Shibu lijack Introducing P6.0 The Best Thing That Happened to Project Planning & Management

Transcript of Primavera6.0

Page 1: Primavera6.0

Shibu lijack

Introducing P6.0

The Best Thing That Happened to Project Planning & Management

Page 2: Primavera6.0

What is a Project?

Project is a job that has a beginning and an end (time) a specified outcome(scope) at a stated level of quality(performance) and a budget(costs).

Page 3: Primavera6.0

Examples of project

Moving a company's office to a new location Developing a new software application Power plant construction Conducting a national election New product development

Page 4: Primavera6.0

Project characteristics

Temporary Has a definite beginning & definite end Does not mean that it is of short duration

Unique Has got some unique features Does not mean that it should start from scratch

Page 5: Primavera6.0

Project Management

Application of knowledge , skills , tools & techniques to project activities in order to meet stakeholder needs & expectations from a project.

Needs stated part of the project

Expectations unstated part of the project

Page 6: Primavera6.0

Why do companies use Project Management?

To handle projects effectively in an organization. To define the project and agree with the customer To plan and assess resource needs for the project To estimate project cost and make proposals To plan & schedule activities in a project. To allocate the right resources at the right time. To assess risk and failure points and make backup plans. To lead a project team effectively and communicate well

among team members.

Page 7: Primavera6.0

Why do people learn PM?

To explore the latest concepts and techniques of project management.

To acquire a professional degree/ recognition and increase job prospects.

To increase value/contribution to the organization. To prove yourself skillful in managing projects.

To learn a new thought process that helps organized thinking and structured approach.

Endless possibilities and benefits……..

Page 8: Primavera6.0

Areas of Application

Engineering All the related areas of engineering

• Software Development Projects• Construction projects• Production management• Finance management• Maintenance and shutdown management• Materials management• Human Resource Management • Logistics and supplies management• and more……………….

Page 9: Primavera6.0

Key Players

Project Manager / Project leader Action and delivery focused

Project Team Members Performs the work

Project Sponsor Benefit focused

Page 10: Primavera6.0

Shibu lijack

Project Management Concepts

Project Management Context

Project Management Process

Knowledge Areas

Page 11: Primavera6.0

Project Management Context

Environment in which the projects operate Project Phases & the Project Life Cycle Project Stakeholders Organizational Influences Key General Management Skills Socioeconomic Influences

Page 12: Primavera6.0

Project Management Processes

Interaction between various project management processes Project Management Processes Product Oriented Processes Process Groups Process Interaction

Page 13: Primavera6.0

Generic Life Cycle of a Project

Page 14: Primavera6.0

Organizational Structure

Functional O rganization

S ta ff

S ta ff

S ta ff

F u n c tio n a l M a n a g er

S ta ff

S ta ff

S ta ff

F u n c tio n a l M a n a g er

S ta ff

S ta ff

S ta ff

F u n c tio n a l M a n a g er

C E O

Page 15: Primavera6.0

Organizational Structure

Projec tized Organ ization

S ta ff

S ta ff

S ta ff

P ro je c t M a n a g er

S ta ff

S ta ff

S ta ff

P ro je c t m a n a g er

S ta ff

S ta ff

S ta ff

P ro je c t M a n a g er

C E O

Page 16: Primavera6.0

Organizational Structure

M atrix Organization

P ro je c t M a n a g er

S ta ff

S ta ff

S ta ff

F u n c tio n a l M a n a g er

S ta ff

S ta ff

S ta ff

F u n c tio n a l M a n a g er

S ta ff

S ta ff

S ta ff

F u n c tio n a l M a n a g er

C E O

Page 17: Primavera6.0

Process Groups

Page 18: Primavera6.0

Time

Scope

Cost

Quality

Communication

Integration Procurement

HR Risk

PROJECT

Knowledge Areas:

Page 19: Primavera6.0

Project Integration Management

Includes the processes required to ensure that various elements of the project are properly coordinated

Page 20: Primavera6.0

Project Scope Management

Includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.

