetin.g. Quorum being present, subjects were taken up for disctlsf·tn and decision thereon..· .~ . .~ . . CO ~irmBn . 1 Lj;3C\,~~'~

Transcript of PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity...

Page 1: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

.. 3

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

PROCEEDINGS OF 68th MEETING OF BOARD OFDIRECTORS OF BANGALORE ELECTRICITY SUPPLYCOMPANY LIMITED HELD ON WEDNESDAY THE 16th OFMAY 2015 AT 11.00 A.M. AT CORPORATE OFFICE,BESCOM, K.R.CIRCLE, BENGALURU.

MEMBERS PRESENT:Sriyuths:

1. P.Ravi Kumar

2. Pankaj Kumar Pandey

3. Arvind Shrivastava

Chairman

Managing Director

Director

4. H.Nagesh

5. B.L.Guruprasad

6. T.H.lVI.Kumar

7. K.T.Mahanthappa

8. M.Nagaraj

9. A.N.Jayaraj

Director (Technical)

Director (Finance)

Director

Director

Director

Director

Invitee:

T.H.Shakeel Ahmed· CGM(F&C),BESCOM

In Attendance

K.T.Hiriyanna Company Secretary,BESCOM and Convener.

At the outset, MD welcomed the Chairman, Directors, newlyappointed Director Sri.A.N.Jayaraj and other officers to t¥e I eetin.g.Quorum being present, subjects were taken up for disctlsf·tn anddecision thereon..· .~

. .~

. . CO ~irmBn. 1 Lj;3C\,~~'~

Page 2: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

TED~ BANGALORE ELECTRICITY SUPPLY COMPANY LIMI :J

PART I - ROUTINE SUBJECTS

Subject No. 68/01: Leave of AbsenceLeave of Absence was granted to the following Directors:

l. Sri.G.Kl..unarNaik2. Sri.Gaurav Gupta3. Smt.Dipti AclityaKanade

Subject No. 68/02: Confirmation of Minutes of the 67thMeeting of Board of Directors ofBESCOMheld on 18.03.2015

The mirrute s of 67th Board Meeting held on 18.03.2015 wereconfirmed with the following modifications.

(1) In respect of subject No. 67/6 (b), the reconstitutedCentral Flu-chase Committee shall be with thefollowing members,

1. Sri.Pankaj Kumar Pandey2. Sri.H.Nagesh3. Sri.Guru Prasad B.L.4. Sri.K.T.Mahanathappa

(2) In respect of subject No. 67/4 (i) (the proceedings of78th CPC of BESCOM CPC 78/04) in respect of co­hosting Data Center services the enhancement beread as "10% of Rs.2,41,88,864/- in place of 10% ofRs.4,83,77 ,722/ -".

Minutes of 67th Meeting of Board of Directors were confirmedwithout any other modifications except the above.

Subject: No. 68/03: Action taken report on the minutes of 67thMeeting of Board of Directors oJ BESCOMheld on. 18.03.2015, \\

Noted \~<I.\\ ~I" 'I,\I:J ',I ',]./ '

2.

4

I

Page 3: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

5ea BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDBRSCOM

Subject No. 68/04: Proceedings of Sub-Committee Meeting ofthe Board of BESCOMfor lcind noting.

Proceedings of the following sub-committee meetings of the Boardwere noted.

1. 80th Meeting of Central Purchases Committee of BESCOMheld on 16th April 2015.

2. 81st Meeting of Central Purchases Committee of BESCOMheld on 22nd April 2015.

3. Borrowing Sub-Committee Meeting of BESCOM held on 16thMarch 2015.

" Subject No. 68/05: a) Changes among Directors on the Board ofBESCOM.

b) Reconstitution of Borrowings Committee.

(a)Vide notification No.EN 124jCo-ordinationj2015dated 07.04.2015, Govt. of Karnataka hasappointed Sri.A.N.Jayaraj, President, Karnataka

. Electricity Board Engineers Association, as aDirector on the Board of BESCOM.

While noting the appointment of the above, Director on the Board ofBESCOM. Board passed the following resolution.

RESOLVED THAT, Company Secretaty, BESCOM be and ishereby authorized to file necessary e-form as per therequirement of Companies Act 2013 with the Ministry ofCorporate Affairs, GOl, New Delhi.

(b)Presently, the Borrowings Committee is comprising ofthe following members.

1. Managing Director, BESCOM : Chairman2. Director (Finance), BESCOM : Member

On cessation of Directorship of Sri.S.V.Govindaraju, on the Board ofBESCOM consequent to transfer from Tr.Zone, KPTCL as ChiefEngineer, the Borrowings Committee was not re-constituted.Sri.K.T.Mahanthappa succeeded Sri.S.V.Govindaraju as ChiefEngineer (Ele), Bangalore Tr.Zone and Government nataka

3

Page 4: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

6

~) BANGALORE ELECTRICITY SUPPLY COMPANY LIlVUTEDhas appointed him. as non-whole time -Director on the Board ofBESCOM. In view of the above change, it was proposed to inductthe said Director on the Borrowings Committee, BESCOM as amember. In this context, following resolutions were passed.

R.ESOLVED THAT, approval be and is hereby accorded to re­constitute the Borrowings Committee BESCOM as below.

1. Sri.Pankaj Kumar Pandey, lAS,Managing Director : Chain-nan2. Sri.Guru Prasad B.L.,IRS, Director (Finance) : Member3. Sri. K.T.Mahanthappa, Director : Member

FUTIIER RESOLVED THAT, Company Secretaru, BESCOM be andis hereby authorized to issue necessary orders accordingly.

Subject No. 68/06: Carrying out Repairs to failed distributionTransformer (conventiona 1 and star rat.edOn item wise rate contract basis-reg.

The following was submitted to the Board for perusal.

1. At present the failed Distribution Transfonners InBESCOM are repaired at 3 kinds of Repair Centres.a) One Mega Repair Center at Doddaballapura with a

capacity to repair 300 no. of Transformers Imonth.b) 18 Major Repair Centers spread across various

Distncts /Taluks (in one Major Repair Center around100 Nos. of DTRs/month can be repaired).

c) 49 nos. of Minor Repair Centers which primarily dealswith minor repairs like replacement of one coil HTILT,replacement of Gasket, Replacement LVIHV Bushingswith metal parts, Replacem.ent of Brass nuts, toppingup of oil etc.,

For all the 3 kinds of repair centers BESCOM has got alurupsurn award wherein the repairers are paid bas ed on theno. of transformers repaired, rather than based ~ri; no. of

items replaced for the failed tra:Sformers. \'\;~~;\,

\:V\ )\\ .

Page 5: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

7-e BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDBUCOM

- Further, the Board was also appraised of the prevailingstandards of performance for the replacement of faultytransformers namely 24 hours for all categories of consumersexcept IP sets and 72 hours for IP sets.

Right now, on an average, BESCOM has spent around28.54 Crores in every year for the repair of Transformers.

No. of Amount81. Year Category Transformers spent (in Total inNo of repair taken for lakhs

repair lakhs)

Minor 12001 . 562.141 2012-13 Maior 10891 1665.78 2387.6

Mega 726 159.64Minor 14094 681.81

2 2013-14 Maior 9579 1421.10 3289.7Mega, 4498 1186.82Minor 11923 559.36

3 2014-15 Major 9295 1675_00 2887.2Mega 2480 652,83

In order to bring better efficiency in the replacement, andrepair of transformers, MD BESCOM constituted 4 teamswhich visited the States of Maharashtra, Telangana, WestBengal and Gujarat. The team leader Mr.Ramesh did apresentation before ACS, Energy on 2ndMarch 2015.

2. The proposal is placed before the Board seeking the followingapprovals.

(a)Whether the existing Minor Transformer Repaircenters to be continued or cancelled?

(b)Whether the existing Major Transformer repaircenter to be continued with the existing scope,terms and conditions of the contract or cancelled?

(c)Whether the repairs to DTRs to be carried out onitem wise rate contract basis by creating oneExecutive Engineer (Testing) supported by I AEE(Testing) and AE(Testing) to look after ex 1 sivelythe transformers repairs in the circle?

5

Page 6: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

8

~nBANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDBEseOM lit

The Board went through the proposal and observed thatpresently, there is no adequate centrally controlled mechanism toget the transformers repaired on time. There is no analysis madewith regard to cost benefit as to whether item wise RCwill be morebeneficial or the existing procedure through outside agencies ismore advantageous from the point of view of cost minimization,transportation charges, loading and unloading charges, testingcharges, the procedure for returning of unserviceable parts/released parts to BESCOM stores etc., It was also observed thatrepairs are carried out without joint inspection. BESCOM hasalready undertaken preventive maintenance which coverspreventive maintenance of distribution transformers also and needto monitor by fixing responsibility in the hierarchy of officers.

The MDexplained the present system in existence in BESCOM.It was further observed that control and monitoring mechanism isinadequate in the present system and accountability is found at verylow level. Sri.Arvind Srivastava, Director expressed that reportingand control mechanism needs to be strengthened instead of addingany additional manpower to the existing system.

(a)Failure of transformer shall be reported to therespective SE(E),EE(E)within 24 hours.

(b)Adequate actions are to be taken by EE(E) to get thedistribution transformers replaced within shortestpossible time.

(c)The released faulty transformers shall be returned tostores by return invoice.

(d)Joint inspection to be carried out and estimate to beprepared by adopting schedule of rates/ contract rates.

(e)All repaired distribution transformers must beguaranteed for at least 2 years duration.

After detailed deliberation, keeping in view the cost control,adequacy of availability of transformers for replacement at emergencyrestoration and to have better control mechanism, the followingresolutions were passed .

.RESOLVED T.HA'l~ for the reasons explained, CG1VI(Op),BESCOMbe and is hereby authorized to enter into competitive ratecontract: throuqh. tender duly defining the exhaueti J€ scope o]

6

Page 7: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

9z: B BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

bEseDM

work without distinguishing, minor, major or mass distributiontransformers repair .. centre, clearly re-defining theresponsibility, accounting and reporting mechanism from downthe line upto CGM(Op)without adding any additional cadre/manpower at extra cost to the existing structure of C,O&MDivision, MT Division, Circle and Zone subject to following.

(l)CGM(Op) be authorized to frame necessary norms forreporting, accountability, identifying the hierarchy ofofficers who are responsible, accountable with timeframe for each stage of activity from the point of releaseupto return to stores within 3 weeks time and monthlyreport shall be submitted to MD.

(2) The CGM(Op) shall ensure that completeimplementation of norms / guidelines and a monthlyreport be submitted to MD before 10th of each monththrough D(T)and ensure minimum, maintenance costof distribution transformers, transportation andloading cost.

(3)The Executive Engineer (Ele), Store Officer shouldensure that repaired transformers are received back atstore with at least minimum time prescribed undercorporate norms.

Subject No. 68/07: Purchase of new SUV Renault Duster,RXZ(O) (Nav) (Diesel) for the use ofManaging Director, BESCOM.

The followingwere submitted to the Board for perusal.

1. The Volkswagen Vento Vehicle is being used by theManaging Director, BESCOM which was procuredduring the year 2011. It has travelled 1,63,000Kms.Presently this vehicle found not suitable for field travelespecially in rural areas since the vehicle is havinglimited ground clearance .

. 2. The Volkswagen Vento vehicle is presently givingnominal mileage per liter of fuel and has covered163000 kms

3. Present proposal is to buy a new SUVRenault Dytster,RXZ(O) (Nav) which is having a sufficieJ. gJound

7 . :,;~~l;;'~

Page 8: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

10

~;lBANGALORE ELECTRICITY SUPPLY COMPA.NY LIMITEDIIlESC:OM .;;"

clearance and has better performance on road. Thesaid vehicle has strong shock absorbers, canaccommodate more staff during field inspections andmore convenient to MD's use.

The Board went through the proposal. Since the ManagingDirector needs roael worthy, good condition vehicle for long journeywithin the jurisdiction of State, Board accorded its approval andpassed the following resolution in this context.

RESOLVED THAT, approval be and is accorded to purchase ofone new SUV Renault Duster, RXZ(O), (Diesel) or equivalentvehicle for the use of Managing Director, BESCOIVI at theprevailing price [rom. an authorized dealer.

RESOLVED FUR TIJER TliAT, the General Manager(Procurement) be and is hereby authorized to take needfulaction for purchase duly following the corporate norms and totake the same to the asset account of BESCOM

Subject No.68/08: Advance payment of Rs.200 crore toUdupi Power Corporation Limited(UPCL) Rs.100 crore paid on27.02.2013.

The followingwere submitted for perusal of Board.

l. Udupi Power Corporation Limited is a thermal based powergenerating capacity of 120Mw and using imported coal forgeneration. CERC has approved provisional tariff during241'1'1Dec.2012. ESCOMS and PCKL have filed appealagainst CERC order before APTEL.APTELduring Feb-2013has directed to pay the tariff as. per CERC provisional orderfor both units from September 2012 to February 2013 infour installments and an amount of Rs.193.96 crore waspaid by BESCOM and for further period, the bills were paidat provisional tariff approved by CERC (Rs.4.1S per unit) asper APTELorder.

2. CERe had issued final Tariff order during 20th Feb.2014.Again it was challenged before APTEL by PCKLjESCOMs.During June 2014, APTELhas directed to pay ·1:.:1.e~i.n.a.ltariff

8 ,v'tl/'-I/ ~... ,

(:~-.,'}I:~. ' ./. I

Page 9: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

11-U:l BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

al!5eoM

approved by CERC from Feb.2013 to March 2014 in eightinstallments. BESCOM has paid its share of Rs.197.76crore in eight installments along with regular monthly billsas per final tariff approved by CERC (Rs.4.25 per unit).

3. UPCL frequently posed the problem of funds shortage forwhich it was unable to procure .coal and continuegeneration. PCKL vide letter No.PCKLjA12/331/2010-11j 4278-90 dated 06.12.201.2 had directed BESCOMto payRs.99.24 crore as advance payment and recover it afterthree months along with interest at higher rate on ESCOM'sborrowed loan. Accordingly BESCOM had paid Rs.99.24crore during Dec 2012/Jan.2013 and recovered it durin.gMay 2013 along with interest of 5.13 crore.

