Basis for project
MAP-21
Identify need
Planning Time Index (PTI)
PTI Thresholds
ID corridors appropriate for adaptive
control
• Traffic conditions fluctuate often
• Incidents change demand
– Crashes
– Special events
– Preemption
– Weather
• Demanding situations
with few constraints
– Low ped volumes
• System reliability
– PTI differs significantly
from TTI
Travel time benefit
Travel time benefit
Benefit/cost
Benefit/cost
Next steps