Primavera Syllabus

1
1. General a. Introduction to Primavera. b. Setting up Enterprise Project Structure (EPS), OBS c. Adding a Project. d. Adding Activity ID, Activity Name & Activity Duration. e. Relationship between Activities & Scheduling. f. Customizing Bars & layouts. g. Creating Work Products & Documents. h. Global Changes 2. Project Calendars. a. Project Calendar b. Global Calendar c. Resource Calendar d. Assigning Project Calendars. 3. Grouping and Filtering a. Work Break Down Structure (WBS). b. Activity Codes & Values. c. Grouping d. Filtering 4. Resource Analysis and Levelling a. Defining the Resources Role & Cost. b. Assigning Roles to Resources. c. Defining the Resource Curves. d. Assigning Curve to a Resource e. Resources Usage Profile / Spread Sheets. f. Activity Usage Profile / Spread sheets. g. Activity ‘S’ Curves and Resource ‘S’ Curves h. Resource Levelling 5. Earned Value Analysis (EVA) a. Define EVA b. Defining Cost Accounts, Currencies c. Top down Estimation d. Top down Budgeting e. Cost Analysis – Baseline and Current Schedule 6. Updating the Project a. Creating Base line Plan b. Assignment Base Line Plan c. Status Updating d. Project Tracking and Monitoring e. Use of Activity Type, Duration Type and Constraints f. Projected Results – Finish Dates, Duration 7. Reports Generation a. Defining Project Reports b. Report Wizards c. Different Types of Tabular Reports d. Preparing Graphical Reports e. Highlighting Progress in Bar chart f. Customizing Reports g. Thresholds and Issues 8. Other General a. Claim Digger b. Using Reflections c. Check in – Check out d. Time Sheets 9. General Doubts and Clarifications Day 3 FN Day 3 AN Advanced Primavera Training Syllabus Day 2 Day 1 AN Day 1 FN

description

primavera

Transcript of Primavera Syllabus

Page 1: Primavera Syllabus

1. General a. Introduction to Primavera.b. Setting up Enterprise Project Structure (EPS), OBSc. Adding a Project.d. Adding Activity ID, Activity Name & Activity Duration.e. Relationship between Activities & Scheduling.f. Customizing Bars & layouts.g. Creating Work Products & Documents.h. Global Changes

2. Project Calendars.a. Project Calendarb. Global Calendarc. Resource Calendard. Assigning Project Calendars.

3. Grouping and Filteringa. Work Break Down Structure (WBS).b. Activity Codes & Values.c. Grouping d. Filtering

4. Resource Analysis and Levellinga. Defining the Resources Role & Cost.b. Assigning Roles to Resources.c. Defining the Resource Curves.d. Assigning Curve to a Resourcee. Resources Usage Profile / Spread Sheets.f. Activity Usage Profile / Spread sheets.g. Activity ‘S’ Curves and Resource ‘S’ Curvesh. Resource Levelling

5. Earned Value Analysis (EVA)a. Define EVAb. Defining Cost Accounts, Currenciesc. Top down Estimationd. Top down Budgetinge. Cost Analysis – Baseline and Current Schedule

6. Updating the Projecta. Creating Base line Planb. Assignment Base Line Planc. Status Updatingd. Project Tracking and Monitoringe. Use of Activity Type, Duration Type and Constraintsf. Projected Results – Finish Dates, Duration

7. Reports Generationa. Defining Project Reportsb. Report Wizardsc. Different Types of Tabular Reports d. Preparing Graphical Reportse. Highlighting Progress in Bar chartf. Customizing Reportsg. Thresholds and Issues

8. Other Generala. Claim Diggerb. Using Reflectionsc. Check in – Check outd. Time Sheets

9. General Doubts and Clarifications