4. Based on UPCL letter dated 15.07.2013,27.09.2013 and18.10.2013, GOK vide letter NO.EN57PSR2013 dated09.12.2013 had directed BESCOM to pay all outstandingdues and one month Power Purchase cost in advance.Accordingly, BESCOM had paid Rs.200 crore duringDec.2013/Jan.2014 on same terms and conditionsindicated by PCKLin letter dated 06.12.2012. This paymenthad been approved by BESCOM Board in 62ncl BoardMeeting held on 16.01.2014 and 63rd Board Meeting held on04.03.2014 had directed to adjust advance payment aftersix months. Accordingly the advance amount of Rs.200crore along with interest of Rs.12.16 crore was adjustedagainst January 2015 bill.

'" The Board took note of the followingsignificant points.

a) UPCLhad addressed letter to GOK,PCKLand BESCOMforreleasing advance payment and posing coal shortageproblem. PCKL vide letter No.PCKL/A12j331/ 2010-11/5289-99 dated 26.02.2015 had made clear to UPCL thatdespite the severe financial difficulties, BESCOMhad paidRs.200 crore advance and adjusted after six month.s. Asper CERCNorms UPCL'has to maintain 45 days coal stock.ESCOMs are settling dues and monthly bills as per ATEorders and it is responsibility of UPCL to maintainsufficient coal stock. Stoppage of generation on account ofthis would adversely affect the Grid manag me /1 t anel

9

Page 10: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

12U,,::H::#O~l BANGALORE ELECTRICITY SUPPLY COMPANY LIlVUTED1tl1i5COM

_ ....

demand supply gap and directed UPCL to maintaincontinuous generation from both units at full capacitywithout interruption. PCKL further instructed that anyconsequential loss and damage on account of stoppage ofgeneration willbe to UPCL's account.

b) In spite of strict direction from PCKL,UPCL had stoppedgeneration from one unit on 27.02.2015 and declaringavailability for only one unit. In the pre-budget meeting.Additional Chief Secretary, Energy Department, GOl{ haddirected to pay the advance amount to avoid stoppage ofgeneration.

c) In view of impeding summer and students exarninationseason the power supply need to be maintained properly.As such Rs.100 crore is paid as advance on 27.02.2015 onthe same conditions as in PCKLletter No.PCKL/A12/331/2010-11/4278-90 dated 06.12.2012, to start generationfrom other unit by UPCL.

Board went through the proposal and Director (Finance)explained the details. Having ratified the action taken the Boardpassed the followingresolution.

RESOLVED TJIAT, f07· the reasons explained, in view ofmaint.aininq uninterrupted power supply during summer andstudents examination season action taken by BESCOM to payan aduance of Rs.100 crores (Rs.One hundred crores} on27.02.2015 on the condition to UPCL, that the qeneration from.UPCLbe started as per the t.ernis of PCl{L letter No.PCKLj A12/33.lj2010-11/4278-90 dated 06.12.2012 be and is herebyRATJPIED.

FUJ?TIIER RESOLVED THAT, the GMfPP) be and is herebyauthorized to ensure compliance of t.ernis & conditions andother aqreement: clauses in the Power Purchase aqreement:executed with l\tI/s.UPCLand recoverq / adjustment: (.~f ~rh.1(!!JICf1

paid as peT' norms, ' I/IA~... i/."., '~\.'" ~' :

,1", t);

10

Page 11: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

13

!l BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDBEseDM

Subject No. 68/09 : Enquiry No.9 BESCOM/BCP-847/2014-15floated for Supply, Installation,Commissioning, Solution Engineeringand Maintenance of GPRS modems ofFeeders/DTCs/HT installations andBoundary Meters in RAPDRP towns of allESCOMs and pushing the data to theMDAS servers of ESCOMs by tying-upwith local service provider for GPRSdata communication. on total turnlceybasis of Rate contract for a period of 3years.

&-, The followingwere broadly submitted to the Board:1. As BESCOM is the nodal agency for RAPDRPproject, for

early completion of the project, the need for early executionof work 8J.1.dits completion before Sept 2015 as the timeline given by Mj s. PFC is going to expire shortly.

2. The default of Mj s. Infosys Ltd., to complete the awardedwork within the stipulated time

3. The CPCdecision at its SOll1 meeting held on 16.04.2015.4. The negotiations had with the modem vendors for securing

reasonable prices and terms & conditions.5. The details of amount put to tender and quantity for each

lot as under :

Qty. for Total AmountLot Name of each QU811tity put toNo. Name of the Lot the ESCOMs for each tender

ESCOM in Nos. Lot in ill

Nos. CroresLot-I South & West Circle inBMAZ area BESCOM 30573 30573 16.74

Lot-II North & East Circle inBMAZ, BESCOM 36699 36699 20.09BRAZ & CTAZ area

Lot-III CESCOM & MESCOM area CESC 1146222088 12.09MESCOM 10626

Lot- IV HESCOM & GESCOM area HESCOM 10618GESCOM 19751

30369 16.63

The followingwere perused by the Board:(a) The prices offered for Lot I & II were acceptable. However

the quoted prices for LOTIII & IVwere abnormally hi n

11

Page 12: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

14.

[.\ BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDDI!SCar"

when compared to other states j purchase orders issuedby other utilities.

(b) The alternative explorable by tie up of Mj s. RelianceCommunication System (GPRSdata) was also remote cluethe possible improper co-ordination between modemvendors and communication vendor Mj s. Reliance Ltd.,

(c) Abnormal extra cost being incurred on account of failureofMj s. Infosys to complete the awarded work.

(d) The subject was debated at length @ 81st CPC since theprices were very abnormal in respect Lot III and Lot IVand it was decided to negotiate further.

(e) Negotiation meeting was held along with Mj s. Infosys andits attention was also drawn with regard to extra costbeing incurred consequent to default of Mj s. Infosys incarrying out the contract for the satisfaction of BESCOMand extra cost burden to be bome by Mj s.Infosys only.

Board noted the following:-(1)As the entire scope of the proposed work under

RAPDRPis on the part ofMj s. Infosys only.(2)The data furnished by the GM(Proc)was perused as

under iri respect of Ll bidders of Lot I and II.(3)The proposal was audited by the GM(ljA).(4)The tender scrutiny committee recommendation dtd

06.04.2015(5)The tender process was made in accordance with the

provisions of KTPPAct.(6)The decisions made in 81st CPCmeeting of BESCOMto

recommend the proposal to Board.

Lot I South & West Circle in BMAZ areaQuantity: 30573Nos Price Quoted by

Price Breakup for individual for supply, Unit cost Mis.installation, commissioning, integration and put to Arnitech

maintenance charges tender India Ltd

S1. Unit total Unit total cost

No. Items Description Unit Qty cost in Rs. all inclusive ill.Rs.

1Supply of GPRSmodems No. 30573 4000 4120with Accessories etc.,

2Installation of GPRS Set 30573 400 587modems

12

iiVi-)/ I I',;hr'"//'I

Page 13: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

15-s BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDDESCDM

3 Commissioning ofmodemi.e., configuration ofS1M No 30573 35 53card

4 Integration to MDASserver No. 30573 100 53Of ESCOMs5 Maintenance ofmodems No. 30573 400 533

GPRS data charges (SIMshouldbe provided along with 50MB

6 free data/month and extra data No 30573 540 1026with 10ps/ 10KB)along withnecessary arrangementsfor 36 months

TOTAL 5475.00 .6372.00Rank Ll

Lot II North & East Circle in BMAZ area, BRAZ & CTAZ Area of BESCOM

Quantity: 36699 Nos Price Quotedby

Price Breakup for individual for supply, Unit cost M/s.installation, commissioning, integration and put to Amitech

maintenance charges tender India Ltd

S1. Uni Unit total Unit total cost

No. Items Description t Qty cost in all inclusive inRs. Rs.

1 Supply of GPRSmodems No. 36699 4000 4120with Accessories etc.,

2 Installation of GPRS Set 36699 400 587modemsCommissioning of modem

3 i.e., configuration of SIM No 36699 35 53card

4 Integration to MDASserver No. 36699 100 53Of ESCOMs5 Maintenance ofmodems No. 36699 400 533

GPRS data charges (S1M shoube provided alongwith 50MB free datal

6 month and extra data with No 36699 540 102610ps/10KB) along withnecessary arrangementsfor 36 months

TOTAL 5"1·72.00 6372.00Rank Ll

.(7) On perusal of quoted price originally in respect of Lot III & IVthe same were substantially high. After necessary negotiatio therates offered by L1 bidders are as under:

13

Page 14: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

16~:~~ BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

Lot-III CESC & MESCOM AreaQuantity: 22088 Nos (CESC-1l462 Nos& MESCOM-I0626Nosl

2'HIQuoted rate Revised

Price Breakup for individual for supply, Amount by Mis. offer rate

installation, commissioning, integration put to Analogie by Mis.Tech. Analogic

and maintenance charges tender India Tech IndiaLtd., Ltd

(Negotiated)Unit Unit total Unit total

S1. Items Description unit Qty total cost all cost allNo. costin Inclusive Inclusive

Rs. In Rs.· In Rs.1 Supply of GPRS modem No 22088 4000.00 4245.75 4245.752 Installation of GPRS modems Set 22088 400.00 969.00 699.96,.., Commissioning ofmodem Nos 22088 35.00 28.50 28.50J i.e , configuration of SIMcru-d

4 Integration to MDASserver of Nos 22088 100.00 20.52 20.52ESCOMs

5 Maintenance ofmodems Nos 22088 400.00 615.60 479.37Total 4935.00 5879.37 5474.10

GPRS data charges (SIMshould be provided along

6 with 50MB free data/month Nos 22088 540.00 1969.92 1026.00and extra data with

10ps/ 10KE) for 36 monthsTotal 5475.00 78"::1·9.29 6500.10

Lot-IV HESCOM & GESCOM AreaQuantity: 30369 Nos (HESCOM-I0618 Nos & GESCOM-19751 Nos)

Quoted Revisedrate by offer rate

Price Breakup for individual for supply, installatior Amount Mis. by Mis.

commissioning, integration put to Analogic Analogic

and maintenance charges tender Tech. Tech India

India LtdLtd., (Negotiated

)

Unit Unit total Unit totalS1. Items Description Uni· Qt.y total cost all cost allNo. t costin Inclusive Inclusive

Rs. In Rs. In Rs.1 Supply ofGPRS modem No 30369 4000.00 4245.75 4245.752 Installation of GPRSmodems Set 30369 400.00 1111.50 699.96

3Commissioning of modem Nos 30369 35.00 28.50 28.50

i.e., configuration of SIMcru-d

4 Integration to MDASserver of Nos 30369 100.00 28.50 20.52ESCOMs

5 Maintenance ofmodems Nos 30369 400.00 769.50 479.37Total 4935.00 6183.t-4 5474.10

'----.

14 \1----.~I .--- ;--\.' ,;

Page 15: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

17ers BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDaE.r.t:OM

GPRSdata charges (SIMshould be provided along

6 with 50MBfree data/month Nos 30369 540.00 1969.92 1026.00and extra data with

10ps/lOKB) for 36 monthsTotal 5475.00 8153.67 6500.10

Board on further perusal of details furnished and annexuresthereon felt that, since the entire scope of work belongs to Mj s.Infosys Ltd, the agreement clauses in the original agreement enteredinto with Mj s. Infosys be strictly and stringently enforced to make it tobe responsible for extra cost and risk on account of default inexecuting the awarded work within the stipulated time as per the timeframe given by Mj s. PFC. As the funding will be made by PFC for thesanctioned quantity only, for the additional quantity the cost need to

"be borne by the respective ESCOMs consequent to above tenderenquiry and present work award. The followingwere explained.

1) PFC shall give the Fund for revised DPR quantities of allESCOMs at the approved Unit cost ofRs.5020j- only

2) The difference amount for the balance· quantity ofmodems should be bome by the respective ESCOMs asper the awarded cost.

3) The modems for HT and boundary meters will be fixed byMj s. Infosys only at the rate of RS.5020 j -being PFCsan.ctioned unit rate.

4) The difference amount between awarded cost and PFCsanctioned cost should be borne by Mj s. Infosys (for thequantity supplied earlier (except HT and boundarymeters) and ESCOMs should bear the difference amount(for the sanctioned quantity as per DPR minus quantitysupplied by Infosys earlier).

5) The entire data charges of the three years contract periodshould be borne by respective ESCOMs by providingnecessary budget every year depending on requirement.

The total contract amount all inclusive for each Lot put to tender,for Lot-I & II (price quoted) and the finally negotiated price for~t -III& IVare as noted below:. f'

'" ).: ~U.. !!: il~;c,~~);<'ii;

15

Page 16: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

18

BANGALOHE EI..IECTRICITY SUPPLY COMPANY LIMITED

Lot Amount put Total cost forName of the Firm No. Qty to tender in each Lot in Rs ,Rs.

lVI/soAmitech India Lot-I 30573 167387175.00 194811156.00

Ltd,Lot-II 36699 200927025.00 233846028.00

Lot-III 22088 120931800.00 143574208.80lVI/ s. Analogic Tech

India Ltd, Lot-IV 30369 166270275.00 197401536.90

Board went through the proposal and debated the matter atlength. Having noted above actions taken by BESCOM,the followingresolutions were passed in this context.RESOLVED THAT, f01~ the reasotis explained, approval be and ishereby accorded to award the worle on rate contract, with aview to complete RAPDRP project within the stipulated timefixed by Pli'C, for supply, installation, commiseioninq,integration to MDAS server of all ESCOMs, solution enqineerinqand maintenance of GPRS modems for [eeders/D'I'Cs/H'Tinstallations and. boundary Meters in RAPDRP towns of a.llESCOMs through. GPRS data communication on total turnkeybasis and maintenance for three years against the hid €llqtdryNo lJESCOM/BCP847/2014-15 on behalf of all ESCOMs, BESCOMbeing the nodal agency for RAPDRPproject.

Total amount Unit rateAmount put quoted/ after (AllNarne of the Firm Lot No. Qty to tender in

Rs. negotiation for inclusive)each Lot in Rs.