Page 21: Primavera6.0

Project Time Management

Includes the processes required to ensure timely completion of the project.

Page 22: Primavera6.0

Project Cost Management

Includes the processes required to ensure that the project is completed within the approved budget.

Page 23: Primavera6.0

Project Quality Management

Includes the processes required to ensure that the project will satisfy the needs for which it was undertaken.

Page 24: Primavera6.0

Project Human Resource Management

Includes the processes required to make the most effective use of the people involved with the project.

Page 25: Primavera6.0

Project Communications Management

Includes the processes required to ensure timely and appropriate generation , collection , dissemination, storage and ultimate disposition of project information.

Page 26: Primavera6.0

Project Risk Management

Includes the processes concerned with identifying, analyzing and responding to project risk.

Page 27: Primavera6.0

Project Procurement Management

Includes the processes required to acquire goods and services from outside the performing organization.

Page 28: Primavera6.0

Shibu lijack

Page 29: Primavera6.0

Scheduling Resource Analysis Cost Estimation Tracking Project Progress Monitoring & Report Generation Multiple Project Support Communication

Page 30: Primavera6.0

Scheduling

Identifying activities and relationship between them. Preparing the Network Diagram.

CPM, PERT

Scheduling the project from the start date. Find the project finish date & the critical path.

Page 31: Primavera6.0

CPM Problem

A

E

H

B

C

F G

D

S

2 7

4

6 8 3

5

10

0

Page 32: Primavera6.0

CPM Problem

A

E

H

B

C

F G

D

S

0

0

0

0

2

1 2

7

89

4

1214 3

1617

5

21

06

5 68

13

010

9 2117

1614

1310

136

93

50

21

167

00

Critical Path S--E--F--G--D

Page 33: Primavera6.0

Resource Analysis

Men, Material, Machinery & facilities Identifying over allocated resources

Analyzing resource over allocation, work done in hourly basis, resolving over allocation by leveling resources, exercising better control over distribution of resources.

Page 34: Primavera6.0

Cost Estimation

Estimation of total project cost prior to execution of the project.

Including various cost factors Fixed cost, baseline cost, actual cost etc.,

Determining variance in budget and cost controlling

Page 35: Primavera6.0

Tracking Project Progress

Editing the schedule based on project progress Earned value analysis

BCWP,ACWP,BCWS

Determining variances from the baseline plan ie., schedule, cost variances

Analyzing Project performance

Page 36: Primavera6.0

Monitoring & Report Generation

To capture, analyze and report project performance, usually as compared to plan.

Both tabular as well as graphical reports is used to monitor the project performance.

Page 37: Primavera6.0

Multiple Project Support

Managing several project simultaneously by combining all project files into one consolidated project file.

Establishing cross project links External predecessor/successor relationship.

Page 38: Primavera6.0

Communication

Exchange project information at web site Microsoft Project Central

E-mail the project information Workgroup Features

Collaborative planning of project team

Page 39: Primavera6.0

Shibu lijack

Primavera P6.0

Page 40: Primavera6.0

Introduction to Primavera 6.0

Project Planning Management Tool Developed by Primavera System Inc. in 1983 Primavera Project Planner (P3) is the 1st

software released by Primavera.

Page 41: Primavera6.0

The versions are P3.0, P3.e, P4.0, P5.0, P6.0 The latest version is P6.1 The modules are

Project ManagementMethodology ManagementmyPrimavera

Page 42: Primavera6.0

Project Management Module

PPM life cycle Initiation Planning Execution Monitoring / Controlling Closing

Page 43: Primavera6.0

Advantages

Central database, Primavera v6.0 enables managers to access project data anywhere, at any time.

This single database design increases efficiency, consistency and repeatability, saving organizations time and money.

