    CMMS

    Performance Measurement

    In

    Maintenance Measurement

  • 8/8/2019 Principle Of Maintenance

    2/24

    Objectives

    Explain the use of performance measurement

    Explain the categories of maintenance for measurement

    Calculate the different types of performance

    measurement

    Explain the steps to implement a measurement system.

  • 8/8/2019 Principle Of Maintenance

    3/24

    Content

    2.0 Introduction

    2.1 Uses of Performance Measurement

    2.2 Categories of Maintenance for Measurement

    2.3 Types of Measurements for Categories of Maintenance for Measurement

    2.3.1 Overall Maintenance Results

    2.3.2 Maintenance Productivity

    2.3.3 Maintenance Organization

    2.3.4 Efficiency of Maintenance Works

    2.3.5 Maintenance Costs

    2.3.6 Maintenance Quality

    2.4 Collecting Data for Performance Measurement

    2.5 Steps to Implement a Measurement system

  • 8/8/2019 Principle Of Maintenance

    4/24

    Introduction

    Performance measurement is important for

    improvement of maintenance management.

    Performance measurement are only as goodas the actions they prompt.

    Performance measurement will improve from

    one year to the next

    It will be use as stimulation in way of finding

    the progression.

  • 8/8/2019 Principle Of Maintenance

    5/24

    Uses of Performance Measurement

    Post implementation review of equipment toassess the result ofbuying and implementingnew equipment against the planned results.

    Machine reliability analysis/failure rates. Labor effectiveness review measuring staff

    allocation tojobs or categories ofjobs comparedto last year.

    Analyses of material usage, equipmentavailability, utilization, productivity, losses, costsetc.

  • 8/8/2019 Principle Of Maintenance

    6/24

    Categories of Maintenance for

    Measurement

    Maintenance productivity -measures the effectiveness of resource

    use

    Maintenance organization -measures the effectiveness of the

    organization and planning activities.

    Efficiency of maintenance work -how well maintenance keeps up with

    workload

    Maintenance costs -overall maintenance cost vs. production

    cost

    Maintenance quality - how well the work is performed

    Overall maintenance results - measures overall results

  • 8/8/2019 Principle Of Maintenance

    7/24

    Types of Measurements for Categories

    of Maintenance for Measurement

    Overall Maintenance Results

    Maintenance Productivity

    Maintenance Organization

    Efficiency of Maintenance Works

    Maintenance Costs

    Maintenance Quality

  • 8/8/2019 Principle Of Maintenance

    8/24

    Overall Maintenance Results

    Availability

    Mean Time to Failure (MTTF)

    Failure frequency or breakdown frequency

    Mean Time to Repair (MTTR)

    Production Rate Index

  • 8/8/2019 Principle Of Maintenance

    9/24

    Maintenance Productivity

    Manpower utilization

    Manpower efficiency

    Materials usage

    Planning and scheduling index

    Breakdown time

    Cost of lost production due to breakdowns

  • 8/8/2019 Principle Of Maintenance

    10/24

    Maintenance Organization

    Planning and scheduling

    Breakdown time

    Cost of lost production due to breakdowns

  • 8/8/2019 Principle Of Maintenance

    11/24

    Efficiency of Maintenance Works

    Work Order turnover

  • 8/8/2019 Principle Of Maintenance

    12/24

    Maintenance Costs

    Overall maintenance costs per unit output

    Maintenance cost versus the cost of the asset

    base

    Overall maintenance effectiveness index

  • 8/8/2019 Principle Of Maintenance

    13/24

    Maintenance Quality

    Repeat jobs and repeat breakdowns

  • 8/8/2019 Principle Of Maintenance

    14/24

    Collecting Data For Performance

    Measurement

    Data is collected from Computer Maintenance

    Management Systems (CMMS)

    Refer Table

  • 8/8/2019 Principle Of Maintenance

    15/24

  • 8/8/2019 Principle Of Maintenance

    16/24

  • 8/8/2019 Principle Of Maintenance

    17/24

    Item Value

    Total time full-time operation 24 x 365 = 8760 hours year

    Emergency Work Orders

    Last year

    This year

    High-priority response time

    Standard

    Last month

    Maintenance cost ofbreakdownsStores value

    Last year

    Current

    Stock-outs

    This year

    Last yearTotal production costs

    Lost production time cost/hour

    152

    130

    4 hours

    3.3 hours

    $135/hour

    $1.8 M

    $2.0 M

    16

    20$45 M

    $5140

    $40 M

    Table

  • 8/8/2019 Principle Of Maintenance

    18/24

    Item Value

    Total time full-time operation 24 x 365 = 8760 hours year

    Production losses

    Last month

    Previous month

    Asset value (replacement cost)

    20 hours

    25 hours

    $40 M

    Table

  • 8/8/2019 Principle Of Maintenance

    19/24

    STEPS TO IMPLEMENT A

    MEASUREMENT SYSTEM

    Review and select the indices that meet the

    objectives of the maintenance department

    and overall business. Select indices which can

    be measured and keep to a minimum the

    amount of extra work needed to build the

    performance measures.

    For each of the chosen measurements, setstandards, values and targets.

  • 8/8/2019 Principle Of Maintenance

    20/24

    Document the measures and targets, plus the

    interpretation of each number or trend.Absolute numbers may not mean anything; so

    whenever a trend is used, explain whether is

    the level good or bad.

    When setting up the measuring process, make

    sure that the person responsible understands

    the nature of the measurement, where the

    data comes from and what type of analysis isrequired.

  • 8/8/2019 Principle Of Maintenance

    21/24

    Install the measuring procedure in the CMMS.

    Publish the results so that all employees can

    see both the targets and the achievements. Review and discuss measurement results for

    continuous improvement

  • 8/8/2019 Principle Of Maintenance

    22/24

  • 8/8/2019 Principle Of Maintenance

    23/24

    Credits

    Created by

    The Mechatronics Engineering

    Group 1Hosted by

    Mohamad Fairulnizam

    SulaimanMohd Amirul

  • 8/8/2019 Principle Of Maintenance

    24/24