Rs.6372/-Lot-I 30573 167387175.0C 194811156.00 (Rs. Six

thousandlVI/soAmitecb. threeIndia Ltd, hundred

Lot-II 36699 200927025.00 233846028.00 seventytwo only)

--

16

Page 17: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

19

lr.l BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDB£SCDM

I Lot-III 22088 120931800.00 143574208.80 Rs.6500.10 I(Rs. Sixthousand

Mj s. Analogic fiveTech India Ltd, Lot-IV 30369 166270275.00 197401536.90 hundred

and tenpaise only)

Note: Covers supply, installation, commissioning, integration,maintenance, GPRSdata charges for 36 months.

FURTHER RESOLVED THAT, the GM(ICT& MIS) and GM(Proc),'-' BESCOMbe and is hereby directed as under

1)Necessary modified agreement shall be executed with M/s.Infosys Ltd and also fresh agreement with new vendors.

2) Penalty clause as per the existing agreement shall beenforced and recovered from M/s. Infosys Ltd.,

3) Necessary intimation/communication shall be made toother ESCOMs to issue DWA as per tender conditions withcompliance of all commercial conditions

4) Necessary contract agreement with M/s. Amitech IndiaLtd., and M/s. Analogic Tech India Ltd., shall be executedby respective ESCOMs duly incorporating necessary t.ernisand conditions as per corporate norms.

5) GM(ICT& MIS) shall take necessary action for recovery ofpenalty and extra cost i.e. difference of cost between

'-' presently awarded amount on tendering (except datacharges) and M/s. PFC sanctioned amount towards cost ofGPRS modern, from the outstanding bills of M/s. InfosysLtd., out of already awarded cost of project

6) Payment against present work award shall be arranged byrespective ESCOMs duly following tender conditions andcorporate norms.

7) The GM(ICT & MIS) shall ensure that the awardedwork/project shall be completed within the time framestipulated by M/s. PFCLtd {i.e. By the end of Sept. 2 15)

17

Page 18: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

20

BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

FUHTJ-JER RESOLVED THAT, subject to above, GM(P140Cj, BESCOMhe and is hereby authorized to issue necessary L01 and ratecontract: order on behalf of all ESCOMs as per tender con.dition.sand duly follotving the corporate nO,.,115.

Subject No. 68/10 : Procurement: of various types of polesrequired for Capex and other wades underRate Contract valid for a period of twoyears.

The followingdetails were submitted for perusal of Board,1 D t '1 f ti ti f bidde '8J. S 0 par lema Ion 0 1 ers

No. ofNo.of

81. Quantity in agenci bidd Name of the Ll qualifiedNo

Enq.No Lots Nos es er bidderspartici qualipated fied

1)Mj s Chamundeshvari

8 mtr PSC-Concrete Products,

103 Nos,9 mtrBangalore .

LOT-01 PSC: 13337 3 3 2) Mj s Malu Enterprises,

BESCOMjBCP- NosBangalore3) Mj s SB Products,

1 824j20 14- Banzalore15jBMAZ 1)Mj s Chamundeshvari

8 mtr RCC-228 Nos;

Concrete Products,LOT-02 9 mtr RCC - 2 2 BangaJore

17712 Nos2) M/ s GayathriConcreteProducts, Chikkaballapura1)M/ s Chamu ndeshvariConcrete Products,Bangalore

8 mtr PSC- 2) Mj s Akshaya Cement

LOT-01 7990 Nos, 9 4 l~Products, Bangalore

mtr PSC - 3) Mj s Rajvaibhav20389 Nos Enterprises Pvt. Ltd.,

Hosakote4) M/ s Shiva Concrete

2 BESCOM/BCP- Products, Turnkur825/2014-15/BRC 1) til/ s Chamundeshvari

Concrete Products,Bangalore

8 mtr RCC : 2) M/ s Akshaya Cement

LOT-02 4737 Nos, 9 4 4Products, BangaJore

rntr RCC - 3) Mjs Rajvaibhav13717 Nos Enterprises Pvt. ua..

Hosakote4) '(..IIjs Shiva ConcreteProducts, T,[!trnl<L1r

. ;'T

18

Page 19: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

21~t§ BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDDIESCO",,"

8.0 Mtr PCC : 1)M/ s Akshaya Cement4523 Nos,8 mtr PSC- Products, Bangalore

LOT-Ol 14600 Nos, 2 2 2) M/ s M/ s Stresscrete

9 mtr PSC- (India) Products, Bangalore

13611 NosBESCOM/BCP-

3 826/2014- 1) M/s Malu15/RMNG Enterprises, Bangalore

8 mtr RCC- 2) M/ s SB Products,

LOT-02 4046 Nos, 5 4 Bangalore9 mtr RCC- 3) M/ s Akshaya Cement4660 Nos Products, Bangalore

4) M/ s M/ s Stresscrete(India) Products, Bangalore

8.0 Mtr PCC : 1)M/ s Rajvaibhav

1058 Nos, 8 Enterprises Pvt. Ltd.,

mtr PSC- HosakoteLOT-O1 3553 Nos, 9 3 3 2) M/ s Gayathri Concrete

mtr PSC - Products, Chikkaballapura

22211 Nos 3) M/ s M/ s StresscreteBESCOM/BCP- _(India)Products, Bangalore

4 827/2014-15/Kolar 1)M/s Rajvaibhav8 mtr RCC - Enterprises Pvt. Ltd.,2938 Nos, Hosakote

LOT-02 9 mtr RCC- 3 3 2) M/ s Gayathri Concrete13012 Nos Products, Chikkaballapura

3) M/ s M/ s Stresscrete(India) Products, Bangalore1) M/ s Karisiddeshwara

8.0 Mtr PCC : Concrete Products,

900 Nos, 8 Davanagere

mtr PSC- 2) M/ S. Shiva ConcreteLOT-01 21120 Nos, 9 6 4 Product, Tumkur

BESCOM/BCP- mtr PSC- 3) M/ s Sree Industries,5 828/2014- 35345 Nos Tiptur

15/Tumkur 4) M/ s Vishava ConcreteProducts, Nelamangala

8 mtr RCC- 1) M/ s Vishava ConcreteLOT-02 4845 Nos, 9 4 2 Products, Nelamangala

mtr RCC- 2) M/ s Amba Industries,4920 Nos Tiptur

19

Page 20: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

22BAl'J'GALORE ELECTRICITY SUPPLY COMPANY LIlVllTED

1) Mis AmberkarPrestressed Prod ucts.Davanagere

8 mtr PSC - 2) lVlI s PKS Prestressed

26760 Nos, Concrete Products,LOT-Ol 9 mtr PSC - 6 4 Davanagere

8025 Nos 3) MI s Karisiddeshwara

6 BESCOM/BCP- Concrete Products,829/2014-15/DVG Davanagere

4) Mis Prakash Spun Pipe,Davanagere

8 mtr RCC- 1) Mis Karisidde shwara

8274 Nos,9 Concrete Products,LOT-02 mtr RCC- 2 2 Davanagere

9120 Nos 2) Mis Arriba Industries,Tiptur

2. The tender enquiry was invited on 11.12.2014 and technical bid wasopened on 16.01.2015,19.01.2015 and 21.01.2015 for enquiry 1&2,enquiry 3&4 and enquiry 5&6 respectively.

3. The computed FORDprice of the bidders against each item of Lot 1and Lot 2 were as under:

BMAZAREAL 1 F S 1 f 80 & 9 OMt P8C 1ot-: : 'or upp.y 0 s po es :

81. LsL BidderCornput ed FORD price in Rs.

No 8mtr PSC 9 mtr PSC Ranking

1 Mis Chamundeshvari 3344.67 3780.63 L1Concrete Products2 MI s Malu Enterprises 3344.67 3780.63 L1

3 Mis S. B. Products 3344.67 3780.63 L1

L 2 F S 1 f 8 & 9 RCC P 1ot- : '01' suppry 0 -' o es :

81. L-I BidderComputed FORD price in Rs.

No 8 mtr RCC 9 mtr RCC Ranldng

1MI s Chamundeshvari 4824.17 6495.19 L1Concrete Products

2 MI s Gayathri Concrete 4824.17 6495.19 LlProducts

Lot-I: For Srrpp y 0 , - . ·s •.::1 po es :

81. L-l BidderComputed FORD price in Rs.

No 8 mtr PSC 9 mtr PSC Ranking1- MI s Chamundeshvari

1 3344.67 3780.63 L1Concrete Products

21\,11 s Akshaya Cement 3344.67 3780.63 L1Products

3Nil s Rajavaibhav 3344.67 3780.63 Ll !Enterprises Pvt Ltd., -r----

BANGALORE RURAL CIRCLE:1 f B 0 & q OlVlt rsc 1

20

Page 21: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

23

B BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED••SCOM,----,_--:---:- --,- --,--- ----,- _

MI s Shiva ConcreteProducts 3344.67 3780.63 L1

L 2 8 1 f 8 & 9 RCC P Iot- :For uppy 0 o es :

81. Computed FORDprice in Rs.L-l Bidder

No 8 mtr RCC 9 mtr RCC Ranldng

1 MI s Charnundeshvari 4824.17 6495.19 LlConcrete Products

2 Mis Akshaya Cement 4824.17 6495.19 L1Products

3 Mis Rajavaibhav 4824.17 6495.19 L1Enterprises Pvt Ltd.,

4 MI s Shiva Concrete 4824.17 6495.19 LlProducts

L t 1 F SRAMANAGARA CIRCLE:

1 f 8 0 PCC & PSC & 9 OMt PSC Io - : lor upp.y 0 s po es

S1. L-l BidderComputed FORDprice in Rs.

No 8 mtr RanldngPCC

8 mtr PSC 9 mtr PSC

1Mis Akshaya 2844.39 3344.67 3780.63 L1Cement Products

2 MI s Stresscrete 2844.39 3344.67 3780.63 L1India Pvt Ltd

Lot-2 :For Supplj 0 & 9 RCC Po es:

81. Computed FORDprice in Rs.

NoL-l Bidder Ranldng

8 mtr RCC 9 mtr RCC

1 Mj s Malu Enterprises 4824.17 6495.19 , L1

2 Mis Akshaya Cement 4824.17 6495.19 L1Products3 Mj s SB Products 4824.17 6495.19 Ll

4 Mis Stresscrete India 4824.17 6495.19 L1Pvt Ltd

I f 8 1

I{OLAR CIRCLE:Lot- : For Supply 0 8.0 PCC & PSC & 9.0Mts PSC poles:

81. L-l BidderComputed FORDprice in Rs.

No 8 mtr PCC8 mtr 9 mtr RankingP8C PSC

1 MI s Stresscrete India 2870.12 3383.27 3819.23 L1Pvt Ltd.,

2 Mis Gayathri Concrete 2870.12 3383.27 3819.23 LlProducts

3 MI s Rajvaibhav 2870.12 3383.27 3819.23 LYlEnterprises Pvt Ltd

"21 Vi)t-

/I~ J_-)'-",I -,

rv . ,,\ . I: : ; _', .:

1 f

Page 22: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

24BANG.I\LORE ELECTRICITY SUPPLY CONIPAl\TYLIMITED ..

L t2 F' S I f 8 II 9 RCC P I0·-. : 'or uIT:Y 0 Ii o es :

81. Computed FORD price in Rs,

NoL-1Bidder

8mtr RCC 9 mtr RCCRanking

1 MI s Stresscrete India 4862.77 6546.65 L1Pvt Ltd

2 Mis Gayathri Concrete 4862.77 6546.65 L1Products

3 Mis Rajvaibhav 4862.77 65<:1·6.65 L1Enterprises Pvt LtdTUMKUR CIRCLE:

Lot-l: For Supply of 8.0 mtr PCC, 8.0 & 9.0Mts PSC poles:Computed FORD price in Rs.

81. L-1 BidderNo 8 mtr 8 mtr 9 mtr RanldngPCC PSC PSC

1 MI s Karisiddeshwara 2882.99 3409.00 3832.09 L1Concrete Products

2 Mis Shiva Concrete 2882.99 3409.00 3832.09 L1Products

3 Mis Vishava 2882.99 3409.00 3832.09 L1Concerete Products

4 MI s Sree Industries 2882.99 3409.00 3832.09 L1

L t 2 F 1 f 8 & 9 RCCP 1o -. :'or uppry 0 o es

81. L-1Bidder Computed FORD price in Rs.No 8 mtr RCC 9.mtr RCC Ranking

1 MI s Shivashakthi 4073.15 5103.65 L1Concrete Products2 M/ s Arnba lndu stries 4867.92 6533.79 L2

') Mis Vishava Concerete 4867.92 6533.79 L2J Products

The price bid of NIls Shiva shaktni Concrete Products, Tumkur has beeninvalidated. .due to submission of forged document in respect: of liquidassets clause, which was found subsequent to the investigation carried outby the T!igilance, BESCOM. The revised offer f01- LOT-02 is shown below (L2bidders become L1):

81. L-1BidderComputed FORD price in Rs.

No 8 mtr RCC 9 mtr RCC Ranking___.1 JVl I sAmba lndustries 4867.92 6533.79 11

L:__MI s Vishava Concerete 4867.92 6533.79 L1Products

,~I22. / ,.!¥ )/.: r:r-·~·-.,J -.r

Page 23: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

25e BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDDIlSC.OM

DAVANAGERE CIRCLE:Lot-I: For Supply of 8.0 & 9.0Mts P8C poles:

i81. Computed FORD price in Rs.

No L-1 Bidder RankingB mtr PSC 9 mtr P8C

1 Mis Prakash Spun Pipe 3396.14 3812.79 L1Manufacturers

2 Mis Amberkar 3396.14 3812.79 L1Prestressed Products

3 Mis PKSPrestressed 3396.14 3812.79 L1Products

4 Mis Karisiddeshwara 3396.14 3812.79 LlConcrete Productso - or up_p.IT 0 o es :

81.. Computed FORD price in Rs.