Page 44: Primavera6.0

What's new in Primavera 6.0? OBS – Organizational Breakdown Structure EPS – Enterprise Project Structure Undo option Unlimited Baselines Edit Activity ID Multiple rates for roles and resources New user preferences to better control the

hours per day, week, month and year

Page 45: Primavera6.0

Organizational Breakdown Structure

Page 46: Primavera6.0

Organizational Breakdown Structure:

OBS represents the management responsible for the projects in a hierarchy.

Structure of your organization ,from top-level personnel down through the various levels.

Page 47: Primavera6.0

OBS and Project Manager

OBS is set up with a Project Manager at the project level to oversee and coordinate the entire project.

Page 48: Primavera6.0

Constraints of OBS:

Maximum of 25 levels can be created Maximum character length for an OBS element

is 100.

Page 49: Primavera6.0

Enterprise Project Structure

Page 50: Primavera6.0

Shibu lijack

EPS is a hierarchical structure that identifies the company- wide projects and enables organizing and management of those projects by means of subdivisions of levels.

Page 51: Primavera6.0

EPS can be used for:

Perform top-down budgeting and resource and cost-analysis.

Organize work breakdown and organizational breakdown structure into one common structure.

Manage multiple projects. Implementing coding standards for flexible

reporting. Maintain appropriate security throughout the

enterprise.

Page 52: Primavera6.0

Calendars

Page 53: Primavera6.0

Calendars can be assigned to each project, resource and each activity.

Defines the available work hours in each calendar day.

Calendar assignments are used for activity scheduling ,tracking and resource leveling.

Page 54: Primavera6.0

Three Calendar pools:

Global :contains calendars that apply to all projects.

Resource :separate pool of calendars for each resource.

Project : separate pool of calendars for each resource.

Page 55: Primavera6.0

WBS-Work Breakdown Structure

Page 56: Primavera6.0

WBS represents a hierarchical breakdown of a project into elements.

Features of WBS: Hierarchical structure to which activities are

attached. A maximum of 50 levels are available.

Page 57: Primavera6.0

Steps for using WBS facility:

Define the WBS structure. Build the WBS code dictionary Assigned the WBS codes to the activities.

Page 58: Primavera6.0

Different type of views of WBS

Tabular or column view

Graphical or chart view

Page 59: Primavera6.0

Activities

Activities are the fundamental work elements of a project. They are the lowest level of a Work Breakdown Structure.

Shibu lijack

Page 60: Primavera6.0

Shibu lijack

Activity type:

Task Dependent Resource Dependent Level of Effort Start Milestone Finish Milestone WBS Summary

Page 61: Primavera6.0

Scheduling

Identifying tasks Estimate task duration Establish relationship between task Identifying critical tasks Revising schedules when needed Analyzing scheduling flexibility with slack values

Page 62: Primavera6.0

Shibu lijack

Constraints

Constraints are used to impose restriction on activities that cannot be realistically scheduled with logical links

Two types of constraints are: Primary Constraints Secondary Constraints

Page 63: Primavera6.0

Shibu lijack

Work Products and Documents:

This feature enables to track all project relayed documents .Including:

Guidelines Procedures Standards Design Templates worksheets

Page 64: Primavera6.0

Benefits of using WP’s and Documents

Actual document files can be stored on a: Network file server Configuration management system Web site

Page 65: Primavera6.0

Shibu lijack

Currencies

This module helps in finding out the cost of project in various other currencies based on the exchange rate

Page 66: Primavera6.0

Shibu lijack

Roles

These are project personnel job titles or skills. Represent a group of resources with a certain

level of proficiency. Can be assigned to specific resources to further

identify the skills of the resource.

Page 67: Primavera6.0

Resource Management

Define resources Assign resources to tasks Analyze resource distribution Trace over allocated resource and idle

resources Level resources

Page 68: Primavera6.0

Status updating

Tracking progress Update actual duration. Update actual % complete. Update actual resource & cost.

Comparing baseline with actual performance Analyze schedule and cost variances Controlling project by corrective actions

Page 69: Primavera6.0

Report Generation

Tabular Reports

Graphical Reports in terms of Units & Cost S-Curve Histogram

Page 70: Primavera6.0