L-l Bidder RankingNo

8 mtr RCC 9 mtr RCC

1 MI s Karisiddeshwara 4869.20 6540.22 L1Concrete Products2 MI sAmba Industries 4869.20 6540.22 Ll

L t 2 F 8 I f 8 & 9 RCCP 1

Board perused the proposal and anriexures. The followingsignificant points were taken note of in this context.

1. Tender is for supply of RCC,PCC,PSCpoles to BMAZarea,· BRC,Kolar, Tumkur, Davanagere circles forCapex works, system improvement works, Gangakalyana works, regularisation of unauthorized IF setsetc.,

2. The proposal is to enter into rate contract withsuccessful bidder against each lot for a period of twoyears. Amount put to tender as per common SR 2014-15 amounting to RS.I0771.37 lakhs.

3. The necessary negotiations were made with successfulL1 biclclers to bring down the quoted pncesubstantially.

4. The poles can be procured on need basis by the fieldofficers for capex and other works of BESCOM.

23

Page 24: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

26.[; BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

5. The tender scrutiny committee recommended onscrutiny of proposal for procurement of 281734 Nosvarious types of poles.

6. Tenders have been processed and evaluated inaccordance with the provision of KTPPAct and auditedby GM(IjA).

Board debated the matter. It was observed that all the biddershave quoted uniform L1 rate and necessary negotiation meetings wereheld as per norms with L1 bidders. As there is urgent need for polesin the field for the works indicated above, it was felt necessary andappropriate to consider the bids on rate contract. However as furtherobserved, all the L1 bidders have agreed for negotiated prices asunder:

Cost of procurement:-BMAZ

Total cost

81. Type ofQuantity (atof poles Negotiated Price negotiated

No poles tendered price) inLalths

1 8 mtr PSC' 103 3269.82 3.372 9 mtr PSC 13337 3780.63 504.22

TOTAL: LOT -01 (PSC) 13440 507.593 8 mtr RCC 228 4776.75 10.894 \ 9 mtr RCC 17712 6449.83 1142.39

TOTAL: LOT-02 (RCC) 17940 . 1153.28TOTAL 31380 1660.B8

-.-- Total cost

81. Type ofQuantity Negotiated

(at

No polesof poles Price

negotiatedtendered price) in

Lakhs

1 8 mtr PSC 7990 3269.82 26l.26'I 9 mtr PSC 20389 3780.63 770.83~

TOTAL: LOT -01 (PSC) 28379 1032.093 8 rntr RCC 4737 4776.75 226.274 9 mtr RCC 13717 6449.83 884.72

TOTAL: LOT -02 (RCel 18454- 1111.00TOTAL 46833 2143.09

---_.

BRC

2.4

Page 25: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

i~'"",l(y'''' j ':'a SZ,,,~~;.;.;,'\'" .. ' t>,,(1 '/JIll,

10'1090 081L9 'JV.LOLLL'B179 99L6 (:J:JtI) eo-aoi :lVlOl88'LI8 88'6"b"b9 0(,;6t :J:JtI .ntn 6 S8"b'18(,; SL'9LLi7 St8t :J:JtI .ntn 8 t

9'17'0900 998L9 bSd) 10-l01 :1VlOl9(';'9881 89'08L8 St8SS :JSd .ntn 6 S6S'069 (,;8'69(,;S 0(';11('; :JSd .ntn 8 (';09'S(,; 6£:-tt8('; 006 :J:Jd .ntn 8 1

SlP[-e'Jul [aoprd

;;JOPdparapuaa sojod ONP;;Jl-eHo~au sojod JO

l-e) pal-eHo~aNAlHu-enO JO ad£.L 'ts

lSOO l-elo.L

89'9961 0LL0V 'IV.LOL69'6L6 09691 b:JtI) zo-ror :1VlOlS(';'6S8 S8'6tt9 (,;10ST :J:JtI .rrtn 6 StS'Otl SL'9LLi? 8S6(,; :J:JtI .ntrr 8 "b66'986 00890 bSd) 10-l01 :1VlOl(,;L'6S8 S9'08LS 11(';(';('; :JSd .ntn 6 881'911 (';8'69(';8 SSSS :JSd .ntn 8 (';

60'OS 6S'i?i?8'0 8S01 :J:Jd .ntn 8 1Stp[u'J

U1 [aojrdaOPd

parapuoa sojod ONpal-en,o~au sojod JOlll) pal-eHo~aN AlHullno

JO adAj, 'tsasoo 11l:j.0.L

·3'J::>'MIJ UV'10JI

9'17''17191 0'17'171'17 'JV.LO.L£8'£6'17 90LS b:JtI) zc-ao'i :1VlOl9S'OOS S8'6tt9 099t :J:JtI .ntn 6 tL(';'S61 SL'9LLt 9tOt :J:JC[I+U1 8 S

£9'0011 v8L0£ bSd) 10-l01 :1VlOl8S'tlS S9'08LS 11981 :JSd I+U1 6 86S'LL"b (';8'69(';8 009tl :JSd I+U1 8 z£9'8(';1 6S'tt8(,; 8(,;St :J:Jd I+U1 8 1slpfu'1ut (aolld

aOPdparapuca sojodpalUnO~au

palUnO~aN sayod JO JO adA.L ON °IS

IluI AlHUllnO

lSOO llllOl. 3'J:::>'MI::>VMVDVNVWV1I

a~.LIWI'I ANVdWO;J A'IddnS .A..LI3H:LL33'I3 3H01:VDNVH tiEOfii!>C"t.""Z

Page 26: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

28

BANGALORE ELECTRICITY SUPPLY COMPANY LIlVHTEDDAVANAGERE CIRCLE'

I Quantity Total costSl. Type of Negotiated (negotiateNo poles of poles Price d] in

tendered Lalrhs1 8 mtr PSC 26760 3269.82 875.002 9 mtr PSC 8025 3780.63 303.40

TOTAL:LOT-01 (PSC) 34785 117BAO3 8 mtr RCC 8274 4776.75 395.234 9 mtr RCC 9120 6449.83 588.22

TOTAL:LOT-02 (RCC) 17394- 983.45TOTAL 52179 2161.85

GFU\.JlfD TOTAL:193525 6877.14-

LOT-01LOT-02 88209 5269.92

GI{AND TOTAL (LOT- 281734 12147.0701 J31i 02)

Since the bidders have accepted the negotiated rates GM(Proc)shall be authorized to issue necessary rate contract order for a periodof two years as per tender conditions subj ect to prices are variable inrespect of steel and cement. However for allowing price variation,BESCOM shall keep the base. price collecting only from designatedmanufacturers of steel and cement.

Approving the proposal, the followingresolutions were passed inthis context:

RESOLVED TI-lAT, f01' the reasons explained, GM(Proc)be and ishereby authorized to offer the following all inclus'iv€ negotiatedrate in respect: of the follow'iny proposal for supply of Ree} pccand PSC poles under rate contract valid for a period of twouears as brouqht: out hereunder.

'--'

Negotiated

Type Approxi all inclusiveSubject Enquiry LOT of

mate Name of the L1 unitFIo No. poles

quantity qualified bidder computedtendered FOH.D price

in Rs.

1) M/s Chamundeshvari 3269.82

68/10,BESCOM/ LOT- 8 mtr

Concrete Products, ( Rs.ThreeBCP- 103 Bangalore thousand

BMAZ 824/2014-01 PSC 2) M/ s lVlalu Enterprises, two hundred

15/BMAZ Bangalore sixty nine 80,26 \l'll~),.I pi ',_/>\/-j.~ \1 ,/

Page 27: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

29e BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED.E$COM-

3) M/s SB Products, eighty twoBangalore ps.only)

3780.63~Rs.Three

,

thousand9 mtr 13337 sevenPSC hundred

eighty &sixty threeps. only)4776.75[Rs.fourthousand

8 mtr 228 sevenRCC hundred

1)M/s Chamundeshvari seventy sixConcrete Products, 8liseventy

LOT- Bangalore five ps.only)02 2) M/ s Gayathri Concrete 6449.83

Products, ~Rs.SixChikkaballapura thousand

9 mtr 17712 fourRCC hundred

forty nine &eighty threeps.only)3269.82IRs.Three

8 mtr 1)M/ s Chamundeshvari thousand7990 two hundredPSC Concrete Products, sixty nineSsBangalore eighty two2) Mj s Akshaya Cement ps.only)LOT- Products, Bangalore

3780.6301 3) M/ s Rajvaibhav~Rs.ThreeEnterprises Pvt. Ltd.,

Hosakote thousand68/10, BESCOM/ 9 mtr 20389 4) M/ s Shiva Concrete seven

BCP- PSC hundredBRC 825/2014- Products, Tumkureighty &

15/BRC sixty three.. ps.only)

1)M/ s Chamundeshvari 4776.75Concrete Products, IRs.FourBangalore thousand

LOT- 8 mtr 4737 2) M/s Akshaya Cement seven02 RCC Products, Bangalore hundred

3) Mj s Rajvaibhav seventy sixEnterprises Pvt. Ltd., & seventyHosakote five,lPs.only)

1;[27 /'tT)..

, I

( ; '1~:.,"'-,'._~)(0 ~1 j ,.~\ '! il,'" [I. -r>\/'.;: "':','._..

Page 28: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

BANGALORE ELECTRICITY SUPPLY COIVIPANYLIMITI~D644.Y.S3 '---J.

(Rs.Sixthousand

fauxhundred

forty nine liz;eighty three

ps.only)

9 mtrRCC 13717

4) M/ s Shiva ConcreteProducts, Tumkur

68/10,Kolar

BESCOM/BCP-

827/2014-

8 mtrPCC 4523

LOT- 8 mtr01 PSC 14600

LOT-01

9 mtrPSC

8 rntrRCC

9 mtrRCC

8mtrPCC

13611

4046

4660

1058

28

1)M/s Akshaya CementProducts, Bangalore2) M/s M/s Stresscrete(India) Products,Bangalore

2844.39(Rs.Twothousand

eighthundred

forty four &thirty nine

~s.o111y}___3269.82.(Rs.Threethousand

two hundredsixty nine &eighty twoliS. only)

68/10, BESCOM/Raman BCP-agara 826/2014-

15/RMNG

3780.63(Rs.Threethousandseven

hundredeighty &

sixty threeI--_-+__ -+ -I- -I-~I)s.only)

47'76.75(Rs.Fourthousandseven

Iiundre dsuverrty sixliz; seventy

five ps.only)6449.83(Rs.Six

thousandfour

hundredforty nine &eighty threeps.onlYL_

1)M/ s Rajvaibhav 2.844.39Enterprises Pvt. Ltd., [Rs.TwoHosakote thousand2) MI. Gayathri Concrete I ,f/,:ight

) if / ''ifri [,I.' I

1)M/ s Malu Enterprises,Bangalore2) M/s SB Products,Bangalore

LOT-02 1----1-----1 3) M/s Akshaya CementProducts, Bangalore4) M/s M/S Stresscrete(India) Products,Bangalore

30

Page 29: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

31

~QBANGALORE ELECTRICITY SUPPLY COMPANY LIMITED15/Kolar Products, hundred

Chikkaballapura forty four &3) Mis Mis Stresscrete thirty nine(India) Products, ps.only)Bangalore 3269.82

(Rs.Three

8 mtr thousand

PSC 3553 two hundredsixt-y nine &eighty twops.only)3780.63(Rs.Threethousand

9 mtr 22211 sevenPSC hundred

eighty &sixty threeps.only)4776.75(Rs.Fourthousand

8 mtr 2938 1) Mis Rajvaibhav sevenRCC hundredEnterprises Pvt. Ltd., seventy sixHosakote

2) Mis Gayathri Concrete & seventyLOT- Products, five ps.only)02 Chikkaballapura 6449.83

3) Mis Mis Stresscrete (Rs.Six

(India) Products, thousand9 mtr fourRCC 13012 Bangalore hundred

forty nine &eighty threeps.only}2844.39(Rs.Twothousand

8 mtr 900 1) MI s Karisiddeshwara eightPCC Concrete Products, hundred

BESCOMI Davanagere forty four &

68/10, BCP- LOT- 2) M/ S. Shiva Concrete thirty nine

Tumkur 828/2014- 01 Product, Tumkur ps.only]3)M/ s Sree Industries, 3269.8215/Tumku Tiptur (Rs.Threer

8 mtr 4) M/ s Vishava Concrete thousand

PSC 21120 Products, Nelamangala two hundredsixty nine &eighty twops.only]

k~29 \/7/:).: -s.>- ,/,1' . "

I. /F~l!iq~.\, j. ",••. :.,, __ " =. :

Page 30: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

32.BANGALORE ELECTRICITY SUPPLY COMPANY LIlVnTED

3780.63IRs.Threethousand

9 mtr 35345 sevenPSC hundred

eighty &sixty threeps.only)4776.75IRs.Fourthousand

8 mtr 4845 sevenRCC hundred

seventy six1) M/ s Vishava Concrete & seventy

LOT- Products, Nelamangala five ps.only)02 2) M/ sAmba Industries, 6449.83

Tiptur IRs.Sixthousand

9 rntr 4920 fourRCC hundred

forty nine &eighty threeps.only)3269.82IRs.Three

8mtr 1) M/s Arnberkar thousand

PSC 26760 Prestressed Products, two hundredDavanagere sixty nine &2) M/ s PKSPrestressed eighty twoConcrete Products, ps.only)Davanagere 3780.633) M/ s Karisiddeshwara (Rs.ThreeConcrete Products, thousand

9 mtr 8025 Davanagere sevenPSC 4) M/s Prakash Spun hundred

68/10, BESCOM/ Pipe, Davanagere eighty·BfiDav811.a BCP- sixty threegere 829/2014- ~YL.__

15/DVG 4776.75[Rs.Fourthousand

8 mtr 8274 1) M/s Karisiddeshwaraseven

RCC hundred.LOT- Concrete Products, seventy six02 Davanagere & seventy

2) M/s Amba Industries, five ps.only)Tiptur 6449.83

9 mtr 9120 [Rs.BixRCC thousand

t ~ ;flOUr.,---, '--j .

30 iy< )-r j • !: /

I/I

Page 31: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

33

-e BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDBEseOM

hundredforty nine &eighty threeps.only) i

FURTHERRESOLVED TIIAT, subject to above nESCOM be and ishereby authorized to allocate equal quantities among the L1bidders.FURTHER RESOLVED THAT, subject to the acceptance ofnegotiated prices by L1 bidders GM(Proc),BESCOM be and ishereby authorized to issue necessary rate contract order as pertender conditions and corporate norms.

Subject No. 68/11 : Recruitment of Assistant Accounts Officers," Assistant Engineers (Ele), Assistant

Engineers (Civil) in BESCOMRegarding.

The followingwere submitted for the perusal of Board.

l. In BESCOMjurisdiction there are 28 O&MDivisions, whichare responsible for distribution of electricity and maintaininguninterrupted power supply. The utility has to capture andmaintain various financial and commercial transactions fromthe field offices. Besides there are 3 Zones, 9 Circles, 3 MTDivisions, BESCOM stores and other offices. As against thesanctioned strength of 17,725 personnel, 11545 Nos areworking and there are vacant posts to all extent of 6180 i.e.,about 350/0 posts are vacant.

2. BESCOMis facing acute shortage of man power and there isconsiderable growth every year in the consumer base, lengthof HT and LT lines, number of transformers installed,stations commissioned etc., maintenance of these assets andthe day to day functions have become very difficult due toshortage of essential staff.

3. BESCOM is facing acute shortage of Assistant AccountsOfficers also, which is supervisory cadre. It has become verydifficult to implement service and quality standards specifiedby KERC "standards of performance" at the cJjivisionlevel. f-_.::::- ,.:..::_ )"

11. lJj i I!.':::.,lV Hl'dcu",31

Page 32: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

34.

BANGALOR.EELECTRICITY SUPPLY COMPANY LIMITED

The followingwere explained to the Board:-

1. 10 Nos of Assistant Accounts Officers were recruited in themonth of Jan.20 15. This SIll. all number of officers areinsufficient to cater the needs of 28 O&M divisions acrossBESCOM due to increased growth of workloadsubstantially.

2. The vital area of handling revenue and revenue accountsare presently entrusted to the Assistants / Senior Assistantsand quality of 'work is not at expected level.

3. The services being given to consumer is not meetingexpected level at some sub divisions in respect of revenuerecovery and revenue accounts maintenance relatedissues and to implement service standards.

4. While approving the revision of tariff during Nov.20 1<:j.directions were given by KERC to fill up at least 50% ofvaC811.tposts is ESCOMs.

Board debated the proposal. It was felt that the problem ofmanpower shortage has to be tackled within the framework ofcompany H.R. policy 8.11.drecruitment and promotion regulationsprevailing. Relaxation of R&Pregulations for direct recruitment as anone time exception measure to recruit 100 Nos of Asst. AccountsOfficers be allowed. On perusal of data placed before the Board, thefollowingresolutions were passed in this context.

R.ESOLVEDTfIAT, for the reasons explained, approval be and ishereby accorded to MD, BESCOM to recruit 100 Nos of Asst.Accourrrs Officers on. direct recruitment in accordance with therecruitment: procedures in for-ce on one time relaxation to R&Prequlatiotu: for the cadre of AAOs only.RESo.LVED FURTI-IER TliAT, the G1VI(A&I-IR)'is authort.zed to takeup further necessary steps for recruitment process uiithin theframe uiork: of relaxed. R&P Regulations and companurecru.itrnetit: pol'icy in force for the cadre of llAOs. , I/!i "UiLJ,'<,

-~'I/.1 )'.~~.L, ,i/, .'~~i" . itIi ,/":'Ir

32.

Page 33: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

35M; BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED."SCOM

Subject No. 68/12: Enquiry No.BESCOM/BCP843/2014-15floated for execution of Action Planworks on total Turnkey basis underRate Contract in BMAZ Jurisdiction fora period of two years on percentagequoting basis.

Broadly the followingwere submitted:

1. Tender for execution action plan works on totalturnkey basis under rate contract in BMAZjurisdiction was floated through e-procurement portaland was notified in news papers duly followingprovisions under KTPPAct.

2. The scope of the action plan works covering supply,erection, testing and commissioning as under:

(a)Providing RCC/PSC/PCC/Spun poles(b)Providing HT/LT Under Ground Cables(c)Providing HTAerial Bunched Cables(d)Providing of HT/ LT Lines uSlng

Coyote/Rabbit ACSR contractor and otherrequired accessories.

(e)Providing Das compatible Ring Main Units(RMUs)/Outdoor Units (ODs).

(f) Providing Single Break 200A/Double Break400A GOS

(g)Providing Single. Pole/Double Pole/Triple. Pole Structure materials.

(h)Providing 500/250/100/ 63kVA, DistributionTransformers

(i)Providing LT Feeder Pillar Boxes of. 8/12ways.

3. Two agencies have participated in the bid. Technicaland financial evaluation was clone on 23.02.2015 and25.02.2015 respectively.

4. Tender for the subject work floated vide enquiry No.BESCOM/BCP843/2014-15 (2nd call) throug}1e-procurement portal. 33 /(j:)

(9-I,-;{: !I/ffn)'[I.'~;~)O~j

Page 34: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

36

~L:~llANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDDIi~O:o:)M

The Board perused the followingand annexures placed:

(a)The tender was called on percentage quoting basis forexecution of action plan works on total turnkey basisunder rate contractlamount put to tender Rs. 250crores). The single qualified bidder namely M/3. AsianFab Tech. Ltd., Bangalore has quoted as noted below:

Amount put to All inclusive All inclusivetender as per percentage evaluated priceName of the common SR 2014-

Firm 15 including quoted w.r.t. w.r.t.% quoted Ranldng

loading factors in amount put for-supply &

Rs. to tender erection in Rs.-

MIs.Asian Fab SingleTech.Ltd., 1,72,23,644.67 (+)19.85% 2,06,42,537.33 qualifiedB'lore bidder

(b)The proposal was discussed at 79th CPC meeting held on07.03.2015 in the matter of awarding rate contract for twoyears duration.

(c)The Chief Engineer (Ele), BMAZ vide letter No.dated05.05.2015 has expressed the view that the action plan.works in BMAZ area is to be awarded on total turnkeybasis including supply of distribution transformers for theworks instead of partial turnkey basis in order to avoiddelay in completion of the works and there is justificationfor awarding on total turnkey basis.

(el) The proposal was evaluated duly following the provisionslaid down under KTPPAct. The tender carries P.V.clauseas per relevant IEEMA/CACMI formula for supply. ofU.G.Cable, distribution transformer, ACSRconductors.

(e)The tender scrutiny committee recommended the offer ofM/S. Asi8J.1.Fab Tech. Ltd., to consider as the same IS

techno commercially responsive.(n The proposal was auditecl by the GM(I/A),BESCOM.

Board debated the matter. Managing Director further'explained the details. Itwas noted that previous year also BESCOMhad floated the tender for execution of action plan works of I! ~(1)tal

34 i r II'II!!..j'li '\f"./. 'if T, .i .;/

f'j

Page 35: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

37

e BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED"'SCOM

turnkey basis under rate contract only in BMAZ area. Board feltthat these works are very significant from the point of view ofensuring continuous power supply to consumers. It was noted thatsince the award of work is on rate contract basis, the exactexpenditure towards the same C811.notbe estimated at this point oftime since the work will be taken up on need basis at the field level.

The proposal was debated at length. The Board felt that, in thepresent circumstances prevailing at field level there is an utmostneed for carrying out action plan works. Agreeing to the proposal forrate contract for a period of two years duration, limiting the budgetto Rs.250 crores plus 19.85% being tender premium, the following

'" resolution was passed.

RESOLVEDTHAT, approval be and is hereby accorded to awardthe work of execution of action plan, on total turnkey basisunder rate contract in BMAZ jurisdiction against EnquiryNo.BCP-84312014-15to L1 qualified bidder Mis. Asian Fab Tech.Ltd., Banqalore at its. following all inclusive quoted ratessubject to the conditions brougItt out hereunder:

SUPPLY PORTION:-

Total cost81. Item Description Unit Qty FORD IAllNo. inclusive)

rate Rs.Supply of llKV /433 Volts, 63 INA, Aluminium

1 Winding 3 Phase BEE 3 Star rated Distribution No 1 139609.90Transformer with Oil.

Supply of 1lIN /433 Volts, 100 INA, Aluminium2 Winding 3 Phase BEE 3 Star rated Distribution No 1 186436.86

Transformer with Oil

3 Supply of l1KV/433 Volts, 250 KVA, 3 Phase No 1 302683.57Distribution Transformer with oil

4 Supply of 1lIN /433 Volts, 500 KVA, 3 Phase No 1 479478.20Distribution Transformer with oil

5 Supply of 11 mtr prestressed tubular spun pole No 1 20119.82designed for working load of 500 kgs.

35

f.lIL~Hn'_·i:n~·/~·:~.;-·,~~.)ri~~

Page 36: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

38BANGALORE ELECTRICITY SUPPLY COMPANY LIlVHTED

6Supply of 11 KVclass SICNComposite/Polymeric No 1 215.20Pin Insulator

7 Supply of 45 KNPolymeric type Insulator No 1 382.02

8Supply of Lightening Arrestors 9kV,5kA, Polymeric No 1 1482.24type

9Supply of Horizontal Cross arm with HT ST No 1 571.76Supports, Pole Clamps, bolt, nuts & washers.

Supply of Gl Grounding pipe, B - Class, 40mm10 dia, 2,5mtrs long, 2,9mm. thick with bolts nuts,GI No 1 770,41

Strips and washers complete,

11 Supply of llKV 200 amps single break GOS Set 1 9321.33

12 Supply of l1KV 400 amps double break GOS Set 1 20969.18f-----.

13Supply of H frame and all other accessories for Set 1 5373,77l1KV GOS (G.1)

14Supply of LTDistribution Box for 100/250 kVA Set 1 31472.24DTCwith MCCB's (SMCtype).

15 Supply of LTprotection kit Set 1 2138,05

16 Supply of SMCMetering Box for DTC No 1 5787.63

Supply of LTElectronic Tri - Vector Meter 5A,--

17 No 1 3820,22Class-0.5 accuracy

18Supply of LTCT Ratio - 100/5A, Class-0.5 No 1 578.13Accuracy, 3.7S VA,Ring type

19Supply of LT CTRatio - 150/ SA,Class-O.5 No 1 434,23Accuracy, 3.75 VA,Ring type

20Supply of LTCTRatio - 400/SA, Class-0.5 No 1 509.36Accuracy, 3,75 VA,Ring type

21 Supply of MS Fish plate Nos 1 75.13

22Supply of 2 Pin Cross Arm with pole clamp, bolt & Nos 1 254.68nuts & washers for RCC Pole - MS

23Supply of Heavy duty long barrel Copper Terminal Nos 1 127.34of95 Sqmm

24Supply of Heavy duty long barrel Copper Terminal Nos 1 356.5501'240 Sqrnrn

25Supply of Heavy duty long barrel Copper Terminal Nos 1 865.92of 400 Sqmm

26 Supply of 7/10 SWGGuy Wire Kg 1 82.30

27 Supply of 8 SWGG.I.Wire Kg 1 79.96

28 Supply of Alkathane Tube Coil 1 636.70

29 Supply of Caution and Danger Board Nos 1 /152.81_L._

36

Page 37: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

39e BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDa.COM --I

30 Supply of GI Barbed wire (12mtrs/Kg) Each 1 92.96\

31 I Supply of PG Clamps for Rabit to Rabit Conductor Nos 1 11333

32 Supply of PG Clamps for Coyote to Coyote Nos 1 351.46Conductor

33 Supply of GI Pipe 100mm dia Mtr 1 1455.51

34 Supply of PVCPipe 150mm dia Mtr 1 370.56

35 Supply of PVCPipe 25mm dia Mtr 1 34.38

Supply of 3 Way Compact RMU, 20D + 1VL,One

36 Incomer + One Breaker + One Outgoing, 350MVA, Unit 1 941624.07650Amps (VCB/ SF6 Type)with Al Busbar (DAS ,compatible)

Supply of 4way Compact RMU, One In comer +

37 Two Breakers +one out going (2 OD + 2 VL),350 Unit 1 1337547.72MVA,650A, (VCB/ SF6 Type) with AlBusbar(DASCompatible)

Supply of 5way Compact RMU,One In comer +

38Three Breakers +one out going (2 OD + 3 VL),350 Unit 1 1726419.25MVA,650A, (VCB/ SF6 Type) with AlBusbar(DASCompatible)

Supply of 6Way Compact RMU,One In comer +

39 Four Breakers +one out going (2 OD + 4 VL),350 Unit 1 2115290.78MVA,650A, (VCB/ SF6 Type) with Al Busbar(DASCompatible)Supply of 11 KVClass, 1 OD RMU Compact

40 RMUs, (VCB/ SF6 Type)with Al Busbar (DAS Unit 1 338815.21Compatible)

Supply of 11 KVClass, 1VLRMUfor41 350MVA,650ARMUCompact RMUs, (VCB/ SF6 Unit 1 395923.65

Type) with AlBusbar (DASCompatible)

42 Supply of grounding set (40 mm. Rod Earthing) as Set 1 2546.81per specifications.Supply of Compact Pre-fabricated Packaged Sub-station llkv / 433V consisting of 3 way SF6/VCBinsulated compact RMU, copper wound

43 transformer and L.T. section with one ACBas Nos J 2558687.01. incoming and 7 No outgoing MCCBfeeders, and.with encloser made of electronically GalvanizedWith 500 kVAoil cooled transformer

44 Supply of UG Cable of round armoured and km 1 859689.30pressure extruded 11KVClass XLPE 3x95 sq.mmA )

37 it~~~ )

i .;j

'.(: :.;' .. r."[,.,,,

1/

Page 38: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

40

BANGAI.OH.E EJdECTRICITY SUPPLY COMPANY LIMITED

45 Supply of UG Cable of.round armoured and km 1 1629896.~4 \pressure extruded 11KVClass XLPE3x240 sq.mm I

46 Supply of UG Cable of round armoured and kill 1 2566193.74pressure extruded 11KVClass XLPE3x400 sq.mm

Supply of Heat Shrinkable Straight through joint "47 kits for 3x95 sq.mm. XLPEUGCable. Nos 1 6844,56

48 Supply of Heat Shrinkable Straight through joint Nos 1 8347.18kits for 3x2L~0 sq.mm. XLPEUGCable,----

49 Supply of Heat Shrinkable Straight through joint Nos 1 10250.91kits [or 3x400 sq.mm. XLPEUGCable,

50 Supply of outdoor type Heat Shrinkable Nos 1 3807.49Termination Kits for 3x95 sq.rnm. )eLPECable.

51 Supply of outdoor type Heat Shrinkable Nos 1 4979.02Termination KIts for 3x240 sq.mm. XLPECable.

52 Supply of outdoor type Heat Shrinkable Nos 1 5017.22Termination Kits for 3x400 sq.mrn. XLPECable.

53 Supply of indoor type Heat Shrinkable Nos 1 3505.68Termination Kits for 3x95 sq.mm. XLPECable.

54 Supply of indoor type Heat Shrinkable Nos 1 4393.25Termination Kits for 3x240 sq.mm. XLPECable.

1---'

55Supply of indoor type Heat Shrinkable Nos 1 4507.86Termination Kits for 3x400 sq.mm. XLPECable.

56 Supply of Cable Covering Tiles 125x250x40 mm. Nos 1 12.73

57 Supply of River Sand Cmt 1 2546.81

58Supply of R.C.C. Hume pipes 150 rnm. dia 2000 Nos 1 483.89mm. long with Collars for 150mm, Dia Hume pipe.

-- -_ .._.-

Supply of G.l. Pipe of Class B, 150 Dia mrn. for59 Cable raising at Transformer centre/ Mtr 1 1456.78

DPstructure/ drainages,etc,.

60 \ Supply of Cable route & joint indicating stones. No i 152.81L--._. __

38

Page 39: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

41e BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED"iI!E5COM

I Supply of RCC Pole - 8 Mtr Long, 115 KgWL II61 No. 1 5506.21

62 I No. 1 2925.01I I Supply of PCC Pole - 8 Mtr Long, 140 KgWL

63 Supply of RCCPole - 9 Mtr Long, 145 KgWL No. 1 7565.30

64 Supply of PSC Pole - 9 Mtr Long, 200 KgWL No. 1 4174.23

65 Supply of PSC Pole - 8 Mtr Long, 200 KgWL No. 1 3583.37

66 Supply of RCCPole - 9 Mtr Long, 150 KgWLSqNo. 1 918l.25Section

Supply of l1kV, HTAerial Bunched Cable of size67 3x95+lx70 Sqmm (Bare/Insulated messenger Krn 1 892428.57

wire)Supply of l1kV, HTAerial Bunched Cable of size

68 3x120+1x95 Sqrrun (Bare/Insulated messenger Km 1 103320l.08wire)

69 llkV, ABCable Straight thru' joint kit suitable forNo 1 3772.5795 - 120 Sqmm

70 llkV ABC- T Jointing kit 95 - 120 Sqrrun No 1 4784.7271 llkV ABCTermination kit 95 - 120 Sqrrun No 1 2392.3672 Surge Arester No 1 1022.5073 Ground Connection for Messenger Wire No 1 154.82

74 Anchor Sleeve for Messenger Wire No 1 28.78

75 Single Phase Distribution Box for 20 Connections No 1 2300.35

76 Three Phase Distribution Box for 6 Connections No 1 2530.38

77 Supply of Guy sets complete Set 1 1088.77

78 Supply of Spiral earth electrode Nos. 1 303.08

'" 79 Supply of Coyote ACSR conductor Ian. 1 11952l.91

80 Supply ofRabbit ACSRConductor krn. 1 46874.08

81 Supply ofWedge connector for Rabbit to RabbitNos. 1 180.83ACSRconductor

82 Supply of EG Stirrups (MS)with GI wire lacing Nos. 1 269.96

83 Supply of Concreting materials For Guy SetsNos. 1 178.28(without cement)

84 Supply of Concreting materials 1:2:4 For PolesEach 1 2782.39Supports

85 Supply of 4 pin cross arms with pole clamps boltsNos. 1 404.95nuts and washers

86 Supply of Pin Insulators 1.1 KVclass withNos. 1 52.21G.I.Pins, Nuts & Wahesrs

,187 Supply of 8 Strain Insulators Nos. 1II ,', //17.83

39 ,4fL1A-L)rJ../ ....""....'I,' 7IH:;fl

I ~:i .:. ' . ~ t .-} [\':"J

Page 40: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

42r.:t,~h-P~ BANGALORE ELECTRICITY SUPPLY COMPANY LIJVHTED

88SlJPply of llkV Class, HG Fuse Unit with Solid' Set 1

\ 1109 14Core Insulators (Set/3 Nos).

89Supply of Special 3 Pin.X-arm with brace, Fish Set 1 972.88 Iplates, clamps, bolts & nuts complete

---- --90

Supply of 2 Pole TC Structure materials for Set 1 18591.73100/ 300kVATransformer - MS

Supply of 2 PoleTC Structure materials for91 25/63kVA Star Rated Transformer with H Frame - Set 1 15599.22

MS

92 Supply of llkV DOLOCutouts REC Specification Set 1 4324.':J.9

Supply of Guarding materials for road crossing in .93 between HT&LTLines & telephone line crossing Mtr 1 678.72

etc.( average span of 40 mtrs.)

94 Supply of LTfeeder piller Box 8 WAYwith cutouts Set 1 50936.25

95Supply of LTfeeder piller Box 12 WAYwith Set 1 61123.50cutouts

96 Supply of LT Line spacers No 1 52.21_.

97 Supply of LTspacer for TCWiring No 1 30.56

98Supply of Armoured LTUG Cable. 1.1KVClass Km 1 "1·32562.093.5x95 sq.mm

99Supply of Armoured LTUG Cable 1.1KVClass km 1 548718.393.5x150 sq.mm

100Supply of Armoured LTUG Cable 1.1KVClass km 1. 957523.833.5x240 sq.mm

Single H Frame with Transformer Seating and101 Seating angle support X arm for 11 mtr Spun Pole Set 1 12869.04

for 63/l00/250/500kVA (OHLine) - MS_- ._.

~3ingleH Frame with Transformer Seating and102 Seating angle support X arm for 11 rntr Spun Pole Set 1 1.6311.06

for 63/ 100/250/500kVA (OHLine) - Gl_.

Three H Frame with Transformer Seating and103 Seating angle support X arm for 11 mtr Spun Pole Set 1 20634.27

for 63/ 100/250/500kVA (UGCable) - MS

Three H Frame with Transformer Seating and104 ~3e8tingangle support X arm for 11 rntr Spun Pole Set 1 2622<+.52

for 63/ lOO/250/500kVA (UGCable) - GI

TOTAL SUPPLY COST 20061631.50I

40

r 1/J\W~<Ulr "J" I

Page 41: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

43.a BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDD8Ii~OM

ERECTION PORTION:-I Total cost

I S1. Item Description Unit qty FORD (AllNo. inclusive)

rate Rs.

1 Erection of 63 KVA,3 Phase 3Star rated No 1 1143.45Distribution Transformer with oil

2 Erection of 100 INA, 3 Phase 3Star rated No 1 1526.49Distribution Transformer with oil

3 Erection of 250 KVA, 3 Phase Distribution Each 1 2290.69Transformer with oil

4Erection of 500 INA, 3 Phase Distribution Each 1 3052.99Transformer with oil

5 Fixing of LTDistribution box for 100/250/500 No 1 764.20KVADTCs (Excluding wiring)-~6 Fixing ofHorizontal Cross arm with HT ST Set 1 166.87Supports, Pole Clamps, bolt, nuts & washers

7 FLung ofPipe type of earthing with 40mm ilia No 1 195.322.5rnm thick and 2.5mts. Class B GI pipe

8 Erection of 1lIN GOS 200 amps single break Set 1 1067.60

9 Erection of 11KV GOS 400 amps double break Set 1 1185.17

10 Erection of 11KV GOS H frame and all other Nos 1 320.47accessoriesErection ofWiring of One circuit of LTWiring forfor 25/63/100 INA DTCto the existing LT

11 protection Kit/Distribution Box via metering box. Set 1 953.83(includes fixing of necessary supports like 2 Pin X-arms, Spacers etc)Erection ofWiring of Two circuits of LTWiring forfor 25/63/100 KVADTC to the existing LT

12 protection Kit/Distribution Box via metering Set 1 1526.49, box.(includes fixing of necessary supports like 2Pin X-arms, Spacers etc)Erection of One Circuit of LTWiring for 250/500

13 KVATransformers via metering box. (includes Set 1 1221.20fixing of necessary supports like 2 Pin X-arms,Spacers etc)

14 Releasing and replacing of 11KVpin insulator No 1 47.41

15 Releasing and replacing of 1lIN Dead End . No 1 56.89Insulators Disc, Strain etc

16 Fixing of LT Protection Kit Set 1 343.23

17 Fixing of lightening arrestors 9KV, 5KA(Set/3 Set 1 119.47Nos.)

18 Fixing ofSMC Metering Box No. 1 197r·81;'

tI ,II41

Page 42: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

44tj::~BANG.A..LOREELECTRICITY SUPIJLY COM:PANY LHVlITEDOFSCOM

19Fixing and Wiring of Single/Three Meter phase No. 1 170:67meter on the existing meter board

20 FIxing of 2 Pin X arm Nos 1 161.19

'21 Erecti')Jl of Anti Climbing Divice, Gf Barbed Wire No 1 43.61J 12 111trs / 1kg)

22 Fixing of or Pipe lOOmm dia Mtr 1 75.85

Construction of platform with size stone, cementconcert for erection upto 500KVA Transformer /Metering cubicle / Heavy Equipment.Construction of platform (1.5x1.5x1.2)mtr in sizestone, for erection of transformers/Heavyequipment including all materials, labour.Excavation of (1.5x1.5) mt pit for foundationproviding and laying cement concrete 1:4:8 for Per

23 foundation laid in lcm thick layers, well Struct 1 34079.71compacted curing etc., complete providing andconstruction of stone masonary 0.9m below ure

ground level 8ll.d 1.2m above ground level neatlyhammer dressed in cement morter 1:6 cuttingcomplete providing pointing to stone masonary incement morter 1:3 after racking joint & niselylining curing etc., plastering the concrete surfacesin cement morter 1:4 including smooth randeringcuring etc., curing at every stages completely.Erection of RMU (3 way), One In comer + One

24Breaker +one out going (20D + 1 VL), 350 MVA, Unit 1 14278.89650ACompact RMUs, (VCB / SF6 Type) with AlBusbar (DAS Compatible)Erection of RMU(LJ-way),One In comer + Two

25Breakers +one out going (20D + 2 VL), 350 MVA, Unit 1 19038.52650A Compact RMUs, (VCB / SF6 Type) With Al

I-----Busbar (DAS Compatible)Erection of RMU(5way), One In comer + Three

~6Breakers +one out going (200 + 3 VL), 350 MVA, Unit 1 23798.1.5650A Compact RMUs, (VCB / SF6 Type) with Al

1-,,--,,- ?~u~;bar (PAS Compatible)Erection of RMU (6Way), One In comer + Four

27Breakers +one out going (200 + 4 VL), 350 MVA, Unit 1 28557.77650A Compact RMUs, (VCB / SF6 Type) with AlBusbar (OAS Compatible)Erection of 11 KV Class, 100 RMU Compact·

28 RMUs, (VCB / SF6 Type) with Al Busbar (OAS Unit 1 4759.63Compatible)Erection of 11 KV Class, IVL RMU for

29 350MVA,650A RMU Compact RMUs, (VCB / SF6 Unit 1 4759.63Type) with Al Busbar (OAS Com)2atible)

30 Lifting of Excess E81-th up to distance of 10 km Cmt 1 390.63

'\ 31 Earth Excavation for RMU foundation depositing of Cmt 1 267.37

42

Page 43: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

45

Ei:l BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDD#SCOM I

I earth on bank -upto lead of 50 mtr with a lift uptoI\ 1.5 mtr as per drawing.

Providing and laying, gran.ite or basalt or trap jelly,cement concrete 1:4:8 proportion using 40 rnm.

32 and down size jelly for foundation laid in 15 cm Cmt 1 7533.87thick layers and well compacted including curingcomplete (including material rate for cementconcrete, sand iellv) as per drawingProviding an.d laying, granite or basalt or trap jelly,cement concrete 1:2:4 proportion using 20 mm andown size jelly including mixing laying, tamping,

33 curing and finishing for exposed phases with Cmt 1 8390.99necessary centering and form work etc., complete(including material rate for cementjely, sand).asper drawingPlastering concrete surface in cement mortar 1:4

34 and 10 mm thick inclusive of smooth rendering Sqm 1 356.49curing etc., complete above ground levelLettering the RMUwith enamel paint and also

35writing single line diagram of each panel, caution Set 1 1001.23board, danger board etc., including cost of paint,brush etc.Installation of Compact Pre-fabricated PackagedSub-station l1kvl'433V consisting of 3 waySF6/VCB insulated compact RMU, copper wound

36 transformer and L.T. section with one ACB as Nos 1 16055.69incoming and 7 no. outgoing MCCBfeeders, andwith encloser made of electronically GalvanizedWith 500 kVAoil cooled transformerLaying of UG Cable 3x95 to 150 sq.rnm in Existing

37 trench/ Gl pipe/Stone Ware/RCC Hume pipe using kID 1 6007l.83Wooden/Aluminum Rollers as directed by thedepartmental staffLaying ofUG Cable 3x185 to 240 sq.rnm in

38 Existing trench/GI pipe/Stone Ware/RCC Hume kID 1 63409.27pipe using Wooden/ Aluminum Rollers as directedby the departmental staffLaying ofUG Cable 3x300 to 3x500 sq.mm in

39 Existing trencb /Gl pipe/Stone Ware/RCC Hume kID 1 66744.80pipe using Wooden/ Aluminum Rollers as directedby the departmental staff

40Installation of Heat shrinkable straight through Nos 1 2844.40joint for 3x95 to 3x150 sq.rnmXLPE UGCable.

41 Installation of Heat shrinkable straight through Nos 1 2844.40joint for 3x185 to 3x240 sq.mm XLPEUG Cable.

42 Installation of Heat shrinkable straight through Nos 1 2844.40joint for 3x300 to 3x400 sq.mm XLPEUGCable.

43 Installation of Heat shrinkable pothead for 3x95 to Nos 1 2607.363x150 sq.mm XLPEUG Cable.

44 Installation of Heat shrinkable pothead for 3x185 Nos 1 2P°'Z(36to 3x240 sq.mm XLPEUG Cable. I ill43 71

Page 44: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

BANGAIJORE ELECTRICITY SUPPLY COMPANY LIIVIITED

45 Nos

1 2063.13

km

Installation of Heat shrinkable pothead for 3x300to 3)(400 sq.mm XLPEUG Cable.

Laying of Cable Covering Tiles

48 Installation of Cable route & joint indicating Nosstones.

47 Spreading & forming of River Sand km

Macadam Road surface Cutting for cable trenches49 and disposing of the excavated earth, as directed Cmt

including Barricading, Danger Lighting thenRefilling the Cable Trenches.

1 LI·31.40

Tar Road surface Cutting for cable trenches and50 disposing of the excavated earth, as directed Cmt

including Barricading, Danger Lighting thenRefilling the Cable Trenches.

1 711.09

Cement Concrete Road surface Cutting for cable51 trenches and disposing of the excavated earth, as Cmt

directed including Barricading, Danger Lightingthen Refilling the Cable Trenches.Laying of UG Cables by trenchless technology by

52 adopting horizontal boring ex, Drawing of cable RMtrincluding preparation at site Without HDPEPipein Rock soil 5"/ 6" bore sizeInstallation of G.I. Pipe of Class B, 150 Dia rnm.

53 for Cable raising at Transformer centre/ DPstructure/ drainages,etc,. .

54 Erection ofRCC/PCC/PSC poles of7.5 to 8 mtrlong in pit of 1.5 mtr depth ..

55 Erection of RCC/PSC poles 9 to 10 mtr long but inI--_-l.~it of 1.8 mtr depth56 Erection of 11 mtr PSC pole with working load of

365kg ill. a pit of 2 rntrs depth.Erection of Llmtr long Concrete spun pole in a pit

57 of 2.5 mtr depth.58 Erection of D.P. Structure using 8.00 Mtrs RC.C

._p_oleswith Poles59 Erection of D.P. Structure using 9.00 Mtrs RC.C

1--__ 1 poles with Poles60 Erection of Guy sets complete

1 1429.31

46

RMtr 1 75.85

Nos. 1 914.00

Nos. 1 1143.45

Nos. 1 1826.11

Nos. 1 2042.28

Set 1 5209.04.,

Set 1 5455.56

Set 1 267.37

Nos. 1 92.9261 Erection of Spiral earth electrode

62

Stringing of 11kV grade Aerial Bunched 3 corecable of XLPE insulation & black LDPE sheathinghaving a standard aluminum conductor, standardaround a weather resistant black XLPEinsulatedA.A./\ messenger wire 11kV size 3](95 sq.mm+lx70sq.ITlrn/3xI20 sq.mm+lx95 with bare messenger

rCm 1 34276.92

63Fixing of suspension clamp/ Anchor Clamp for AB~?-ble - 25 to 95 sq.mm bare messenger

44

No 1

Page 45: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

47t,j.:::.~o

.~ BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDOEseOM

L 64 Fixing of Universal Hook No 1 193.41

65Fixing of Distribution box suitable for 20 single No 1 644.73 1phase connections

66Fixing of Distribution box suitable for 6 3 phase No 1 902.63connections

67 Installation of 11kV AB Cable T-joint for 3 Core No 1 1736.35

68Installation of 11kV AB Cable Straight thru' joint No 1 1389.34for 3 Core

69Installation of 11kV AB Cable Termination for 3 No 1 1175.06Core

70Stringing of Coyote ACSR conductor per wire (per Km 1 7643.85km/wire)

71 Stringing of Rabbit ACSR Conductor (per krri/wire) Km 1 4376.59

, 72 Fixing of Wedge connector for Rabbit conductor Nos. 1 12l.36

.. ""73 Fixing of E.G. Stirrups with wil-e lacing Nos. 1 166.87

74 Fixing of 4 pin cross arms with pole clamps bolts Nos. 1 16l.19nuts and washers

75 Fixing of DOLO cutouts/Hom. Gap Fuses including Set 1 237.04fixing of cross arms and wiring

76 Fixing of Special 3 Pin Xvarrn with brace, Fish Set 1 166.87plates, clamps, bolts & nuts.

77 Erection ofTC Structure materials for 100 kVA Set 1 1526.49Transformer.

78 Erection of TC Structure materials for 200-250 Set 1 2290.69kVA Transformer.

79 Erection of TC Structure materials for 300-500 Set 1 3052.99kv'A Transformer.Erection of Guarding materials for road crossing in

80 between HT&LT Lines & telephone line crossing Set 1 1010.71etc.(average span of 40 mtrs.]

III' 81 Fixing of LTfeeder piller Box 8WAYwith cutouts Set 1 1659.23

82 Fixing of LTfeeder piller Box 12WAYwith cutouts Set 1 1793.87

83 Fixing of LT Line spacers No 1 68.27

Laying of 35 to 95 sq.mrn LTCable in Existing

84 trench/GI pipe/Stone Ware/RCC Hume pipe using Km 1 32033.63Wooden/ Aluminum Rollers as directed by thedepartmental staff.Laying of 120 to 240 sq.mm LTCable in Existing

85 trench/GI pipe/Stone Ware/RCC Hume pipe using Km 1 31369.93Wooden!Aluminum Rollers as directed by thedepartmental staff.

86 Releasing of 7.5 to 8 mtr long RCC/PCC/PSC poles No. 1 822.60

87 Releasing of 9 to 10mtr long RCC/PSC poles No. 1 19#9.10I

45

!~F!{:,

Page 46: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

48

.~!1~BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

88 Releasing of 11 mtr PSC pole with workmg load ot No. 1 16L~3.49365kg

89 Releasing of I lmtr long Concrete spun pole No. 1 183806-

90Releasing of 11 KVHorizontal Cross Arms with Set 1 150.18Accessories

91 Releasing of Rabbit ACSR (per kmywire) Km 1 3938.93

92 Releasing of Coyote ACSR (per krrr/wire] K111 1 6879.46

93 Releasing of 200amps GOS Set 1 960.84

94 Releasing of 400amps GOS Set 1 1066.65

95 Releasing of DP Structure Set 1 4687.57

TOTAL ERECTION COST 580906.63

Conditions :-

(a) The contractor shall procure the transformersfrom Govt. manufacturers only viz., M/s.I{avilra,M/s.:KEL & M/s.Andrew Yule Limited at the rateson which ESCOMs procured.

(b) The budget on the subject rate contract shall notexceed Rs.250 crores [Rs.Two hundred fifty croresonly), I.e , amount put to tender plus 19.85% beingtender premium during the rate contract period oftwo years.

(e) 50% payrnerrt towards materials shall be paidagainst supply and balance 50% including 100%erection charges will be paid after complet.icn andcornrniaaiontng of works.

(d)The award of rate contract shall be .lmrited to aperiod of two years only.

[e] TIH~ equlpments supplied and commissioned bythe contractor shall have to be compatible withDlstrtbutton Autornat.ion System EQUiPlllentlr' I /'f

ILI~if/J46 IrlJ 1

Page 47: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

49e BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDDESCOM

Subject No. 68/13 : Selection of IT Implementation Agency forDesign, Development and Implement.ationof Distribution Transformer TrackingSystem (DTTS) in BESCOM-reg.

The followingwere submitted to the Board:

l. KERC norms stipulated that the failed distributiontransformers are to be replaced within 24 hours in urbanarea and 72 hours rural area.

2. The data in respect of failed transformers during last 3years to an extent of 25163 Nos costing to an extent ofRs.28.54 crores for repairs.

3. Prevailing monitoring mechanism to return the failedtransfonners to stores for getting them repaired.

4. The need to implement the project i.e., DistributionTransformer Tracking System in BESCOM(DTTS)in webbased application which shall support and track thecomplete life cycle of distribution transformers which canbe assessed anytime and anywhere through any deviceincluding mobile phone by the authorized users puttingthem on GIS is very essential which helps in replacementof failed transformers to upkeep KERC norms, lessinventory, repairs, preventive maintenance to reducetransformer failures, allocation to replacement / variousworks at stores, up-keeping average one month bufferstock on average failure rates per month at stores foravoiding theft/missing of transformers due non-return offailed transformers to stores in time etc., to restore powersupply in time thereby providing services to consumersatisfaction.

The followingpoints were taken note ofby the Board.

(a)The aims and objectives of proposal by selectingM/s. KEONICSas IT implementation agency.

(b)The scope of the proposed system and itsadvantages.

(c)Commercial conditions and terms of paymentsubmitted by Mj s.KEONICS for hardwarefor welding of unique ID, Software cost.

47

Page 48: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

50

rl) BANGALORE ELECTR.ICITY SUPPLY COMPANY LIMITED

(d)The cost benefit analysis, benefits that are goingto be derived.

(e)The total cost at Rs.14.52 crores against theproposed contract with M/ s.KEONICS.

The followingdata submitted were perused by the Board.

l. M/ s.KEONICS is exempted from KTPP Act for ITrelated works.

2. The rates quoted for four components viz., Hardware,welding of unique ID, software cost, applicationsupport cost. .

3. The price comparison was not made with any othersource data.

4. There was no adequate budget provision for thecurrent year.

5. Cost benefit analysis was not in quantifiable terms totake up the proposal.

The proposal. was debated at length. It was directed thatexisting systeln be continued and strengthened with moremanaqerial. commitment: rather than going for ururiablealternative. It was fu.r"ther directed MD BESCOIVI to explore thebetter alternaHve option availalJle and to call ten.der, ifnecessary.

,

Subject: No. 68/.14 : Tender floated for" Design, Supply, Testing,Installation, Commissionlnq, Repair atui "Maintenance for a period of 10 years of 250Nos grid tied Solar PV based irrigationpUlnp selt under "Surya Raitho. Scheme" OIl.

l11cV Harobele F2 Feeder, KanalcapuraTalu/c, Ramanaqara District, Karn.atalca.state on Net Metering basis us a pi lotscheme".

The followingwere submitted in this context:(1) The approval which was accorded by the Board at

its 67th meeting held on 18.03.2015 to take up theproject for implementation. 1 .

(2)The scope of the project, key players of the proj c,

responsibility of BES~~M. lit;.:, '0'

\ ~I ,<,., \{ ,,\,1:

Page 49: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

51e BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDBaSCOM

(3)Responsibility of ESCROWManager, Responsibilityof the farmers.

The Board took note of the following:

(l)The estimated cost of the project IS around Rs.23Crores.

(2)The founding of the project is as under:

5 HP 7.5 HP

capacity capacity Total cost foParticulars per IP 250 pump

per IP set set in programein Rs. Rs.

GOl{ contribution 58,000 1,69,000 Rs.2.2 CroresMNREcontribution 1,62,000 1,62,000 Rs.4.1 CroresUpfront payment by 50,000 75,000 Rs.1.4 CroresfarmerInterest free loan 5,41,000 8,16,000 Rs. 15.5from BESCOM' Crores

Total 8,11,000 12,22,000 23 Crores

(3)Tencler evaluation was made duly following KTPPActand recommendation of Tender Scrutiny Committee,BESCOM.

(4)The proposal was audited by GM(I/A)(5)The Central Purchase Committee recommendation was

made for the proposal to approve for Ll qualifiedbidder.

(6)M/s.SunEdison Solar Power India Private Limited,Chennai is the L1 bidder with the quoted price ofRs.19,50,21,500/- (Rs.Nineteen crores fifty lakhstwenty one thousand five hundred only) againstamount put to tender Rs.23 Crores which is below15.2%.

(7)The proposal was placed before the 81st CPC meeting. held on 22.042015. After detailed discussions, it wasapproved in the Cf'C to place this proposal before theBOardof Directors Meeting BESCOM.

. Board went through the proposal and debated. Approving theproposal the followingresolutions were passed in this context./j

49

Page 50: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

52

~~J:~ BANGALOHE ELECTRICITY SUPPLY COMPANY l,JMJTEDnr,~c~""

R.ESOLVE.DTIIAT, for the reasons explained, approval be and isherein] accorded to the following:

a} To issue LOI/wor/c award to L1 bidder Mis.SunEdison. SolnrPouter India Private Limited, Chennai ur .a toted cost of.11.s. .19,50,21,5001- (Rs.Nineteen crores fifty lalxh» twenty onethousand five hundred only) (includin.g taxes) fo,- "Design,Supply, Testing, Installation, Commiseioninq, Repair andMaintenance for a period of 10 years of 250 Nos. gdd tiedSolar PV based irrigation pump sets under "Surua. RaitnaScheme" on 1.lleV Harobele .F2 Feeder, .Ka.r1.a.1captUTl To.lulc,Ramaruujar District, Karnataka state on net meterinq basisas a. pilot scheme" du.ly follouring tender conditions andc011JOI"atenorms,

hI To incur an investment of Rs.l1. 8 crores [rom. BESCOM a.sinterest free loan umounr to fanners' co-operative for rollingout this pilot projects. Loan repayment shall be recoveredwithin. 9 yea.rs.

c) A. su.bsidy of Rs.4.1 crores be obtained [rom MNRE Jar 250pu.mp s at the rate of Rs.l.62 lalchs per ptUllp throu.gh}{REDL.

d) The excess ene,4gy exported to the grid shall be used [orseruicinq the loan corpus fund as per the tariff of Rs, 7.20fixed by [{ERC for SRTPV/Slnall solar projects ou.t of whichRs.l/- will be paid as generation based incentive to fannersduring the loan period.

e) After completion. of loan term, the solar generation exportedto the grid shall be paid to the farmers at Rs, 7.20 as per thetariff fixed by [{ERC for a period of 25 years (life of plant)i.e., from the date of commission. of the plant) ..n A [artners' Co-operative shall be formed con.si.stinsi ofmembers drawn I,"01n 250 (beneficiaries) farmers identifiedin the pilot project of F-2Harobele feeder,

g) An IJJSCROW accou.nt with a local bank: shall be opened byenrolling all the 250 beneficiaries by opening individual SBa.ccou.nt's with. zero balance, till the loan debt isc leared/c lased.

h) An ESCROTtlr manaqer shall. be appointed fr0111. BE1' 'COlli tornonCtg€ the ESCROW account and the corpus [urul: 0'

)<17)50 -, <.»

" \

Page 51: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

53Ee.S BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDBESCOM

RESOLVED FURTHER THAT, the GM(DSM) be and is herebyauthorized to take further needful action as per tenderconditions and corporate norms.

Subject No.681A01: Ratification of the action taken forextension of the contract period of thecontract order No DWA 0712012-13 I19.03.2013 placed on Mis Landis + GyrLtd, Kolkcita for sale of L1' Three phasewhole current meters at retail outlets ofBESCOM.

The followingwere submitted for perusal of Board.

1) Contract order No DWA07/ 2012-13/19.03.2013 was placedon M/ s Landis + Gyr Ltd, Kolkata for sale of LT Three phasewhole current meters in retail outlets of BESCOM for 2 yearsat the following rate:

Contract orderUnit saleable

Firm Type ofmeter price (InclusiveNo of all rates)

BESCOMj·RETAILjGM Mjs Landis LTThree phase whole(M&C)j DWA &Gyr, 2449.3907j 2012-13 Kolkata current meters

dt:- 19.03.2013

2) As per the clause 14.0 of schedule B of contract order, thevalidity of the retail outlets is two years from 15.4.2013.

3) The validity of the order is expired on 15.4.2015.4) The new tender was not floated in advance as the government

had to form PQR committee for finalizing common PQR &specifications.

5) Short term tender for sale of LT Three phase whole currentmeters in retail outlets of BESCOM for 3 years is floated videenquiry No BESCOM/GM(M & EA) 42 /2015-16 on 22.4.15soon after receipt of approved unified PQR and specificationsfrom the GOKvide letter No EN 89/VSC/2014/26.3.15.

6) The last date for receipt of bid documents was give till21.5.2015.

c51

Page 52: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

i} BANGALORE ELECTRICITY SUPPLY COMPANY LIlVIITED .

7) The clause No 9.0 of Conditions of Contract in the tenderdocuments floated vide enquiry No. GM(M&C)/06/16.7.2012state "After 2 years of opening of outlets further renewal ofcontract is again subject to type tests at the cost of supplierand price negations with BESCOM at that point of time. Incase of any disagreement in cost/ quality after 2 years, outletswill be closed and retendered. The supplier shall keep theoutlets open for at least 6 months (after 2 years) or till suchother alternative arrangements are made."

The Board took note of the following:-

1) The willingness of M/s. Landis -I- Gyr Ltd was obtained forcontinuation of sales of three phase whole current meter atretail outlets of BESCOM for further period of 6 morith fromthe expiry date i.e. till 14.10.2015 or till finalization of newtender floated vide enquiry No. BESCOM/GM(M&EA)42/2015-16 whichever is earliest at all inclusive unit price of Rs.2449.39

2) The communication of the firm expressing its willingness videNo. L+G/BESCOM/DWA-07/71/28.4.15

The proposal was discussed. The following points were furthertaken note of

a) BESCOM has already called short term tender vide enquiryNo. BESCOM/GM(M&EA)42/2015-16 on receipt of unifiedPQR and specifications fr011.1GOK

b) The sufficient numbers of meters are required at retail outletsto avoid inconvenience to BESCOMconsumers

c) The circumstances were justified in extending the validity ofcontract for a period of 6 months of finalization of new tenderwhichever is earlier

Having noted the above, the proposal was accepted and thefollowingresolution was passed

RESOLVED TIIAT action taken by the MD, BESCOM forextension. of contract period of the contract order No BESCOll1/RJ.DTA.lL/G1VI(.WUJr.C)/DlVA 07/2012-13 dt: - 19.03.2013 placedon lllJ/sLan.di.s + Gy,', Kollcata for sale of LT Three phase wholecurrent meters a.t retail outlets of BESCOlllIfor further periodof 6 monthe from. the expiry date t.e till 14.10.20.1~) 0 ii till rhe

52 ,~f) .\/

.54

,

Page 53: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

55Ii BANGALORE ELECTRICITY SUPPLY COMPANY LIMITEDDI!SCOM

finalization of new tender floated vide enquiry No.BESCOM/GM (M& EA) 42/2015-16 whichever is earlier at theall inclusive unit price of Rs. 2449.39 (Rs. Two thousand fourhundred forty nine & thirty nine ps.only) be and is herebyRATIFIED

Subject No. 68/A02: Ratification of the action taken forextension of the contract period of thecontract order No DWA 08/2012-13 I9.04.2013 placed on Mis Landis + GyrLtd, Kolkata for sale of LT Three phaseCT operated meters at retail outlets ofBESCOM.

Broadly the followingwere submitted:

1) Contract order No DWA 08/ 2012-13/9.04.2013 was placedon M/s Landis + Gyr Ltd, Kolkata for sale of LTThree phaseCT operated meters in retail outlets of BESCOM for 2 yearsat the following rate:

Unit saleableContract order No Firm Type of meter price (Inclusive

of all rates)BESCOM/RETAIL/GM M/s Landis + LTThree phase CT

(M&C)/ DWA08/ Gyr Ltd, operated ETVmeters 2999.902012-13 dt:- Kolkata9.04.2013

2) As per the clause 14.0 of schedule B of contract order, thevalidity period of the retail outlets is two years from 15.4.2013.

3) The validity of the order is expired on 15.4.2015.4) The new tender was not floated in advance as the government

had to form PQR committee for finalizing common PQR &specifications.

5) The PQR committee is yet to finalise the unified PQR and thespecifications for three phase CT operated ETVmeters.

6) New tender for sale of LTThree phase CT operated ETVmetersin retail outlets of BESCOMwill be floated soon after receipt ofapproved unified PQR and specifications from the GOK .

7) The clause No 9.0 of Conditions of Contract in the te derdocuments floated vide enquiry No. GM(M&C)/05/ 6.. 012

53

Page 54: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

-56·

~l BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED'state "After 2 years of opening of outlets further renewal ofcontract is again subject to type tests at the cost of supplierand price negations with BESCOM at that point of time. Incase of any disagreement in cost/ quality after 2 years, outletswill be closed and retendered. The supplier shall keep theoutlets open for at least 6 Inonths (after 2 years) or till suchother alternative arrangements are made."

Board discussed the matter. New tender yet to be floated sincePQR Committee yet to finalize the PQR and Specifications for LTthree phase CT operated ETV meters. Taking note of the same,action taken by MD, BESCOMwas ratified in extending the contractupto 14.10.2015 or till finalization of new tender whichever is ~earlier. Following resolution was passed in this context. ,

RESOL VED TliA T the action ta1cen by the MD, B.ESCOM forextension of contract: period of the contract order- No BESCOM/RETAIL/GM (M(.~C)/ DIVA 08/ 2012-13 dt:- 9.04.2013 pla.ced on.lVI/s Landis + Gyr., Kollcata for sale of LT Three phase CToperated ETV meters at retail outlets of BESCOM for furtherperiod of 6 montlis from. the expiry date i.e till 14.10.2015 Of"

till the finalization of new tender proposed to be floateduiliicheuer is earlier at the all inclusive unit price of Rs2999.90 (Rs. two thousand nine hundred and ninety nine andninety paise only)

Subject: No. 68/A03 : Formation. of Pension Section/PensionTrust Pension Cell with required staff.

The following were submitted for kind perusal of the Board.

1. Present arrangement of pension payrnent and ordersthereon vide KPTCL/FA(A&R)/KCO-1/39728/12-13dated 17.11.2012.

2. The posts sanctioned viele No.BESCOM/BC31/3339/2012-13 dated 04.12.2012 and subsequentwithdrawal of the same consequent to rejection ofproposal at 58tb Board Meeting.

3. Present employees working strength of BESCOM and~:~~;11:~c~io~uties & ,:eSPol1SibilitieSil1VO:I in

" ' -~ ,r" ~-~ ,,_ :: ~ i

Page 55: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

57• e BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

DESCOM.. 4. The present proposal is for new structure comprisingof one DGM(F&C),Three AGM Posts, One ManagerPost, 2 Senior Assistants Posts, and 4 AssistantsPosts" as explained by the CGM(F&C).

Board observed that, the activities involved in pension sectioncan be managed in the computerized system by one AGMand withtwo Assistants without additional sanction of posts. Accordingly thefollowingresolutions were passed in this context.

RESOLVED THAT, approval be and is hereby accorded forsanction of following posts to the newly proposed pensionsection/ pension trust cell, BESCOM.

81. Posts Nos.No.1 Asst. General Manager One2 Assistants Two

.The personnel presently working'at extra cost be regularized againstthe said sanctioned posts forthwith.

FURTHER RESOLVED THAT, the GM (A&HR) be and is herebyauthorized to issue necessary corporate orders.

Subject No. 68/A04 : To revise the Budget to 369.83 crores forreplacement of Electromechanicalmeters by electrostatic meters.

The followingwere explained:-

1. Rural Electrification Corporation Limited under NEF(National Electricity Fund), an interest subsidy scheme ofMoP), had offered the financial assistance of Rs.332.84crores towards replacement of electromechanically meters asagainst the DPR cost of Rs.369.83 crores. However amountis not drawn by BESCOMand documentations are' also notmade.

2. The Board had accorded approval for FY 2015 Capex, withan outlay of 2604.47 crores wherein Budget of Rs.180 cro esprovision is made for replacement of EMby ES mete s.

55

Page 56: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

·58.•~D.BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED'

3. Accordingly budget was restricted to 180 crores during theFY2014-15.

4. As per CEA guidelines, all the existing Electromechanicalmeters are to be replaced in the field for better accuracy andto improve the revenue.

5. It is proposed to replace all the existing meters during thecurrent FY.

..

The followingwere taken note of:-l. The present proposal is for meeting the entire cost of DPR

Rs.369.83 crores towards replacement of electromechanicalmeters by electrostatic meters.

2. The Board at its 66th meeting had accorded its approval ~during FY 2014-15 under capex to an extent of RS.2604.47 ..,crores wherein a budget of Rs.180 crores only wasprovisioned towards replacement of electromechanicalmeters by electrostatic meters.

3. The validity for the financial assistance which was offered byMs/REC Limited to an extent of Rs.332.84 is lapsed clue tonon-drawal and documentation.

4. It was also noted that the Board had taken decision at its66th Meeting a budget of Rs.154.53 crores will be providedfor the capital budget for 2015-16.

5. It was further noted that, a PQR committee be constitutedwhich shall finalise PQR within the time frame as per thedecision of Board at its 66th Meeting.

Board debated the proposal. As per CEA guidelines all the ....existing electromechanical meters are to be replaced in the field forbetter accuracy and to improve the revenue. For this, substantialquantity of electrostatic meter are required. Board on perusal of theproposal passed the followingresolutions in this context.

RESOLVED TTfA.l', approval be and is hereby accorded to incurtoted budget outlay of Rs.369.83 being DPR cost towards theproject: of replacement of single phase electromectuinicalmeters by electrost.atic meters.

FURTHER R.l:'CSOL'VED THAT, approval be and is t".elJyaccorded for a budget of Rs.189.83 crores out of cap' J(" the

56 )~.'

It,f­'it

Page 57: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

• ," 59.. e BANGALORE ELECTRICITY SUPPLY COMPANY LIMITED

DE.COM

FY 2015-16 and to call an exclusive tender duly finalizing thenew PQR and technical specification as per the order of GOKtouiard.s replacement of single phase electromechanical metersby electrostatic meters.

Subject No. 68/A05: Modification of existing operating systemof lllcV GOS by repositioning ofredesigning in BESCOM area using therequired materials, executing the workand commissioning as per the conceptdemo for new design under Rate Contractfor the period of one year on tota 1turnlcey basis.

The followingwere submitted to the Board.

1. The circumstances under which, the rate contract wasextended with M/s.Gugan Engineering, Bangalore formodification of 500 Nos of GOS in E8 and C8 SubDivisions Ontrial basis.

2. The Technical committee recommendation to awardthe rate contract on M/ s.Gugan Engineering,Bangalore for balance 59000 Nos of GOS acrossBESCOMsince modified GOSwere found suitable.

3. Letter of intent issued vide No.2538-45 dated12.01.2015 for balance 59000 Nos of GOS acrossBESCOM.

The followingwere explained to the Board.

(a)The representation given by the firm M/s.GuganEngineering, Bangalore seeking modification ofcommercial terms & conditions.

(b)Request made by the firm for payment of mobilizationadvance.

(c)Constitution of GOS modified cell by BESCOMconsisting of 10 teams for early successful completionof the project.

(d)The need for implementation of direction of Hon'bleHigh Court of Karnataka and KERC to make footpa 'hfree and safe for pedestrians.

57

Page 58: PROCEEDINGS OF 68 MEETING OF BOARD OF DIRECTORS OF ... Meeting... · ..3 bangalore electricity supply company limited proceedings of 68th meeting of board of directors of bangalore

60... ...~~~; BANGALORE ELJ!;CTRICITY SUPPLY COlVIPANYLIMJTED ill

Board debated the proposal placed. However modification ofcomrnercial terms & conditions deviation from already stipulatedterm.s & conditions in tender is not appropriate one and contrary tothe provisions. Accordingly PROPOSAL FOR .MODIFICA TION OFCOMlltIERCIAL TERMS & CONDITIONS ARE DROPPED ANDTER.MS OF PAYlVIENT BE CONTINUEDAS WER.E STIPULATED INTENDER CONDITIONS.

Subject No. 68/A06 : Enquiry No.BESCOM/BCP-846/2014·-15floated for supply of LT Aerial BunchedCable of size 3x95 +lx70 +lx16 Sq.m.J11.

Lt..tDEFERRED

Meeting concluded with vote of thanks to Chair.